Determination 642869

Bank's response to complainants' financial difficulty and online access removal, plus alleged lending and valuation failures

FirmBank of Queensland
Decided2022-07-18
ProductCredit · Home loan
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss$8,000
Amount claimed—
SourceAFCA PDF

Summary

Complainants disputed the bank's lending, valuations, insurance payout and handling of a construction loan after a builder failed to complete their home. AFCA found the bank complied with its lending and implementation obligations but failed to meet hardship obligations and unreasonably blocked online access, ordering $8,000 non-financial loss compensation.

Under the Code of Banking Practice and hardship obligations, the bank's response to the complainants' financial difficulty and its unexplained blocking of loan access were unreasonable, while the bank had no responsibility for the builder's defects.

Issues

Subjects and remedies

digital banking or appfinancial hardshiphome or building damagerelated party investmentthird party authoritypay non financial loss

Related

All Bank of Queensland determinations · Find similar determinations

Text of the determination

Determination Case number 642869 Financial firm Bank of Queensland Limited Determination | Case number: 642869 Page 2 of 25 Case number: 642869 31 March 2022 1 Determination overview 1.1 Complaint In May 2015, the financial firm (bank) provided the complainants with a $650,000 residential construction loan (loan). Along with the loan application, the complainants provided the bank with a residential building contract to build a residential owner-occupied house on their land. Several problems occurred throughout the build and subsequently the builder failed to complete the house in accordance with the building contract. As a result, the complainants have incurred significant loss. The complainants previously lodged complaint 529144 (previous complaint) with the Financial Ombudsman Service (FOS), which was a predecessor scheme to the Australian Financial Complaints Authority (AFCA). On 9 January 2019, AFCA issued a decision in relation to the previous complaint which was in favour of, and accepted by, the complainants. In May 2019, the complainant‟s lodged this complaint . The have raised several complaints about the b ank‟s conduct including that it :  incorrectly implemented the determination for the previous complaint  should not have released any progress payments to the builder without a copy of council approved drawings and signed specifications and drawings  failed to request the signed council approved drawings and the correct signed addenda which allowed the builder to con them  did not lend responsibly when it approved the loan  relied on inaccurate valuation reports  should have warned them that the building insurance payout was capped at $100,000  wanted the building insurance payment paid to it  failed to: > comply with recommendations made to it in the 2018 valuation report, and > advise them of the recommendations leaving them in a potentially unsafe house  made it clear that it would routinely complete valuations at their expense  has conspired to cover up its corrupt activity, lied to AFCA, and withheld evidence during the FOS case,  has bullied, harassed, intimidated and threatened them since the FOS determination was issued. Determination | Case number: 642869 Page 3 of 25 1.2 Issues and key findings Did the bank implement the determination for the previous complaint correctly? The panel is satisfied the bank correctly implemented the determination issued in the previous complaint. The determination stated the bank was to reduce the loan by $59,982 and that is what it did. This does not constitute the bank giving itself a refund because:  it had paid this money to the complainants ‟ builder, and  by reducing the loan, the complainants benefit as they do not need to repay it to the bank. The bank was not required to allow the funds to be made available for the complainants to use to build the house. Did the bank lend responsibly when it provided the loan? The panel is satisfied the bank lent responsibly when it provided the loan. The complainants have made conflicting statements about their claim that the bank did not lend responsibly. However, the available information does not support their claim. It is not reasonable to hold the bank accountable for the actions of all the parties involved in the building of the house including under contracts the bank was not a party to. The bank is not responsible for problems the complainants encountered with the builder. Did the 2015 valuation errors contribute to the complainant’s loss ? Whether or not any errors in the valuations completed in March 2015 affected the overall valuation, the bank obtained the valuations for its own benefit. The complainants were not aware of the information i n the bank‟s valuations until they raised the previous complaint and this complaint. There is no information available to show or suggest the complainants relied on the March 2015 valuations for any purpose. If the valuations had been completed with the correct details it is more likely than not:  the loan would have proceeded, and  the complainants would have experienced the same problems with the builder. Did the bank’s failure to meet its own policy cause further loss? Before it advanced the loan, t he bank‟s policy required it to obtain a copy of building plans approved by the local authority (approved plans). The bank did not follow its own policy when it relied on building plans that had not been approved by the local council. The bank ‟s failure to comply with its policy does not mean the bank breached the responsible lending obligations of the National Consumer Credit Protection Act (NCCPA). This breach of the bank‟s own policy only contributed to the complainants‟ loss in respect of the last advance of the loan. The last advance of the loan has already been dealt with in the previous complaint and will not be reconsidered in this determination. The panel is not satisfied that the bank‟s failure to obtain a copy of the approved plans caused the complainants‟ additional losses. Whether or not the bank held a copy of the approved plans before it provided:  the first advance on the loan Determination | Case number: 642869 Page 4 of 25  or any subsequent advance prior to the final advance, it is more likely than not the complainants would have encountered the subsequent issues. T he complainants‟ losses have been caused by the bui lder, not the bank. Should the complainants pay the insurance payout to the bank? As a matter of fairness, the panel is satisfied the complainants should not be required to pay the insurance payout to the bank. Therefore, the bank is not required to be involved in the works required to rectify any faults to the property. Did the bank respond appropriately to the complaint? There is no doubt the complainants have experienced stress and inconvenience because of the issues they have had to deal with in relation to building their house. When issues arose, it is how the bank responded that is important. When the complainants expressed their concerns about how they would pay for the house to be completed, the bank did not respond appropriately. Both parties have an interest in ensuring proper completion of the house. As such it was not appropriate for the bank to respond in a manner that left the complainants to find their own way to rectify and complete the building works. I accept this caused the complainants stress and inconvenience. 