Home / Lloyd's / Determination 648603
Determination 648603
Water damage claim declined
Summary
The owners' corporation of a commercial strata property claimed for water damage from a long-running leak, and the insurer declined cover. AFCA found the leak and damage occurred outside the policy period and were not accidental, so it made no order.
The complainant did not establish a valid claim because the leak began before the policy was taken out and the damage was not accidental.
Issues
- Claim denial primary · not upheld“For the reasons above, the insurer is not liable for the damage. It was not on risk at the time the leak started.”
- Product terms interpretation secondary · not upheld“Cover applies when an event causing a claim takes place during the period of cover. The damage was not accidental.”
Subjects and remedies
home or building damageno remedy
Related
Text of the determination
Determination
Case number 648603
Financial firm Lloyd's Australia Limited
Determination | Case number: 648603 Page 2 of 13
Case number: 648603 22 May 2020
1 Determination overview
1.1 Complaint
The complainant is the owners’ corporation of a property development insured under
a commercial strata insurance policy with the financial firm (the insurer). The policy
covers accidental loss or damage.
In May 2018, the complainant lodged a claim with the insurer for water damage to the
insured property, which it believes was from a leaking water pipe that was first
investigated in December 2015.
The insurer denied cover for several reasons. It says: the leak occurred outside the
policy period; the complainant failed to promptly notify the insurer of the leak and to
take reasonable care to prevent further damage occurring; the damage would not be
covered in any case as it was not from a single event, but was caused by gradual
deterioration/developing flaws.
The complainant believes the claim should be paid.
1.2 Issues and key findings
Was the insurer on risk for the claimed damage?
The period of insurance was 1 October 2015 to 1 April 2016. The available evidence
indicates that the leak itself started in November 2013 (or earlier) and continued over
some years before it was repaired. The complainant only identified movement and
cracking damage in October 2016, which was after the policy had ended.
The available evidence shows, on balance, the insurer was not on risk when the leak
first started or when the damage was found/occurred. Nor was the damage
‘accidental’, given the prolonged period and circumstances leading up to it. That
means the complainant has not established it has a valid claim for an event insured
under the policy, and so the insurer is not liable for the damage. It is therefore not
necessary for the insurer to show exclusions apply, or that it would otherwise be
entitled to decline the claim.
In any case, the Panel considers the complainant’s failure to promptly deal with the
water leak once alerted to it, allowed the damage to occur/progressively worsen and
prejudiced the insurer’s position in terms of its potential liabilit y under the policy.
1.3 Determination
This determination is in favour of the insurer. It is not required to take any further
action.
Determination | Case number: 648603 Page 3 of 13
2 Reasons for determination
There has been a full exchange of material between the parties, and each party has
had the opportunity to address the issues arising from that.
Due to the nature of/complexities involved in this dispute, it has been referred to a
Panel for determination.
This determination follows consideration of all the information exchanged, and is
based on what is fair in all the circumstances, having regard to the relevant legal
principles, terms of the policy, good industry practice including codes of practice and
previous AFCA decisions where applicable.
While both parties have made numerous submissions, for the purposes of this
determination, commentary has been restricted to those issues which have a direct
bearing on the outcome of the complaint.
In this determination, for simplicity, the owners’ corporation , the individual lot owner
and their representatives will all be referred to as the ’complainant’ , unless otherwise
stated.
2.1 Was the insurer on risk for the claimed damage?
Onus on the complainant to show he has a valid claim under the policy
It is well established insurance law that the onus is on the complainant to show, on
the balance of probabilities, a claimed loss falls within the cover provided by the
policy. This is known as establishing a ‘valid’ or prima facie claim.
It is only once the complainant is able to establish this, that the onus transfers to the
insurer to establish it is entitled to decline the claim on the basis of a policy exclusion
or otherwise.
The complainant held a commercial strata policy which covers the insured property
against accidental loss or damage for the period shown on the policy schedule, which
is from 1 October 2015 to 1 April 2016.
‘Accidental’ is not defined in the policy. So, the Panel considers it reasonable and
appropriate to apply the ordinary or normal meaning of ‘unexpected, unforeseen’ .
Cover applies ‘when an event causing a claim takes place during the period of cover’.
That cover is subject to certain other conditions and exclusions, including gradual
deterioration, developing flaws, wear and tear, and earth movement.
