The insurer initially denied a building damage claim, then accepted cover for pipe-leak damage but denied the balcony leak portion and proposed a two-year wait before reassessing. AFCA upheld the balcony denial, ordered reassessment within 12 months of repairs, and awarded $750 for non-financial loss.

The insured must show a covered loss and the insurer must then prove an exclusion, and reassessment timing is set for fairness given the expert drying period.

Issues

Subjects and remedies

home or building damagepay non financial lossreassess claim

Related

All Suncorp Group determinations · Find similar determinations

Text of the determination

Determination Case number 644624 Financial firm AAI Limited Determination | Case number: 644624 Page 2 of 6 Case number: 644624 31 January 2020 1 Determination overview 1.1 Complaint The complainant lodged a claim after she noticed damage to her house due to several leaks from stormwater and sewerage pipes. The financial firm (insurer) initially declined the claim as it believed the damage occurred prior to the policy inception. The insurer subsequently accepted the claim in relation to cover for the damage from the leaks. A dispute has arisen in relation to the repairing of the leaks and waterproofing. The insurer has denied part of the claim on the basis of its belief that it is excluded under the terms of the policy. The case analyst provided the parties with a preliminary assessment. The assessment was substantially in favour of the insurer but with $500 non-financial loss payment to the complainant. The complainant has rejected the preliminary assessment and the matter has been referred for determination. 1.2 Issues and key findings Did the complainant suffer damage covered under the policy? On the information available to me, on balance, I find that the leaking pipes ha ve caused damage and this is not disputed by the insurer. Is the insurer entitled to deny the claim for the leak from the balcony? On the information provided to me I am satisfied that the leak from the balcony is as a result of a defect, structural fault or design that the complainant should reasonably have known about. The insurer is entitled to deny this portion of the claim. Is it reasonable for the insurer to delay the repairs for a period of two years? The insurer says they cannot complete the repairs until the following:  The leaking pipes are repaired  The property has sufficient time for the foundations to dry out On the information provided to me I accept that until these two matters have occurred the insurer is unable to further assess the damage. The insurer should further assess the property after a period of one year, from when the leaking pipes have been repaired. Determination | Case number: 644624 Page 3 of 6 Is the complainant entitled to non-financial loss? The complainant suffered when the insurer initially denied the claim on the basis that the event likely had occurred over time prior to the complainant incepting her building cover in September 2017. Subsequently the insurer reneged on this position and agreed to cover the resultant damage from the leaking pipes. In the circumstances the complainant has suffered and is entitled to $750 compensation. 1.3 Determination This determination is substantially in favour of the insurer. The insurer is to proceed as follows: 1. pay the complainant $750 non-financial loss 2. enter into a process which will result in an assessment of the property within one year after the complainant completes the repairs to the damaged pipes Determination | Case number: 644624 Page 4 of 6 2 Reasons for determination I have decided this case on its merits, having regard to the relevant law, good industry practice, codes of practice, previous Australian Financial Complaints Authority (AFCA) decisions and fairness. I have taken into account all material submitted by the parties both before and after the preliminary assessment. I am satisfied the documentation I have relied on has been provided to both parties. 2.1 Did the complainant suffer damage covered under the policy? Onus on complainant It is well established insurance law that the onus is on the insured to show, on the balance of probabilities, a loss claimed falls within the cover provided by the policy. This is known as a prima facie (valid claim). If the complainant is able to establish this, the onus transfers to the insurer to show an exclusion applies to deny the claim. The policy covers escape of liquid. The complainant has established a prima facie claim. The insurer must now establish the application of an exclusion to deny the claim or otherwise. Insurer obtained expert reports The insurer obtained a forensic engineering report from their expert (ME). ME concluded as follows: „… the proximate cause of the water damage (ingress) into the Bedroom (beneath the balcony) is due to the failure of the existing waterproofing system or due to inadequate waterproof detailing of the balcony … … the observed damage within the northeast corner of Bedroom and eastern side of En-suite only (i.e. cracking to plasterboard wall and ceiling and along skirting board at northeast corner of Bedroom and cracking along mortar joints of floor tiles within En-suite) has most likely been exacerbated by the foundation movement as a result of leaking sewer and stormwater pipes at southeast corner of the house. … a “drying period” of 12 to 24months (at least 2 summer period) since the repair of the sewer and stormwater pipes should be allowed for the foundation soil moisture content to dry and return to their “pre - event” levels, prior to the commencement of any reinstatement/repair works (i.e. patching and painting the cracks to the plasterboard walls and ceilings at northeast corner of Bedroom and repairing mortar joints within En-suite). … that the observed internal and external damage in the remainder of the subject house is caused by concrete slab deformation due to long term differential foundation movement as a result of long term contributing factors…‟ Determination | Case number: 644624 Page 5 of 6 …observed damage to the subject house is considered to be generally „non - structural‟ damage only and no structural damage was observed‟. The complainant rej ects ME‟s report however she has not provided any information or alternative report that convinces me that the report is inaccurate. The complainant says that there are 5 locations of broken rainwater pipes and 3 locations of broken sewerage pipes. She says further that where there are no broken pipes, there are no cracks inside the property. In the absence of any alternative information, on balance, I accept that there has been foundation movement as the result of the leaking pipes. The Product Disclosure Statement (PDS) states: Dealing with defects If a known defect is the cause of the damage We do not pay for loss or damage caused by a defect, structural fault or design fault at the building that you knew about (or should reasonably have known about) and did not fix before the loss or damage occurred. If an unknown defect is the cause of the damage If an incident covered by your policy damages the building and an unknown defect was the cause or part of the cause, we will pay for the resulting damage. If the unknown defective part of the building is also damaged by the same incident, we will fix this as well. I am satisfied the damage to parts of the premises are as the result of an unknown defect and thus covered by the policy. The insurer refers to ME‟s report and says that the damage can only be reassessed after 24 months. ME has suggested that the property requires 12 -24 months drying period. In view of this, on the application of fairness, the insurer should reassess the property 12 months after the repairs to the pipes have been completed. The insurer says that the PDS does not cover the cost of repairing or replacing the items from which the liquid escaped. I accept this but consider the PDS does cover exploratory costs of exploratory work and up to $750 extra wall tiles, so they match or complement the new tiles used for repairs. At this stage these costs have not been incurred. Determination | Case number: 644624 Page 6 of 6 2.2 Is the insurer entitled to deny the claim for the leak from the balcony? Insurer is entitled to deny ME‟s report found „ the water damage (ingress) into the Bedroom (beneath the balcony) is due to the failure of the existing waterproofing system or due to inadequate waterproof detailing of the balcony ‟ The insurer says the leak is as a result of: wear and tear, or loss or damage by the escape of liquid occurring as a result of a gradual process of leaking, splashing, dripping or overflowing over a period of time when you could reasonably be expected to be aware of this condition; This is excluded under the policy. On the information provided to me, on balance, I accept that the damage caused by the leak from the balcony is excluded under the policy. 2.3 Is it reasonable for the insurer to delay the repairs for a period of two years? Insurer is to reassess the property after 12 months. ME said the property needs 12 to 24 months to dry out following the repairs to the leaks. Fairness dictates that the insurer should reassess the property 12 months after the complainant has repaired the leaks. At that time a decision can be made whether further time is required before the repairs can commence. The complainant is to notify the insurer once the leaks have been repaired. 2.4 Is the complainant entitled to non-financial loss? Complainant is entitled to non-financial loss. AFCA expects complainants to be robust and acknowledges that complainants will suffer some degree of inconvenience during the claims process. In the current situation the denial of the claim will have caused the complainant more than the normal degree of inconvenience. The complainant is entitled to $750.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.