1.3 Determination This determination is substantially in favour of the bank. However, within 14 days of the date the complainants accept this determination, the bank is to pay $4,000 for non-financial loss compensation each (total of $8,000) into an account they nominate. Determination | Case number: 642869 Page 5 of 25 2 Reasons for determination 2.1 Did the bank implement the FOS determination correctly? The bank implemented the determination correctly The previous complaint was about the final progress payment the bank made to the complainant‟s builder. The outcome provided for in the determination was: The Determination is in [sic] mainly favour of the complainant. The bank should reduce the complainant‟s loan by $59,982 being 80% of the final progress payment. In addition, the bank should refund the interest charged on the $59,982 from the date of payment until the date the refund is processed. On 9 January 2019, AFCA issued the determination in favour of the complainants. It is not necessary to repeat the reasons for the determination because it is the final decision in that case and it was accepted by the complainants. However, the complainants now say:  the bank reduced the loan balance as set out in the determination, but also reduced the amount of funds available on the loan by the same amount  the determination said it was clear from the 2018 valuation that the building was not at practical completion  the bank refused to provide them with the funds they need to complete the house. The determination did not require the bank to provide the complainants with funds to complete the building. If the determination intended the bank to give funds to the complainants, in a loan or otherwise, it would have said that. The panel is satisfied the bank implemented the determination as it was required to. The bank has adjusted the loan account in line with the determination The bank provided a copy of the loan account statement showing a deposit of $66,031.08 on 28 February 2019. This represents the amount to be refunded ($59,982) plus interest charged ($6,049.08) on that amount from the date of drawing (17 October 2016) to the date of refund (28 February 2019). The bank later advised it had made a processing error and refunded a further $50.40 which it backdated accordingly. This amount is an accurate calculation of the refund required by the bank to meet its obligations under the determination. The amount of the refund has not been disputed by the complainants. Did the bank lend responsibly when it provided the loan? The bank lent responsibly when it provided the loan The complainants say the bank did not lend responsibly because:  it is clear to them that the loan application is a fraudulent document  its conduct in terms of the valuation and inspection of the property raises most serious questions about whether the bank complied with its obligation to lend responsibly Determination | Case number: 642869 Page 6 of 25  the second valuation completed in March 2015, before building commenced, may have been increased to avoid the need for lender ‟ s mortgage insurance (LMI)  the specifications in the valuation were not correct, and has resulted in over capitalisation of the property and their loan should not have been approved  they could not afford to pay for the extra items outside of the building contract as well as the loan  it has failed to ensure its professionals acted in their best interest as bank customers. There is no information available to support the view that the loan application is a fraudulent document. In the absence of any such information it is not open to the panel to find that it was. The bank obtained the valuations, for its own benefit so it knew the value of the property mortgaged as security for the loan. The complainants are not entitled to rely upon the valuation. If the bank had required LMI for the loan, it would have been at the complainants ‟ expense and for the bank‟s benefit, not the complainants‟ benefit. There is no benefit to the bank in avoiding LMI. The complainants have said several times that they could afford to repay the loan. It is important to bear in mind the nature of the relationship between a bank and its customer. The bank does not have a” fiduciary” duty or responsibility to its customer. This means that it was not obliged to ensure its professionals acted in the complainants ‟ best interest. A fiduciary responsibility arises only where the bank‟s role is seen to extend beyond that of lender and into the area of advice. There is no information to show or suggest the bank led the complainants to believe its role was any more than a lender. The complainants signed the loan application The complainants say: upon review of the hand-written application form, in [the bank‟s] possession, it is clear to us that this is a fraudulently [ sic ] document, submitted to our [bank] file. This is not the document we filled out, it is not in our hand writing and has false details within it. This document has also been used to fill in a digital copy of the mortgage application form, complete with the incorrect information on the hand-written copy. Determination | Case number: 642869 Page 7 of 25 The complainants also say:  there was a motor vehicle listed on the loan application that was an asset of their company, and a motor vehicle with an inflated value  $35,000 worth of insured jewellery that they never had was stated  the price of the land they bought was $275,000 however it was $350,000 on the loan application  the female complainant‟ s occupation was incorrect  the fees for their two older children attending a private school were not included  there is no consideration of the land being rural and the commuting costs increasing their living expenses. The motor vehicle, jewellery and land are assets that are included in the complainants‟ statement of position in the loan application, and are not relied on when a loan assessment is made. It is unclear how these errors were made; however, it is important to note that the assets listed were connected to the complainants. That is to say the assets listed were not fictitious despite the complainants disputing their values. The loan application does not detail the female‟s occupation other th an indicating she was self-employed. The complainants do not dispute their incomes recorded in the loan application. Whether or not:  the complainants living expenses increased due to living rurally, or  the school fees were not considered, the complainants have maintained that they could “comfortably afford [t heir] repayments” . The panel is satisfied that, even if there are inaccuracies in the loan application, it did not result in the bank incorrectly complying with its responsible lending obligations. The valuation is not part of the bank’s responsible