Home / QBE / Determination 644373

Determination 644373

Storm water damage claim settlement amount and claims handling

FirmQBE
Decided2020-03-12
ProductGeneral Insurance · Strata
OutcomeFor the complainant
Amount awarded$213,356
Non-financial loss$5,000
Amount claimed$213,106
SourceAFCA PDF

Summary

A lot owner claimed storm water damage under a strata policy; the insurer offered $144,927.57 based on its builder's quote, while the owner's builder quoted $213,106.30. AFCA preferred the owner's quote, ordered a cash settlement with interest, temporary accommodation, $250 transport and $5,000 for non-financial loss.

The insurer must act fairly when exercising its right to nominate a repairer, and its builder's quote was incomplete and uncertain, so the owner's comprehensive quote reflected the reasonable cost of reinstatement.

Issues

Subjects and remedies

home or building damagepay claimpay interestpay non financial loss

Related

All QBE determinations · Find similar determinations

Text of the determination

Determination Case number 644373 Financial firm QBE Insurance (Australia) Limited Determination | Case number: 644373 Page 2 of 24 Case number: 644373 11 March 2020 1 Determination overview 1.1 Complaint The complainant is a lot owner in a residential development insured under a strata policy with the financial firm (insurer). On 6 November 2018, she lodged a claim for storm water damage to her property. The insurer accepted the claim and briefed an engineer to provide a scope of works. A dispute has arisen over the scope of repairs, repair costs and the insurer‟s claims handling. 1.2 Issues and key findings How should the claim be settled? A cash settlement is an appropriate and fair way to settle the claim. Is the insurer required to increase the cash settlement for repairs? Yes. The insurer‟s quote for repairs does not adhere to the updated scope of works. It is neither comprehensive nor certain. The complainant‟s quote is preferred; it generally reflects t he fair and reasonable cost of repairs to restore the property to its pre-loss condition. Is the complainant entitled to temporary accommodation expenses? Subject to proof, the complainant is entitled to $200 per week temporary accommodation expenses from 21 December 2018 until the complainant reoccupies the property following completion of repairs. Is the complainant entitled to compensation for the way the claim was handled? Yes. The insurer mismanaged the claim by its delays and lack of responsiveness; this caused the complainant an undue degree of stress and inconvenience. Compensation for non-financial loss is warranted. However, apart from $250 for transport expenses, the complainant has not established the insurer is liable for her other claimed financial losses. 1.3 Determination This determination is substantially in favour of the complainant. Should the complainant accept this determination, then within 7 days of the complainant‟s notification of acceptance of this determination, the insurer is to liaise with BBK and determine the cost of sanding and polishing the floors. Determination | Case number: 644373 Page 3 of 24 Once the cost is ascertained, the insurer is to forthwith:  cash settle the claim based on the quote by BBK for $21 2 , 358.30 (inclusive of GST), less the agreed cost of sanding and polishing the floors, plus $748 (inclusive of GST) for the cost of retiling the ensuite bathroom floor  pay statutory interest on this net sum pursuant to section 57 of the Insurance Contracts Act 1984 from 24 August 2019 until the date of payment  subject to satisfactory proof, pay the complainant temporary accommodation benefits of $200 per week from 21 December 2018 until the repairs are complete  pay statutory interest on this sum pursuant to section 57 of the Insurance Contracts Act 1984 from 24 August 2019 until the date of payment  pay $5,000 compensation for non-financial loss and $250 for transport expenses. Additionally, the policy provides:  the reasonable costs of the lot owner‟s removal and s torage costs. Once the complainant incurs these expenses, she is entitled to reimbursement by the insurer upon presentation of the supporting invoices  a benefit of up to $2,000 for contributions, levies, maintenance and other fees the complainant is required to pay during the period the unit is unfit to be occupied. If the complainant has incurred these expenses, she is entitled to reimbursement by the insurer upon presentation of the supporting invoices. Otherwise, the insurer is not required to take any further action in relation to this claim or complaint. Determination | Case number: 644373 Page 4 of 24 2 Reasons for determination 2.1 How should the claim be settled? A cash settlement is fair in the circumstances It is not in dispute the insured property was damaged in a storm in November 2018. The dispute is in relation to the amount payable by the insurer. The complainant wants the insurer to either authorise repairs by her preferred builder, BBK, or cash settle for the value of BBK‟s quote. The insurer offered to authorise repairs by its builder, SBG, or cash settle the claim based on SBG‟s quote. The policy provides cover against damage to the property which occurs during the period of insurance. The insurer relies on a claims condition which says it has the right to nominate the repairer. When the insured property is damaged the policy provides the insurer may choose to either repair or pay the amount it would cost to repair the insured property. The policy says if an insured submits a claim for cash settlement instead of repair then the insurer will reduce the amount payable after consideration of the age and condition of the property at the time of loss and not be obliged to pay more than the indemnity value of the insured property. There is no basis under the policy for the insurer to authorise BBK to carry out