Home / Allianz Australia / Determination 643786

Determination 643786

Storm damage flooring and wall repairs only partly covered

FirmAllianz Australia
Decided2020-07-07
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$50,045
Non-financial loss$1,000
Amount claimed$90,945
SourceAFCA PDF

Summary

The complainants claimed storm damage to their home and the insurer cash settled some repairs but declined the flooring replacement. AFCA found the insurer's builder's repairs were unsatisfactory and the complainants' own failure to complete recommended works also contributed to the damage. AFCA ordered $50,045 in payments plus interest on two items and $1,000 non-financial loss.

Where several causes operate, the proximate cause is the dominant cause; the evidence could not separate the insurer's builder's defects from the complainants' failure, so AFCA settled on a fair figure.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay interestpay non financial loss

Related

All Allianz Australia determinations · Find similar determinations

Text of the determination

Determination Case number 643786 Financial firm Allianz Australia Insurance Limited Determination | Case number: 643786 Page 2 of 9 Case number: 643786 1 June 2020 1 Determination overview 1.1 Complaint The complainants lodged a storm damage claim for their home building, which the financial firm (insurer) accepted. After the complainants reported repair quality issues, the insurer agreed to cash settle for rectification works. It declines liability for replacing timber floorboards because it says the complainants and not its builder caused this damage. The complainants are dissatisfied with this response and the claim handling. They say the insurer’s builder’s failure to install adequate expansion joints caused damage to flooring, walls and windows. 1.2 Issues and key findings Is the insurer required to pay the complainants’ floorboard quote? The insurer is required to pay part of complainants’ builder’s flooring quote in accordance with the terms of this determination. Is the insurer required to pay other costs? The insurer is required to pay the complainants for billiards table assembly ($595) and windows/glass ($700). Statutory i nterest under section 57 of the Insurance Contracts Act 1984 (the Act) applies to the two amounts payable, from 16 April 2019. The insurer is required to pay a further amount of $3,750 for temporary accommodation. Interest is not payable on this amount. Th e insurer is not required to pay AA’s report cost ($880). The insurer is required to compensate the complainants $1,000 (total) for non- financial loss due to the inconvenience they experienced during the claim and repairs. 1.3 Determination This determination is partially in favour of the complainants. Within 14 days of the complainants’ acceptance, t he insurer is required to:  pay the complainants $45,000 (for the sake of clarity, this includes the $20,565.60 previously offered, if that amount has not already been paid)  pay the complainants $595 for billiard table assembly, $700 for window/glass and $3,750 for temporary accommodation  pay the complainants $1,000 (total) in non-financial loss compensation. Determination | Case number: 643786 Page 3 of 9 2 Reasons for determination 2.1 Is the insurer required to pay the complainants ’ floorboard quote? Complainants say insurer’s rectification offer is insufficient The complainants lodged a claim in March 2017, for storm damage to their home building. The insurer accepted the claim and authorised repairs by builder JL. The complainants reported repair quality issues. The insurer agreed to cash settle some rectification works to flooring (including sanding and replacing some areas), skirting boards and painting. JL’s costing of the agreed rectifications is $20,565.60. The complainants are dissatisfied with this response and the claim handling and say:  repairs should have taken three months, but remain unfinished years later  the insurer and its agents caused inconvenience and delays through multiple instances of inadequate works and responses  primarily, JL installed insufficient expansion joints in the floorboards, so JL’s repairs have caused floor cupping and pushed walls and windows outwards. The complainants want the insurer to cash settle the claim for $90,945. This is based on their remedial builder’s quote for flooring rectification ($71,940), a billiard table reassembly quote ($595), glass installation quote ($1,400) and accommodation quote ($17,010) during the works. Insurer says complainants’ failure caused floor ing damage The insurer declines liability for the cupped and warped flooring and damaged walls and windows. It disputes this occurred due to the storm or because of JL’s repairs. The insurer says the damage occurred due to building defects pre - dating JL’s repairs, which the complainant did not address as requested. Based on this view of the cause of damage, the insurer says:  the complainants have not established a