Text of the determination
Determination
Case number 644373
Financial firm QBE Insurance (Australia) Limited
Determination | Case number: 644373 Page 2 of 24
Case number: 644373 11 March 2020
1 Determination overview
1.1 Complaint
The complainant is a lot owner in a residential development insured under a strata
policy with the financial firm (insurer). On 6 November 2018, she lodged a claim for
storm water damage to her property. The insurer accepted the claim and briefed an
engineer to provide a scope of works. A dispute has arisen over the scope of repairs,
repair costs and the insurer‟s claims handling.
1.2 Issues and key findings
How should the claim be settled?
A cash settlement is an appropriate and fair way to settle the claim.
Is the insurer required to increase the cash settlement for repairs?
Yes. The insurer‟s quote for repairs does not adhere to the updated scope of works. It
is neither comprehensive nor certain.
The complainant‟s quote is preferred; it generally reflects t he fair and reasonable cost
of repairs to restore the property to its pre-loss condition.
Is the complainant entitled to temporary accommodation expenses?
Subject to proof, the complainant is entitled to $200 per week temporary
accommodation expenses from 21 December 2018 until the complainant reoccupies
the property following completion of repairs.
Is the complainant entitled to compensation for the way the claim was handled?
Yes. The insurer mismanaged the claim by its delays and lack of responsiveness; this
caused the complainant an undue degree of stress and inconvenience.
Compensation for non-financial loss is warranted.
However, apart from $250 for transport expenses, the complainant has not
established the insurer is liable for her other claimed financial losses.
1.3 Determination
This determination is substantially in favour of the complainant.
Should the complainant accept this determination, then within 7 days of the
complainant‟s notification of acceptance of this determination, the insurer is to liaise
with BBK and determine the cost of sanding and polishing the floors.
Determination | Case number: 644373 Page 3 of 24
Once the cost is ascertained, the insurer is to forthwith:
cash settle the claim based on the quote by BBK for $21 2 , 358.30 (inclusive of
GST), less the agreed cost of sanding and polishing the floors, plus $748 (inclusive
of GST) for the cost of retiling the ensuite bathroom floor
pay statutory interest on this net sum pursuant to section 57 of the Insurance
Contracts Act 1984 from 24 August 2019 until the date of payment
subject to satisfactory proof, pay the complainant temporary accommodation
benefits of $200 per week from 21 December 2018 until the repairs are complete
pay statutory interest on this sum pursuant to section 57 of the Insurance Contracts
Act 1984 from 24 August 2019 until the date of payment
pay $5,000 compensation for non-financial loss and $250 for transport expenses.
Additionally, the policy provides:
the reasonable costs of the lot owner‟s removal and s torage costs. Once the
complainant incurs these expenses, she is entitled to reimbursement by the insurer
upon presentation of the supporting invoices
a benefit of up to $2,000 for contributions, levies, maintenance and other fees the
complainant is required to pay during the period the unit is unfit to be occupied. If
the complainant has incurred these expenses, she is entitled to reimbursement by
the insurer upon presentation of the supporting invoices.
Otherwise, the insurer is not required to take any further action in relation to this claim
or complaint.
Determination | Case number: 644373 Page 4 of 24
2 Reasons for determination
2.1 How should the claim be settled?
A cash settlement is fair in the circumstances
It is not in dispute the insured property was damaged in a storm in November 2018.
The dispute is in relation to the amount payable by the insurer.
The complainant wants the insurer to either authorise repairs by her preferred builder,
BBK, or cash settle for the value of BBK‟s quote.
The insurer offered to authorise repairs by its builder, SBG, or cash settle the claim
based on SBG‟s quote.
The policy provides cover against damage to the property which occurs during the
period of insurance. The insurer relies on a claims condition which says it has the
right to nominate the repairer.
When the insured property is damaged the policy provides the insurer may choose to
either repair or pay the amount it would cost to repair the insured property.
The policy says if an insured submits a claim for cash settlement instead of repair
then the insurer will reduce the amount payable after consideration of the age and
condition of the property at the time of loss and not be obliged to pay more than the
indemnity value of the insured property.
There is no basis under the policy for the insurer to authorise BBK to carry out
repairs.
However, in exercising its rights under the policy, the insurer must act fairly. It has the
right to nominate the repairer, but its repaire r‟s quote must be fair and represent the
fair cost to repair the insured property.
Having reviewed the available material, the panel is satisfied it is fair in all the
circumstances that the claim is cash settled. This is because:
the policy allows the in sured to choose a cash settlement for the „Indemnity Value‟
(as defined)
the insurer does not dispute the complainant‟s choice of settlement method
it will avoid potential complications regarding repair management and warranties
it will expedite the repair process, which is fair to the complainant given the delays
in the claim process to date.
Determination | Case number: 644373 Page 5 of 24
2.2 Is the insurer required to increase the cash settlement for repairs?
Cash settlement should reflect fair cost of repairs
Indemnity Value is defined under the policy as set out in supporting section 3.3 of this
determination.