Leaking pipe confirmed
On 1 December 2015 the complainant engaged the services of MLD to undertake a
leak detection test. MLD reported:
Determination | Case number: 648603 Page 4 of 13
leak detection equipment used to listen to all exposed taps and pipes around
property and found only very slight noise readings on front tap
after moving the tap the noise stopped
monitored water meter and found only very slight and inconsistent movement on
small dial
due to water lines being poly and leak being so small it may be very difficult to
locate
recommend disconnecting front tap as fa r back as line can be traced in garden bed
if there is still an issue tracer gas leak detection may be required
recommend NA to do this work.
On 12 September 2016 (about nine months after MLD’s test and recommendations) ,
NA attended the property, locating the leak on the buried domestic cold-water supply
pipework and recommending bypassing the faulty pipework.
Finally, on or about 7 October 2016, AB attended the property to disconnect the
leaking water supply and install a new cold-water service.
As a result of the above three reports/investigations, and after damage was
discovered, the complainant submitted a claim with the insurer on 11 May 2018.
Rising damp/cracking damage likely, in part, from water leak
The insurer appointed chartered loss adjuster, ASTA, to assess the claim. In its report
dated 8 June 2018, ASTA said:
according to lot owner, in late 2015 they started receiving excessive water bills and
noticed signs of rising dampness on the rear warehouse brick wall from the ground
at the time, no signs of movement and cracking was evident to the building
on 1 December 2015 plumber MLD attended, noticed inconsistency with water
meter and recommended AB leak detectors
owners ’ corporation manager finally agreed to engage AB to attend site in
September 2016
on 12 September 2016, AB attended to conduct further investigations, and
identified burst mains water pipework at front of property
after unsuccessful attempts by the lot owner to prompt the owners ’ corporation
manager, AB carried out the bypass of the burst cold water pipework
following the leak rectification works, signs of cracks and movement in various
areas of the building were noted (in October 2016) and reported to the owners ’
corporation
the owners ’ corporation engaged an independent building engineer to attend the
property and investigate the cause of the cracking/movement
engineer attend site in late 2016 and told the owners ’ corporation that the cracking
and movement to the premises has most likely occurred as result of major building
Determination | Case number: 648603 Page 5 of 13
renovation works to the next-door building – no report supplied by the lot owner or
owners ’ corporation
the above report was provided to the next-door building owners, who disagreed
after engaging their own surveyor to attend the site in late 2016 or early 2017 –
again, no report supplied
the lot owner continued to follow up the owners’ corporation and in March-April
2018 raised the matter urgently with them which resulted in the insurance claim
being lodged.
ASTA confirmed sighting significant movement and cracking, and suggested possible
causes: that included ground movement over time, which ‘more than likely’ dislodged
or damaged the mains cold water supply pipe, with the burst pipe then possibly
contributing to the existing issues. (In other words, the suggestion was that the
proximate cause of the leak and the resulting damage was ground movement, which
is excluded under the policy. However, this was not fully investigated.)
ASTA recommended engaging HC, consultant engineer, to attend the property and
provide an opinion as to the timing and cause of the damage.
In its first report dated 24 July 2018, HC observed:
the current owner has occupied the building six years
the front section of the building was constructed approximately 70 years ago
the warehouse at the rear was constructed prior to 2009
an inspection of the rear extension showed stepped diagonal cracks along the
dividing wall
these cracks showed that they have sharp edges which indicate that they are not
old cracks and have recently occurred
a vertical crack is evident at the junction between the brickwork original wall and
the concrete pre-cast panel wall at the north-west corner
the office area showed that movement is evident between the carpet floor tiles and
the skirting along the northside wall.
HC concluded:
it is our opinion that the dampness in the ground could be from the leaking pipe
saturating the ground below the concrete floor slab of the original building and / or the
warehouse …
the efflorescence was evident along the entire length of the dividing wall. This could
indicate that if the leak was occurring for a long period of time, then water could have
tracked along the footing trench for the length of this wal l…
in our opinion, if the rising damp is related to the leaking pipe, the rising damp could
have occurred during the policy coverage between 1 December 2015 and 1 April 2016
Determination | Case number: 648603 Page 6 of 13
as the escaping water was occurring during this period and would have resulted in
saturation of the ground…
the cracking that has occurred of the brickwork dividing wall is a result of differential
settlement of the footings due to an extreme change in the moisture content of the
foundation material possibly from the leaking pipe.