lending obligations The bank had obligations to exercise the care and skill of a diligent and prudent lender when it assessed the loan application. The bank must comply with the responsible lend ing provisions of the NCCPA. Meeting the responsible lending obligations means the bank should have:  made reasonable enquiries about the complainants‟ financial situation and the complainants ‟ requirements and objectives  made an assessment about whether the loan was not unsuitable for them. When a bank obtains a valuation, it does so for its own purposes. The amount of the valuation does not guarantee a sale price, at any time the property is sold. In these circumstances the bank does not rely solely on the valuation or the information detailed within the document. The valuation is not a requirement of the bank‟s responsible lending obligations. There is no supporting information that the second valuation completed in March 2015 had an inflated property value to avoid the need for LMI. The panel notes that LMI is an insurance policy obtained in the bank‟s name and for the bank‟s benefit, but is paid for by the consumer. Determination | Case number: 642869 Page 8 of 25 It is not logical to suggest the bank would have obtained a higher valuation to avoid the need for LMI which affords it a greater protection in the event of default. The additional items in the valuation were advised by the complainants The second valuation in March 2015, included the following additional items totalling $98,297:  water tank $29,440  garage/workshop $60,368  carpet $8,489 These items were allowed for by the valuer but were not included in the building contract provided to the bank. The amount of the loan provided did not allow for the payment of these items. Whilst the complainants say they could not afford these additional items, as well as the loan, the complainants obtained the quotes for these items. The complainants provided the quotes to the bank/valuer who included them in the valuation. The bank did not provide for these items in the loan amount, however at the time of the loan application, the complainants did not provide details of how these items were going to be paid for. The bank would have only become aware that these items had not been completed at the time of the valuation at final payment stage. As set out above, the final payment has been dealt with in the FOS case and will not be reconsidered in this complaint. The bank does not have a ‘fiduciary’ duty or responsibility to its customer The bank was not obliged to ensure the valuers acted in the complainants ‟ best interest when it completed the valuations for the bank. A fiduciary responsibility may arise where the bank‟s role is seen to extend beyond that of lender and into the area of advice. There is no information to show or suggest the bank led the complainants to believe its role was any more than a lender. Did the 2015 valuation errors contribute to the complainant’s loss ? Any errors in the 2015 valuations did not contribute to the complainant’s loss The bank‟s valuation is an assessment of the value of the property used as security for the loan if it has to sell the property to recover the debt. The bank obtained the valuation when it was assessing the loan application, however it was not required to do so. The bank used the valuation to assess the credit risk involved for it in lending the money. A valuation is not obtained for a borrower‟s benefit and does not provide a borrower with any representation as to the future value for the property. In these circumstances, the complainants should not, and would not, have relied on the bank‟s valuations when it engaged and worked with the builder to build their home. The building contract, which the bank is not a party to, sets out the specifications to which the house was to be built. If the house was not built to the specifications in the building contract, the problem lies with the builder, not the valuer, or the bank as the lender. The builder has caused the complainant‟s loss, no t the bank. Determination | Case number: 642869 Page 9 of 25 The panel also notes that the complainants signed the building contract with the builder on 25 October 2014, which was well before the loan application with the bank (on 25 March 2015) and the date of the loan contract (8 May 2015). The general loan conditions show the build is the complainants ’ responsibility The complainants say:  they are not builders  they are inexperienced first-time builders  they do not have the expertise to advise the state of the house and that is why they paid the bank a valuation fee for the bank‟s professional to inspect the build. Whilst the complainants say they are not builders, neither are the bank. Part B of the loan‟s general conditions include the bank‟s additional requirements for a construction loan. In particular, 2.3 (b) sets out: you alone are responsible for ensuring that all plans are followed, and that materials and workmanship are satisfactory even if we also monitor the works . (If we do so, it is only for our own purposes, and even if we make a loan advance, it does not mean the works are necessarily satisfactory). We are not liable for the quality of, or any delays in, the works , The loan contract advises the borrowers in bold at the top of the loan contract that “terms and conditions and pre- contractual disclosure information are in the General Conditions”. On 8 May 2015, the borrowers signed the loan contract. Directly above the complainants‟ signatures were the appropriate warnings which included, amongst other things:]  they should not sign the loan contract unless they had read it, so they understood what they were entering into and what they were required to do under the contract  not to sign the document if there was anything they did not understand. There is no information available to show the bank led the complainants to believe it would assume responsibility for the quality and/or completion of the build. In fact, it provided explicit information to advise the complainants it was their responsibility to ensure the building works were completed satisfactorily. If they did not have the ability to do so, the responsibility does not revert to the bank. The complainants should have employed the services of a professional to take on these responsibilities on their behalf. The complainants have identified errors in the 2015 valuations In March 2015, prior to the loan being provided, the bank requested two valuations. The first valuation is dated 18 March 2015 and the second valuation is dated 25 March 2015, and the complainants say they contain the following errors:  the borrower‟s name  construction of a double brick house  it included an oven, range hood and cooktop which were not included in the build price  the address is incorrect (different road and different estate)  no significant views and irregular shaped block Determination | Case number: 642869 Page 10 of 25  the “as if complete” valuation of $775,000 on the first valuation  the “as if complete valuation of $840,000 on the second valuation . The complainants say the bank “failed to value the build using the specification documents supplied for the