The panel is satisfied the insurer is required to pay the complainant the reasonable
cost of restoring the property to its pre-loss condition. This means the cash settlement
amount should be fair and sufficient to ensure the complainant is able to engage her
own builder to repair the property to a condition which is substantially the same as it
was at the time of the storm event.
It is not in dispute that when the storm occurred substantial renovations were being
undertaken to the insured building.
After the storm event, repair quotes were obtained by the parties based on a scope of
works prepared by the insurer‟s engineer, MCS. The original scope of wor ks is dated
13 March 2019.
Following a site meeting on 4 June 2019, MCS prepared an updated scope of works
on 12 August 2019.
BBK’s amendments to scope of works are generally reasonable
BBK reviewed the updated scope. It made some additions to the scope a nd estimated
repairs could be undertaken for $212,358.30.
BBK proposed additions to the updated scope of works which included:
duct works need to be removed due to mould spores
3-layer plasterboard cornices need to be supplied and installed
roughed- in electrical in ceiling need to be replaced. BBK‟s electrician advised that
with water entering in ceiling connections, this will cause earth leakage to be
tripped in the future.
old skirtings will also need to be removed to allow access to ceiling space below
and remove insulation
exposed existing floor was sanded and polished and needs to be included in scope
of works as finished floor surface
when relining walls, additional plastering required from original scope, and
removing bulkheads and existing vertical plaster walls due to mould spores found
in existing plaster walls
replace tiling to bathroom floor (+6.5m) (although annotated photograph 13 noting
bathroom floor has been tiled)
a full dust barrier will need to be supplied and installed between the floor and lower
ceiling level as per current building regulations
Determination | Case number: 644373 Page 6 of 24
screed stepless floor with correct fall to both ensuite and bathroom.
The panel accepts BBK is a professional builder with sound knowledge of the pre-
incident condition of the property and is qualified to propose such additions.
The insurer provided comments from its assessor. The panel considers these
observations were comprehensively answered by BBK.
The available material does not show the insurer‟s builder (SBG) was asked to
comment.
Having reviewed all the commentary, the panel is satisfied that, apart from the
sanding and polishing of the floorboards, BBK‟s amendments are fair and reasonable.
Moreover, as early as March 2019, MCS cautioned in relation to mould and fungal
mould.
The panel accepts the sanding and polishing work is not warranted given the pre-loss
condition of the floors. MCS commented the timber flooring appeared quite old. The
photographs support this observation.
In addition, the assessor commented the bedroom floors were to be carpeted and did
not require sanding and polishing. BBK agreed and said the floors were to be sanded
and polished after the renovation works were completed. The panel accepts the policy
does not cover a betterment of the property.
In the absence of a cogent submission from the insurer to the contrary, and apart
from the sanding and polishing of the floors, the panel accepts BBK‟s amendments to
the scope of works are reasonably required to reinstate the property to its pre -loss
condition.
In addition, the complainant contends that the scope should be amended to include
the replacement of the ensuite bathroom floor tiling. In view of the mould remediation
issues, the panel agrees the complainant‟s submission is reasonable. In the absence
of any substantive argument on this point from the insurer, the panel accepts the tiling
work should be included in the scope of works.
The next issue in dispute is the amount which represents the reasonable cost of
implementing the scope of works includi ng BBK‟s amendments.
Complainant says insurer’s offer is unreasonable
The insurer is prepared to authorise repairs or cash settle the claim based on the
quote for repairs by SBG for $144 ,927. 57 (inclusive of GST) .
The complainant wants BBK to conduct repairs based on her quote in the total
amount of $212,358.30 (inclusive of GST) . The complainant also wants the cost of
retiling the ensuite bathroom floor. This cost is $680 plus GST.
Determination | Case number: 644373 Page 7 of 24
The total amount of the complainant‟s claim is $213,106.30 inclusive of GS T.
T he difference in the parties‟ positions is $68,178.73.
The insurer argues its offer to settle is fair and SBG‟s quote is actionable.
The complainant says BBK‟s quote should be preferred because:
SBG‟s quote does not adhere to the updated MCS scope of works dated 12 August
2019. SBG‟s quote is based on the original MCS scope dated 13 March 2019 (with
inclusions discussed at the site meeting of 4 June 2019)
SBG‟s quote is not comprehensive and is silent on several important items
SBG‟s quote does not in clude a like-for-like breakdown of the cost of works,
whereas BBK‟s quote does
the insurer has not adequately explained why BBK‟s quote is unacceptable.
Panel considers BBK’s quote is preferable
The panel accepts the complainant‟s submissions have merit. The panel considers
the insurer has not persuasively refuted those submissions.
Firstly, SBG‟s quote is based on the initial March 2019 scope of works (with the
inclusions following the 4 June site meeting). It does not adhere completely to the
updated August 2019 scope. Critically, SBG does not address mould remediation or
the necessary extent of floor removal and replacement (and associated works). The
insurer‟s engineer (MCS) points this out. No satisfactory explanation has been
provided for this omission.