repairs. However, in exercising its rights under the policy, the insurer must act fairly. It has the right to nominate the repairer, but its repaire r‟s quote must be fair and represent the fair cost to repair the insured property. Having reviewed the available material, the panel is satisfied it is fair in all the circumstances that the claim is cash settled. This is because:  the policy allows the in sured to choose a cash settlement for the „Indemnity Value‟ (as defined)  the insurer does not dispute the complainant‟s choice of settlement method  it will avoid potential complications regarding repair management and warranties  it will expedite the repair process, which is fair to the complainant given the delays in the claim process to date. Determination | Case number: 644373 Page 5 of 24 2.2 Is the insurer required to increase the cash settlement for repairs? Cash settlement should reflect fair cost of repairs Indemnity Value is defined under the policy as set out in supporting section 3.3 of this determination. The panel is satisfied the insurer is required to pay the complainant the reasonable cost of restoring the property to its pre-loss condition. This means the cash settlement amount should be fair and sufficient to ensure the complainant is able to engage her own builder to repair the property to a condition which is substantially the same as it was at the time of the storm event. It is not in dispute that when the storm occurred substantial renovations were being undertaken to the insured building. After the storm event, repair quotes were obtained by the parties based on a scope of works prepared by the insurer‟s engineer, MCS. The original scope of wor ks is dated 13 March 2019. Following a site meeting on 4 June 2019, MCS prepared an updated scope of works on 12 August 2019. BBK’s amendments to scope of works are generally reasonable BBK reviewed the updated scope. It made some additions to the scope a nd estimated repairs could be undertaken for $212,358.30. BBK proposed additions to the updated scope of works which included:  duct works need to be removed due to mould spores  3-layer plasterboard cornices need to be supplied and installed  roughed- in electrical in ceiling need to be replaced. BBK‟s electrician advised that with water entering in ceiling connections, this will cause earth leakage to be tripped in the future.  old skirtings will also need to be removed to allow access to ceiling space below and remove insulation  exposed existing floor was sanded and polished and needs to be included in scope of works as finished floor surface  when relining walls, additional plastering required from original scope, and removing bulkheads and existing vertical plaster walls due to mould spores found in existing plaster walls  replace tiling to bathroom floor (+6.5m) (although annotated photograph 13 noting bathroom floor has been tiled)  a full dust barrier will need to be supplied and installed between the floor and lower ceiling level as per current building regulations Determination | Case number: 644373 Page 6 of 24  screed stepless floor with correct fall to both ensuite and bathroom. The panel accepts BBK is a professional builder with sound knowledge of the pre- incident condition of the property and is qualified to propose such additions. The insurer provided comments from its assessor. The panel considers these observations were comprehensively answered by BBK. The available material does not show the insurer‟s builder (SBG) was asked to comment. Having reviewed all the commentary, the panel is satisfied that, apart from the sanding and polishing of the floorboards, BBK‟s amendments are fair and reasonable. Moreover, as early as March 2019, MCS cautioned in relation to mould and fungal mould. The panel accepts the sanding and polishing work is not warranted given the pre-loss condition of the floors. MCS commented the timber flooring appeared quite old. The photographs support this observation. In addition, the assessor commented the bedroom floors were to be carpeted and did not require sanding and polishing. BBK agreed and said the floors were to be sanded and polished after the renovation works were completed. The panel accepts the policy does not cover a betterment of the property. In the absence of a cogent submission from the insurer to the contrary, and apart from the sanding and polishing of the floors, the panel accepts BBK‟s amendments to the scope of works are reasonably required to reinstate the property to its pre -loss condition. In addition, the complainant contends that the scope should be amended to include the replacement of the ensuite bathroom floor tiling. In view of the mould remediation issues, the panel agrees the complainant‟s submission is reasonable. In the absence of any substantive argument on this point from the insurer, the panel accepts the tiling work should be included in the scope of works. The next issue in dispute is the amount which represents the reasonable cost of implementing the scope of works includi ng BBK‟s amendments. Complainant says insurer’s offer is unreasonable The insurer is prepared to authorise repairs or cash settle the claim based on the quote for repairs by SBG for $144 ,927. 