Home / Lloyd's / Determination 647112

Determination 647112

Insurer denied storm damage claim for two 7-a-side pitches and limited professional fees

FirmLloyd's
Decided2020-07-23
ProductGeneral Insurance · Business / commercial
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss—
Amount claimed$80,000
SourceAFCA PDF

Summary

The insurer declined the claim for damage to two 7-a-side pitches after a 2015 storm, attributing it to wear and tear and later events. AFCA found the 2015 storm likely caused the damage, so the insurer must meet the claim on the same cost basis as the 5-a-side pitches with Insurance Contracts Act interest, but the professional fee sub-limits were upheld.

The insurer did not prove that the 2015 event played no role or that an exclusion applied, while the policy's clear professional fee and claims preparation limits were already exceeded.

Issues

Subjects and remedies

natural disasterpay claimpay interest

Related

All Lloyd's determinations · Find similar determinations

Text of the determination

Determination Case number 647112 Financial firm Lloyd's Australia Limited Determination | Case number: 647112 Page 2 of 7 Case number: 647112 22 July 2020 1 Determination overview 1.1 Complaint The complainant lodged a claim for storm damage to 5-a-side (5s) and 7-a-side (7s) soccer pitches in 2015, following a rain event. The financial firm (insurer) partially accepted the claim but denied liability for two 7s pitches, saying they were not damaged by the claimed event. The only damage noted by the insurer was some wear and tear in high traffic areas. The insurer also denied a portion of the claimed professional fees saying they were unnecessarily high. The complainant seeks full indemnity for the 7s pitches and reimbursement of professional fees in the amount of $80,000 to resolve the complaint. 1.2 Issues and key findings Can the insurer deny the claim for the 7s soccer pitches? The insurer is not entitled to deny the claim for the 7s pitches because the damage was likely caused by an event covered by the policy. However, the insurer is entitled to settle the 7s pitches repair costs on the same basis it settled the 5s pitches repair costs. Can the insurer limit its liability for professional fees? An insurer is generally entitled to limit its liability in relation to professional fees. The Certificate of Insurance clearly details the limits of the insurer’s obligation in relation to Professional Fees and Claims Preparation Costs. In this instance, the insurer, for various reasons, paid more than the sub-limit for Professional Fees. The insurer is not required to pay additional amounts for Professional Fees or Claims Preparation Costs. 1.3 Determination This determination is substantially in favour of the complainant. The insurer is to indemnify the complainant in relation to the 7s pitches. The insurer is entitled to settle the 7s pitches ’ repair costs on the same basis it settled the 5s pitches ’ repair costs. If the complainant has paid for the repairs, the insurer is to pay interest, in accordance with the Insurance Contracts Act 1984 (the Act), on the settlement amount from the date the payment was made by the complainant, until the date the insurer pays the settlement amount. Determination | Case number: 647112 Page 3 of 7 2 Reasons for determination 2.1 Can the insurer deny the claim for the 7s soccer pitches? Policy covers material damage The complainant holds an industrial special risk property insurance policy covering material loss or damage, subject to certain terms, conditions and exclusions. The policy provides that the insurer will pay for reinstatement, replacement or repair. It is not in dispute the complain ant’s property suffered damage. Rather, the complaint is about whether the policy responds to the damage suffered by the 7s soccer pitch. Claim partially accepted On 20 April 2015, a storm caused damage to several soccer pitches owned by the complainant. A claim was lodged in August of that year. The complainant notified the insurer that eight soccer pitches were damaged in the event including seven 5s pitches and one 7s pitch. On assessing the damage, the insurer accepted the 5-aside pitches but said the only damage on the 7s pitch was two open seams and a dip in the goal mouth. Being high traffic areas, the damage was attributed to wear and tear which the policy excludes. The complainant disagreed but did not pursue the matter in order to expedite the remainder of the claim. Several repair attempts and further assessments took place over the next 18 months. In 2017 the complainant sought to pursue a claim for the 7s pitches, but the insurer again denied the claim. The insurer settled the complainant for the 5s pitches in November 2017, after some negotiation and the damage to the 7s pitches remains in dispute. In its notice of response, the insurer accepted damage caused by hydrostatic pressure was present on the 7s pitches and that the damage was consistent with that on the 5s pitches. It says damage on the 7s pitches was not identified in the original assessments, was only discovered 2.5 years after the original event and cannot be attributed to the 2015 storm. Rather, it must have occurred in a subsequent event. Conflicting expert opinions Following the failed repair attempts, several experts were e