Secondly, SBG‟s quote does not account for the amendments proposed by BBK
which the panel accepts are mostly reasonable and should be included. Apart from
this, there are other items identified by BBK to be missing from SBG‟s quote, which
neither SBG nor the insurer has addressed. The panel considers SBG‟s quote is
incomplete compared with the quotation provided by BBK.
Moreover, it is not clear SBG revisited the site as suggested by MCS when MCS
provided the updated scope of works in August 2019.
Thirdly, unlike BBK‟s quote, SBG‟s quote lacks an itemised breakdown of costs. This
makes it difficult to compare the costs of each builder‟s work.
Fourthly, SBG‟s quote excludes „any item not detailed in this scope of works‟. The
ambit of this exclusion is unclear and, given the potential of variation to the scope of
works, SBG‟s final c ost of repairs is potentially uncertain and therefore unfair.
Moreover, when reviewing SBG‟s quote, the engineer MCS notes: SBG „has done a
pure pricing exercise without fully taking into consideration all the various (especially
minor) items … required if they were to undertake the work.‟
Determination | Case number: 644373 Page 8 of 24
By contrast, the panel considers BBK‟s quote is itemised and comprehensive.
Fifthly, although the insurer argues BBK‟s quote includes works which would
constitute a betterment of the property, the insurer has not provided sufficient
reasoning or persuasive evidence to support this assertion. The panel considers
BBK‟s quote clearly corresponds to each item in the scope of works. Accordingly, on
the available information, the panel does not accept the insurer‟s assertion i n this
regard.
Sixthly, the panel notes S (the alternative panel builder) provided a quote for an
amount not dissimilar to BBK‟s quote.
The panel notes SBG said its quote was actionable. However, the panel considers the
available information does not support this assertion. In an email dated 13 June 2019
SBG indicated the amount was an estimate for cash settlement purposes only. And,
in an email dated 14 June 2019 MCS said if SBG were quoting to do the job then the
price would be different.
Finally, in the context of the ongoing renovation works, if BBK does the repairs it will
avoid potential complications with repair management and warranties.
For these reasons, the panel finds BBK‟s quote is preferable to SBG‟s quote. The
panel is satisfied BBK‟s quote fairly represents the cost to repair the property to a
condition which is equivalent to or substantially the same as its condition at the time
of loss.
As noted above, the only item in BBK‟s scope which is not accepted by the panel is
the cost to sand and polish the floors. BBK did not cost this work. In these
circumstances, should the complainant accept this determination, the insurer is to
forthwith liaise with BBK to determine the cost of this work and deduct it from the cash
settlement amount.
In addition, as noted above, the insurer is to cover the cost to re-tile the ensuite
bathroom floor, which amounts to about $748 (inclusive of GST).
In summary, the insurer is to cash settle the complainant the value of BBK‟s quote
($212,358.30), less the cost of sanding and polishing the floors (to be ascertained),
plus the cost of retiling the ensuite bathroom floor ($748).
The insurer is also required to pay interest on the net settlement sum pursuant to
section 57 of the Insurance Contracts Act 1984 (Cth) (the Act) from 24 August 2019
(the date BBK‟s repair quote was provided) until the date of payment.
Determination | Case number: 644373 Page 9 of 24
2.3 Is the complainant entitled to temporary accommodation expenses?
Subject to proof, temporary accommodation to be paid from 21 December 2018
until complainant re-occupies property
The complainant says when the insured event occurred, the insured property was
undergoing major renovations. She says renovations commenced on 3 September
2018 and were scheduled for completion on 21 December 2018.
The complainant agrees she had vacated the insured property to allow for the
renovation, but the storm event halted the renovations.
In these circumstances the complainant says she was forced to extend temporary
accommodation for an indefinite period which has created great financial and
emotional strain.
The complainant claims accommodation expenses from the date of the storm on 6
November 2018 until repairs are complete. Because of the renovation, she says she
has been staying with family. Pursuant to an informal agreement she claims she is
paying the family $200 per week plus payment of utilities.
The complainant estimates that repair and reinstatement work will take about three
months.
The insurer says temporary accommodation will only be paid during the period of
repair relating to the claimable damage. It points out the complainant was not living in
the insured property when the storm occurred and that she was not living there
because of the renovations not because of the storm event.
The insurer says it is only liable to pay temporary accommodation to the complainant
during the repair period, being about 10 weeks (relying on SBG‟s estimate). The
insurer agreed to $200 per week.
The policy provides the insurer will pay the reasonable costs of temporary
accommodation an insured necessarily incurs if the unit is made unfit to be occupied
for its intended purpose by damage to the property which is admitted as a claim.
The damage to the property was admitted as a claim. The dispute was about the
quantum of the claim.
The policy provides the insurer will pay from the time of the event until the time the
complainant reoccupies the unit following completion of repairs.