57 (inclusive of GST) . The complainant wants BBK to conduct repairs based on her quote in the total amount of $212,358.30 (inclusive of GST) . The complainant also wants the cost of retiling the ensuite bathroom floor. This cost is $680 plus GST. Determination | Case number: 644373 Page 7 of 24 The total amount of the complainant‟s claim is $213,106.30 inclusive of GS T. T he difference in the parties‟ positions is $68,178.73. The insurer argues its offer to settle is fair and SBG‟s quote is actionable. The complainant says BBK‟s quote should be preferred because:  SBG‟s quote does not adhere to the updated MCS scope of works dated 12 August 2019. SBG‟s quote is based on the original MCS scope dated 13 March 2019 (with inclusions discussed at the site meeting of 4 June 2019)  SBG‟s quote is not comprehensive and is silent on several important items  SBG‟s quote does not in clude a like-for-like breakdown of the cost of works, whereas BBK‟s quote does  the insurer has not adequately explained why BBK‟s quote is unacceptable. Panel considers BBK’s quote is preferable The panel accepts the complainant‟s submissions have merit. The panel considers the insurer has not persuasively refuted those submissions. Firstly, SBG‟s quote is based on the initial March 2019 scope of works (with the inclusions following the 4 June site meeting). It does not adhere completely to the updated August 2019 scope. Critically, SBG does not address mould remediation or the necessary extent of floor removal and replacement (and associated works). The insurer‟s engineer (MCS) points this out. No satisfactory explanation has been provided for this omission. Secondly, SBG‟s quote does not account for the amendments proposed by BBK which the panel accepts are mostly reasonable and should be included. Apart from this, there are other items identified by BBK to be missing from SBG‟s quote, which neither SBG nor the insurer has addressed. The panel considers SBG‟s quote is incomplete compared with the quotation provided by BBK. Moreover, it is not clear SBG revisited the site as suggested by MCS when MCS provided the updated scope of works in August 2019. Thirdly, unlike BBK‟s quote, SBG‟s quote lacks an itemised breakdown of costs. This makes it difficult to compare the costs of each builder‟s work. Fourthly, SBG‟s quote excludes „any item not detailed in this scope of works‟. The ambit of this exclusion is unclear and, given the potential of variation to the scope of works, SBG‟s final c ost of repairs is potentially uncertain and therefore unfair. Moreover, when reviewing SBG‟s quote, the engineer MCS notes: SBG „has done a pure pricing exercise without fully taking into consideration all the various (especially minor) items … required if they were to undertake the work.‟ Determination | Case number: 644373 Page 8 of 24 By contrast, the panel considers BBK‟s quote is itemised and comprehensive. Fifthly, although the insurer argues BBK‟s quote includes works which would constitute a betterment of the property, the insurer has not provided sufficient reasoning or persuasive evidence to support this assertion. The panel considers BBK‟s quote clearly corresponds to each item in the scope of works. Accordingly, on the available information, the panel does not accept the insurer‟s assertion i n this regard. Sixthly, the panel notes S (the alternative panel builder) provided a quote for an amount not dissimilar to BBK‟s quote. The panel notes SBG said its quote was actionable. However, the panel considers the available information does not support this assertion. In an email dated 13 June 2019 SBG indicated the amount was an estimate for cash settlement purposes only. And, in an email dated 14 June 2019 MCS said if SBG were quoting to do the job then the price would be different. Finally, in the context of the ongoing renovation works, if BBK does the repairs it will avoid potential complications with repair management and warranties. For these reasons, the panel finds BBK‟s quote is preferable to SBG‟s quote. The panel is satisfied BBK‟s quote fairly represents the cost to repair the property to a condition which is equivalent to or substantially the same as its condition at the time of loss. As noted above, the only item in BBK‟s scope which is not accepted by the panel is the cost to sand and polish the floors. BBK did not cost this work. In these circumstances, should the complainant accept this determination, the insurer is to forthwith liaise with BBK to determine the cost of this work and deduct it from the cash settlement amount. In addition, as noted above, the insurer is to cover the cost to re-tile the ensuite bathroom floor, which amounts to about $748 (inclusive of GST). In summary, the insurer is to cash settle the complainant the value of BBK‟s quote ($212,358.30), less the cost of sanding and polishing the floors (to be ascertained), plus the cost of retiling the ensuite bathroom floor ($748). The insurer is also required to pay interest on the net settlement sum pursuant to section 57 of the Insurance Contracts Act 1984 (Cth) (the Act) from 24 August 2019 (the date BBK‟s repair quote was provided) until the date of payment. Determination | Case number: 644373 Page 9 of 24 2.3 Is the complainant entitled to temporary accommodation expenses? Subject to proof, temporary accommodation to be paid from 21 December 2018 until complainant re-occupies property The complainant says when the insured event occurred, the insured property was undergoing major renovations. She says renovations commenced on 3 September 2018 and were scheduled for completion on 21 December 2018. The complainant agrees she had vacated the insured property to allow for the renovation, but the storm event halted the renovations. In these circumstances the complainant says she was forced to extend temporary accommodation for an indefinite period which has created great financial and emotional strain. The complainant claims accommodation expenses from the date of the storm on 6 November 2018 until repairs are complete. Because of the renovation, she says she has been staying with family. Pursuant to an informal agreement she claims she is paying the family $200 per week plus payment of utilities. The complainant estimates that repair and reinstatement work will take about three months. The insurer says temporary accommodation will only be paid during the period of repair relating to the claimable damage. It points out the complainant was not living in the insured property when the storm occurred and