HC also concluded that it would ‘approximately’ apportion 70% of the cause of the
damage to the leaking water supply, and the 30% balance to other factors, including
differential settlement due to seasonal changes, and also the ‘brittleness’ of the
structure/footings.
HC recommended that a scope of works be carried out for reinstatement of the
resultant damage however, this was subject to the provision of the water supply bills
and, significantly, locating the leaking pipe.
Water supply bills indicate long term water leak, from before policy inception
The water supply bills show that from 16 November 2013 until 16 November 2015,
shortly after the policy was incepted, there had been a steady increase in daily water
consumption at the property (from between 33 and 56 kl per billing period).
After the policy was taken out, the evidence indicates the leak continued to cause
water consumption increases. However, from 16 November 2016 (shortly after the
leak was repaired) the bills reflect a considerable decrease (being between 6 and 8 kl
per billing period).
Based on its review of the water supply bills, HC expressed the view that the leak was
occurring from at least two years prior to the insurance policy being incepted.
Event causing damage occurred outside the policy period
The Panel accepts the property has suffered damage caused at least in part as a
result of a leaking pipe.
The cracking damage was first noted in October 2016, which is after the policy came
to an end in April 2016. While it is possible that some damage was occurring
progressively during the period of insurance, the available evidence indicates that the
leak itself started in or around November 2013, if not earlier. That was well before the
policy was taken out in October 2015.
The evidence also shows that the movement/cracking damage itself was identified
and, on balance, had occurred after the period of cover ended. That means the
insurer was not on risk when the ‘event causing the claim ’ (the leak) first arose, or
when the damage occurred.
The Panel also considers, in any case, that given the circumstances leading to the
damage and its discovery, it should not be regarded as ‘accidental’ (that is, it was not
unexpected or unforeseen, given the protracted period over which the leak was
Determination | Case number: 648603 Page 7 of 13
ongoing when there had been warning signs of it, at least in the form of the excessive
water bills).
In other words, the complainant has not established a valid claim under the policy,
which means the insurer is not liable for the damage.
Insurer was prejudiced by delay in notifying of potential claim/making the claim
The Panel considers, in any case, the insurer has been prejudiced in its investigations
by the complainant’s failure to comply with the policy condition which required prompt
notification of an ‘event which may lead to a claim’ (namely the concerns which
prompted the leak detection test in December 2015). That policy condition applies
even in the absence of actual identifiable damage.
As well, the Panel considers the complainant failed to then meets its policy obligation
to ‘take all reasonable steps to stop further …loss or damage’. The Panel is satisfied
that would include proactively investigating a situation where the evidence shows
there is a risk of damage, even if the damage itself has not yet occurred or been
found.
In this case, MLD identified a ‘small leak’; it was not until about nine months later that
NA attended and located the leak (by which time the policy had already ended), and
then another month before AB repaired it. In the meantime, however, the very
significant water bills over several years should reasonably have put the complainant
on notice of water leak issues.
So even if the Panel was satisfied the leak event had occurred during the period of
insurance, it does not consider it would be fair, on the available evidence, to hold the
insurer fully responsible (or at all).
That is because the Panel is satisfied the delays by the complainant in notifying the
insurer of the issues, and dealing with the leak, were responsible for causing or
contributing to the damage, allowing it to progressively develop. Those delays had
also prejudiced the insurer in its ability to properly investigate the cause and assess
its potential liability, if any.
Exclusions may have applied to entitle insurer to decline the claim
Because the complainant has not established a valid claim under the policy, it is not
necessary for the insurer to show exclusions applied which would have entitled it to
decline cover for the water damage.
However, it is worth noting that several possible causes of the damage (apart from a
water leak from a pipe) have been flagged, although not fully investigated. These
include factors which might be excluded under the policy, such as ground
movement/differential settlement; issues with construction (different footing
systems/brittleness of structure).
Determination | Case number: 648603 Page 8 of 13
Insurer is not liable for the claim
For the reasons above, the insurer is not liable for the damage. It was not on risk at
the time the leak started (nor has it been shown it was on risk when the damage
occurred or became evident).