When the event occurred, the panel accepts the complainant was not living in the
property and it was unfit to be occupied because of renovations. However, in the
absence of any compelling information to the contrary, the panel accepts the
renovation works were to be completed by 21 December 2018.
Determination | Case number: 644373 Page 10 of 24
Therefore, the panel accepts from 21 December 2018 the property was unfit for
occupation because of the storm event.
Accordingly, the panel is satisfied the insurer is liable to pay the temporary
accommodation benefit from 21 December 2018 until the complainant re-occupies the
property following completion of repairs (including unfinished renovations).
The complainant has provided extensive information about her out-of-pocket
expenses. However, she has provided no persuasive independent or objective
evidence supporting the contention she paid $200 per week to a family member
pursuant to an informal arrangement.
The insurer accepts $200 per week is a reasonable amount. In view of the informal
nature of the arrangement, the panel considers it is fair the complainant provide proof
she paid $200 per week to a family member pursuant to the informal agreement.
Subject to the provision of this proof, the insurer is to reimburse the complainant $200
per week temporary accommodation from 21 December 2018 until the date of
payment.
The insurer is required to pay interest on the said amount pursuant to section 57 of
the Act from 21 August 2019 (the date of the insurer‟s final decision letter) until
payment.
Subject to proof, the insurer is also to continue to pay $200 per week temporary
accommodation until the repairs are completed.
2.4 Is the complainant entitled to compensation?
AFCA may award compensation in some circumstances
The complainant seeks compensation because she is dissatisfied with the way the
claim has been handled, including delays and a lack of communication. She says the
insurer‟s claims mismanagement has caused her an unusual degree of stress and
inconvenience, particularly given she recently became a mother.
AFCA Rules allow the payment of compensation (capped at $5,000) for non-financial
loss. AFCA may decide an insurer should compensate a complainant for such loss
only where there has been an unusual amount of physical inconvenience, time taken
to resolve a situation, or interference with the complainant‟s expectation of enjoyment
or peace of mind.
Fair the insurer pays to the complainant $5,000 compensation
The panel has carefully reviewed the available information to determine if
compensation is warranted.
Determination | Case number: 644373 Page 11 of 24
The insurer had the opportunity to address the complainant‟s claims handling
concerns in both its internal review process and during the AFCA complaint process.
It failed to do so in any substantive way. Neither did the insurer provide useful
supporting information to assist the review of this issue (such as claim file notes).
Accordingly, the panel has drawn the inference the unavailable information would not
have supported the insurer‟s position. The panel accepts the complainant‟s account of
events.
The complainant has provided a substantial chronology of events.
A chronology of events is also set out in supporting section 3.2 of this determination.
These basic facts are not in dispute:
at the time of the storm on 6 November 2018, the complainant was renovating her
property. The renovations were to be completed on 21 December 2018
on about 20 November 2018, the claim was formally lodged
on 13 March 2019, the engineer MCS drafted the initial scope of works
in April 2019 SBG provided a quote based on the scope of works
on 1 May 2019 BBK provided a quotation for repairs
on 4 June 2019 there was a site meeting between relevant parties
on 13 June 2019 SBG provided a further quotation
On 12 August 2019 MCS revised the scope of works
BBK quoted on the revised scope of works and SBG did not
the insurer offered to authorise repairs or cash settle based on SBG‟s quote and
maintained this offer throughout the internal dispute resolution process and the
AFCA complaint process.
Based on the available information, the panel is satisfied the insurer unreasonably
delayed the claim, did not proactively and clearly communicate with the complainant
and demonstrated a lack of responsiveness to the co mplainant‟s concerns.
The panel considers the insurer did not comprehensively or persuasively address the
complainant‟s submissions and the issue of temporary accommodation and
compensation . The insurer‟s claims management results in the complainant and he r
family being unable to live in their home since the end of 2018. As repairs are still to
be undertaken, they will not live in their property for a substantial part of this year.
The panel is satisfied the insurer‟s claims handling caused the complainan t an undue
degree of stress and inconvenience. She was expecting her first child at the time of
the insured event and the stress of being a new mother was compounded by this
protracted insurance claim. The complainant may have also paid for temporary
accommodation while repaying a mortgage, which may have added to stress. The
complainant has also been inconvenienced because of extra commuting and she has
been out of the insured property for substantially longer than necessary.
Determination | Case number: 644373 Page 12 of 24
Having considered all the available information, the panel is satisfied it is fair the
insurer pays the complainant $5,000 compensation for non-financial loss.
Insurer to pay the complainant for some financial loss
The complainant also says the insurer‟s claims handling caused her fi nancial loss for
which she seeks compensation.
Apart from any entitlements under the policy, AFCA may award compensation for
consequential financial loss (capped at $5,000) caused directly or indirectly because
of the insurer‟s conduct.
The complainant seeks reimbursement of ongoing costs (calculated on 4 September
2019) as follows:
utility costs ($4,703.27)
transit costs ($1,131.35)
finance costs ($2,483)
The complainant also claims when renovation recommences, she will need to pay
removalists to deliver white goods and kitchen appliances from personal storage to
the insured property. These items were meant to be delivered from warehouses
directly to the apartment for installation by BBK in November 2018. Instead, after
extensive storage at warehouses, the goods are now in personal storage.