that she was not living there because of the renovations not because of the storm event. The insurer says it is only liable to pay temporary accommodation to the complainant during the repair period, being about 10 weeks (relying on SBG‟s estimate). The insurer agreed to $200 per week. The policy provides the insurer will pay the reasonable costs of temporary accommodation an insured necessarily incurs if the unit is made unfit to be occupied for its intended purpose by damage to the property which is admitted as a claim. The damage to the property was admitted as a claim. The dispute was about the quantum of the claim. The policy provides the insurer will pay from the time of the event until the time the complainant reoccupies the unit following completion of repairs. When the event occurred, the panel accepts the complainant was not living in the property and it was unfit to be occupied because of renovations. However, in the absence of any compelling information to the contrary, the panel accepts the renovation works were to be completed by 21 December 2018. Determination | Case number: 644373 Page 10 of 24 Therefore, the panel accepts from 21 December 2018 the property was unfit for occupation because of the storm event. Accordingly, the panel is satisfied the insurer is liable to pay the temporary accommodation benefit from 21 December 2018 until the complainant re-occupies the property following completion of repairs (including unfinished renovations). The complainant has provided extensive information about her out-of-pocket expenses. However, she has provided no persuasive independent or objective evidence supporting the contention she paid $200 per week to a family member pursuant to an informal arrangement. The insurer accepts $200 per week is a reasonable amount. In view of the informal nature of the arrangement, the panel considers it is fair the complainant provide proof she paid $200 per week to a family member pursuant to the informal agreement. Subject to the provision of this proof, the insurer is to reimburse the complainant $200 per week temporary accommodation from 21 December 2018 until the date of payment. The insurer is required to pay interest on the said amount pursuant to section 57 of the Act from 21 August 2019 (the date of the insurer‟s final decision letter) until payment. Subject to proof, the insurer is also to continue to pay $200 per week temporary accommodation until the repairs are completed. 2.4 Is the complainant entitled to compensation? AFCA may award compensation in some circumstances The complainant seeks compensation because she is dissatisfied with the way the claim has been handled, including delays and a lack of communication. She says the insurer‟s claims mismanagement has caused her an unusual degree of stress and inconvenience, particularly given she recently became a mother. AFCA Rules allow the payment of compensation (capped at $5,000) for non-financial loss. AFCA may decide an insurer should compensate a complainant for such loss only where there has been an unusual amount of physical inconvenience, time taken to resolve a situation, or interference with the complainant‟s expectation of enjoyment or peace of mind. Fair the insurer pays to the complainant $5,000 compensation The panel has carefully reviewed the available information to determine if compensation is warranted. Determination | Case number: 644373 Page 11 of 24 The insurer had the opportunity to address the complainant‟s claims handling concerns in both its internal review process and during the AFCA complaint process. It failed to do so in any substantive way. Neither did the insurer provide useful supporting information to assist the review of this issue (such as claim file notes). Accordingly, the panel has drawn the inference the unavailable information would not have supported the insurer‟s position. The panel accepts the complainant‟s account of events. The complainant has provided a substantial chronology of events. A chronology of events is also set out in supporting section 3.2 of this determination. These basic facts are not in dispute:  at the time of the storm on 6 November 2018, the complainant was renovating her property. The renovations were to be completed on 21 December 2018  on about 20 November 2018, the claim was formally lodged  on 13 March 2019, the engineer MCS drafted the initial scope of works  in April 2019 SBG provided a quote based on the scope of works  on 1 May 2019 BBK provided a quotation for repairs  on 4 June 2019 there was a site meeting between relevant parties  on 13 June 2019 SBG provided a further quotation  On 12 August 2019 MCS revised the scope of works  BBK quoted on the revised scope of works and SBG did not  the insurer offered to authorise repairs or cash settle based on SBG‟s quote and maintained this offer throughout the internal dispute resolution process and the AFCA complaint process. Based on the available information, the panel is satisfied the insurer unreasonably delayed the claim, did not proactively and clearly communicate with the complainant and demonstrated a lack of responsiveness to the co mplainant‟s concerns. The panel considers the insurer did not comprehensively or persuasively address the complainant‟s submissions and the issue of temporary accommodation and compensation . The insurer‟s claims management results in the complainant and he r family being unable to live in their home since the end of 2018. As repairs are still to be undertaken, they will not live in their property for a substantial part of this year. The panel is satisfied the insurer‟s claims handling caused the complainan t an undue degree of stress and inconvenience. She was expecting her first child at the time of the insured event and the stress of being a new mother was compounded by this protracted insurance claim. The complainant may have also paid