ngaged. The complainant engaged expert N who was involved in the original construction of the pitches. N provided a scope of works and costing to replace all eight 5s pitches and both 7s pitches in September 2016. Determination | Case number: 647112 Page 4 of 7 The insurer’s engineer P assessed the property on 5 December 2016. P provided a scope of works for repairs rather than replacement and no 7s pitch damage was noted in his report. N disagreed with P’s findings and the insurer appointed JM to assess the property in May 2017. JM generally agreed with P but said there were severe deficiencies in the drainage system which was not constructed in accordance with the drawn plans and was partially non-functional. JM sought advice from N on the construction of the pitches several times. JM concluded there was no functional drainage, the damage was likely caused by design/maintenance flaws and determined the two 7s pitches were unaffected by the 2015 event. The insurer negotiated a claim settlement with the complainant in November 2017, for the 5s pitches. The complainant says they accepted the amounts offered as settlement for the 5s pitches but maintained the 7s pitches were also damaged. The earlier reports say this damage presented as split seams , which the insurer attributed to wear and tear. In 2018, the complainant pursued the claim for the 7s pitches. At that time, the insurer appointed expert IE, and the complainant engaged K to further explore any damage to the 7s pitches. IE assessed the property in July 2018. IE acknowledged its expertise in relation to the behaviour and durability of artificial turf was limited but applied engineering principles to its review. It should be noted that one of the 7s pitches and a section of drainage had been replaced prior to IE’s attendance. IE noted a larger rain event occurred in 2013 when the pitches were approximately two years old but that no damage occurred at that time. It is suggested the 2015 event caused damage due to partially blocked drainage. IE said: … such a blockage (or partial blockage) would cause the water accumulating in the OSD pit and the stormwater pipes over the site to surcharge, which would in turn cause water to accumulate in the general stormwater drainage pipes around the pitches, from where it could flow back into the agricultural drain pipes in the east-west walkways between the pitches. IE conducted a site level survey which found the drainage pits along the north side of the 7s pitches to be between 40mm and 80mm higher than the pits near the 5’s pitches. IE said this meant no water would have accumulated on the surface of the 7s pitches. A new rain event occurred on 29 November 2018 and the complainant provided colour photographs showing the 7s pitches inundated with water in contrast to IE’s Determination | Case number: 647112 Page 5 of 7 earlier conclusions. IE then provided a further report attributing this inundation to a blocked stormwater drain east of the 7s pitches. IE’s final report concluded the storm water and ag drain subsoil systems servicing the site containing the 5s and 7s pitches surcharged during heavy rainfall that fell in April 2015, because of a partial or total blockage of the stormwater drainage pipework. The surcharge adversely affected the performance of the ag drains that were intended to remove runoff water from the soccer pitches and that water runoff from the pitches has not been able to flow into the ag drains because they were water-filled and not free-draining. IE did not make comment on current damage to the 7s pitches but maintained they would not have suffered the same damage as the 5s pitches during the 2015 event. The complainant then appointed K to complete the final reports dated 26 November 2018 and 11 March 2019. K said based on the site level survey all areas would have been inundated with water during the 2015 event. This is suppor ted by the complainant’s photos taken during the 2018 event. K further noted that regardless of potential drainage issues, the proximate cause of water inundation was heavy rainfall. K concluded drainage issues only presented during heavy rain and damage occurred due to the flooding of the pitches during such events rather than being attributable to any design issues. K said: As the only issues recorded with the drainage on this site have been days of extremely high intensity events, it is logical to come to the conclusion that the issues are as a result of the intensity of the rainfall being more extreme than that designed for, rather than any issues with the drainage system itself. It is our opinion that the water rushing across the surface of the fields during these events, as well as that soaking into the ground and into the drainage system, has caused the finer bonding materials which effectively “glue” the larger particles together have been washed away during the initial event. This has then meant that the larger particles have become loose either immediately or as a result of use of the fields after the event as no one was aware of the issues created. While the damage may not have been fully apparent at the time of the previous inspections, it would have been present at that time. On review of the relevant reports and photos provided by the complainant, the panel accepts the 7s pitches would have been