The complainant says the agreement with her family was to pay $200 per week plus
payment of utilities. The complainant has provided utility bills and costs for transit in
the form of receipts and credit card transactions. She says these would not have been
incurred but for the insurer‟s claims management.
The complainant also says due to the disruption to construction funding
arrangements, which cannot be relied upon as works cannot progress, she had to pay
out of pocket renovation costs for works totalling $85,509 which would otherwise be
offsetting mortgage. She says the finance costs reflect the interest incurred while
enduring the lengthy delay.
The policy covers certain contributions and fees, contents removal and storage costs,
and certain travel costs. The policy excludes consequential (or indirect) financial
losses incurred following an insured event.
While the panel acknowledges the policy term, the policy term does not prevent an
award of compensation under the AFCA Rules.
The panel carefully considered the bank statements and other supporting information
provided by the complainant.
The panel notes the complainant must establish either an entitlement under the policy
or a causal connection to the insurer‟s claims mismanagement.
Determination | Case number: 644373 Page 13 of 24
Having reviewed the complainant‟s material, the panel is of the view that:
utility costs would be incurred in any event and the panel makes no allowance for
this item
transport costs are consequential losses and it is unclear how the insurer‟s conduct
caused the transport costs claimed
the policy covers up to $250 for reasonable travel costs incurred in visiting the unit
to consult with claim adjusters and/or building repairers. The panel accepts some
of the complainant‟s transport expenses are likely referable to such consultations,
and in the absence of any submission from the insurer to the contrary, it is fair the
insurer pays the complainant the policy entitlement of $250
there is insufficient evidence to establish the claim for bank interest. The funding
arrangements between the complainant and the financier are unknown and it is
unclear how the insurer‟s claim delays – as distinct from the insured event itself –
caused this loss
the policy covers the reasonable costs of the lo t owner‟s removal and storage
costs. Once the complainant incurs these expenses, she is entitled to
reimbursement by the insurer upon presentation of the supporting invoices
the policy also provides a benefit of up to $2,000 for contributions, levies
maintenance and other fees the complainant is required to pay during the period
the unit is unfit to be occupied. If the complainant has incurred these expenses,
she is entitled to reimbursement by the insurer upon presentation of the supporting
invoices.
Determination | Case number: 644373 Page 14 of 24
3 Supporting information
3.1 Our Approach
This complaint has not been the subject of a recommendation. Due to the nature of
the complaint, it has been referred directly to a panel for determination, in line with the
Operational Guidelines to the AFCA Rules. The panel consists of an ombudsman and
two representatives with consumer and insurance experience.
The panel has decided this complaint based on what is fair in all the circumstances,
having regard to legal principles, applicable industry codes or guidance, good industry
practice and previous relevant determinations of AFCA or predecessor schemes
(which are not binding).
There has been a full exchange of all material information relied on for the purposes
of this determination and each party has had the opportunity to address any issues
raised by the other.
The panel has reviewed and considered all the material provided by the parties. While
the parties have raised numerous issues in their submissions, for the purposes of this
determination the panel has restricted its commentary to those issues that it considers
directly relevant to the outcome only.
It is an accepted principle of general insurance law that the insured bears the onus to
establish on the balance of probabilities that they have suffered a loss ca used by an
event to which the policy responds. This is known as a prima facie claim. Once so
established, the onus shifts to the insurer to prove on the balance of probabilities that
an exclusion applies if it seeks to deny or limit its liability for the loss.
3.2 Chronology of events/documents
This chronology is a high-level summary of key events and documents in the claims
process. It does not record every document or instance of contact between the
parties. Unless text is put in “quotation marks”, it has bee n paraphrased.
Abbreviations:
BBK = the complainant‟s preferred builder
Com = the complainant / her representative/s
FF = the financial firm (the insurer)
MCS = engineer briefed by the insurer to draft scope of works
SBG = the FF‟s preferred builder
SOW = scope of works
Determination | Case number: 644373 Page 15 of 24
Date / document Event / details
BBK invoice
19 November 2018
Progress payment request balance outstanding $71,100.
Designer’ s invoice
20 November 2018
Balance now due $14,509.36.
21 November 2018 – 1
December 2018
$85,509 renovation works payments.
6 November 2018 Insured event – storm – damages property.
Com says she notified the body corporate and the ins urer of claim
shortly after this time.
TBS builder email
19 November 2018
No claim made yet.
Gutters and downpipes not adequate during heavy rains causing
water entry into building
Recommended assessor and engineer be appoint ed
20 November 2018 Claim formally lodged.
Assessor attended
17 December 2018
Building is a converted warehouse factory about 130 years old.
Only inspected Unit 19. Unit 19 damage occurred along the wall
adjoining the box gutter.