for temporary accommodation while repaying a mortgage, which may have added to stress. The complainant has also been inconvenienced because of extra commuting and she has been out of the insured property for substantially longer than necessary. Determination | Case number: 644373 Page 12 of 24 Having considered all the available information, the panel is satisfied it is fair the insurer pays the complainant $5,000 compensation for non-financial loss. Insurer to pay the complainant for some financial loss The complainant also says the insurer‟s claims handling caused her fi nancial loss for which she seeks compensation. Apart from any entitlements under the policy, AFCA may award compensation for consequential financial loss (capped at $5,000) caused directly or indirectly because of the insurer‟s conduct. The complainant seeks reimbursement of ongoing costs (calculated on 4 September 2019) as follows:  utility costs ($4,703.27)  transit costs ($1,131.35)  finance costs ($2,483) The complainant also claims when renovation recommences, she will need to pay removalists to deliver white goods and kitchen appliances from personal storage to the insured property. These items were meant to be delivered from warehouses directly to the apartment for installation by BBK in November 2018. Instead, after extensive storage at warehouses, the goods are now in personal storage. The complainant says the agreement with her family was to pay $200 per week plus payment of utilities. The complainant has provided utility bills and costs for transit in the form of receipts and credit card transactions. She says these would not have been incurred but for the insurer‟s claims management. The complainant also says due to the disruption to construction funding arrangements, which cannot be relied upon as works cannot progress, she had to pay out of pocket renovation costs for works totalling $85,509 which would otherwise be offsetting mortgage. She says the finance costs reflect the interest incurred while enduring the lengthy delay. The policy covers certain contributions and fees, contents removal and storage costs, and certain travel costs. The policy excludes consequential (or indirect) financial losses incurred following an insured event. While the panel acknowledges the policy term, the policy term does not prevent an award of compensation under the AFCA Rules. The panel carefully considered the bank statements and other supporting information provided by the complainant. The panel notes the complainant must establish either an entitlement under the policy or a causal connection to the insurer‟s claims mismanagement. Determination | Case number: 644373 Page 13 of 24 Having reviewed the complainant‟s material, the panel is of the view that:  utility costs would be incurred in any event and the panel makes no allowance for this item  transport costs are consequential losses and it is unclear how the insurer‟s conduct caused the transport costs claimed  the policy covers up to $250 for reasonable travel costs incurred in visiting the unit to consult with claim adjusters and/or building repairers. The panel accepts some of the complainant‟s transport expenses are likely referable to such consultations, and in the absence of any submission from the insurer to the contrary, it is fair the insurer pays the complainant the policy entitlement of $250  there is insufficient evidence to establish the claim for bank interest. The funding arrangements between the complainant and the financier are unknown and it is unclear how the insurer‟s claim delays – as distinct from the insured event itself – caused this loss  the policy covers the reasonable costs of the lo t owner‟s removal and storage costs. Once the complainant incurs these expenses, she is entitled to reimbursement by the insurer upon presentation of the supporting invoices  the policy also provides a benefit of up to $2,000 for contributions, levies maintenance and other fees the complainant is required to pay during the period the unit is unfit to be occupied. If the complainant has incurred these expenses, she is entitled to reimbursement by the insurer upon presentation of the supporting invoices. Determination | Case number: 644373 Page 14 of 24 3 Supporting information 3.1 Our Approach This complaint has not been the subject of a recommendation. Due to the nature of the complaint, it has been referred directly to a panel for determination, in line with the Operational Guidelines to the AFCA Rules. The panel consists of an ombudsman and two representatives with consumer and insurance experience. The panel has decided this complaint based on what is fair in all the circumstances, having regard to legal principles, applicable industry codes or guidance, good industry practice and previous relevant determinations of AFCA or predecessor schemes (which are not binding). There has been a full exchange of all material information relied on for the purposes of this determination and each party has had the opportunity to address any issues raised by the other. The panel has reviewed and considered all the material provided by the parties. While the parties have raised numerous issues in their submissions, for the purposes of this determination the panel has restricted its commentary to those issues that it considers directly relevant to the outcome only. It is an accepted principle of general insurance law that the insured bears the onus to establish on the balance of probabilities that they have suffered a loss ca used by an event to which the policy responds. This is known as a prima facie claim. Once so established, the onus shifts to the insurer to prove on the balance of probabilities that an exclusion applies if it seeks to deny or limit its liability for the loss. 3.2 Chronology of events/documents This chronology is a high-level summary of key events and documents in the claims process. It does not record every document or instance of contact between the parties. Unless text is put in “quotation marks”, it has bee n paraphrased. Abbreviations: BBK = the complainant‟s preferred builder Com = the complainant / her representative/s FF = the financial firm (the insurer) MCS = engineer briefed by the insurer to draft scope of works SBG = the FF‟s preferred builder SOW = scope of works Determination | Case number: 644373 Page 15 of 24 Date / document Event / details BBK invoice 19 November 2018 Progress payment request balance outstanding $71,100. Designer’ s invoice 20 November 2018 Balance now due $14,509.36. 