Determination | Case number: 648603 Page 9 of 13
3 Supporting information
3.1 Relevant Policy Terms
Page Product Di sclosure Statement
9 Building means – all Strat a buildings at the Location buildings plus:
1. Covered ways
2. Exterior blinds awnings signs and tanks
3. Jetties and Pontoons used for private purposes
4. Light fittings
5. Overhead transmission lines and their supports that are
within 100 metres of an insured building
6. Pathways and roads
7. Saunas, spas and swimming pools
8. Underground pipes and cables
9. Walls, gates, fences but not hedges.
10. Your common area fixtures and fittings, furnishings and
carpets; gymnasium equipment, maintenance and cleaning
equipment and mat erials
9 Location means - The place where the items that are covered by
this Policy are. This place is shown in the Schedule
9 Occurrence means – An event that You do not expect nor do You
intend
10 HOW TO CLAIM
If You become aware of an event that may lead to a claim, You
must:
1. Tell Us about it as soon as You can.
2. Within the next 30 days give Us in writing full details of the event.
This must include all proofs for which We may ask.
3. …
4. Take all reasonable steps to stop further:
a) Loss or damage
b) Loss of use of property …
3.2 Expert Reports
Record Key points
Complainant Leak Detection
(MLD)
Report
1 December 2015
used leak detection equipment to listen to all exposed taps and
pipes around property and found only very slight noise readings on
front tap
after moving the tap the noise stopped
monitored water meter and found only very slight and inc onsistent
movement on small dial
due to water lines being poly and leak being so small it may be
very difficult to locate
recommend disconnecting front tap as far back as line can be
Determination | Case number: 648603 Page 10 of 13
Record Key points
traced in garden bed
if there is still an issue tracer gas leak detection may be required
recommend NA to do this work
Complainant Leak Detection
(NA)
Report
12 September 2016
identify & locate whereabouts of concealed leak on buried
domestic cold water supply pipework at front of property as
requested.
recommend bypass of defected pipework as cost effective
alternative to repairs
Complainant Plumbing (AB)
Report
7 October 2016
disconn ect leaking water supply from the meter at the back of the
property
supply and fit new cold water service from the meter into the
building and raise to high - level and install a 20 mm copper cold
water servic e to the fixtures in the toilets and the kitchen
Insurer Loss Adjuster
(ASTA)
Report
8 June 2018
in late 2015, they have started to receive excessive water bills,
and further noticed signs of rising dampness on the rear
warehouse brick wall from the ground
at the time, no signs of movement and cracking was evident to the
building
on 1 December 2015, a plumber from MLD attended site and
noticed inconsistency with the water meter, and recommended
engagement of NA for further investigations
after continual fol low up, the OC Manager finally agreed and
engaged NA to attend site in September 2016
on 12 September 2016, a plumber attend site and conducted
further investigative works and located an underground/concealed
burst mains water pipework at the front of the property
follow up with Owners Corporation regarding the leak rectification
repairs, and due to no immediate response, in October 2016 A
engaged NB to carry out the bypass of burst cold water pipework
according to the owner, following the leak rectificatio n works, he
noticed signs of cracks and movement in various areas of the
building (in October 2016); and reported the issue to the Owner
Corporation
the owners corporation had then engaged an independent Building
Engineer to attend site and investigate th e cause of reported
cracking/movement
an engineer attend site in late 2016 (unable to remember dat es);
and told the Owners Corporation, that the cracking and movement
to the premis es has most likely occurred as a res ult of major
building renovation works to the next door building. No report
supplied by the owner or OC
The report was then presented to the next door building owners,
who had then engaged their own building surveyor (sometime in
late 2016 o r early 2017); and the neighbours surveyor attend site
and advis ed the cracking and movement to Unit 2 are unrelated to
their client’s renovation works. Again, no report supplied by the
Determination | Case number: 648603 Page 11 of 13
Record Key points
owner or OC In March - April 2018, as the cracking and movement
started g etting worse, A contacted the Owners Corporation to
raise urgency of this matter
Insurer Consul tant Engineer
(HC)
Report
24 July 2018
the brickwork wall between the original front section of the building
and the extension is an original wall
inspection o f the rear extension showed that along the dividing
wall, steeped diagonal cracks are evident of the painted brickwork
a close up of these crac ks showed that they have sharp edges
which indicated that they are not old cracks and have recently
occurred
inspection of the extension also showed that there is a vertical
crack evident at the junction between the brickwork original wall
and the concrete precast Panel wall at the nort h - west cor n er