valid claim, as they have not shown an event the policy covers caused the damage  further, policy conditions excluding cover for pre-existing faulty design or workmanship apply, allowing it to decline the claim. As the parties dispute the cause of the damage, the proximate cause needs to be ascertained based on the information the parties provided. Proximate cause is the dominant or operative cause of the loss Damage can have more than one cause. When deciding whether the policy covers the damage, we need to identify what the proximate cause of the damage was. This is a question of fact depending on the circumstances in each complaint. The proximate cause is not necessarily the first or last or the sole cause of the loss. It is Determination | Case number: 643786 Page 4 of 9 the effective, dominant or operative cause of the loss. If there are several causes operating at the same time, AFCA will co nsider each one to determine which cause set the train of events in motion. Courts have said that if one cause would have resulted in the harm in any case and the other would not have done so in the absence of the first, then the first is the proximate cause. Insurer says its experts confirm pre-existing faults caused flooring damage The available materials confirm that JL included repairs to the surface of water damaged timber flooring in the initial repair estimate, but not full flooring replacement. Following variations on the repair SOW, in August 2018, JL appointed a licensed building consultant (AA) to assess whether the flooring’s structure was also water damaged. AA completed a technical and defects inspection report, recommending replacement of are as of the flooring’s structure due to water damage. These reflected the claimed areas of storm-driven rain entry (through windows and the front door), plus near the bathroom. He also recommended a barrier beneath the front door to prevent water ‘blow back’ during rain and inserting end plates in exterior windowsills to avoid the likelihood of excess water entering the floor area. The insurer says the complainants then told JL that they had carried out the recommended works to the windowsill and door. JL then arranged for the floor structure repairs and replacement of the timber flooring. After the complainants raised concerns about the repair quality, the insurer arranged for a building consultant (RD) to review and report on any substandard repair work by JL. RD completed a causation report stating there were areas of substandard and incomplete work, including incorrect sealant on the new timber flooring, misaligned skirting, poor painting and damaged doors. RD noted AA’s door and windowsill recommendations had not been completed by the complainants and reported water staining near the front door, which the complainants attributed to recent storms. The complainants were dissatisfied with the extent of rectifications suggested and the timber flooring ’s conditi on and said that the walls and windows were being pushed outwards by the flooring. The insurer arranged a site meeting between the complainants, JL and RD in March 2019. The insurer says at this meeting the complainants agreed to carry out the windowsill-end and door-stop works. The insurer provided RD’s meeting minutes , which it says confirm: - … The insured accepts and agrees to rectify the moisture and water ingress issues in the entry, snooker/rumpus room and hallway, detailed in the [AA] report (dated 20/08/18) obtained. Determination | Case number: 643786 Page 5 of 9 - The insured accepts and agrees to rectify the moisture and water ingress issues in the entry as per the [RD] report, recommendations (dated 14/12/19). The insurer says its loss assessor’s (CC’s) and experts’ (JL’s, RD’s and AA’s) views confirm the windowsill and door allowed water entry. It says the complainants did not address this or did so too late. On this basis the insurer says ongoing water entry is the proximate cause of the timber flooring, wall and window damage , rather than JL’ s installation. Further, the insurer says that if the complainants had not told JL that the windows and door works were completed, JL would not have laid the flooring. After the site meeting, the complainants arranged for AA to reattend in April 2019 and complete a technical and defects report on the timber flooring. AA reported that inadequacies in JL’s flooring installation caused the damage. Specifically, he stated: The incidence of minor defects … is considered to be: Not Applicable . The incidence of ma jor defects … is considered to be: poor relative to the flooring laid on the ground floor … It is my opinion that the flooring has not been acclimatised and the omission of expansion joints is the cause of the buckling and swelling of the floorboards … Significant Items: Omission of expansion joints; Failure to acclimatize flooring material appropriately prior to laying; Timber cupping and pushing timber frame walls, window and door units out … The corking that would have