Insurer declined balcony repairs and cash settled storm water damage at a figure disputed as too low
Text of the determination
Determination
Case number 646202
Financial firm AAI Limited
Determination | Case number: 646202 Page 2 of 6
Case number: 646202 4 February 2020
1 Determination overview
1.1 Complaint
The complainants made a claim under their home building insurance policy held with
the financial firm (insurer) for water damage to two balconies and other areas
following a storm in May 2015.
The insurer cash settled part of the claim (covering the resultant water damage) but
declined cover for certain work to the balconies themselves, saying that was not
caused by the storm event, but related to maintenance issues.
The complainants believe the insurer should cover the $25,095 quoted cost they
obtained for repairs to the balconies. The complainants are also concerned the
insurer tampered with documents relating to the claim.
1.2 Issues and key findings
Is the insurer liable for repairs to the balconies?
The available evidence does not show, on balance, the damage and major work
needed to the balconies themselves is attributable to the storm, or any other insured
event. That means the insurer is not liable for those repairs to the balconies.
The insurer was correct in accepting that part of the claim for damage resulting from
water entry during the storm. However, it is not clear, on the available evidence, that
the cash settlement of $9,961.88 (based on the insurer‟s builder‟s „liability quote‟)
represents the amount it would cost the complainants to have all the necessary work
done themselves. It is fair, in the circumstances, that the cash settlement be
increased.
Did the insurer tamper with documents?
The evidence does not show the insurer tampered with or altered any of the claim-
related reports or quotes. Instead, it requested a revised builder‟s report to include
more relevant detail, and a new quote amended to address the repairs it would cover.
1.3 Determination
This determination is substantially in favour of the insurer. It is required to pay the
complainants a further $2,690, representing an increase on the cash settlement
already made for resultant water damage; together with interest on that amount
calculated from the date the first cash settlement was made, to the date of this further
payment. It is not required to take any further action.
Determination | Case number: 646202 Page 3 of 6
2 Reasons for determination
I have decided this case on the basis of what I consider fair in all the circumstances,
having regard to the relevant law, good industry practice, codes of practice and
previous AFCA decisions.
I have taken into account all the material submitted by the parties. I am satisfied that
the documentation I have relied on has been provided to both parties. For the
purposes of this determi nation, I will deal with only those points considered relevant.
2.1 Is the insurer liable for repairs to the balconies?
Insurer accepted damage from a storm event, but not to balconies
It is the responsibility of the complainants to show the loss or damage occurred from
an event insured by the policy; that is, to show they have a valid claim. Only once a
valid claim is established, does the responsibility pass to the insurer to show that an
exclusion applies, or that it is otherwise entitled to decline the claim.
The policy covers listed insured events, including „loss or damage to the building
caused by a storm‟. The complainants say that the balconies were damaged by the
storm on 19 May 2015. They have said the balconies had never leaked before that
event. However, they are also reported as having told the insurer there had been
„sporadic‟ leaking, although leaks only occurred during very heavy downpours, and
that they can go eight months without any leaking (which does reasonably suggest
previous on-going issues with the balconies).
The insurer accepted there had been damage to the property from the storm event,
with water leaking from the balconies, and it cash settled for the resultant water
damage by paying the complainants $9,961.88, less the applicable excess.
However, the insurer declined cover for the balconies themselves (specifically the
cost to lift tiles, re-waterproof and re-tile) because it said that was not storm damage,
but related to gradual deterioration and maintenance issues over time, including what
it says were „poorly installed floor sheets‟.
The policy excludes cover for gradual deterioration and wear and tear, and it is the
complainant‟s responsibility to ensure the property is well maintained.
Expert evidence does not identify storm as cause of the balcony issues
A number of reports and quotes relating to the damaged balconies have been
provided. The findings are summarised below.
D report (10 June 2015) – notes water damage to „rear balcony linings‟, „under the
balconies‟ as well as to ceilings and eave linings; referenced AB‟s report : “ After
looking around a bit I noticed the silicone decaying under the balustrade post
bases, possibly leaking through the gaps in the silicone, and tracking through the
Determination | Case number: 646202 Page 4 of 6
bolts/screws .” From that preliminary non-invasive inspection, D identified no
maintenance issues or prior damage, and recommended acceptance of the claim
for the „resultant damage‟, which D said was ceilings, eave linings and rear balcony
linings. The inspection and recommendation did not identify or address the
underlying issues with the balconies themselves, which required more focussed
investigation.
AB report (11 August 2015) – initially completed before D ‟s report above; AB was
not sure as to cause of internal damage and how balcony is leaking, said need to
remove eave sheets and inspect from other side of balcony.
AB full report (10 September 2015) – AB returned and removed the sheets
underneath the balcony as suggested in original report; this confirmed the issues
with the balustrade related to eave damage, and were not causing the internal
damage. The internal damage was found to be caused by a leak in the balcony
floor join sheets: “I removed more cement sheet to inspect more of the area, and I
found leaking to be coming from the join in the floor sheets, seeping through onto
the plaster ceiling and the eave sheet. It looked to me like the joins in the floor
sheets were not bedded properly from waterproofing, and have cracked or moved
under the tiles, allowing water to enter…” AB said tiles on the balcony needed to
be removed to fully confirm this. The report does not say anything about storm
damage to the balcony itself. AB reported leaking only occurred in heavy or
soaking rain, and said that was consistent with his findings. AB noted „the balcony
is well- built‟ and „the only weakness is the floor tiles.‟ AB‟s conclusion was „The
damage inside the house was from water seeping through the grout between the
tiles on the balcony floor, then seeping through join in floor sheets.‟
CTC report (18 December 2015) – leak detection test conducted to the front
balcony, no leak detected; balcony frame in good condition; specifically says he
cannot confirm storm damage.