Building is heritage listed and requires special dispensation from
Herit age Council before being altered or repaired.
Recommend an engineer be appointed to identify the cause of the
leaks and provide a scope of works considering the heritage status
of the building.
11 February 2019 Initial inspection by MCS.
13 March 2019 MCS provided report outlining cause of damage and scope of
works.
Box gutters, sumps and downpipes are not compliant and will
require rectification. Proximate cause of damage was wat er ingress
as overflow from box gutters/sumps.
Renovation work stopped due to water ingress and no work done
since. Unit 17 suffered the most damage.
Timber fl ooring quite old and would need to be rejuvenated as part
of the renovation.
Ceiling will need to be replaced entirely.
Wall tiling had just commenced in the bathroom. Recommended all
wet areas will need to be removed and rebuilt to satisfy code.
Annotated photographs refer to partially completed tiled wall in
bathroom and newly tiled floor in bathroom/laundry.
Determination | Case number: 644373 Page 16 of 24
Date / document Event / details
Report highlighted possible presenc e of mould and fungal mould in
the floor ceiling insulation bet ween Unit 9 and Unit 17.
Unit 17 will require ma jor remedial works to bring damaged new
works back to new and guaranteed and damage status. It will
require new ceilings throughout and removal and replacement of
the old timber with new boards throughout after replacement of
subfloor installation.
Genera l work required preparing and repainting the walls, ceilings
and timber floors.
28 March 2019 FF sends Com MCS‟s report and SOW, appoints SBG and S to
quote.
Assessor‟s report
10 April 2019
Unit 17 was under renovation at the time of the incident and un it
owners were not living on site.
Renovations stopped because of the water ingress. Unit owners
have not been able to move into the property.
Unit owners requested temporary accommodation as they have had
to rent elsewhere for longer than intended.
Unit n ot unfit due to damage but due to incomplete renovations.
16 April 2019 Other units damaged, and claim sent to major loss team.
26 April 2019 SBG quotation based on MCS 85237.
$137,280.55 total including GST.
Unit 17 $86,130.06 excluding GST.
Common areas 17,9 $2, 412 excluding GST.
Valid for 30 days.
1 May 2019 (expires 31 May
2019)
BBK quotation $271,810.66 including GST.
May 2019 1 May: Com emails FF revised BBK quote.
8 May: FF requests SBG to requot e due to differences in quotes so
far.
29 May: Com complains about claims handling.
4 June 2019 Site visit by BBK with assessor, MCS (second inspection) and SBG
(third ins pection) to explain quot e.
BBK points out various items missing from MCS‟s SOW.
SBG updates its quote to reflect this discussion.
SBG (FF‟s builder)
Repair quote
13 June 2019 (valid for 30
days) the Unit 17 only.
Quote based on doc uments provided by MCS dat ed 13 March
2019, reference 85237.
SBG updated quotation inc GST: $144,927.57.
In an email on 2 Oct 2019, SBG add the following c omments:
> the quote is actionable;
Determination | Case number: 644373 Page 17 of 24
Date / document Event / details
> SBG provide full warranties in line with Victorian Building Aut hority
regulations coupled with supplier/manufacturer product
warranties;
> the builder‟s margin is 20%;
> „from our attendances we do not believe there is a l ikelihood of
potential variation for additional works due to undiscovered
damage‟;
> „an allowance of 10 weeks should be provided to complete all
works as per the SOW provided‟.
Email SBG
13 June 2019
Amended estimate and should be read in conjunction with the MCS
scope and additional items discussed on site.
“…as advised this estimate is for cash settlement purpose only…”
Email MCS
14 June 2019
Will compare scopes shortly.
“Gut tells me that if SBG were quoting to actually do the job then the
price would be different ….”
Email MCS
20 June 2019
SBG Scope section has been added wit h some additions.
Scope addresses much of the final scope that was discussed during
recent site inspection but is still silent on many items that BBK
stated is included.
Items included flooring and skirting, mould remediation and
allowance for new tiling throughout including waterproofing.
SBG done a pure pricing exercise without taking into consideration
all various items aspects required if they were to undertake the
work.
Al l items cannot be deemed to be included and must be additional
to the amount quoted.
BBK have included specified exactly what they will do especially all
minor items as would be expected from a competent builder.
Without itemised pricing it is difficult to gauge where the right price
should be but probably it will be somewhere in bet ween.
21 June 2019 FF IDR team contacts Com re her complaint.
4 July 2019 FF contact Com to propose three options to resolve:
i) go with SBG‟s quote
ii) allow new builder, AB, to conduct a new assessment and quote
iii) negotiate about Indemnity Value cash settlement and then go
with BBK as builder.
5 July 2019 Com emails FF noting MCS says SBG‟s quote is
ambiguous/incomplete and additional costs are expected bey ond
the amou nt quoted.