construction”. However, a valuation is only able to be completed based on the information provided to the bank by the complainant. The errors identified by the complainant are unlikely to affect the valuations The borrower‟s name is the surname of one of the joint borrowers. The valuations refer to the main wall as rendered brick and the main interior linings to be plastered brick. Despite that the complainant says the external wall was not brick, it was rendered with interior walls plastered. The report that was carried out by the Independent expert builder Mr B on 18 May 2018 for the insurance warranty claim described the external walls of the property as “ 3 course standard face brickwork on footing and timber frame with cement-based sheeting textured finish.” Whether or not the oven, range hood and cooktop were included in the build price, it is not unreasonable to include these items in the value of the finished build. Whilst the address is incorrect and identifies the property as being on M road, M road intersects approximately 450 metres from the complainant‟s property on E road. If the property had significant views and was a regular shaped block, it may increase the valuation of the property. As explained by the bank, the first and second valuations have a different “as if complete” valuation due to the inclusion of the rain water tank and workshop/shed in the second valuation. Whether or not the water tank was included in the builder‟s price it was a feature of the property excluded from the first valuation. Whether or not the bank established the complainants had the funds to pay for the workshop/shed, the bank‟s valuation in March 2018 included a “colorbond workshop”. In these circumstances, the errors identified by the complainants may not have significantly changed the valuations, if at all. The difference in the values does not represent the cost of the additional items The complainants‟ say :  the workshop/shed is a second hand six by six metre storage shed used to store materials  it is not a workshop, and not the $60,000 workshop the bank approved its mortgage for  the storage shed does not belong to them  it was installed in November 2017  they can provide receipts and pictures. The difference in the first valuation and the second valuation is $65,000. This does not necessarily mean the items included in the second valuation that were omitted from the first valuation are valued at $65,000. Whilst this may be an indicator of the extra money being spent, it is more likely to show the effect that those items will have on the overall value of the property. The 2016 valuations have not been considered in this determination The valuations completed in 2016 have been dealt with in the previous FOS case and will not be reconsidered in this complaint. Determination | Case number: 642869 Page 11 of 25 The 2018 valuation was completed for the bank’s purposes The complainants have identified errors in the March 2018 valuation and say:  the valuation reported that the bank needed to employ a structural engineer and a building inspector, and  the bank failed to comply with the valuation. The valuation says:  the valuer is neither a construction nor a structural engineering expert and is therefore unable to certify the extent of the damages or determine the cost of repairs required for the above-mentioned works  they recommend seeking a building inspection and structural engineering report  multiple issues were identified during the inspection which comprise of essential repairs and non-essential repairs  for the sake of clarity, the incomplete nature of the subject property is considered to have a detrimental impact on the market value of the property, and such impact has been reflected within this assessment. As noted, when a valuer provides the bank with a valuation, it is for the bank‟s own credit purposes. Whilst the valuation includes recommendations, it does not direct the bank as to its role in seeking the building inspection and structural engineering reports. The bank obtained the valuation and may choose to follow the recommendations at its own discretion. Indeed, there is nothing in the contractual documentation between the complainant and the bank that states the bank agrees to undertake such action. Did the bank’s failure to meet its own policy c ause further loss? The bank’s failure to meet its own policy did not cause further loss The complainants say the bank should not have released any progress payment to the builder without a copy of:  council approved drawings, and  signed specifications and drawings. The bank may ask for a copy of the approved plans for several purposes including:  to obtain a valuation for its own purpose and ensure the completed value of the property is sufficient to secure the loan it is providing  so that upon completion, it can complete a further valuation to ensure the build is completed in line with the approved plans and sufficient to secure the loan it has provided. After the first valuation is completed, in line with its policy, the bank does not review or inspect the property or the building until completion. The bank relies on the property owner to protect their own interests by ensuring the building works are satisfactorily completed in line with what they agreed. Because the FOS case dealt with the final valuations and final payment, they cannot be reconsidered in this complaint. The fact that the bank did not hold a copy of approved plans Determination | Case number: 642869 Page 12 of 25 before it made the first and subsequent payments before the final payment did not cause the complainants to incur further loss. The complainants advised the bank the works were completed satisfactorily The bank required the complainants to sign a progress payment authority each time they requested a progress payment be made to the builder. By signing the progress payment authority, the complainants provided the following authorisation: I/we advise that the building being constructed for me/us by the Builder has been completed to the said construction stage to my/our satisfaction according to the builder's certificate and building contract. I/we authorise the Bank's agent to inspect the building work. I/we acknowledge that any inspection made on behalf of the Bank is done solely at the Bank's discretion, for the Bank's security purposes only and is not construed as an inspection for or on behalf of me/us or the builder. I/we am/are aware that this payment will be made only after the Bank's requirements and loan conditions are met fully to its satisfaction. The complainants signed and authorised each progress payment the bank made to the builder. Given th e authorisation was directly above the complainants‟ signatures, they were aware of the terms they were agreeing to and were legally bound by those terms. It is irrelevant whether they read the document before signing it. There is no information to show there were extenuating circumstances that misled them to sign the progress payment authority. Should the complainants pay the insurance payment to the bank? The complainants should not be required to pay the insurance to the bank The complainants lodged a claim