21 November 2018 – 1 December 2018 $85,509 renovation works payments. 6 November 2018  Insured event – storm – damages property.  Com says she notified the body corporate and the ins urer of claim shortly after this time. TBS builder email 19 November 2018  No claim made yet.  Gutters and downpipes not adequate during heavy rains causing water entry into building  Recommended assessor and engineer be appoint ed 20 November 2018  Claim formally lodged. Assessor attended 17 December 2018  Building is a converted warehouse factory about 130 years old.  Only inspected Unit 19. Unit 19 damage occurred along the wall adjoining the box gutter.  Building is heritage listed and requires special dispensation from Herit age Council before being altered or repaired.  Recommend an engineer be appointed to identify the cause of the leaks and provide a scope of works considering the heritage status of the building. 11 February 2019  Initial inspection by MCS. 13 March 2019  MCS provided report outlining cause of damage and scope of works.  Box gutters, sumps and downpipes are not compliant and will require rectification. Proximate cause of damage was wat er ingress as overflow from box gutters/sumps.  Renovation work stopped due to water ingress and no work done since. Unit 17 suffered the most damage.  Timber fl ooring quite old and would need to be rejuvenated as part of the renovation.  Ceiling will need to be replaced entirely.  Wall tiling had just commenced in the bathroom. Recommended all wet areas will need to be removed and rebuilt to satisfy code.  Annotated photographs refer to partially completed tiled wall in bathroom and newly tiled floor in bathroom/laundry. Determination | Case number: 644373 Page 16 of 24 Date / document Event / details  Report highlighted possible presenc e of mould and fungal mould in the floor ceiling insulation bet ween Unit 9 and Unit 17.  Unit 17 will require ma jor remedial works to bring damaged new works back to new and guaranteed and damage status. It will require new ceilings throughout and removal and replacement of the old timber with new boards throughout after replacement of subfloor installation.  Genera l work required preparing and repainting the walls, ceilings and timber floors. 28 March 2019  FF sends Com MCS‟s report and SOW, appoints SBG and S to quote. Assessor‟s report 10 April 2019  Unit 17 was under renovation at the time of the incident and un it owners were not living on site.  Renovations stopped because of the water ingress. Unit owners have not been able to move into the property.  Unit owners requested temporary accommodation as they have had to rent elsewhere for longer than intended.  Unit n ot unfit due to damage but due to incomplete renovations. 16 April 2019  Other units damaged, and claim sent to major loss team. 26 April 2019  SBG quotation based on MCS 85237.  $137,280.55 total including GST.  Unit 17 $86,130.06 excluding GST.  Common areas 17,9 $2, 412 excluding GST.  Valid for 30 days. 1 May 2019 (expires 31 May 2019)  BBK quotation $271,810.66 including GST. May 2019  1 May: Com emails FF revised BBK quote.  8 May: FF requests SBG to requot e due to differences in quotes so far.  29 May: Com complains about claims handling. 4 June 2019  Site visit by BBK with assessor, MCS (second inspection) and SBG (third ins pection) to explain quot e.  BBK points out various items missing from MCS‟s SOW.  SBG updates its quote to reflect this discussion. SBG (FF‟s builder) Repair quote 13 June 2019 (valid for 30 days) the Unit 17 only.  Quote based on doc uments provided by MCS dat ed 13 March 2019, reference 85237.  SBG updated quotation inc GST: $144,927.57.  In an email on 2 Oct 2019, SBG add the following c omments: > the quote is actionable; Determination | Case number: 644373 Page 17 of 24 Date / document Event / details > SBG provide full warranties in line with Victorian Building Aut hority regulations coupled with supplier/manufacturer product warranties; > the builder‟s margin is 20%; > „from our attendances we do not believe there is a l ikelihood of potential variation for additional works due to undiscovered damage‟; > „an allowance of 10 weeks should be provided to complete all works as per the SOW provided‟. Email SBG 13 June 2019  Amended estimate and should be read in conjunction with the MCS scope and additional items discussed on site.  “…as advised this estimate is for cash settlement purpose only…” Email MCS 14 June 2019  Will compare scopes shortly.  “Gut tells me that if SBG were quoting to actually do the job then the price would be different ….” Email MCS 20 June 2019  SBG Scope section has been added wit h some additions.  Scope addresses much of the final scope that was discussed during recent site inspection but is still silent on many items that BBK stated is included.  Items included flooring and skirting, mould remediation and allowance for new tiling throughout including waterproofing.  SBG done a pure pricing exercise without taking into consideration all various items aspects required if they were to undertake the work.  Al l items cannot be deemed to be included and must be additional to the amount quoted.  BBK have included specified exactly what they will do especially all minor items as would be expected from a competent builder.  