Storm damage claim to balcony denied
Summary
The complainant, represented by a solicitor, claimed under a commercial material damage policy for balcony damage after a storm in August 2017. AFCA found the storm was not the dominant cause, which was long-standing rot, decay and corrosion, and that the policy excludes those causes, so it ordered nothing.
The proximate cause of the loss was long-term deterioration and corrosion, which the policy expressly excludes.
Issues
- Claim denial primary · not upheld“The insurer is entitled to deny the claim and is not required to take any further action.”
Subjects and remedies
home or building damagenatural disasterno remedy
Related
Text of the determination
Determination
Case number 641965
Financial firm Lloyd's Australia Limited
Determination | