Home / Tokio Marine / Determination 645011

Determination 645011

Water damage claim declined as gradual leak began before cover and is excluded

FirmTokio Marine
Decided2020-03-10
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The complainant claimed water damage to his home from a burst shower pipe in August 2018 under a farm protection policy. AFCA found a gradual leak began before the insurer was on risk and was excluded as gradual deterioration, mould and rot, so the decline stands.

The complainant failed to establish on the balance of probabilities a sudden insured event within the policy period, and gradual deterioration and mould are excluded.

Issues

Subjects and remedies

home or building damageno remedy

Related

All Tokio Marine determinations · Find similar determinations

Text of the determination

Determination Case number 645011 Financial firm Tokio Marine & Nichido Fire Insurance Co Ltd Determination | Case number: 645011 Page 2 of 11 Case number: 645011 10 March 2020 1 Determination overview 1.1 Complaint The complainant held insurance cover under a farm protection policy with the financial firm (the insurer) for the period between 31 May 2017 and 31 May 2019. On or about 24 September 2018 the complainant lodged a claim with the insurer for water damage to his home. He says the damage was caused by a burst pipe in the main bathroom on 16 August 2018. The insurer says:  the damage occurred before the insurer was on risk  the damage was due to a gradual water leak which resulted in timber floorboards bowing, timber beams rotting and the existence of mould – all of which are excluded causes under the policy. The complainant disputes this decision. He says the pipe burst during the period of insurance and, even if it did not, the insurer should pay the claim and seek recovery from the previous underwriter. 1.2 Issues and key findings How and when did the damage occur? The available material establishes on the balance of probabilities the damage was due to a slow water leak which began before 15 December 2016 and continued to cause damage until it was discovered in August 2018. Is the claim covered? No. The complainant has not established that the cause/s of the damage occurred during the period when the insurer was on risk from 31 May 2017. To the extent there was gradual deterioration which occurred during the period of insurance, this is excluded under the policy. 1.3 Determination This determination is in favour of the insurer. The insurer is not required to take any further action in relation to the claim or the complaint. Determination | Case number: 645011 Page 3 of 11 2 Reasons for determination 2.1 How and when did the damage occur? Onus on complainant to establish insured event The complainant had a farm protection insurance policy with the insurer covering his farm and home between 31 May 2017 and 31 May 2019. The complainant’s home was covered against accidental loss or damage during the period of cover along with specific perils. The complainant bears the initial onus to show, on balance, an accident or peril during the period of cover caused the damage. This is known as a prima facie claim. Once the complainant establishes a prima facie claim, the onus then shifts to the insurer to demonstrate, on balance, the loss is not covered, either by way of one of the policy exclusions or on some other basis. The complainant says that there were two events which caused damage: the first occurred around December 2016, although the complainant’s c ontractors could not find where water came from; and the second – the burst shower pipe – occurred in August 2018 and caused the substantial claimed damage. The insurer says there was only one event – a slow leak from the shower which began prior to 31 May 2017, before the insurer was on risk. The insurer also says exclusions apply because the damage was caused by gradual deterioration, mould and rot. Parties disagree about cause of damage The context of the dispute is as follows:  on or before 15 December 2016, the complainant noticed cupping and tenting of the timber strip flooring within the hall. He notified his representative (the broker) and arranged for his builder, AD, to inspect the floor  with the assistance of other contractors, AD assessed the damage but was unable to determine the cause of the floor buckling. He recommended monitoring the buckling. The complainant prepared a claim for lodgement with his insurer at the time, but as no leak was identified he did not lodge the claim  over the next several months, the complainant considered the floor buckling appeared to lessen  on 12 August 2018, the complainant contacted the builder because the carpet in the master bedroom was saturated along the wall shared with the bathroom  AD and other contractors undertook several investigations without initially identifying the source of the leak Determination | Case number: 645011 Page 4 of 11  AD pulled up the skirting board along the wall and broke away some of the plasterboard. He saw water pooling under the wall frame but still could not identify the source of the leak  Eventually, a plumber (LD) cut into the wall and tiles around the bathroom taps and found a leak in the mixer body  AD commented that water was running down between the bathroom shower and the second shower in the laundry. Because both walls were tiled, AD said