formed the expansion joint at the end of the flooring has been completely squeezed out. The boards are hard up against the door frame. After the insurer asked AA for further information, specifically regarding the cause of the damage, he confirmed his view by email of 16 September 2019: … My second report was after the flooring contractor installed the new flooring, he did not follow my recommendations and failed to install adequate expansion joints in the floor. The failure to install adequate expansion joints or acclimatise the flooring correctly is the reason that the walls have been pushed out … I note with sig nificant concern that within AA’s email of 16 September 2019, he also says: I have issued two reports for the property ... In neither of those reports did I suggest that the minor water leaks were the cause behind the damaged [sic]. On my first inspection of the property, there had been no damage caused to the external walls. In my first report … I was not concerned about any minor leaks that had occurred previously from the corner windows units, as I water tested these units and found them to be satisfactory. However, I am in satisfied that this is in stark contrast to AA’s report of 20 August 2018, wherein he says: Determination | Case number: 643786 Page 6 of 9 I inspected the aluminium window and door units that are located in the living room on at the northwest and southwest end of the building. These units are a commercial type window and door frame and have a sub-sill which replaces the need for a common type sill flashing such as Alcor or PVC. A commercial sub-sill is an aluminium channel; generally, each side is approximately 30mm in height and slightly wider than the width of the window or door frame. When installed the sub sills need to be closed at each end as the sill acts as a water trap and has weep holes for the water to disperse. Unfortunately, as these unit are commonly used in commercial application the installer/s do not generally take into account better building practices that are more suitable in a residential type application and tend not to fold the ends of the sub sills up, but rather use a bead of Sikaflex or similar to close of the end of the sub-sill. As the window units located on the ground floor northwest and southwest corners of the building are subject to strong wind and rain, it is likely that the sub-sill is unable to disperse that water quick enough, and therefore water builds up in the sub-sill and overflows over the top of the Sikaflex allowing water ingress into the floor area and this is why there is severe water staining around these areas. I am satisfied that this apparent contradiction in statements from AA raises concern regarding the conclusions he has reached in subsequent correspondence. I am also satisfied that whilst the complainants advised that the work suggested by AA in his initial report had been completed, at that time it in fact had not been completed. This raises concerns regarding the credibility of the information provided by the complainants and the reliability of any expert conclusions based upon that information. On the other hand, there is no doubt that the o riginal repairs completed by JL were unsatisfactory and required rectification. The parties dispute whether the current problems are related to the compl ainant’s failure to conduct the work recommended by AA or the poor-quality rectification work completed by JL, including an alleged failure to install adequate expansion joints and an alleged failure to acclimatise the flooring. I note that the insurer challenges the latter two allegations. Each party has presented evidence as to whether the rectification work by JL included expansion joints and whether the flooring was acclimatised. The insurer provided JL’s written comments of 4 September 2019 , about the flooring repairs and RD’s caus ation report of 12 July 2019. The insurer says that these reports confirm that JL acclimatised the timber appropriately and installed expansion joints. RD concluded the damage was caused by water ingress based on:  the inclusion of the windowsill /door defects in AA’s first report Determination | Case number: 643786 Page 7 of 9  the complainants’ failure to address these  the subsequent flooring damage  his view is that, as AA omitted to consider the effect of moisture from the windowsills/doors in his second report, AA’ s view on the cause of flooring damage is flawed. The insurer also relies on annotated photographs of the timber flooring in AA’s second report. AA noted the cork in perimeter expansion joints would have been totally pushed out by the timber s’ expansion. The insurer says this confirms JL installed expansion joints. The insurer says this also contradicts the complainants’ and AA’s views on the cause of damage. On the other hand, JL’s views on the steps they took during the building process are retrospective and not supported by contemporaneous records or photographs. RD noted the minimum necessary