Home / Lloyd's / Determination 647112
Determination 647112
Insurer denied storm damage claim for two 7-a-side pitches and limited professional fees
Summary
The insurer declined the claim for damage to two 7-a-side pitches after a 2015 storm, attributing it to wear and tear and later events. AFCA found the 2015 storm likely caused the damage, so the insurer must meet the claim on the same cost basis as the 5-a-side pitches with Insurance Contracts Act interest, but the professional fee sub-limits were upheld.
The insurer did not prove that the 2015 event played no role or that an exclusion applied, while the policy's clear professional fee and claims preparation limits were already exceeded.
Issues
- Claim denial primary · upheld
“The insurer is not entitled to deny the claim for the 7s pitches because the damage was likely caused by the covered April 2015 storm event.”
- Claim amount dispute secondary · not upheld
“The insurer is not required to pay professional fees or claims preparation costs above the policy sub-limits.”
Subjects and remedies
natural disasterpay claimpay interest
Text of the determination
Determination
Case number 647112
Financial firm Lloyd's Australia Limited
Determination | Case number: 647112 Page 2 of 7
Case number: 647112 22 July 2020
1 Determination overview
1.1 Complaint
The complainant lodged a claim for storm damage to 5-a-side (5s) and 7-a-side (7s)
soccer pitches in 2015, following a rain event.
The financial firm (insurer) partially accepted the claim but denied liability for two 7s
pitches, saying they were not damaged by the claimed event. The only damage noted
by the insurer was some wear and tear in high traffic areas. The insurer also denied a
portion of the claimed professional fees saying they were unnecessarily high.
The complainant seeks full indemnity for the 7s pitches and reimbursement of
professional fees in the amount of $80,000 to resolve the complaint.
1.2 Issues and key findings
Can the insurer deny the claim for the 7s soccer pitches?
The insurer is not entitled to deny the claim for the 7s pitches because the damage
was likely caused by an event covered by the policy. However, the insurer is entitled
to settle the 7s pitches repair costs on the same basis it settled the 5s pitches repair
costs.
Can the insurer limit its liability for professional fees?
An insurer is generally entitled to limit its liability in relation to professional fees. The
Certificate of Insurance clearly details the limits of the insurer’s obligation in relation to
Professional Fees and Claims Preparation Costs. In this instance, the insurer, for
various reasons, paid more than the sub-limit for Professional Fees. The insurer is not
required to pay additional amounts for Professional Fees or Claims Preparation
Costs.
1.3 Determination
This determination is substantially in favour of the complainant.
The insurer is to indemnify the complainant in relation to the 7s pitches.
The insurer is entitled to settle the 7s pitches ’ repair costs on the same basis it settled
the 5s pitches ’ repair costs.
If the complainant has paid for the repairs, the insurer is to pay interest, in accordance
with the Insurance Contracts Act 1984 (the Act), on the settlement amount from the
date the payment was made by the complainant, until the date the insurer pays the
settlement amount.
Determination | Case number: 647112 Page 3 of 7
2 Reasons for determination
2.1 Can the insurer deny the claim for the 7s soccer pitches?
Policy covers material damage
The complainant holds an industrial special risk property insurance policy covering
material loss or damage, subject to certain terms, conditions and exclusions. The
policy provides that the insurer will pay for reinstatement, replacement or repair.
It is not in dispute the complain ant’s property suffered damage. Rather, the complaint
is about whether the policy responds to the damage suffered by the 7s soccer pitch.
Claim partially accepted
On 20 April 2015, a storm caused damage to several soccer pitches owned by the
complainant. A claim was lodged in August of that year.
The complainant notified the insurer that eight soccer pitches were damaged in the
event including seven 5s pitches and one 7s pitch.
On assessing the damage, the insurer accepted the 5-aside pitches but said the only
damage on the 7s pitch was two open seams and a dip in the goal mouth. Being high
traffic areas, the damage was attributed to wear and tear which the policy excludes.
The complainant disagreed but did not pursue the matter in order to expedite the
remainder of the claim.
Several repair attempts and further assessments took place over the next 18 months.
In 2017 the complainant sought to pursue a claim for the 7s pitches, but the insurer
again denied the claim.
The insurer settled the complainant for the 5s pitches in November 2017, after some
negotiation and the damage to the 7s pitches remains in dispute.
