Determination 648002

Flood exclusion applied to inundation of clubhouse storerooms

FirmQBE
Decided2020-02-03
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss—
Amount claimed$22,849
SourceAFCA PDF

Summary

A sporting club's building was inundated during the February 2019 Townsville floods and the insurer declined the claim under the flood exclusion. AFCA found the initial stormwater runoff was covered, the peak floodwater damage excluded, and ordered cash settlement of the initial inundation with interest.

Rainwater mixed with floodwater is flood, but the insurer could not establish on the balance of probabilities that the initial inundation was caused by flood.

Issues

Subjects and remedies

natural disasterpay claimpay interest

Related

All QBE determinations · Find similar determinations

Text of the determination

Determination Case number 648002 Financial firm QBE Insurance (Australia) Limited Determination | Case number: 648002 Page 2 of 8 Case number: 648002 9 January 2020 1 Determination overview 1.1 Complaint The complainant is a hockey/sporting club that holds an insurance policy with the financial firm (insurer). The insured property is located in Annandale, Queensland. A claim was lodged under the policy after the insured property was inundated wi th water on or about 2 February 2019. The insurer maintains the inundation was caused by flood, which is excluded from cover under the terms of the policy. 1.2 Issues and key findings Is the damage covered under the terms of the policy? Based on the available material, the panel is satisfied that:  the policy provides cover for loss or damage to building and contents from storm and runoff of rainwater  the insurer has not established that the initial inundation was caused by flood as opposed to stormwater runoff  the remaining damage was caused by flood. 1.3 Determination This determination is partially in favour of the complainant. The insurer is required to meet its liability for loss and damage sustained as a result of stormwater runoff prior to the floodwater arriving, in accordance with the policy and as set out under section 2.1 of this determination. The insurer is otherwise entitled to refuse payment of the balance of the complainant’s claim on the grounds that the damage was caused as a result of flood. Determination | Case number: 648002 Page 3 of 8 2 Reasons for determination 2.1 Is the damage covered under the terms of the policy? The complainant’s policy with the insurer covers loss or damage to building and contents caused by or arising out of an insured event under the policy, including storm, wind and rain and water damage. However, the policy specifically excludes loss or damage caused by flood, unless optional cover for flood is shown in the schedule. Flood is defined on page 15 of the product disclosure statement (PDS) as: Flood means the covering of normally dry land by water that has escaped or been released from the normal confines any of the following: (a) a lake (whether or not it has been altered or modified); (b) a river (whether or not it has been altered or modified); (c) a creek (whether or not it has been altered or modified); (d) another natural watercourse (whether or not it has been altered or modified); (e) a reservoir; (f) a canal; (g) a dam. Flood cover is not shown in the policy schedule. The panel is satisfied that the PDS adequately informs the complainant of the exclusion of cover for flood damage. Circumstances of the loss In late January and early February 2019, the city of Townsville and surrounding areas of north Queensland experienced a significant weather event. Heavy rainfall occurred over the Townsville catchment for several days and at or about the complainant’s property. The complainant is a hockey/sporting club which is situated at the same site as another Hockey Association (TH). The complainant leases two fields from TH. The complainant has a building alongside one of the two fields, being the Hawks Field, which is divided into two storerooms and a hall. The insurer has provided a report from a hydrologist (WR) dated 8 April 2019, which was prepared following a site inspection on 25 March 2019. WR says the building was inundated to a depth of approximately 0.46m above floor level. The floor level is approximately 0.11m above the surrounding ground level and the ground level around the subject property is about 5.25 mAHD. Determination | Case number: 648002 Page 4 of 8 Following the site inspection and review of data from the Bureau of Meteorology and Townsville City Council, WR concluded that the initial and maximum depth of above floor level inundation at the insured property was caused by floodwater overflowing from the Ross River upstream of the Bowen Road Bridge. Complainant says there was stormwater runoff prior to floodwater The complainant’s position is that WR attended the neighbouring property (TH) and concluded that there was some initial inundation due to local catchment stormwater runoff. The panel notes that TH had cover with a different insurer. The complainant says given this and the position and low-lying level of the building against the field, it is expected that rainwater entered the building on 2 February 2019 and was only exacerbated by Ross River flooding the following day. In this regard, the complainant relies on a version of events which was provided to WR by staff at TH. At least one staff member from TH was onsite at the TH facility for the period between 1 and 4 February 2019 and confirmed the following: Initial flow at the TH facility travelled north to south with extensive above ground level inundation throughout the morning of Saturday 2 February. After the initial flow from north to south, flow directions changed at some time on Saturday 2 February with flow now travelling from west-northwest to east- southeast across the TH facility. Historically runoff travels predominately from north to south after periods of heavy rainfall, this is the first event in memory where water has flowed through the subject property from west-northwest to east- southeast… The complainant has provided a copy of the report for TH which was completed by WR in respect of the same event. That report is dated 1 March 2019, following a site inspection of TH by WR on 21 February 2019. Insurer has settled complainant for damage to awning The exchanged material confirms that there was damage to an awning at the property which was accepted by the insurer as it was not caused by floodwater overflowing from the Ross River. The complainant’s broker and representative in this complaint has confirmed that this aspect of the claim has been settled and is not in dispute. Initial inundation covered under the policy The panel notes that cover is provided under the policy for storm, wind and rain (including snow, sleet or hail) as follows: Determination | Case number: 648002 Page 5 of 8 This is limited to: (a) storm; (b) wind; (c) rainwater; (d) cyclones or tornadoes; (e) snow or sleet; (f) hail; and (g) run-off of rainwater that accumulates directly on and flows across normally dry ground or that overflows from public roadside gutters, channels and drains that are normally dry or swimming pools, spas or saunas. The panel has considered the hydrology reports completed by WR for both the complainant and TH. The panel notes in the TH report, WR concluded (in part) that: The initial above ground level inundation of the four grassed playing fields (Roos Field, Panthers Field, Hawks Field and Bears Field) was due to local catchment stormwater runoff. The maximum depth of inundation was caused by floodwater overflowing from the Ross River upstream of the Bowen Road Bridge. As indicated earlier, the complainant’s building is situated alongs ide Hawks Field. However, no mention is made by WR in this complainant’s report of any initial stormwater runoff above ground level of the Hawks Field. Nevertheless, given WR concluded that the field at the site of the complainant’s building was inundated by stormwater runoff above ground level and noting the images provided by WR show the base of the complainant’s building at ground level , the panel does not find it persuasive that stormwater runoff would not have entered the subject building. The panel notes that the floor level inside the building is reported as approximately 0.11m above ground level; this provides very little margin for post-event estimation. This is particularly so, having noted the estimated height of stormwater inundation at the TH Gate Booth, which also differs marginally from the estimation for the subject complaint. In order for the insurer to rely on its flood exclusion, it must establish on the balance of probabilities that the initial inundation was caused by floodwater. In the panel’s view it is equally possible that local catchment stormwater runoff did enter the building from the surrounding fields, particularly given the insignificant height of the building above ground level. In addition, WR states in its report for this complaint that overflows from the Ross River into the insured property’s local catchment ‘would’ have occurred after 9.00 am on 2 February 2019. The panel considers there is a degree of uncertainty with this statement. Determination | Case number: 648002 Page 6 of 8 Given the conflicting evidence, on balance, the panel cannot be satisfied the insurer has established that the initial inundation of the building was definitely caused by flood. It is entirely possible that local catchment stormwater runoff caused the initial inundation of the complainant’s bu ilding, which is covered under the terms of the policy. Peak inundation caused by flood WR says that the peak depth of inundation at the property would have occurred shortly after 0000 on 4 February 2019 as the water level in the Ross River reached its peak. Having reviewed the exchanged material and considered numerous flood disputes, the panel is satisfied that the peak level of inundation was caused by flood. Once the water from the Ross River combined with stormwater, the water is classified as flood water. Any damage caused as a result of this would be excluded under the terms of the policy. The insurer is otherwise entitled to refuse payment of the balance of the complainant’s claim on the grounds that the damage was caused as a result of flood. Conclusions The insurer is liable for the initial inundation to the building caused by stormwater runoff that occurred prior to the floodwater arriving. It is difficult to determine at what point the stormwater runoff impacting on the complainant’s property mixed with the water escaping from the Ross River to become floodwater. Without precise information on which to determine the level of the initial inundation, the panel can only do what is fair in all the circumstances. In the absence of precise measurements, the panel is satisfied it is fair in the circumstances to allow for the initial inundation to a level of approximately 100mm above floor level. The panel notes that the complainant’s broker has submitted a scope of works for building damage and quotations for contents items totalling $22,848.87 (taking into account the damage to the awning which has already been approved). Subject to acceptance of this determination by the complainant, the parties are asked to work cooperatively to determine a suitable settlement figure for the initial inundation based on the scope of works and quotations obtained and in accordance with the terms of the policy. If the insurer cash settles the complainant’s claim, then the insurer is to pay interest in accordance with Section 57 of the Insurance Contracts Act 1984 (the Act) from 16 May 2019 (date of insurer’s denial letter) to the date of payment of the claim. Determination | Case number: 648002 Page 7 of 8 If the parties are unable to reach agreement as to any cash settlement, then the parties may return the matter to the Authority for determination as to quantum. The insurer is entitled to refuse payment of the balance of the loss or damage sustained due to flood in accordance with the terms and conditions of the policy. Determination | Case number: 648002 Page 8 of 8 3 Supporting information 3.1 AFCA approach to this dispute We have considered it appropriate to expedite this complaint in accordance with the Operational Guidelines to the AFCA Rules, due to the nature of the complaint. Accordingly, this complaint has not been the subject of a preliminary assessment and has proceeded directly to determination. The determination is made by a panel consisting of the Ombudsman together with a consumer representative who has extensive experience in consumer claims and an industry representative who has extensive experience in the insurance industry. The Ombudsman, who has had extensive experience with flood complaints, viewed the general area and specific site in November 2019. This complaint has been determined based on what is fair in all the circumsta nces, having regard to the relevant law, good industry practice, codes of practice and previous decisions (which are not binding). There has been a full exchange of all material information relied on for the purposes of this determination and each party has had the opportunity to address any issues raised by the other. All of the material provided by the parties has been reviewed and considered. While the parties have raised numerous issues in their submissions, for the purposes of this determination, commentary has been restricted to those issues considered directly relevant to the outcome only. 3.2 Rainwater that mixes with flood water is flood The Courts have established that once rainwater mixes with flood water, it is all considered flood water. Where rainwater mixes with flood water and causes damage, a flood exclusion will usually apply to defeat the claim. Accordingly, when deciding complaints, consideration has been given to whether there was any rainwater runoff damage before the flood water arrived at the insured property.