inspection of the brickwork wall also showed that efflorescence is
occurring along the base of the wall generally along the entire
length of the wall
inspection of the office area located at the northern end of the
original building showed that movement is evident between the
carpet floor tiles and the skirting along t he north side wall
inspection of the northern offices also showed that pulling away is
occurring of the bottom track of the internal dividing wall between
the offices with the movement occurring at the northern end
a perusal of street view images on Google Maps show the crack
above the front entry from at least March 2013
soil in this area is Quaternary Basaltic Clay which is classified as
Highly Reactive Clay Site (Class H type)
it is ou r opinion that the damp ness in the ground could be from the
leaking pi pe saturating the ground below the concrete floor slab of
the original building and / or the warehouse
in order to provide clarification on the extend of the leak and if
water from the leak could have tracked along the footing trench of
the dividing brick wall, copies of the water supply bills pertaining to
the claim should be made available for our perusal and
consideration
we should also recommend that NA provide more information on
where the leaking pipe oc curred
if the rising damp is related to the leaking pipe, the rising dam p
could have occurred during the policy coverage between 1
December 2015 and 1 April 2016 as the escaping water was
occurring during this period and would have result ed in saturation
o f ground
with respect to the movement that has occurred at the northern
end of the office, this movement is typical of problems that can
occur from settlement of the sub - base. In our opinion, this
settlement may have occurred if the sub - base bec ame satur ated
from the leaking pipe and has then gradually dried out
the movement at the northern end of the office has occurred
following the front office fitout, as movement has occurred of the
office internal walls. It is also our opinion that this movement has
Determination | Case number: 648603 Page 12 of 13
Record Key points
occurred post repair of the leaking pipe
with respect to the cracking of the dividing brickwork wall, it is our
opinion that this cracking is related to differential settlement of the
footings . Differential settlement of the footings can occur due to
an extreme change in the moisture content of the foundation
material which can be accentuated by the brittleness of the
structure
rising dam p is evident along the base of the dividing wall indic ating
excessive moisture, the cracking of the brickwork could ha ve
resulted from the initial saturation of the foundation material
possibly from the leaking pipe
the cracking of the brickwork dividing wall has also been
contribut ed by the brittleness of the structure
it is ou r opinion that this cracking has occurred l at er than the policy
coverage period
with respect to the cracking at the junction of the brickwork and the
concrete wall Panel , it is ou r opinion that this is related to
differential movement between different footing systems and
movement between different building materials. This could be
related back to the leaking pipe resulting in differential movement
of the brickwork wall. In our opinion it would have been prudent to
install a control joint at this location to accommodate movement
between different f ooting system s and different building materials
in our opinion the cracking at the junction of the brickwork wall and
concrete wall Panel could have occurred prior to policy coverage,
during policy coverage and later than policy coverage noting that
differ ential movement between different footing systems is not
related to a leaking pipe event
with respect to the cracks of the front elevation, it is our opinion
that these are not related to the leaking pipe event as the crack s
have weathered which indicate t hat they are old cracks and are
pre - existing to the claimed event
Insurer Consul tant Engineer
(HC)
Supplement ary Report
14 November 2018
our office has been provided with water supply bills commencing
from November 2013 through to August 2018
the location of the leaking pipe has not been provided to our office,
therefore, we do not know the location of the leaking pipe
policy coverage with the subject insurer commenced from 1
October 2015 and was cancelled effective from 1 April 2016 . In
our opinio n, according to the water supply usage, the policy
coverage was during the period the water supply leak was
occurring
the water supply leak based on the water supply usage bills
commenced at least 2 years prior to the insurance policy being
taken, and was not repaired until mont hs after the insurance policy
was cancelled
considering the long period the water supply leak was occurring, it
is our opinion that the efflorescence evident along the dividing
brickwork wall has likely resulted from the leaking wate r supply
pipe as the water supply bills show a dramatic higher water usage
Determination | Case number: 648603 Page 13 of 13
Record Key points
while the leak was occurring compared to when the leak was
repaired.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.