Continued decline of mould and water damage claim on unit

FirmStrata Unit Underwriters
Decided2019-11-25
ProductGeneral Insurance · Strata
OutcomeFor the complainant
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The complainant's strata insurer declined a claim for mould treatment in a rental unit, and maintained the decline after a later leaking pipe was found. AFCA found a valid claim and ordered the insurer to settle it under the policy with interest.

Once new expert evidence linked the mould to a leaking pipe, the insurer could not reasonably maintain its decline, and interest is payable under section 57 of the Insurance Contracts Act 1984.

Issues

Subjects and remedies

home or building damagepay claimpay interest

Related

All Strata Unit Underwriters determinations · Find similar determinations

Text of the determination

Determination Case number 644801 Financial firm Strata Unit Underwriters Determination | Case number: 644801 Page 1 of 8 Case number: 644801 22 November 2019 1 Determination overview 1.1 Complaint The complainant is a beneficiary under a residential strata insurance policy (policy) held with the financial firm (insurer). On 17 September 2018, the complainant lodged a claim seeking cover for costs incurred in treating a mould infestation issue within the unit (unit 3) as well as loss of rent in June 2017. The insurer declined the claim on the basis the complainant has not established a valid claim. Alternatively, loss or damage due to mould is specifically excluded from cover under the policy and the delay in lodging the claim had prejudiced the insurer‟s ability to assess its liability under the policy, if any. 1.2 Issues and key findings What does the policy provide cover for? The policy covers the insured property for accidental loss or destruction occurring within the period of insurance, subject to the limitations and exclusions specified in the product disclosure statement (PDS). Has the complainant established a valid claim? The available information establishes, on the balance of probabilities, the complainant‟s claim relates to a leaking pipe event to which the policy does respond. Accordingly, the complainant has, on balance, established a valid claim. Is the insurer’s decision to continue to decline the claim reasonable ? The available information establishes the insurer‟s original decision to decline the claim was reasonable at the time. However, given the more recent evidence made available by the complainant, the insurer‟s decision to maintain the decline is not reasonable under the circumstances. Accordingly, the insurer is to settle the claim in line with the policy. 1.3 Determination This determination is in favour of the complainant. The complainant has been successful in establishing, on balance, a valid claim exists under the policy. The insurer is to accept the claim and settle the complainant in line with his entitlements under the policy. Determination | Case number: 644801 Page 2 of 8 2 Reasons for determination 2.1 What does the policy provide cover for? The policy is an accidental loss or damage contract of insurance The policy covers the insured property for accidental loss or destruction occurring within the period of insurance, subject to the limitations and exclusions specified in the PDS. The policy defines an accident as something that is not intended or expected by the policyholder and would not be expected by a reasonable person in the policyholder‟s position. Accordingly, the policy extends to cover loss or damage to the insured property within the policy period, which is not intended or expected by the policyholder or a reasonable person in a similar position. 2.2 Has the complainant established a valid claim? The complainant has, on balance, established a valid claim I have considered the available information and am satisfied, on balance, it establishes the following:  the complainant has owned unit 3 since 2005 and the property has been leased to various tenants since then  in June 2017, the tenants occupying the property noted mould infestation, arranged a report on the issue by consultant „BB‟ and proceeded to terminate their lease and vacate the property  the complainant arranged for treatment of the mould infestation and re-let the property  on 17 September 2018, the complainant lodged a claim seeking cover for costs associated with the mould infestation treatment as well as a loss of rent  the insurer, based on reports from consultants‟ BB and „MO‟, proceeded to decline the claim on the basis the circumstances of the loss claimed did not trigger cover under the policy  the complainant continued to dispute the insurer‟s decision and was of the opinion the proximate cause for the mould infestation was a water leaking event. However, did not provide any evidence in support of this position  in or around September 2019, the complainant has made available additional information showing a water leak from the unit 5 above, had been found and was causing damage to the ceiling in the bathroom within unit 3 Determination | Case number: 644801 Page 3 of 8  further, the complainant has made available comments from several consultants including MO, supporting the mould infestation in 2017 was very likely the result of this slow leaking pipe event recently discovered. It is established law that in order to seek cover under the policy the onus first rests on the claimant to establish, on balance, the loss claimed is covered by the terms of the policy. Only once this has been established, will the onus shift to the insurer to establish, on balance, that it is not responsible to cover the claimant for the loss in line with a provision or exclusion present in the terms of the policy. Given the more recent evidence provided by the complainant, I am satisfied the complainant has, on balance, established a link between the leaking water pipe from the unit above and the mould infestation noted within the property in 2017. Therefore, on balance, the complainant has established a valid claim for the purpose of the policy. The onus rests with the insurer to establish, on balance, an entitlement to decline the claim in line with the policy provisions or otherwise. 