Fire damage building repair scope, cash settlement amount, temporary accommodation and non-financial loss

FirmIAG
Decided2020-09-22
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$315,690
Non-financial loss$1,500
Amount claimed—
SourceAFCA PDF

Summary

After a fire, the insurer accepted the claim but disputed the repair scope, cash settlement, temporary accommodation and make-safe arrangements. AFCA ordered a cash settlement of $305,789.60 with a $9,900 engineer report reimbursement, the balance of temporary accommodation, interest and $1,500 non-financial loss.

The insurer's repair scope and settlement method were largely fair, but the insurer's discretion to cash settle was exercised with a 15% uplift and it wrongly stopped temporary accommodation payments.

Issues

Subjects and remedies

home or building damagepay claimpay compensationpay interestpay non financial loss

Related

All IAG determinations · Find similar determinations

Text of the determination

Determination Case number 645596 Financial firm Insurance Manufacturers of Australia Pty Ltd Determination | Case number: 645596 Page 2 of 10 Case number: 645596 22 July 2020 1 Determination overview 1.1 Complaint The complainant holds a home and contents insurance policy with the financial firm (the insurer) and claimed on the policy when fire damaged his home in November 2018. The claim was accepted. The complainant disputes the scope of work permitted by the insurer, complains about the make safe arrangements at his home, seeks additional allowance for temporary accommodation and non-financial loss compensation. 1.2 Issues and key findings Has the insurer correctly assessed the repair costs for the building? Yes. The insurer has obtained a scope of works from a builder who is prepared to undertake the works. The complainant’s scope of works, contains work that the Panel is not satisfied is required. This is in relation to under the floor and in t he roof. The Panel has made an allowance for the restitution of bedrooms 1, 2, and 3. Should the claim be settled by way of cash settlement? Yes. The dispute in relation to the scope of works cannot be resolved. The preference of the insurer is to complete the repairs through its builder, but the preferred builder does not agree with the scope of works proposed by the complainant. The Panel is satisfied that further disputes may occur if the insurer’s preferred builder was to repair based on its scope of works. Has the insurer correctly paid the complainants entitlement to temporary accommodation? The insurer has not paid the complainant his full entitlement pursuant to the extra cover for temporary accommodation. He is entitled to 12 months under the policy unless various conditions are met. The Panel is satisfied none of those conditions have been met. As such, the insurer is required to pay the balance of the 12 months permitted. Is the complainant entitled to compensation for non-financial loss? Yes. The insurer should pay the complainant $1,500 in non-financial loss compensation. Determination | Case number: 645596 Page 3 of 10 1.3 Determination This determination is substantially in favour of the insurer. The insurer is required to:  Pay the complainant the sum of $265,904 together with a 15% uplift. A total sum of $305,789.60.  The balance of the temporary accommodation allowance  Pay interest on the sum insured pursuant to section 57 of the Insurance Contracts Act from 29 November 2018 to the date the monies are paid  Pay interest on the outstanding accommodation costs pursuant to section 57 of the Insurance Contracts Act from the date the allowance was stopped to the date the balance is paid  Compensation for non-financial loss in the sum of $1,500  Pay the complainant the sum of $9,900, as agreed, for the costs of the two reports from the complainant’s engineer based on invoices dated 11 July 2019 in the sum of $3,300 and 31 October 2019 in the sum of $6,600. Determination | Case number: 645596 Page 4 of 10 2 Reasons for determination There has been a full exchange of all material information relied on for the purposes of this determination and each party has had the opportunity to address any issues raised by the other. This decision has been made by a Panel consisting of an Ombudsman, a representative with extensive experience in the insurance industry and another representative with extensive experience in consumer claims. The decision follows consideration of all the material exchanged. It is based on what is fair in all the circumstances having regard to the relevant legal principles, terms of the policy, good industry practice including codes of practice and previous decisions where applicable. While the parties have raised numerous issues in their submissions, for the purposes of this determination, commentary has been restricted to those issues considered directly relevant to the outcome. 2.1 Has the insurer correctly assessed the repairs costs for the building? The experts arranged by the complainant and the insurer disagree on the scope of works The insurer arranged for the damage to the fire to be assessed by a builder (R) and later an engineer (H). The complainant had asserted the fire caused damage to the external brickwork, underfloor and stumping. R did not agree with the complainant and neither did H. H said there was no fire damage to the stumps or subfloor framing and they were able to be used in any build. H also said the building was structurally adequate and this included the brickwork allegedly cracked. Additional areas of dispute have arisen during the course of the claim. The complainant has submitted reports from an engineer (B). B disagrees with the building allowances accepted by R and H. The insurer proposed a joint examination of the home by B and H in a response of 6 October 2019. The