Without itemised pricing it is difficult to gauge where the right price should be but probably it will be somewhere in bet ween. 21 June 2019  FF IDR team contacts Com re her complaint. 4 July 2019  FF contact Com to propose three options to resolve: i) go with SBG‟s quote ii) allow new builder, AB, to conduct a new assessment and quote iii) negotiate about Indemnity Value cash settlement and then go with BBK as builder. 5 July 2019  Com emails FF noting MCS says SBG‟s quote is ambiguous/incomplete and additional costs are expected bey ond the amou nt quoted. Determination | Case number: 644373 Page 18 of 24 Date / document Event / details 11 July 2019  FF reaches decision on Indemnity Value.  FF emails Com to say that: i) anything apart from the items in SBG‟s quot e is unrelated to the insured event ii) the FF won‟t be arranging an inspection by AB or anyone else iii) there is no process to calculate Indemnity Value ot her than the value of the most competitive quote iv) the FF‟s cash settlement for Indemnity Value is based on SBG‟s quote for $144 ,927. 57  Com asks FF to specify how BBK‟s quote does not adhere to the SOW – FF does no t ans wer this. 17 July 2019  FF instructs MCS to provide updated and specific SOW. MCS (FF‟s engineer) Updated scope of works 12 August 2019  Referenc e 86763. Detailed and updated scope of works provided.  Unit 17 below rooftop Unit 19.  Unit 17 had widespread water damage since incoming water into Unit 19 above quickly spread over its floor areas through old floorboard joists and onto Unit 17 ceiling space.  Ceiling insulation damaged.  Describes work which had been completed in the renovation and reme dial works required to match progress status on the day of the event.  Describes further work determined after site meeting.  Cont ractor to visit the unit as part of pricing. FF‟s IDR Stage 1 response 21 August 2019  Reviewed tenders. SBG has provided a fair estimate for the reinstatement work.  Difference bet ween the quotations is $68,178.73.  In cases like this we expect variations to come to fruition which will always be considered as reinstatement work progresses.  All building regulations and compliance ma tters will be adhered to in the reinstatement.  Indemnity Value for repairs remain at $144,927.57 including GST.  You may proceed with your own repairer.  Alternatively, insurer can appoint SBG to proceed as per its quotation at no additional cost to complainant. BBK (Com‟s builder) Repair quote 24 August 2019  BBQ reviewed updated MCS SOW. Added items missed within the scope and advice from mould remediation company. Gained some efficiencies.  Quote based on updated MCS SOW, referenc e 86763 .  Total ex cl. GST is $193,053.  Including GST the quote is $212,358.30. 26 and 27 August 2019  BBK confirms ensuit e floor wasn‟t tiled just screed and waterproofed.  In subsequent email agrees ens uite tiled. Determination | Case number: 644373 Page 19 of 24 Date / document Event / details  Additional $680 plus GST includes tiles.  All electricals to be replaced as mentioned in the notes section. 27 August 2019  Complainant confirms ensuite was tiled at the time of the event.  BBK says additional cost for the ensuite is $680 plus GST ($748).  Complainant says this to be added to BBK‟s final quote of $212,358.30 ($213,106.30). Email SBG 2 October 2019  Quote includes prices available to retail customer.  Full warranty provided.  Builder‟s margin 20%.  Unlikely to be variations.  Quote is actionable.  Allowance of 10 weeks should be provided to complete all works as per the SOW provided. Email BBK 3 October 2019  Sets out items missing from quotation.  No allowance made for on - site parking during duration of repairs but included in BBK quote. Email BBK 15 January 2020  Commented on assessor‟s commentary. 3.3 Key policy provisions The relevant policy extracts are referred to in the correspondence between the parties and in the insurer‟s Notice of Response. Both the policy document and the Notice have been exchanged with the complainant. Insuring provision Policy 1 - Insured Property What We insure If selected and shown in the Schedule, We will insure You up to the Sum Insured shown for Policy 1 – Insured Property in the Schedule against Damage to Your Insured Property which occurs during the Period of Insurance. Determination | Case number: 644373 Page 20 of 24 Special benefits (temporary accommodation) The following Special Benefits are included in addition to Your Sum Insured for Policy 1 – Insured Property. 1. Temporary Accommodation / Rent / contributions / storage a. Temporary Accommodation When You occupy Your Lot/Unit We will pay the reasonable cost of Temporary Accommodation You necessarily incur if Your Lot/Unit is made unfit to be occupied for its intended purpose by: i. Damage to Your Insured Property that is admitted as a claim under Policy 1 – Insured Property; or ii. reasonable access to or occupancy of Your Lot/Unit being prevented by Damage from an Event claimable under Policy 1 – Insured Property happening to other property in the immediate vicinity. We will pay: • under Clause a.i from the time of the Event until the time You reoccupy Your Lot/Unit following completion of rebuilding, repairs or replacement; and • under Clause a.ii. from the time of the Event until the time when access to Your Lot/Unit is re- established.” According to the policy schedule, the cap on the temporary accommodation benefit is 15% of the sum insured. … g. Lot Owners’ contributions and fees We will pay, up to $2,000 a Lot/Unit, for contributions, levies, maintenance and other fees You are required to pay during the period Your Lot/Unit is made unfit to be occupied for its intended purpose by Damage to Your Insured Property that is admitted as a claim under Policy 1 – Insured Property. h. Lot Owners’ removal and storage