2.3 Is the insurer’s decision to continue to decline cover reasonable ? The insurer’s original decision to decline the claim was reasonable It is not in dispute that the insured property did present with mould infestation in 2017 and that this resulted in the tenants occupying the unit at the time, terminating the lease and vacating the property. Further, it is also not disputed by the parties that there occurred a significant delay in the complainant lodging the claim and that the mould rectification works had already been completed and paid for by the complainant prior to claim lodgement. The available information shows that at the time (2017), two consultants BB and MO, had provided reports regarding the cause and extent of the mould infestation. I accept both of these reports were consistent in their findings that the cause for the mould infestation was likely the result of structural issues with the unit‟s cons truction and a lack of ventilation. I acknowledge and agree with the concerns raised by the complainant, that neither BB or MO, were suitably qualified to provide opinions‟ regarding the structure and/or construction of the unit. I have not been provided with any evidence showing they were appropriately qualified to comment on the construction of the unit nor that the unit has not been built in line with the required building standards in force at the time of construction. In saying that, I am satisfied that both consultants were suitably qualified to provide their opinion regarding the nature and extent of the mould infestation as well as Determination | Case number: 644801 Page 4 of 8 provide their opinion this was likely the result of a lack of ventilation within the unit. Regardless, there was an absence of any compelling information showing the mould infestation was the result of circumstances which trigger cover under the policy. The policy specifically excludes from cover damage arising from or caused by mould/fungi, mildew, atmospheric or climatic changes. Accordingly, in the absence of information showing the mould infestation was the result of an event triggering cover under the policy at the time, I accept the insurer‟s original decision to decline the claim was reasonable. The insurer is to accept the claim considering the new information In line with matters discussed above, it is not in dispute between the parties that in or about September 2019, the tenants occupying the insured property noted water damage to the ceiling of the bathroom above the shower. Investigations into this damage by a plumber „MF‟ found that there was a leaking waste pipe for the main shower of Unit 5 above. The complainant, subsequent to the preliminary assessment issued by AFCA, has provided evidence from consultants involved with the investigations and repairs to the insured property, linking the mould infestation in 2017 to the leaking pipe and associated damage located in 2019. The relevant information from this additional evidence has been summarised in section 3 of this determination. Additional comments/opinions from the consultants’ support complainant I acknowledge the insurer has raised concerns regarding the additional information provided by the complainant and especially the evidence from MO, which the insurer asserts the complainant has compelled MO to revise its position on the matter. This is a serious assertion and without supporting information, I am not of the opinion the insurer has shown MO‟s evidence should be ignored and/or that it has been compelled by the complainant. Rather, MF‟s latest comments are consistent with other consultants who have also opined that the mould infestation event in 2017, was on balance, linked to the leak located in 2019. I acknowledge the insurer‟s position that an extended period of time had passed between 2017 and when the leak was discovered in 2019, with no re-occurrence of mould or water leak damage at the insured property. In saying that, I note in the expert evidence, it is possible that particular environmental conditions at any given time may result in a one-off event of mould infestation when a water leak exists. In saying that, I also acknowledge the complainant‟s reference to the fact that between 2005 and 2017, there had never occurred any mould related issues within the insured property. Given this, it is equally reasonable to question how suddenly, a lack of ventilation became an issue. Determination | Case number: 644801 Page 5 of 8 As noted above, without evidence to the contrary, it was reasonable for the insurer to rely on the available consultants‟ evidence to support a decision to decline the claim in 2018. However, given the more recent information from various consultants including MO, I do not believe it is reasonable for the insurer to disregard and this information and maintain the decision to decline the claim. Given, the additional information including the fact there existed a double plaster lining ceiling, insulation and rusting of the fire collar. I am of the opinion it is reasonable and fair in all the circumstances, to accept the proximate cause for the mould infestation was the moisture introduced by the leaking water pipe from unit 5 above. It is also reasonable to accept, although slowly, this water leak had been slowly degrading and damaging the bathroom ceiling. The insurer has not been prejudiced to the extent it can decline the claim There is no dispute the complainant delayed lodgement of the claim and at the time of lodgement the mould infestation treatment works had already been completed. I acknowledge the late lodgement of the claim did prevent the insurer from being able to arrange its own investigation into the issue in order to assess its liability under the claim. However, in saying that, I do not accept the insurer has shown it would be reasonable to allow it to reduce its liability under the claim to nil, given the prejudice suffered. The available information establishes the mould infestation of the property did take place, that it was hazardous and