insurer said it would then accept the joint opinion of the two engineers on the scope of works. The insurer said it would pay for B’s report fees. The two engineers did attend the site but ultimately did not reach agreement. The disagreements are well defined. They have been subject to multiple reports and commentary. The insurer considers B quotes for the worst-case scenario while B defends its position by saying R and H have not made adequate allowances for the quality of the fixtures and fittings to be replaced. Determination | Case number: 645596 Page 5 of 10 The experts have provided a wide divergence in the scope of works The Panel prefers the scope of works provided by R. R is prepared to undertake the repairs. It is not satisfied that B has provided a more considered assessment. It is not possible to analyse in detail each disagreement. However, the Panel addresses some matters to give context as to why some matters in B’s report still need to be addressed. In B’s supplementary report dated 11 December 2019 the following matters are noted:  There are three bedrooms not included in the assessment.  There is no allowance in the quote for removal of asbestos or remediation.  There is no detail as to the quality of the fixture and fittings to be used in the rebuild.  There is also no allowance for building permits and safety analysis for the build The Panel has reviewed the multiple reports and emails back and forth between, B, R and H on the repair of the building. There are significant differences. These are highlighted clearly in the latest report from B dated 11 December 2019, the notice of response from the insurer dated 6 December 2019 and the commentary from H dated 25 November 2019 and R dated 5 December 2019. On 6 December 2019 the insurer provided its analysis of what it accepts from this quote based on the opinion of H. R did not quote for remediation and asbestos removal. The insurer allowed 50% of B’s quote because it says the quote is excessive. This is not a satisfactory basis to determine the cost and nothing has been provided that allows the Panel to assess the accuracy of this reduction. The Panel notes that an assessment for this has not been undertaken and accepts that it may not require that amount of remediation. In view of this the panel considers that a 25% reduction would be fair and reasonable in the circumstances. The insurer has also reduced the scope of works by items its says should be considered under a contents claim, already paid in full. B’s scope of works allows for carpet removal which is a building cost, not a contents cost. To the extent B has allowed for carpet replacement, B has removed this from the initial quote. Three bedrooms have not been included in the scope of work of H and the cash settlement offer of the insure. The insurer has not provided an allowance for these rooms. The report from H together with photographs indicates that this area was smoke damaged. In view of this the Panel does not accept B’s assessment as he allowed for total replacement of the plaster. Determination | Case number: 645596 Page 6 of 10 The insurer says the pergola does not need to be removed but the Panel accept B’s opinion that this needs to be removed for safety issues in any rebuild. It is not going to be replaced as part of the scope of works. The allowances of the insurer are based on H and R ’s opinion and to the extent that they disagree with B the Panel prefers the opinion of H and R on the basis that B is not prepared to undertake the repairs whereas H is. The Panel considers R’s assessment is accurate. However, whist cleaning is included it does not specifically deal with the repainting of bedrooms 1, 2 and 3. Appling a fairness approach the Panel considers a total of $2,000 per room is appropriate. 2.2 Should the claim be settled by way of cash settlement? The insurer’s preference to repair the buildi ng is appropriate Most polices will provide an insurer with a discretion to:  repair an item  replace an item  pay a cash settlement to an insured. AFCA expects an insurer to exercise this discretion fairly in all the circumstances. If AFCA determines the insurer has not fairly settled the claim, we can vary the settlement method in line with the cover provided. From the beginning of the claim the insurer has indicated a willingness to repair the building. The insurer has however respected a preference from the complainant to obtain a cash settlement. During the claim the insurer has increased its cash settlement offer based on a compromise on the opinions it has obtained from R, H and B. The insurer has also offered a 10% uplift on the repair costs to cover contingences and the lack of a warranty. Given it is the insurer’s choice as to whether to repair or provide a cash settlement under the policy, AFCA has to consider whether this choice is exercised fairly. The Panel accepts the insurer has done so but considers that a 15% uplift, on the repair costs, is more appropriate. The Panel has noted that B does not propose that they would carry out the work. The assessment by B is over the sum insured. The insurer is not required to pay the complainant over the sum insured. Determination | Case number: 645596 Page 7 of 10 The scope of works by B also provides extensive repairs to the roof. This is disputed by the insurer. On the information provided, on balance, the Panel does not accept that the roofing repairs are required. A ny sum determined, in the Panel’s v iew should attract interest from the date of the assessment. The insurer is provided an offer of settlement of $246,404 plus an uplift of 10 %. The Panel has accepted this offer as a fair basis but has added a further $13,500 for mould and asbestos remediation and allowance for remediation of bedrooms 1,2 and 3. As previously discussed the Panel believes a 15 % uplift is more appropriate. The Panel notes an amount has been allowed for the Pergola although it appears it is not to be replaced. This amount is included. The insurer is pay $265,904 plus a 15% uplift a total of $305,789.60. 