against the builders‟ indemnity insurance, for the defective and incomplete work on the house. The Housing Indemnity Insurance company (HII) paid the claim. The insurance payment was paid directly to the complainants. The complainants say:  they spent hundreds of hours compiling evidence and attending hearings to assist their insurance claim  the time spent on the claim affected their earning capacity which was at a significant financial cost to them  they had to employ a building inspector and a structural engineer to obtain reports for their claim  the bank did not offer any assistance through this period, when they were fighting for the bank‟s security asset  when the claim was approved, the HII payment was provided to them to rectify the build ers‟ mistakes Determination | Case number: 642869 Page 13 of 25  they received the money and used it to make the property compliant. In these circumstances it is not appropriate for the bank to ask for the HII payment, given the complainants have used the insurance money to rectify the property and have obtained a copy of the local authorities ‟ certificate of compliance. The bank was not obliged to advise the building insurance was capped The complainants say:  the bank held a certificate of currency for an amount of $530,000  the bank should have been aware the HII in their state was capped at $100,000  the bank said they take risks on every construction loan they approve  it may be acceptable for the bank to take risks, but they do not accept those risks are at their expense  the bank should have told them that the HII is capped at $100,000. The bank‟s consumer lending terms and conditions, additional requirements for construction loans, state: we will not make the first loan advance unless [we] have received an adequate and appropriate insurance policy in your name for the period of construction for the contract price of the building work The certificate of currency fulfilled this requirement and was a home insurance policy covering flood, fire, storm and other insured events. The certificate of currency is separate to and did not cover HII. The bank does not have a contractual relationship or obligation to the builder and it is up to the home owner to obtain and satisfy themselves about the builder‟s indemnity insurance. The ultimate decision to engage the builder rested with the complainants. It was up to them to conduct appropriate due diligence and to satisfy themselves that he was an appropriate builder to engage and to confirm the HII cover. The bank was not a party to the HII The complainants signed a building contract with the builder. When the builder failed to complete the contract, the complainants ma de a claim against the builder‟s HII. The claim was paid, and the complainants received the insurance payment. The bank was not a party to the building contract or the HII claim. The loan contract sets out the how the insurance should be paid When the complainants received the insurance money, the bank challenged them, saying it should receive the money to use as they see fit. The bank referred to their real property mortgage general conditions (which was registered over the property), that say: 9 Insurance claims and compensation claims Determination | Case number: 642869 Page 14 of 25 9.1 You must do your best to ensure that proceeds from an insurance claim or compensation claim ( including a claim by a governing body if the property is part of a shared scheme ) of more than $5,000 are paid to us. (We must then use them as set out in clause 32). All other proceeds must be used to reinstate the property. However, if we direct you to use or hold any insurance proceeds in a particular way, you must use or hold them as we direct. The complainants say:  the condition is unfair  the bank is trying to secure the funds with minimal input of the funds in to the house  the bank will only address structural issues but nothing that is missing or classed as cosmetic  any remaining funds will be paid to the loan account or used as the bank sees fit  the payment is not only for current works but also for possible building defects, over the next six years. In accordance with the terms of the mortgage, the bank is, strictly, entitled to require the insurance payment to be made to it. This is because where such a large insurance payment is obtained, it often indicates that the property has been subjected to significant damage. In such instances, the bank‟s security position is likely to have been impacted. However, having considered the circumstances of this complaint, the panel is of the view that it is fair and reasonable for the complainants to retain the insurance payment. This is primarily because the complainants have used the funds to rectify damage to the house and bring it to a point where it is liveable and compliant in circumstances where they were unable to borrow additional amounts to do this. Are the complainants entitled to any compensation? The bank failed to comply with its hardship obligations In May 2018, the loan fell into arrears by about $3,000. On 22 May 2018, the bank (or a collection agent) contacted the complainants to discuss the arrears. The bank‟s file note of that conversation is as follows: AD ARR OF $2979.34 … GOING THROUGH LEGAL BATTLE REGARDING THE BUILDER WHO HAS DONE RENEVATIONS (sic) ON THE HOUSE AND FRAUD HAS BEEN COMMITTED AGAINST [THE BANK] … ADV THE MANAGER … IS PUTTING THEM ON AN INTEREST ONLY PROGRAMME OR SUSPENDING PAYMENTS ALL TOGETHER … After a series of emails between the bank and the complainants, the bank stated they could offer an interest only period to allow them time to resolve their dispute with the builder. If the complainants accepted this offer, they were to end all complaints lodged with the bank. Good banking practice suggests the bank should have requested a statement of financial position after it was aware of the complain ants‟ financial difficulty and then assessed their Determination | Case number: 642869 Page 15 of 25 financial position. There is no information to show the bank made a firm offer of hardship assistance and genuinely considered their financial position. This is particularly in the circumstances when the bank was aware of the issues with the builder and also, at the end of 2017, had agreed to capitalise arrears that had then accrued of about $9,800. In the panel‟s view, the bank failed to comply with its financial hardship obligations and should pay the complainants non-financial loss for the stress and inconvenience caused. AFCA‟s approach to non -financial loss compensation is set out in section 3 below. The complainants are entitled to non-financial loss compensation of $2,000 each for the stress they expe rienced as a result of the bank‟s inappropriate response. The bank removed online access to the loan On 8 March 2019, the Ms complainant logged in to her bank accounts online. She was unable to access her loan account. She contacted the bank for an explanation but was not provided with a reason. On 20 March 2019, the bank advised her the loan was removed by their operational risk team. The bank finally advised the loan was removed to prevent funds being removed from the loan