therefore needed to be addressed. Any prejudice, if any, to the insurer would reasonably be limited to the cost of the repairs and/or if any additional damage occurred as a result of the delay in properly investigating the cause for the mould infestation. The complainant is not seeking cover for costs associated with the repairs to the bathroom ceiling and therefore no prejudice to the insurer exists in this regard. The only other prejudice, if any, would relate to the cost to undertake the mould infestation remedial works. I have not been provided with any information showing the insurer could have had these works done at a lower cost. Regarding the loss of rent aspect of the claim, the tenants terminated the lease and vacated the insured property within a short period of time and therefore, I am not of the opinion there is any aspect of prejudice to the insurer in this regard either. Claim to be settled in line with the policy provisions I note the complainant is seeking cover under the claim for various costs and losses he believes to be covered under the policy including payment he was required to pay under a court order towards the tenant‟s property, filing fees, refund of rent etc. Determination | Case number: 644801 Page 6 of 8 The insurer, given there exists a valid claim, does not automatically become liable to cover all costs/losses the complainant is claiming . The insurer‟s liability under the claim is dictated by the policy provisions including any limitations and exclusions. Accordingly, I determine the insurer is to accept the complainant‟s claim in line with this determination. However, its liability under the claim is limited to what the policy provisions actually extend cover for subject to the limitations and exclusions specified in the PDS. In the interest of completeness, the insurer is to arrange payment to the complainant in line with its obligations under the policy, within 14 days of the complainant accepting this determination. Further, the insurer is to pay interest in line with section 57 of the Insurance Contracts Act 1984, from 1 November 2019 (from this point on the complainant had made available reasonable information in support of his claim) to the date on which the settlement is issued to the complainant. 3 Supporting information 3.1 Summarise the key references Accidental Means something that is not intended or expected by You and would not be expected from the standpoint of a reasonable person in Your position. … WHAT YOU ARE COVERED FOR This Section is an Accidental, Physical Loss or Destruction Contract of Insurance between You and Us. We will cover Your Insured Property for any Damage occurring during the Period of Insurance not excluded by this Section. The most We will pay is the Sum Insured shown on Your Schedule. … ADDITIONAL BENEFITS Determination | Case number: 644801 Page 7 of 8 18. LOSS OF RENT, TEMPORARY ACCOMMODATION AND REMOVAL COSTS We will pay the following costs where Your Unit or Common Area suffers Damage and is unable to be occupied for its intended purposes or when reasonable access to or occupancy of Your Unit or Common Area is prevented by Damage happening to other property within the immediate vicinity of Your Unit or Common Area: a. Loss of Rent Where a Unit or Common Area is leased out, or You can provide evidence by means of a signed agreement that it would have been leased out, We will pay an amount equal to the actual rent lost. We will pay up until the time the Unit is re- leased. b. Reletting Costs Where a lease agreement is terminated as a result of Damage to Your Unit or Common Area, not excluded by this Section, We will pay the reasonable re-letting costs of that Unit or Common Area. The most We will pay is $1,200. 3.2 Relevant consultants’ evidence Record Key points MF feedback on mould issue 2017  it is very likely that given this new leak and damage has appeared, that the issue in 2017 and September 2019 are closely associated if not the same altogether  the leak in question could have been active for some period of time and only recently managed to present through the double l ayer of plaster sheeting  rusting present on the fire collar through the slab also supports this leak is not new MO Additional information 25 October 2019  providing additional information regarding report provided 23 June 2017  MO was not in a position to investigate beyond what was presented to it on the surface of the walls and ceilings at the time  moisture and water ingress can be a very slow to manifest, hence mould infestation due to continuous moisture presence  acknowledged that the insured unit being at a high position in Paddington and has two large sliding doors to patio that provide ventilation  the environmental conditions that contributed to the mould may well be a one - off case caused by the undetected water leak Determination | Case number: 644801 Page 8 of 8 Record Key points  confirms MO, in 2017, did not have access to unit 5 above  in light of the above, MO is of the opinion that the gradual leak from the unit above was the cause of the initial mould issue and damage to the ceiling in the bathroom Email from Unit 5 Real Estate agent 17 October 2019 “I ha ve spoken to the technician from [consultants name] who attended Lot 5 to seal the shower earlier this month. He tells me the pipework and waste from our unit showed a problem with a pipe within another pipe from the floor waste. He confirmed that it looke d like the leak has been slowly festering away for some considerable time. He also confirmed that it may well be the cause of your problem in 2017…” Email General Manager MF 22 October 2019  given the bathroom ceiling has in fact two plaster linings and roof insulation present, it is entirely possible that this leak has been active for considerable time and only recently the damage became apparent  is of the opinion that it is certainly possible that the leak has been active for the time period May 2017 to September 2019  when there is water present within ceiling cavity for an extended period, the resulting moisture can create an environment for mould to develop