In its notice of response, the insurer accepted damage caused by hydrostatic
pressure was present on the 7s pitches and that the damage was consistent with that
on the 5s pitches. It says damage on the 7s pitches was not identified in the original
assessments, was only discovered 2.5 years after the original event and cannot be
attributed to the 2015 storm. Rather, it must have occurred in a subsequent event.
Conflicting expert opinions
Following the failed repair attempts, several experts were e ngaged.
The complainant engaged expert N who was involved in the original construction of
the pitches. N provided a scope of works and costing to replace all eight 5s pitches
and both 7s pitches in September 2016.
Determination | Case number: 647112 Page 4 of 7
The insurer’s engineer P assessed the property on 5 December 2016. P provided a
scope of works for repairs rather than replacement and no 7s pitch damage was
noted in his report.
N disagreed with P’s findings and the insurer appointed JM to assess the property in
May 2017. JM generally agreed with P but said there were severe deficiencies in the
drainage system which was not constructed in accordance with the drawn plans and
was partially non-functional. JM sought advice from N on the construction of the
pitches several times.
JM concluded there was no functional drainage, the damage was likely caused by
design/maintenance flaws and determined the two 7s pitches were unaffected by the
2015 event.
The insurer negotiated a claim settlement with the complainant in November 2017, for
the 5s pitches. The complainant says they accepted the amounts offered as
settlement for the 5s pitches but maintained the 7s pitches were also damaged. The
earlier reports say this damage presented as split seams , which the insurer attributed
to wear and tear.
In 2018, the complainant pursued the claim for the 7s pitches. At that time, the insurer
appointed expert IE, and the complainant engaged K to further explore any damage
to the 7s pitches.
IE assessed the property in July 2018. IE acknowledged its expertise in relation to the
behaviour and durability of artificial turf was limited but applied engineering principles
to its review. It should be noted that one of the 7s pitches and a section of drainage
had been replaced prior to IE’s attendance.
IE noted a larger rain event occurred in 2013 when the pitches were approximately
two years old but that no damage occurred at that time. It is suggested the 2015
event caused damage due to partially blocked drainage. IE said:
… such a blockage (or partial blockage) would cause the water accumulating in
the OSD pit and the stormwater pipes over the site to surcharge, which would in
turn cause water to accumulate in the general stormwater drainage pipes around
the pitches, from where it could flow back into the agricultural drain pipes in the
east-west walkways between the pitches.
IE conducted a site level survey which found the drainage pits along the north side of
the 7s pitches to be between 40mm and 80mm higher than the pits near the 5’s
pitches. IE said this meant no water would have accumulated on the surface of the 7s
pitches.
A new rain event occurred on 29 November 2018 and the complainant provided
colour photographs showing the 7s pitches inundated with water in contrast to IE’s
Determination | Case number: 647112 Page 5 of 7
earlier conclusions. IE then provided a further report attributing this inundation to a
blocked stormwater drain east of the 7s pitches.
IE’s final report concluded the storm water and ag drain subsoil systems servicing the
site containing the 5s and 7s pitches surcharged during heavy rainfall that fell in April
2015, because of a partial or total blockage of the stormwater drainage pipework. The
surcharge adversely affected the performance of the ag drains that were intended to
remove runoff water from the soccer pitches and that water runoff from the pitches
has not been able to flow into the ag drains because they were water-filled and not
free-draining. IE did not make comment on current damage to the 7s pitches but
maintained they would not have suffered the same damage as the 5s pitches during
the 2015 event.
The complainant then appointed K to complete the final reports dated 26 November
2018 and 11 March 2019.
K said based on the site level survey all areas would have been inundated with water
during the 2015 event. This is suppor ted by the complainant’s photos taken during the
2018 event. K further noted that regardless of potential drainage issues, the
proximate cause of water inundation was heavy rainfall.
K concluded drainage issues only presented during heavy rain and damage occurred
due to the flooding of the pitches during such events rather than being attributable to
any design issues.
K said:
As the only issues recorded with the drainage on this site have been days of
extremely high intensity events, it is logical to come to the conclusion that the
issues are as a result of the intensity of the rainfall being more extreme than that
designed for, rather than any issues with the drainage system itself.
It is our opinion that the water rushing across the surface of the fields during these
events, as well as that soaking into the ground and into the drainage system, has
caused the finer bonding materials which effectively “glue” the larger particles
together have been washed away during the initial event. This has then meant
that the larger particles have become loose either immediately or as a result of
use of the fields after the event as no one was aware of the issues created. While
the damage may not have been fully apparent at the time of the previous
inspections, it would have been present at that time.