account, after the bank paid the FOS determination proceeds in to it on 28 February 2019. Over the course of 12 days, the complainants did not know what had happened to their loan and whether the bank had initiated legal or recovery action against them. Clause 3.2 of the 2013 Code of Banking Practice (which applied at the time) states: We will act fairly and reasonably towards you in a consistent and ethical manner. In doing so we will consider your conduct, our conduct and the contract between us. In the panel‟s view, the bank‟s actions in blocking online access to the loan and other accounts without warning or explanation was unreasonable. This was especially in the context that the determination for the previous complaint had recently been accepted by the complainants. The panel accepts that the bank‟s actions give rise to an award of non -financial loss compensation and that $2,000 per complainant is appropriate. The bank was entitled to rely on its terms and conditions The complainants say:  they received no assistance from the bank, throughout their HII claim and subsequent property repairs  it is unfair that the bank‟s terms and conditions provide the bank the power to seize an asset even though there is no monetary default against it  the bank should have helped by paying the costs associated with the expert reports required for the HII claim On 4 May 2018, the bank emailed the complainants, telling them they were in dispute with the builder and the dispute would need to be resolved without the involvement of the bank. Determination | Case number: 642869 Page 16 of 25 The bank was entitled to rely on its:  consumer lending general conditions; and  real property mortgage general conditions which refer to construction home loans and insurance claims. The panel has a lot of sympathy for the position the complainants found themselves in with regards to the builder and the quality of the build. However, it is important to consider what the bank‟s role was – it was a lender. While the bank had a commercial interest in ensuring the house was built, its role did not extend to assisting pursing a claim against the builder. The fact that the bank was not actively involved in the claim against the builder is not an error. The complainants are entitled to non-financial loss The complainants are entitled to non-financial loss compensation for the stress and anxiety caused by the bank. The bank must pay the complainants $4,000 each ($8,000 in total) for the stress and inconvenience caused. Determination | Case number: 642869 Page 17 of 25 3 Supporting information 3.1 The AFCA process AFCA‟s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted our determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established. 3.2 AFCA’s approach to non -financial loss AFCA can compensate a complainant for non-financial loss (capped at $5,000 per claim). Compensation for non-financial loss is limited. AFCA may decide a financial firm should compensate a complainant for such loss only where there has been:  an unusual amount of physical inconvenience;  an unusual amount of time taken to resolve a situation;  interference with the complainant‟s expectation of enjoymen t or peace of mind. AFCA takes a conservative approach to compensation and expects a complainant to be moderately robust and bear the usual degree of inconvenience associated with correcting an error. AFCA does not award compensation for loss that a complainant may incur as a result of pursuing a dispute or rectifying a financial firm‟s error. Determination | Case number: 642869 Page 18 of 25 Chronology Date & source Key points 25 October 2014 Ms M and Mr C sign contract of sale to purchase land LC for $275,000. 25 October 2014 Ms M and Mr C sign building contract. Contract amount $499,850. Builder is WE Pty Ltd trading as H D. 13 March 2015 Building permit approved. Estimated value of building work $530,875. Nature of building work: Single storey timber framed and clad dwelling with steel roof. Ms M notifies the bank building permit has been approved. 18 March 2015 Valuation completed (by HTW ). Upon completion market value $775,000 (Land $275,000, Improvements $500,000). 25 March 2015 Loan application for $650,000 signed by Ms M and Mr C. Loan purpose: construct an owner - occupied home. 7 May 2015 Bank issued loan approval letter and loan contract to Ms M and Mr C. Loan amount $650,000. Loan purpose: construct a dwelling. 7 May 2015 Loan terms and conditions (April 2015) state: Claus e 2.2(b) We need not make the first loan advance unless the following requirements (in addition to those in clause 3 of part A and clause 1 of this part B) are all satisfied:  You have contributed any money we have required you to contribute  We have received o A copy of the fully signed building contract o A Copy of the building plans approved by the local authority o A full set of the specifications signed by you and your builder o A copy of all relevant approvals (including a set of council approved plans and specificatio ns) o Evidence that the builder is registered, holds all necessary licences and has contractors all risks insurance (including work ers compensation relat ed insurance) in an amount acceptable to us o An adequate and appropriate insurance policy in your name for the period of construction for the contract price of the building work, and o Where required by us, a surveyor‟s certific ate and a consulting engineer‟s certificate, each in a form satisfactory to us. Claus e 2.3(b) You alone are responsible for ensuring al l plans are followed and that materials and workmanship are satisfactory even if we also monitor the works. (If we do so, it is only for our own purposes and even if we make a loan advance, it does not mean the works are necessarily satisfactory). We Determination | Case number: 642869 Page 19 of 25 Date & source Key points are n ot liable for the quality of, or any delays in, the works. Claus e 2.7 We may only make a loan advance  If you ask us to in writing at least 3 business days before you want us to make the loan advanc e Claus e 2.9 The making of any advance shall not be const rued as proof or admission that the works or any part of the works have been undertaken in accordance with this contract. 8 May 2015 Ms M and Mr C sign the loan contract. 18 May 2015 Ms M and Mr C sign progress payment authority for $29,991 (Stage one). 20 May 2015 First loan drawdown completed for $148,392.25. Second loan drawdown complet ed for $29,991.00. 4 June 2015 Ms M and Mr C move in to a rental property. 4 July 2015 Ms M and Mr C sign progress payment authority for $74,977.50 (Slab stage). 13 July 2015 Third loan drawdown completed for $74,977.50. 19 October 2015 Ms M and Mr C sign progress payment authority for $84,974.50 (Wall plate height stage). 21 October 2015 Fourt h loan drawdown completed for $84, 974. 50. 25 January 2016 Ms M and Mr C sign progress payment authority for $84,974.50 (Roof cover stage). 27 January 2016 Fifth loan drawdown completed for $84,974.50. 30 April 2016 Ms M and Mr C sign progress payment authority for $74,977.50 (Lock Up stage). 