ASW quote (29 May 2019) says “Balconey (2) repairs – damage caused by
water/moisture” ; this quote obtained by the complainants provides no evidence for
or analysis of what was damaged or how the damage might have been caused;
there is no reference to storm as a cause of damage. So that in itself does not
justify any increase in the cash settlement already made, to cater for the balcony
issues.
I am satisfied the internal damage was caused by storm/rainwater leaking through the
join sheets and that there was damage to the eaves from leaks under the balustrades.
That resultant water damage has been cash settled, although, as set out below, I am
not persuaded the cash settlement amount was fair or sufficient.
The cause of the problems with the balconies which has allowed the leaking to occur
seems likely to do with original installation and subsequent deterioration. As
Determination | Case number: 646202 Page 5 of 6
suggested by AB, it would appear either the floor sheets were not bedded properly
from waterproofing, the floor may not have been primed prior to waterproofing, or the
joint may not have been bedded.
To be clear, the underlying issues with the balconies were not themselves caused by
the storm – they just became apparent following the storm and subsequent
investigations. None of the expert evidence attributes the failings in the balconies to
the storm event, and no information has been provided to confirm the complainants ‟
suggestion that it was the storm which had compromised the waterproofing under the
balcony tiles.
Since the evidence does not establish, on balance, that the damage to the balconies
themselves was caused by the storm or any other insured event, that means the
insurer is entitled to decline the claim for repairs to the balconies. That is the case
regardless of whether the damage was a result of maintenance issues, wear and tear,
gradual deterioration or other causes not specifically covered under the policy.
I appreciate the complainants say the insurer only inspected one of the balconies.
However, I am satisfied, given the information that is available, it is not unreasonable
to accept the particular circumstances and conclusions about the condition of the
balconies reasonably apply to both.
Cash settlement for covered damage should be increased
D initially provided a repair cost of $12,651.16 in its report which identified (and
recommended cover for) resultant damage to ceilings, eave linings and balcony
linings.
At the insurer‟s request, a „liability quote‟ was la ter provided, for $9,961.88. That was
intended to remove the cost of work to the balconies themselves, but to include the
cost of repairing eaves damaged in the course of CTC‟s leak detection test.
The complainants say the damage caused in the leak detection test has not been
accounted for. I accept it is not entirely clear from the liability quote that that has been
specifically included: CT‟s leak detection report refers to work and investigations on
the „ front balcony ‟ , including removal of the eave lining there, while the liability quote
refers to eaves on the „driveway side‟ and rear eaves. The cost of repairing the
damage caused in the course of the leak detection test needs to be covered by the
insurer, as it has acknowledged in its claim file notes.
I understand the „balcony linings‟ are what was removed from the initial repair cost on
the basis of the insurer‟s partial denial for gradual deterioration, and lack of
maintenance. The photos provided do show some areas of the property where
damage has arguably been longer-term, however, the extent to which damage to the
balcony linings was from excluded factors is also not entirely clear.
Determination | Case number: 646202 Page 6 of 6
I understand the insurer has already paid $9,961 (less the policy excess) by way of
cash settlement for the water damage it accepted as being attributable to the storm.
However, I am not satisfied that specifically covers all the water/investigation-affected
areas. I am also not satisfied, in any case, it has been shown that amount is sufficient
to allow the complainants to have the necessary work done themselves. That is
because the „liability quote ‟ on which the cash settlement was based was prepared for
the insurer, and was not stated as being actionable by the complainants.
In the circumstances, I consider it fair that the insurer make a further cash settlement
payment of $2,690 (which takes the amount up to the original repair cost assessment
by D).
2.2 Did the insurer tamper with documents?
The complainants are concerned about the differences between the two reports
provided by AB, one of which is more detailed than the other; and about the change
from D‟s original quote to the one on which the cash settlement for resultant damage
was made.
The insurer has explained it reviewed the first AB report and found it was
inconclusive, so requested additional more detailed information to clarify that. This is
supported by the insurer ‟s claim file notes , and is a reasonable explanation for the two
differing reports from AB, which remain fundamentally consistent.
It has also explained that the new quote was requested from D to remove the cost of
balcony repairs, and to add the work arising from the leak detection test. That request
is also not unreasonable, and I do not consider it amounts to „tampering‟ or any other
improper dealing with claim-related information.
The evidence does not show the insurer told any of its experts what to put in their
reports, or that it otherwise inappropriately influenced the contents of the reports or
quotes provided. I am satisfied the insurer has not done anything wrong in this regard.
Compensation not warranted in the circumstances
The insurer has apologised to the complainants for the level of service they received .
That was related to the confusion over the cash settlement amount and how it was
arrived at, and to acknowledge the time involved in finalising its claim decision while
different assessments were undertaken. I understand this will have caused the
complainants concern and some inconvenience, however that was not unusual or
excessive in the circumstances. I do not consider compensation is warranted.