the water could not seep through but spread sideways towards the bathroom and hallway  LD cut and capped the water lines. In late September 2018, the complainant lodged a claim with the insurer for water damage from the leaking pipe behi nd the mixer tap of the main bathroom shower. He said that water had run into the wall cavity. He did not mention the previous event where he saw damage to the timber flooring. The insurer says:  the damage occurred before the insurer was on risk  the damage was due to gradual deterioration, mould and rot – all of which are excluded causes under the policy  because the reports from the complainant’s plumber did not provide an explanation of the original location and cause of the leak or supporting photographs, the insurer’s ability to properly asses the cause of damage has been prejudiced  the complainant failed to mitigate the loss. After he realised the floor was buckling, he should have more thoroughly investigated its cause. Had he done so, the damage would not have been so severe. The complainant provided material from his builder, water proofer and plumbers. The insurer relies on a report from a builder (CRD) who inspected and photographed the damage on 8 October 2018. Although the insurer’s builder could not state with certainty the location or cause of the leak because the leak was repaired, having inspected the nature and extent of the damage he concluded the leak had been occurring for about one or two years. A summary of the findings of the insurer’s b uilder and the complainant’s contractors is set out in supporting section 3.4 of the determination. The panel has carefully reviewed the available evidence to determine the proximate cause of the damage and when the damage occurred. Damage caused by gradual shower leak which began before 15 December 2016 As CRD and the insurer point out, neither AD or the plumbers provided supporting evidence (such as photographs) to support their assessments. Determination | Case number: 645011 Page 5 of 11 Having considered all the available evidence, the panel is satisfied on the balance of probabilities the damage was caused by a single event: a gradual leak from the breech piece behind the shower taps. Further, the panel is satisfied this leak probably began prior to the complainant noticing the buckling timber floor on or about 15 December 2016. In reaching this conclusion, the panel placed weight on the following:  the reports of AD and the plumbers, which are consistent with a single long -term leak from the shower breech piece  the nature and extent of the resultant damage, such as the presence of extensive mould and decay  the fact that mould growth was most severe inside the bathroom wall cavity  CRD’s expert observation that the damage has been occurring for one or two years due to the extent of decay to the wall frames. Although this is not supported by extensive reasoning or evidence, it is supported by photographs which add weight to the view the leak was long-term  CRD’s view is supported by the complainant’s water proofer who examined the damaged area in both 2017 and 2018. When he removed wall sheets in the bedroom directly behind the shower he found rotten timber which he said was from a leak which had obviously been happening for quite some time  the presence of damage throughout areas which could well have been affected by the path of moisture from the shower leak, particularly the hallway flooring which showed elevated moisture levels initially near the bathroom doorway  the obvious buckling/swelling of the flooring in late 2016, and the exacerbation of the buckling in August 2018 coinciding with the discovery of the shower leak  the deterioration of the timber floor buckling, even after the installation of a waterstop angle in the bathroom. There is some suggestion the buckling improved somewhat after the installation of the waterstop, but it does not appear the buckling ceased. In any case, the only evidence that the buckling improved is the complainant’s subjective impression, and in August 2018 the complainant noticed the buckling getting worse (despite the waterstop)  the absence of other leaks in the general pipework, roof vent pipework, shower recess, screen or waterproofing  the absence of compelling evidence supporting the contention there were two separate events, or any plausible explanation for the floor buckling other than the shower leak. The only other explanation for the damage to the flooring was initially hypothesised by AD to be ‘excessive moisture coming through the bathroom doorway which had caused the timber to swell and create pressure thr ough the flooring.’ However, AD’s report, when read in its entirety, suggests the source of water was ultimately determined to be the shower mixer body – and this is more consistent with Determination | Case number: 645011 Page 6 of 11 the rest of the available evidence. There is no alternative plausible cause of the flooring damage. There is some suggestion in correspondence the complainant told the loss adjuster he first noticed the floor buckling around July-September 2017. However, the weight of the evidence establishes he first noticed the buckling of the timber floor on or before 15 December 2016. The complainant says that the absence of water staining proves the damage is not long-term. This statement is unsupported by expert opinion and is insufficient to refute the other evidence (supported by photographs) consistent with long-term damage. 