2.3 Has the insurer correctly paid the complainants entitlement to temporary accommodation The policy in force at the time of the insured event provided for 12 months alternative accommodation. The exact terms of such a benefit are referenced in section three of this determination. The complainant has not received 12 months allowance , despite not being able to reside at home. There has been no undue delay caused by the complainant. The insurer has accepted the complaints of the complainant as to the settlement sum and those complaints have led to the insurer’s final position on 4 December 2019 being significantly better for the complainant than the proposal from 2 July 2019. The complainant is therefore entitled to the balance of the accommodation, subject to the policy terms, that has not been paid subject to the complainant providing invoices for accommodation costs incurred. The accommodation is payable from 29 November 2018 to 29 November 2019. 2.4 Is the complainant entitled to compensation for non-financial loss? We have a conservative approach to compensation Non-financial loss includes claims for stress or inconvenience caused by an error of the insurer. The maximum amount we can award for non-financial loss is $5,000 for each claim of loss. We will only award this type of compensation if there has been an unusual degree or extent of inconvenience. We will not award compensation for loss that a complainant may incur because of pursuing a complaint or rectifying an insurer’s error. Determination | Case number: 645596 Page 8 of 10 When assessing whether the circumstances are of an unusual nature we will review:  the degree or extent of physical inconvenience suffered  the general time taken to resolve the complaint  the extent to which the insurer’s actions interfered with the complainant’s expectation of enjoyment or peace of mind. We will assess any claims for non-financial loss in accordance with the AFCA Rules. If we do award compensation, it is unlikely to be substantial: The complainant is entitled to non-financial loss compensation The insurer has worked towards accommodating the complainant’s needs throughout the claim and has, from the beginning, accepted the claim and been willing to repair the building. The insurer has conducted multiple reviews of the scope of works provided by R, H and B with a view to accommodate the preference of the complainant for a cash settlement and made appropriate allowances. A major complaint has been with the make safe arrangements in place at the home. The complainant has reported multiple invasions of his home by trespasses who have used his home to consume drugs and generally make a nuisance of themselves. The Panel accepts extra damage has occurred as a result of the inadequate make safe arrangements. Furthermore, the complainant was required to store some of his possessions in the fire damaged home after he moved into alternative accommodation. He was subject to further aggravation when valuable tools and personal possessions were stolen. The complainant was not covered for this loss. The complainant says he was not advised of the consequences of the payment to him for his contents. The consequence of a total loss claim is that the contents policy was cancelled. The complainant says he was not advised of this. He therefore made the decision to leave personal possessions in the fire damaged home when he was not insured. It is not clear whether the stolen items were included i n the contents settled when the claim was settled as a total loss. If any were then the complainant obtained a benefit by being able to keep them. However, once the complainant could keep salvageable contents they regained value to him. The theft of these items is not covered. This loss was caused primarily because of a communication issued between the insurer and the complainant. AFCA cannot ask the insurer to pay the complainant for these lost items under the policy, but it can award a sum for non-financial loss compensation for this aggravation. Determination | Case number: 645596 Page 9 of 10 Finally, the insurer stopped payments to the complainant for alternative accommodation without basis forcing the complainant to use his payment for his contents claim to pay the rent in this alternative accommodation. Because of the foregoing, the Panel considers a sum of $1,500 appropriate for non- financial loss compensation. Determination | Case number: 645596 Page 10 of 10 3 Supporting information 3.1 Relevant PDS excerpts Record Key points Table 3.2 Other Cover Temporary Accommodation for Home Owners If a listed event causes loss or damage to your home and we agree you can’t live in it and you need to move out so it can be repaired or rebuilt. Covered under Building Insurance  Costs for temporary accommodation that we agree are reasonable and appropriate for you, your family and your pets that you normally keep at your site  Any additional living expenses that we agree are appropriate  Costs to remove and store your contents and then ret urn them to your home. We pay these costs for the reasonable time we ag ree it should take to repair or rebuild your home for up to 12 months from when the listed event took place. We pay this on top of the Building sum insured. Conditions  You must have lived in your home Permanently before the listed event took place  We mu st agree to pay the costs before you make any arrangements  We won’t cover costs caused by unreasonable delays in repairing or rebuilding your home The most we pay The most we pay for your home is the building sum insured.