costs We will pay the reasonable costs You necessarily incur in: Determination | Case number: 644373 Page 21 of 24 i. removing undamaged Lot Owners‟ Contents to the nearest place of safe keeping; ii. storing undamaged Lot Owners‟ Contents at that place or an equivalent alternate place; iii. returning undamaged Lot Owners‟ Contents to Your Situation when occupancy of their Lot/Unit is permitted; iv. insuring undamaged Lot Owners‟ Contents during such removal, storage and return; following Damage to Your Insured Property that is admitted as a claim under Policy 1 – Insured Property that renders the Lot/Unit unfit to be occupied for its intended purpose. i. Lot Owners’ travel costs When You have leased out Your Lot/Unit We will, if Your Lot/Unit is made unfit to be occupied for its intended purpose by Damage to Your Insured Property that is admitted as a claim under Policy 1 – Insured Property, We will pay up to $250 a Lot/Unit for reasonable travel costs You incur in visiting Your Lot/Unit for the purpose of consulting with claim adjusters and/or building repairers. We will not pay unless You first obtain Our consent to incur such travel costs. 21. Removal, storage costs of Lot Owners Contents We will pay up to $25,000 for the reasonable costs You necessarily incur in: a. removing any undamaged portion of Your Insured Property to the nearest place of safe keeping; b. storing such undamaged portion at that place or an equivalent alternate place; c. returning such undamaged portion to the Situation when restoration work is completed; d. insuring Your undamaged Insured Property during such removal, storage and return; following Damage to Your Insured Property that is admitted as a claim under Policy 1 – Insured Property. Determination | Case number: 644373 Page 22 of 24 Exclusions … 3. We will not pay for: … d. consequential loss, loss of use or Depreciation other than as specifically provided under an operative Additional Benefit or Special Benefit. Method of settlement Claims - how We will settle Your claim 1. Replacement If Your Insured Property is Damaged, We may choose to either rebuild, replace, repair or pay the amount it would cost to rebuild, replace or repair. The amount We pay under Policy 1 – Insured Property will be the cost of Replacement at the time of Replacement subject to the following provisions: a. the necessary work of rebuilding, replacing or repairing (which may be carried out upon another site or in any manner suitable to Your requirements provided Our liability is not increased), must be commenced and carried out without unreasonable delay; b. where Your Insured Property contains any architectural or structural feature of an ornamental, heritage or historical character or where materials used in the original construction are not readily available We will use the nearest equivalent available to the original materials; c. if it is lawful, and with Our prior written consent, You will not be required to actually rebuild any building destroyed but may purchase an alternative existing building or part thereof to replace all or part of the one destroyed. Such Replacement will be deemed to constitute Replacement for the purpose of this insurance provided Our liability is not increased; d. if You cause unreasonable delays in commencing or carrying out Replacement, We will not pay any extra costs that result from that delay; e. when We wish to rebuild, replace or repair and You do not want this to occur We will only pay Indemnity Value. Determination | Case number: 644373 Page 23 of 24 If You choose not to repair or replace Your Insured Property and submit a claim for cash settlement in lieu, We will: i. reduce the amount payable after due consideration of age and condition of the property at the time of loss; ii. not pay in excess of Indemnity Value of Your Insured Property; iii. seek release from further liability under this Policy. We will not pay under Policy 1 – Insured Property as part of the cost of Replacement for the cost to: i. i. rebuild or replace Your undamaged Insured Property; ii. ii. rebuild, replace or repair illegal installations.” Definitions Indemnity Value means the cost to rebuild, replace or repair property to a condition which is equivalent to or substantially the same as but not better nor more extensive than its condition at the time of loss taking into consideration age, condition and remaining useful life. Replacement Replacement means: a. the reasonable cost of rebuilding, replacing or repairing to a condition which is equivalent to or substantially the same as but not better nor more extensive than when it was new; and b. the extra costs necessarily incurred to alter or upgrade Your Insured Property to comply with Public, Statutory or Environmental Protection Authority requirements, but does not include: i. any costs that would have been incurred in complying with orders issued prior to the happening of the loss; ii. any extra costs to alter or upgrade any portion of Your undamaged Insured Property if the cost to rebuild, replace or repair the Damaged portion is less than twenty five percent (25%) of what the cost would have been had Your Insured Property been totally destroyed.” Determination | Case number: 644373 Page 24 of 24 Temporary Accommodation means, as regards to any Lot/Unit occupied by the Lot Owner, an amount of money calculated on the basis of the annual rentable value (including any „outgoings‟ that would have been payable by a Tenant or lessee) that would have applied immediately prior to the Damage. 3.4 Other relevant material considered and relied on  Parties‟ submissions /emails and all attachments to all submissions/emails including invoices, receipts, spreadsheets, bank statements, tax invoices and quotations.  Parties‟ expert reports.  Photographs.  Correspondence between the parties.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.