2.2 Is the claim covered? Damage occurred before policy commenced 31 May 2017 The complainant held substantially the same insurance policy – renewing annually – since 2010. The insurer was the underwriter for the policy periods:  31 May 2017 to 31 May 2018, and  31 May 2018 to 31 May 2019. The complainant says all the damage was caused by a leaking pipe on 16 August 2018. Based on the available information, for the reasons set out above, the panel does not accept this contention. On the balance of probabilities, the panel is satisfied the proximate cause of damage – being the leak from the breech piece in the pipework behind the shower – occurred before the insurer was on risk on 31 May 2017 and prior to when damage was first noticed on or about 15 December 2016. The panel is satisfied there was one continuing event and not two events as claimed by the complainant. Having considered the available evidence the panel is also satisfied the damage was caused gradually. As this cause of damage is excluded from cover, the insurer is entitled to decline the claim. Insurer entitled to decline the claim The complainant’s onus of proof extends to establishing the precipitating event which caused the damage occurred within the policy period. For the reasons set out above, the panel is not satisfied he has done so. The complainant says the insurer should pay the claim and seek recovery from the previous underwriter, but the panel considers this does not accord with the insurer’s policy obligations. It remains open to the complainant to pursue a claim with the insurer on risk prior to the insurer in this complaint. Determination | Case number: 645011 Page 7 of 11 Since the available evidence does not establish on the balance of probabilities the insured event occurred within the policy period, the insurer was not on risk and is entitled to decline the claim. The insurer is not required to take any further action in relation to the claim or the complaint. Determination | Case number: 645011 Page 8 of 11 3 Supporting information 3.1 Our Approach As advised to the parties, we have considered it appropriate to expedite this complaint in accordance with the Operational Guidelines to the AFCA Rules, due to the nature of the complaint. Accordingly, this complaint has not been the subject of a recommendation and has proceeded directly to determination. This complaint has been determined based on what is fair in all the circumstances, having regard to legal principles, applicable industry codes or guidance, good industry practice and previous relevant determinations of AFCA or predecessor schemes (which are not binding). There has been a full exchange of all material information relied on for the purposes of this determination and each party has had the opportunity to address any issues raised by the other. All the material provided by the parties has been reviewed and considered for the purposes of this determination. While the parties have raised numerous issues in their submissions, for the purposes of this determination, commentary has been restricted to those issues considered directly relevant to the outcome only. It is an accepted principle of general insurance law that the insured bears the onus to establish on the balance of probabilities that they have suffered a loss caused by an event to which the policy responds. This is known as a prima facie claim. Once so established, the onus shifts to the insurer to prove on the balance of probabilities that an exclusion applies if it seeks to decline or limit its liability for the loss. The complainant is represented. For the sake of convenience and brevity, references in this determination to the complainant include references to the complainant’s representative. 3.2 Case law and proximate cause Case law establishes:  The proximate cause of the loss is the dominant or effective or operative cause of the loss whether or not that be the last in time or the sole cause.  If there are several causes operating contemporaneously, each must be examined for the qualities of reality, predominance and efficiency as the active, efficient cause that sets a relevant chain of events in action. If one cause would have caused the harm in any case, and the other would not have done so in the absence of the first, the first is the proximate cause.  A common-sense approach is taken to determine proximate cause. Determination | Case number: 645011 Page 9 of 11 3.3 Relevant policy terms The relevant policy extracts are referred to in the correspondence between the parties and in the insurer’s Notice of Response. Both the policy document and the Notice have been exchanged with the complainant. OUR AGREEMENT TO COVER YOU We agree to give You the cover that is shown in this policy and in Your Certificate: (1) For each section, part of a section, option or optional extra that is shown as being chosen by You in the Certificate. (2) For the period of cover that is shown in the Certificate. (3) When an event causing a claim takes place during the period of cover for which You have paid the premium. Insuring provisions Option 1 Priority Choice Your Home Buildings that are at the Location. They are covered against loss or damage caused by the following events, if they happen during the period