Determination | Case number: 644373 Page 18 of 24
Date / document Event / details
11 July 2019 FF reaches decision on Indemnity Value.
FF emails Com to say that:
i) anything apart from the items in SBG‟s quot e is unrelated to the
insured event
ii) the FF won‟t be arranging an inspection by AB or anyone else
iii) there is no process to calculate Indemnity Value ot her than the
value of the most competitive quote
iv) the FF‟s cash settlement for Indemnity Value is based on SBG‟s
quote for $144 ,927. 57
Com asks FF to specify how BBK‟s quote does not adhere to the
SOW – FF does no t ans wer this.
17 July 2019 FF instructs MCS to provide updated and specific SOW.
MCS (FF‟s engineer)
Updated scope of works
12 August 2019
Referenc e 86763. Detailed and updated scope of works provided.
Unit 17 below rooftop Unit 19.
Unit 17 had widespread water damage since incoming water into
Unit 19 above quickly spread over its floor areas through old
floorboard joists and onto Unit 17 ceiling space.
Ceiling insulation damaged.
Describes work which had been completed in the renovation and
reme dial works required to match progress status on the day of the
event.
Describes further work determined after site meeting.
Cont ractor to visit the unit as part of pricing.
FF‟s IDR Stage 1 response
21 August 2019
Reviewed tenders. SBG has provided a fair estimate for the
reinstatement work.
Difference bet ween the quotations is $68,178.73.
In cases like this we expect variations to come to fruition which will
always be considered as reinstatement work progresses.
All building regulations and compliance ma tters will be adhered to in
the reinstatement.
Indemnity Value for repairs remain at $144,927.57 including GST.
You may proceed with your own repairer.
Alternatively, insurer can appoint SBG to proceed as per its
quotation at no additional cost to complainant.
BBK (Com‟s builder)
Repair quote
24 August 2019
BBQ reviewed updated MCS SOW. Added items missed within the
scope and advice from mould remediation company. Gained some
efficiencies.
Quote based on updated MCS SOW, referenc e 86763 .
Total ex cl. GST is $193,053.
Including GST the quote is $212,358.30.
26 and 27 August 2019 BBK confirms ensuit e floor wasn‟t tiled just screed and
waterproofed.
In subsequent email agrees ens uite tiled.
Determination | Case number: 644373 Page 19 of 24
Date / document Event / details
Additional $680 plus GST includes tiles.
All electricals to be replaced as mentioned in the notes section.
27 August 2019 Complainant confirms ensuite was tiled at the time of the event.
BBK says additional cost for the ensuite is $680 plus GST ($748).
Complainant says this to be added to BBK‟s final quote of
$212,358.30 ($213,106.30).
Email SBG
2 October 2019
Quote includes prices available to retail customer.
Full warranty provided.
Builder‟s margin 20%.
Unlikely to be variations.
Quote is actionable.
Allowance of 10 weeks should be provided to complete all works as
per the SOW provided.
Email BBK
3 October 2019
Sets out items missing from quotation.
No allowance made for on - site parking during duration of repairs but
included in BBK quote.
Email BBK
15 January 2020
Commented on assessor‟s commentary.
3.3 Key policy provisions
The relevant policy extracts are referred to in the correspondence between the parties
and in the insurer‟s Notice of Response. Both the policy document and the Notice
have been exchanged with the complainant.
Insuring provision
Policy 1 - Insured Property
What We insure
If selected and shown in the Schedule, We will insure You up to the Sum Insured
shown for Policy 1 – Insured Property in the Schedule against Damage to Your
Insured Property which occurs during the Period of Insurance.
Determination | Case number: 644373 Page 20 of 24
Special benefits (temporary accommodation)
The following Special Benefits are included in addition to Your Sum Insured for
Policy 1 – Insured Property.
1. Temporary Accommodation / Rent / contributions / storage
a. Temporary Accommodation
When You occupy Your Lot/Unit We will pay the reasonable cost of Temporary
Accommodation You necessarily incur if Your Lot/Unit is made unfit to be
occupied for its intended purpose by:
i. Damage to Your Insured Property that is admitted as a claim under Policy
1 – Insured Property; or
ii. reasonable access to or occupancy of Your Lot/Unit being prevented by
Damage from an Event claimable under Policy 1 – Insured Property
happening to other property in the immediate vicinity.
We will pay:
• under Clause a.i from the time of the Event until the time You reoccupy Your
Lot/Unit following completion of rebuilding, repairs or replacement; and
• under Clause a.ii. from the time of the Event until the time when access to
Your Lot/Unit is re- established.”
According to the policy schedule, the cap on the temporary accommodation
benefit is 15% of the sum insured.