expansion joints included intermittent joints. No evidence of these (as opposed to perimeter joints) was provided. No explanation as to why the flooring had not cupped and pushed the walls out due to the windowsill/door issues before JL’s installation was provided. Having carefully reviewed all the exchanged information, I am not satisfied that there is sufficient information to establish whether JL’s acclimatisation of the flooring was adequate or whether it has contributed to the further damage requiring repair. However, I am satisfied that whilst JL had installed some expansion joints, overall the rectification work completed by JL was unsatisfactory and has contributed to further damage. Equally, I am satisfied that the complainants ’ failure to complete the works, recommended by AA, has also contributed to the damage at the property in a significant way. The complainants provided a remedial bu ilder’s flooring quote of $71,940. They want the insurer to cash settle the cost of the works, so they can arrange their own repairs. The insurer has declined the claim for replacement of the flooring and has provided a quote of $20,565.60, for rectification of the previous repairs. I am not satisfied that the material exchanged is sufficient to reach a precise conclusion as to the respective contribution to the damage, between the failure of the complainants to complete the work recommended by AA and the inadequate repairs of JL. To bring finality to this complaint I propose to do what I consider is fair in the circumstances, having reviewed all the exchanged material. The insurer is required to pay the complainants $45,000, to finalise its obligations to the complainant regarding the repairs. This includes the offered amount of Determination | Case number: 643786 Page 8 of 9 $20,565.60, if it has not already been paid. The insurer is not required to pay interest on this amount. 2.2 Is the insurer required to pay other costs? Insurer is required to pay further costs The insurer is required to pay the complainants’ quote for the billiards ’ table to be reassembled ($595). This is because there is no dispute the insurer paid for the first part of this quote (to dissemble the billiards table) and I accept the table will need reassembly upon its return. The complainants provided a window repair quote by PP for $700. The complainants say glass repairs will cost double. The insurer did not challenge the amount of the original quote. Given PP did not support the complainants’ own view that repairs will cost double the amount quoted, the insurer’s liability for this quote is limited to $700. Statutory interest under section 57 of the Insurance Contracts Act 1984 (the Act) on the two amounts applies from 16 April 2019, if they have not already been paid. Insurer is not required to pay AA’s report c osts Under our Rules, AFCA can require a financial firm to reimburse the cost of professional reports, up to a maximum of $5,000. Given the apparent contradiction in the information provided by AA, I am not satisfied that the insurer should be required to pay for the cost of this report. Insurer is required to pay temporary accommodation during floorboard repairs During initial repairs, the insurer provided the complainants with temporary accommodation in a serviced apartment. The complainants provided a quote for 28 nights in this apartment at $375 per night, for the further flooring repair period he says is now required. Given my findings in relation to the proximate cause of the damage requiring repair, I am not satisfied that 28 nights is appropriate However, there is little information on which to determine the time the covered repairs will take. Again, based upon all the exchanged material and doing what is fair in the circumstances, the insurer is to pay the complaints the additional amount of $3,750, for ten nights temporary accommodation. This will finalise the insurer’s obligations and interest is not payable on this amount. Determination | Case number: 643786 Page 9 of 9 Insurer is required to pay $1,000 non-financial loss compensation Under our Rules, AFCA may require a financial firm to pay compensation for non- financial loss. This includes claims for stress or inconvenience caused by an error of the insurer. The maximum amount we can award for non-financial loss is $5,000 for each claim of loss. We will only award this type of compensation if there has been an unusual degree or extent of inconvenience. If we do award compensation, it is unlikely to be substantial. I accept the complainants experienced an undue extent of stress and inconvenience caused by JL’s inadequate repairs. They will now reside in temporary accommodation for a second attempt at repairs. I accept this is a physical inconvenience they otherwise would have avoided. Given the above, the insurer is required to pay the complainants $1,000 (in total) in non-financial loss compensation. Interest is not payable on this amount.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.