of cover: (1) Perils Loss or damage that is caused by: …… [n] Water that bursts leaks or overflows from a bath, fixed home appliance, gutter, shower base, sink, toilet fitting, fixed tank, swimming pool, spa or pipe. We do not pay for repair or replacement of the item that burst or leaked. Option 2 Priority Plus Your Home Buildings that are at the Location. They are covered against accidental loss or damage during the period of cover, along with the perils covered under Option 1 Priority Choice. [The policy schedule for the 2018-2019 period confirms the complainant had Option 2 Priority Plus] General exclusions What’s not covered: Loss or damage caused by mould or mildew. Any loss or damage to Home Buildings and Home Contents kept therein that are not maintained in good repair and condition. The Home Building is required to be structurally sound, watertight, Secure and well-maintained. Determination | Case number: 645011 Page 10 of 11 For wear and tear, fading, scratching or marring, gradual deterioration or developing flaws, rust, corrosion, rot, normal upkeep or making good, inherent or structural defects, faulty design or faulty workmanship. 3.4 Key evidence Record Key points Complainant’s builder (AD) 20 March 2019  15 December 2016 complainant reported timber floor in the hallway was buckling.  11 January 2017 moisture readings showed elevat ed levels bathroom door.  Inspected floor in doorway but found no evidence of moisture.  Plumber found no leaks.  No issue with waterproofing.  Over next few months, buckling in the floor ing lessened.  12 August 2018 carpeting master bedroom saturated.  Water pooling under the wall frame. Couldn’t detect where water was coming from. Plumber found no leak until cut into the wall around the flick mixer taps in the bathroom and found a leak in the mixer body.  Water running down between the bathroom shower and the second shower in the laundry. Both walls tiled. Water couldn’t seep through and spread sideways towards the bathroom and hallway.  Water lines cut and capped. Complainant’s plumber (RB ) 12 January 2017  Suspect water leak adjacent bat hroom.  Did quick pressure test to main household piping. Held pressure for 30mins. Test shower rose pressure and find after adjusting fitting to be OK. Check around taps and other areas. Complainant’s plumber (LB) 26 September 2018  Found shower mixer pipe had split in the wall causing significant damage to the house frame, Floorings & walls .  Disconnected the mixer & capped of the pipes to stop the leak. Complainant’s water proofer report (M) 14 November 2018  2 March 2017 inspected water damage to the timber flooring in the hallway behind the shower recess which was buckled.  After testing, no water escaping from shower recess.  Removed wall sheets in the bedroom directly behind the shower recess a nd found rotten timber from a leak of some sort that had obviously been happening for quite some time.  Water damage not consistent with typical membrane failure.  Get plumbing checked as no failure in the membrane. Insurer’s expert (CRD ) Building consulta nt report 11 October 2018  Inspected and photo graphed property 8 October 2018.  Breech piece to the bat hroom shower had been removed by the plumber prior to my inspection. The plumber has cut an access panel in the wall tiles and fibre cement wall lining to gain access to repair the leaking breach piece.  PVC water pipes have been installed throughout this building. I am Determination | Case number: 645011 Page 11 of 11 Record Key points unable to confirm the location or cause of the leak as the breach pipe has been removed prior to my inspection. I recommend that the original plumber provides a report and photographs to confirm the location and cause of the leak.  Observed significant mould growth and decay of the timber wall frames bet ween the bathroom and bedroom1, and the bat hroom and laundry.  Water had flooded the w all cavity bet ween the bathroom and laundry and entered the adjacent areas including Bedroom 1, the cavity beneath the inset spa bath, Laundry wall cavity and beneath the timber flooring in the Hall.  Complainant explained that he first noticed the cupping and tenting of the timber strip flooring within the Hall. A plumber was engaged and installed a wat erstop angle in the bat hroom, however, the timber flooring continued to worsen.  Complainant then noticed that the carpet within Bedroom 1 was saturated. With further investigation the plumber discovered a leak in the brass breach piece.  Wall frames are extensively damaged with decay and mould growth. The timber frame crumbles with a screw driver and requires replacement.  Bathroom backs onto the Laundry. The re placement of the timber wall frame around the bathroom requires to renovation of the Laundry to access the framework.  Leak has been occurring for approximately 1 - 2 years due to the extent of decay to the wall frames.  Provided scope of works for visible dam age.  Additional framework may require replacement but cannot be inspected until wall linings removed.  E stimate the work to cost approximately $120,000.00 including margin and GST . 3.5 Other relevant material considered and relied on  Parties’ submissions /emails and all attachments to all submissions/emails.  Photographs and invoices.  Correspondence between the parties.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.