…
g. Lot Owners’ contributions and fees
We will pay, up to $2,000 a Lot/Unit, for contributions, levies, maintenance and
other fees You are required to pay during the period Your Lot/Unit is made unfit to
be occupied for its intended purpose by Damage to Your Insured Property that is
admitted as a claim under Policy 1 – Insured Property.
h. Lot Owners’ removal and storage costs
We will pay the reasonable costs You necessarily incur in:
Determination | Case number: 644373 Page 21 of 24
i. removing undamaged Lot Owners‟ Contents to the nearest place of safe
keeping;
ii. storing undamaged Lot Owners‟ Contents at that place or an equivalent
alternate place;
iii. returning undamaged Lot Owners‟ Contents to Your Situation when
occupancy of their Lot/Unit is permitted;
iv. insuring undamaged Lot Owners‟ Contents during such removal, storage
and return;
following Damage to Your Insured Property that is admitted as a claim under
Policy 1 – Insured Property that renders the Lot/Unit unfit to be occupied for its
intended purpose.
i. Lot Owners’ travel costs
When You have leased out Your Lot/Unit We will, if Your Lot/Unit is made unfit to
be occupied for its intended purpose by Damage to Your Insured Property that is
admitted as a claim under Policy 1 – Insured Property, We will pay up to $250 a
Lot/Unit for reasonable travel costs You incur in visiting Your Lot/Unit for the
purpose of consulting with claim adjusters and/or building repairers.
We will not pay unless You first obtain Our consent to incur such travel costs.
21. Removal, storage costs of Lot Owners Contents
We will pay up to $25,000 for the reasonable costs You necessarily incur in:
a. removing any undamaged portion of Your Insured Property to the
nearest place of safe keeping;
b. storing such undamaged portion at that place or an equivalent alternate
place;
c. returning such undamaged portion to the Situation when restoration work
is completed;
d. insuring Your undamaged Insured Property during such removal, storage
and return;
following Damage to Your Insured Property that is admitted as a claim under
Policy 1 – Insured Property.
Determination | Case number: 644373 Page 22 of 24
Exclusions
…
3. We will not pay for:
…
d. consequential loss, loss of use or Depreciation other than as specifically
provided under an operative Additional Benefit or Special Benefit.
Method of settlement
Claims - how We will settle Your claim
1. Replacement
If Your Insured Property is Damaged, We may choose to either rebuild, replace,
repair or pay the amount it would cost to rebuild, replace or repair.
The amount We pay under Policy 1 – Insured Property will be the cost of
Replacement at the time of Replacement subject to the following provisions:
a. the necessary work of rebuilding, replacing or repairing (which may be
carried out upon another site or in any manner suitable to Your requirements
provided Our liability is not increased), must be commenced and carried out
without unreasonable delay;
b. where Your Insured Property contains any architectural or structural
feature of an ornamental, heritage or historical character or where materials used
in the original construction are not readily available We will use the nearest
equivalent available to the original materials;
c. if it is lawful, and with Our prior written consent, You will not be required
to actually rebuild any building destroyed but may purchase an alternative existing
building or part thereof to replace all or part of the one destroyed.
Such Replacement will be deemed to constitute Replacement for the purpose of
this insurance provided Our liability is not increased;
d. if You cause unreasonable delays in commencing or carrying out
Replacement, We will not pay any extra costs that result from that delay;
e. when We wish to rebuild, replace or repair and You do not want this to
occur We will only pay Indemnity Value.
Determination | Case number: 644373 Page 23 of 24
If You choose not to repair or replace Your Insured Property and submit a claim
for cash settlement in lieu, We will:
i. reduce the amount payable after due consideration of age and condition of
the property at the time of loss;
ii. not pay in excess of Indemnity Value of Your Insured Property;
iii. seek release from further liability under this Policy.
We will not pay under Policy 1 – Insured Property as part of the cost of
Replacement for the cost to:
i. i. rebuild or replace Your undamaged Insured Property;
ii. ii. rebuild, replace or repair illegal installations.”
Definitions
Indemnity Value
means the cost to rebuild, replace or repair property to a condition which is
equivalent to or substantially the same as but not better nor more extensive than
its condition at the time of loss taking into consideration age, condition and
remaining useful life.
Replacement
Replacement means:
a. the reasonable cost of rebuilding, replacing or repairing to a condition which is
equivalent to or substantially the same as but not better nor more extensive than
when it was new; and
b. the extra costs necessarily incurred to alter or upgrade Your Insured Property
to comply with Public, Statutory or Environmental Protection Authority
requirements, but does not include:
i. any costs that would have been incurred in complying with orders issued prior to
the happening of the loss;
ii. any extra costs to alter or upgrade any portion of Your undamaged Insured
Property if the cost to rebuild, replace or repair the Damaged portion is less than
twenty five percent (25%) of what the cost would have been had Your Insured
Property been totally destroyed.”
Determination | Case number: 644373 Page 24 of 24
Temporary Accommodation
means, as regards to any Lot/Unit occupied by the Lot Owner, an amount of
money calculated on the basis of the annual rentable value (including any
„outgoings‟ that would have been payable by a Tenant or lessee) that would have
applied immediately prior to the Damage.
3.4 Other relevant material considered and relied on
Parties‟ submissions /emails and all attachments to all submissions/emails including
invoices, receipts, spreadsheets, bank statements, tax invoices and quotations.
Parties‟ expert reports.
Photographs.
Correspondence between the parties.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.