inundated with water during major rain events, but in particular, the 2015 event. Insurer accepts damage on 7s pitches but says not caused in the 2015 event Following a recent site visit during which a section of the 7s pitch was peeled back, the insurer wrote: Determination | Case number: 647112 Page 6 of 7 It is accepted that hills and hollows could be felt under foot on the 7-aside pitches and a section of Pitch No. 1 was opened to expose a hill of “fines” in the crusher dust layer, which had likely formed due to hydrostatic pressure consistent with the 5-aside pitches. This damage was discovered/reported two and a half years after the event. Given the hydrostatic pressure and crusher dust movement can occur under various rain events, we believe the damage and discovery are too remote to be associated with the April 2015 event. The complainant maintains minor damage was noted after the original event and this damage took time to fully manifest due to the size, location and variable usage of the 7s pitches. In support of the complainant, N wrote: I can confirm that, at no point did we say the 7s pitches were not damaged, we could see that there was damage, however, it initially did not look as bad , therefore in order to get a quick settlement (and this was fully discussed) we would agree to an amount, myself and John knew we would still have some work to do on the 7’s , the extent of which left us at risk in taking the settlement. It ’ s clearly obvious when you look at the two areas. The fives pitches has effectively two areas flowing into a central pipe. This is like two garage roofs flowing into a central gutter. The 7’s pitch es only has one side flowing in, like a mono pitch roof. Therefore damage will clearly show earlier on the fives pitches. The complainant further says the insurer’s tact (sic) of focusing on the alleged inadequacies of the drainage system is irrelevant given the complainant holds an ISR policy, in that regardless of any defect found the resultant damage would in fact be covered and that although it maintains the damage was caused by the original event, the policy would still respond to subsequent events with the application of a further deductable. Insurer not entitled to deny the claim for 7s soccer pitches Having reviewed all the exchanged material and in particular the reports from N, the panel is satisfied that the 7s pitches were likely damaged, just like the 5s pitches, during the 2015 storm event. In this regard, the panel notes that the insurer accepts there is now damage to the 7s pitches consistent with the accepted damage to the 5s pitches, which the insurer accepts was caused by a claimable event The panel does not agree that the insurer has established that the 2015, event played no role in the damage to the 7s pitches. Further, the panel is not satisfied that the insurer has met its onus to establish the application of an exclusion to deny this aspect of the claim. The result is that the insurer is not entitled to deny the claim for the 7s pitches and must meet the claim under the terms of the policy. Determination | Case number: 647112 Page 7 of 7 The insurer is entitled to settle the 7s pitches repair costs on the same cost basis as it settled the 5s pitches repair costs. 2.2 Can the insurer limit its liability for professional fees? Policy covers professional fees The insurance under this item is to cover such reasonable professional fees as may be payable by the insured and such other reasonable expenses necessarily incurred by the insured and not otherwise recoverable, for preparation of claims under the insured’s material damage and consequential loss insurance policies and the insurer shall indemnify the insured for such reasonable fees and expenses. Policy schedule sets limits for professional fees Under section 1 cover for material damage, the policy schedule lists a sum insured of $25,000 for Professional Fees. The panel is satisfied that the complainant’s expert , N, would fall under this heading. The insurer has paid Professional Fees of $70,000. A further $25,000 is listed under section 2, consequential loss for Claims Preparation. The complainant’s self -appointed loss adjuster L, has been paid the policy limit. Insurer entitled to limit its liability for professional fees The complainant says N was initially commissioned by both parties and that the insurer was aware N’s costs would be high. Whilst the insurer does not appear to accept this, the panel is satisfied that N is suitably qualified and played a very important role in the resolution of this complaint. However, the limits on the policy coverage are clear and unambiguous. Having met the policy limit for Claims preparation and paid more than the limit for Professional Fees, the panel does not accept that it is fair that the insurer be required to pay an amount greater than that which is clearly stated within the Certificate of Insurance. Compliance with this determination discharges the insurer’s liability in full For clarity, this panel finds that the damage to the 5s pitches, the 7s pitches and the resultant consequential loss claims have arisen from the 2015 rain event and settlement of the insurer’s liability as set out in this determination is sufficient to finalise its liability in full.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.