6 May 2016 Sixth loan drawdown completed for $74,977.50. Determination | Case number: 642869 Page 20 of 25 Date & source Key points 1 June 2016 Ms M and Mr C sign progress payment authority for $74,977.50 (Tiling stage). 7 June 2016 Seventh loan drawdown completed for $74,977.50. 8 June 2016 Ms M and Mr C vacate rental property and move in to the security p roperty LC . 10 October 2016 Ms M and Mr C sign progress payment authority for $74,977.50 (Practical completion stage). 12 October 2016 Valuation completed (by HTW ). Comments in valuation: We confirm that construction has reached practical completion. We stress to the lender that we have NOT sighted a final inspection certificate. We recommend releasing the final progress payment upon receiving a letter of satisfaction from the clients. Estimated market value $499,850. 17 October 2016 Eighth loan drawdow n completed for $74,977.50. Final loan drawdown completed for $2, 340. 18. Loan balance $650, 000. Loan repayments changed from int erest only to principal and interest. 23 November 2016 Loan repayment $3,500 made. 24 November 2016 Bank emailed Ms M and Mr C saying:  the valuation has been completed and the market value was $720,000 (if the required works get completed it will be $750,000).  based on the valuation, the bank would not be able to lend any further funds as the LVR is at 90%. 28 November 2016 Ms M send email to bank: Hey buddy. Hope u had a good weekend. What‟s the chances of us getting a personal loan for $40,000??.. we have enough to finish the kitchen, concrete and outdoor bathroom ourselves. We can pay the spark the $10,000 we owe him and if we have to pay the credit card off. We could use the loan to pay off the builder. We don't have any other debt to pay then only our mortgage. The company pays for the car. We don't have any school fees to pay now either. We can finish the house off and look at getting it re valued in 3 - 6 months then. The only thing that will need doing is the ac and carpets after the above is done and we can pay for them after Christmas ours elves. Hope all of that makes sense... Cheers Bank respond, stating they will do the researc h and see what they can do. 1 December 2016 Ms M send email to bank: Hey buddy. What‟s the chances of redacted being able to borrow $7,000 for Determination | Case number: 642869 Page 21 of 25 Date & source Key points a 6x6 workshed. We were going to pay this ourselves but with circumstances being what they are that‟s not going to happen. We need somewhere for Dwayne to work from at home. The money is for the shed and concrete pad. We have the electric sorted all ready. The only bill reda cted have is the car at $850 per month. Even if we could get a business credit card rather than a loan. Whatever is easiest. Dwayne is getting more and more work for himself now, so we need a dedicated work space. Cheers Bank respond: We can‟t lend anymore based on the current financials that I have (the ones that have been lodged) but I know that these shed places offer interest free finance packages.. Have you ex plored that option? 8 February 2017 Ms M sends email to bank: I was loo king at a few figures over the weekend. When the valuation guy came out he asked me how much the build was, I replied it was 540 he didn't ask any other questions. After sitting down and adding everything we have put into the build it works out around 100k that me and Dwayne have paid so the build cost is at least 640. Plus, the fact another 20 - 23k for carpets and ac is to be added too. On top of the 125 deposit we paid does that mean we have made no money on this house whatsoever.... 17 January 2018 Ms M sends email to bank: The builder was caught sneaking around our front gate on Saturday night. 1 of our dogs let u s know someone was there, it was pitch black, but he knew lol. The builder left a n envelope full of invoices and statement of accounts. There‟s a lot that doesn't add up..... We are just getting ready to send him notification of complaints we are going to make to the building commission. 1 of the big things is we have proof he didn't get part B done on the pest control, apparently this is a big thing as it's his responsibility as the builder, something to do with legislation and part of the building contract. So, it‟s another thing he is in breach of as a builder , plus the fact he hasn't done a completion notice with our Shire too after all this time, it‟s a massive can of worms. We have to try and get his license revoked to claim off the indemnity insurance. Would he have had to have the pest control done to be able to claim the practical completion payment from the bank?.... 2 March 2018 Bank send s email to Ms M: A valuer from CBRE will be contacting you and I have noted that there are multiple defects and the builder has not built the property according to the approved specifications. I have noted that you will be outlining the issues when he comes and inspects your property. Determination | Case number: 642869 Page 22 of 25 Date & source Key points I will call you when the valuation comes back. 7 March 2018 Ms M sends email to bank: Can you please give me a name and number of who I need to speak to regarding our builder? The valuer called me yesterday and ha d no clue of what he was coming out to do. I suggested he should call you to confirm then call me back. I understand this is not a priority for the bank, they will get their mortgage payments regardless of the outcome. This matter for us though is upmost i mportant as we need to recover our losses asap. We know the builder has anot her build at the moment, so we need to strike while he is working. We are going to issue complaints to ACCC, master builders, ATO as well as our file with the building commission. I need guidance from our Financial institution as to whet her they can help us or not Bank respond: I am dealing with the original valuer at the moment. We have sent them the information that they requested, and I have been dealing with them in regard to w hat is going on. This is certainly a priority as it is not just the mortgage payments that we are concerned about, it is also our security position. This is a very fragile matter and the valuation that we will be getting is critical to the next step that w e take. I have just received confirmation from them that they are going to inspect and liaise with the Shire. This is certainly being treated with the utmost of importance. 14 March 2018 Valuation completed (by HTW ). Upon completion market value $725,000 (Land $250,000, Improvements $450,000). Valuation report includes comments: „The dwelling is showing signs of structural defects (refer to photographs). From our physical inspection it appears that the dwelling has not been completed to a non - tradesperson standard, with a number of defects noted. 