On review of the relevant reports and photos provided by the complainant, the panel
accepts the 7s pitches would have been inundated with water during major rain
events, but in particular, the 2015 event.
Insurer accepts damage on 7s pitches but says not caused in the 2015 event
Following a recent site visit during which a section of the 7s pitch was peeled back,
the insurer wrote:
Determination | Case number: 647112 Page 6 of 7
It is accepted that hills and hollows could be felt under foot on the 7-aside pitches
and a section of Pitch No. 1 was opened to expose a hill of “fines” in the crusher
dust layer, which had likely formed due to hydrostatic pressure consistent with the
5-aside pitches. This damage was discovered/reported two and a half years after
the event. Given the hydrostatic pressure and crusher dust movement can occur
under various rain events, we believe the damage and discovery are too remote
to be associated with the April 2015 event.
The complainant maintains minor damage was noted after the original event and this
damage took time to fully manifest due to the size, location and variable usage of the
7s pitches.
In support of the complainant, N wrote:
I can confirm that, at no point did we say the 7s pitches were not damaged, we
could see that there was damage, however, it initially did not look as bad ,
therefore in order to get a quick settlement (and this was fully discussed) we
would agree to an amount, myself and John knew we would still have some work
to do on the 7’s , the extent of which left us at risk in taking the settlement.
It ’ s clearly obvious when you look at the two areas. The fives pitches has
effectively two areas flowing into a central pipe. This is like two garage roofs
flowing into a central gutter. The 7’s pitch es only has one side flowing in, like a
mono pitch roof. Therefore damage will clearly show earlier on the fives pitches.
The complainant further says the insurer’s tact (sic) of focusing on the alleged
inadequacies of the drainage system is irrelevant given the complainant holds an ISR
policy, in that regardless of any defect found the resultant damage would in fact be
covered and that although it maintains the damage was caused by the original event,
the policy would still respond to subsequent events with the application of a further
deductable.
Insurer not entitled to deny the claim for 7s soccer pitches
Having reviewed all the exchanged material and in particular the reports from N, the
panel is satisfied that the 7s pitches were likely damaged, just like the 5s pitches,
during the 2015 storm event.
In this regard, the panel notes that the insurer accepts there is now damage to the 7s
pitches consistent with the accepted damage to the 5s pitches, which the insurer
accepts was caused by a claimable event
The panel does not agree that the insurer has established that the 2015, event played
no role in the damage to the 7s pitches.
Further, the panel is not satisfied that the insurer has met its onus to establish the
application of an exclusion to deny this aspect of the claim.
The result is that the insurer is not entitled to deny the claim for the 7s pitches and
must meet the claim under the terms of the policy.
Determination | Case number: 647112 Page 7 of 7
The insurer is entitled to settle the 7s pitches repair costs on the same cost basis as it
settled the 5s pitches repair costs.
2.2 Can the insurer limit its liability for professional fees?
Policy covers professional fees
The insurance under this item is to cover such reasonable professional fees as
may be payable by the insured and such other reasonable expenses necessarily
incurred by the insured and not otherwise recoverable, for preparation of claims
under the insured’s material damage and consequential loss insurance policies
and the insurer shall indemnify the insured for such reasonable fees and
expenses.
Policy schedule sets limits for professional fees
Under section 1 cover for material damage, the policy schedule lists a sum insured of
$25,000 for Professional Fees. The panel is satisfied that the complainant’s expert , N,
would fall under this heading. The insurer has paid Professional Fees of $70,000.
A further $25,000 is listed under section 2, consequential loss for Claims Preparation.
The complainant’s self -appointed loss adjuster L, has been paid the policy limit.
Insurer entitled to limit its liability for professional fees
The complainant says N was initially commissioned by both parties and that the
insurer was aware N’s costs would be high.
Whilst the insurer does not appear to accept this, the panel is satisfied that N is
suitably qualified and played a very important role in the resolution of this complaint.
However, the limits on the policy coverage are clear and unambiguous.
Having met the policy limit for Claims preparation and paid more than the limit for
Professional Fees, the panel does not accept that it is fair that the insurer be required
to pay an amount greater than that which is clearly stated within the Certificate of
Insurance.
Compliance with this determination discharges the insurer’s liability in full
For clarity, this panel finds that the damage to the 5s pitches, the 7s pitches and the
resultant consequential loss claims have arisen from the 2015 rain event and
settlement of the insurer’s liability as set out in this determination is sufficient to
finalise its liability in full.