Determination 647671

Home insurance claim for mains box, meter panel and cable replacement declined

FirmSuncorp Group
Decided2019-11-08
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The complainant's home mains box and cable failed and she claimed the replacement costs under her home policy. The insurer declined the claim because the loss was not shown to arise from a covered event, and AFCA agreed.

The complainant bears the initial onus to show a covered loss under a defined events policy, and the material points to gradual deterioration, which the policy excludes.

Issues

Subjects and remedies

home or building damageno remedy

Related

All Suncorp Group determinations · Find similar determinations

Text of the determination

Determination Case number 647671 Financial firm AAI Limited Determination | Case number: 647671 Page 1 of 3 Case number: 647671 8 November 2019 1 Determination overview 1.1 Complaint The complainant holds a home building and contents policy underwritten by the financial firm (the insurer) covering her home address. On 17 May 2019, the electrical supply to the complainant’s home ceased. As this was not an area blackout, she called the power supplier (JE) who shut off power to the residence from the power lines. Her electrician (OE) attended the next day and confirmed the mains box had burnt out. The complainant subsequently lodged a claim under the policy for the costs incurred in installing a new mains box, meter panel and cable. After considering the claim, the insurer declined it on the basis that the loss had not arisen as a result of one of the listed events covered by the policy. 1.2 Issue and key findings Was the insurer entitled to decline the claim? The insurer was entitled to decline the claim because the evidence provided does not show that the loss arose as a result of one of the covered events. 1.3 Determination This determination is in favour of the insurer. The insurer was entitled to decline the claim and is not required to take any further action. Determination | Case number: 647671 Page 2 of 3 2 Reasons for determination 2.1 Was the insurer entitled to decline the claim? Complainant has the onus to establish a prima facie claim It is established insurance law the complainant carries the initial onus to show that the terms and conditions of the relevant insurance policy covers the loss. This is known as a prima facie claim. Once the complainant establishes a prima facie claim, the onus then shifts to the insurer to demonstrate the loss is not covered, either by way of one of the policy exclusions or on some other basis. The insurer’s policy is a defined events polic y. Therefore, the policy only responds where an incident caused by one or more of the listed events results in loss or damage, subject to any exclusions. There is no dispute that the complainant was provided with a copy of the relevant documents including the product disclosure statement (PDS) setting out the terms of cover. It is therefore fair that the insurer is entitled to rely on those terms when assessing any claim made against the policy. Material shows the cause of the outage is unknown The insurer was unable to inspect the damage, as the complainant had repairs completed prior to lodging the claim. Therefore, the only material available for consideration is that from JE and OE. I have considered this material as part of my review. JE’s report, whilst brief, states the cause of the failure was due to the deterioration of the mains cable. OE’s report confirms the mains cable had burnt out, but says the cause was unknown. Crucially for the complainant, neither JE or OE attribute the damage to any of the insured events listed in the policy such as fire or storm. As the onus rests with the complainant to show that she has suffered a loss to which the policy would respond, the inconclusive cause of the failure does not assist her in satisfying this onus. Further, the available material suggests the cause of the failure was due to deterioration of the mains cable. The policy specifically excludes loss or damage which is caused by or arises from gradual deterioration. Therefore, even if I were to accept a claim had been established, the exclusion would likely be operative in the circumstances and defeat the claim. Determination | Case number: 647671 Page 3 of 3 As the complainant has not discharged the onus on her to establish a valid claim under the policy terms, the insurer was entitled to decline it. Other matters The complainant suggests that the insurer should accept the claim as JE assured her this type of loss should be covered by her insurer. Leaving aside for the moment that there is no evidence of such a remark being made, JE was not an agent of the insurer when attending to diagnose the power fault. Therefore, the insurer cannot be bound by any statements JE made, as JE was not acting on the insurer’s behalf. On this basis, the claim is to be assessed on its merits, as set out above. 3 Supporting information 3.1 AFCA approach to this dispute This complaint has been determined based on what is fair in all the circumstances, having regard to the relevant law, good industry practice, codes of practice and previous decisions of AFCA or its predecessor schemes (which are not binding). A full exchange of the relevant information has taken place between the respective parties. Each party has had the opportunity of addressing any issues raised. All of the provided material has been reviewed and considered. The parties have raised numerous issues in their submissions to AFCA. However, commentary in this determination is restricted only to those issues considered relevant to the outcome.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.