13 April 2018 Ms M sends email to bank: I spoke with S from customer complaints today. She informed me that our dispute is between the builder and ours elves. She advised the bank were not required to check any paperwork prior to releasing practical completion payment. I beg to differ. S doesn't seem to grasp the idea of our complaint, so I will explain myself again 1. The builder applied for and took practical completion payment from the bank, knowing full well he had not completed pest control and septic system. This is fraud against the bank 2. A $30,000 payment has been paid to an unregistered subcontractor whos e ABN was cancelled at the time of work and still is to date. He was paid GST included in this payme nt. That is fraud against the bank and ATO 3 . We believe the builder has taken payment from the bank for unauthorized variations of over $30,000. This is work he did not have permission to do and has admitted to undocumented it. Again, this is fraud 4. We know that paperwork has not been check correctly by someone in the bank, not only paperwork for practical completion but also on the addenda attached to the building contract. The bank failed to notice that the addenda Determination | Case number: 642869 Page 23 of 25 Date & source Key points is for a 4 bedroom hous e yet the draw ings show a 5 bedroom house. S asked if we were struggling financially, is that why I have asked for the mortgage to be changed back to interest only. My complaint has been lodged with the bank since 20th Marc h 2018, to get a phone call today and have to e xplain everything again is disappointing. Bank respond saying their Senior Customer Relations Manager is looking in to options. 24 May 2018 Ms M lodges a complaint with FOS (#529144). Complaint relates to the final progress payment. 7 December 2018 Home Indemnity Insurance (HII) company processes indemnity insurance payout of $99,500 ($100,000 less excess of $500) to Ms M and Mr C. 9 January 2019 AFCA issues Determination (Complaint #529144) to Ms M and Mr C and the bank. The Determination is in fa vour of Ms M and Mr C. the bank to pay $59,982 (80% of final progress claim) plus interest charged. 6 February 2019 Ms M and Mr C accept AFCA‟s Determination (Complaint #529144). 12 February 2019 The bank and Ms M and Mr C meet at security property to discuss the complaint and construction issues. The bank completed a file note of the meeting (refer email from Complainant to AFCA 14 August 2019)  Ms M alleged the local government council could not explain how the building plans were originally approved  Ms M assumed the bank was conducting property inspections prior to each progress payment to the builder and that‟s why she continued to sign the progress claim authorisation forms  Ms M said she has made payments directly to the builder outside of the progr ess claims  Ms M said they have received an indemnity insurance payout of $100,000 from the HII  Ms M has invested $140,000 in the property  The bank employees signed the file not e 6 March 2019 28 February 2019 The bank made a payment for $66,031.08 to the loan, following AFCA Determination (complaint number 529144). Ms M withdrew $66,031.08 from the loan and deposited it in to a savings account with the bank. 28 February 2019 Ms M transferred $5,000 to another bank savings account. This was the maximum dai ly allowance she could trans fer. 1 March 2019 Ms M transferred a second amount of $5,000 to another bank savings account. Determination | Case number: 642869 Page 24 of 25 Date & source Key points 1 March 2019 The bank put a hold on $51, 411. 15 held in account ending 575. The bank requested Ms M and Mr C to return these funds to the loan. 7 March 2019 The bank issued letter to Ms M and Mr C det ailing loan arrears was $28,210.80 (as at 6 March 2019) and the loan is currently in monetary default. 8 March 2019 Ms M agreed to trans fe r $51,411.15 back in to the loan account. The bank agreed to adjust the loan to reflect the arrears had been cleared and the loan was in order. The bank also adjusted the loan to reflect that the surplus bet ween the arrears of $28k and the deposit of $51k was not available from the loan for future payments on the house. 28 May 2019 Ms M lodges a complaint with AFCA (#642869). 5 August 2019 Ms M states the bank did not follow their own lending policies which required them to hold a copy of the council approved building plans. The bank only had a copy of the plans, provided by the builder which were on the back of the building cont ract. These plans were not council approved. 9 September 2019 The bank makes the following offer: 1. Voluntary surrender and s ale of property  Vacate the property and surrender keys to the bank within 60 days  All fixtures and fittings to remain on the property  The bank aft er taking vacant possession will take all necessary steps to prepare the property for sale (including building works which will be debited to the loan) and proceed to sell the property as mortgagee in possession  If following the sale of the property there is a short fall debt, the bank will write off the shortfall  If following the sale of the property there is a surplus, the bank will pay the surplus to Ms M and Mr C  The bank is released from all claims relating to the loan and property 2. Payment to Ms M and Mr C  The bank to pay $50,000 (Settlement sum) 3. Building Indemnity Insurance claim  The bank will not make a ny claim on the amount of $99,500 received by Ms M and Mr C from HII as a result of the building indemnity insurance claim. 24 September 2019 Ms M rejects the banks offer to resolve complaint. Determination | Case number: 642869 Page 25 of 25 Date & source Key points 31 October 2019 Email from Ms M saying the Enforcement Team from the state Building Commission had attended the property and assessed the home. The State Building Commission advised her that she has no recourse. 12 November 2019 Ms M provided a scope of works detailed the recently completed work and upcoming work on the home.  May 2019 $6,595  June 2019 $4,709.50  September 2019 $6,305  October 2019 $10,712.35  November 2019 $13,970  December 2019 $15,670  January 2020 $32,000 Extra works $30,870 19 November 2019 The bank Customer Advocate says the bank do not hold a confirmation of the current insurance policy over the „building site‟. The bank has taken out a „Distressed Mortgagor‟ policy but this does not provide public liability cover. In order for the bank to comply with the Distressed Mortgagor policy they are re quired to provide the insurer with evidence of the rectification works having been completed including any expert reports. The bank has requested copies of the following from Ms M:  Any structural engineers report completed since February 2019  Any other ind ependent expert report outside of structural engineer (eg: building inspector or plumber)  Engineers approval / complianc e certificate of rectification works completed to the slab  Copy of council approval of the resubmitted plans and compliance certificates (as built)  Final council approval – occupancy certificate  Proof that the insurance proceeds have been applied to correcting known defects 28 November 2019 MP‟s office cont acts AFCA 5 December 2019 Ms M called to advise she has obtained a copy of the Certificate of Building Compliance which she will send through. 10 December 2019 Ms M provides a list of defects and missing items that have been rectified and those that are still to be completed. Ms M confirms the certificate of compliance has been issu ed, based on new „as built‟ drawings supplied by the building surveyor. The rectification works, reports and new drawings were paid from the HII payment.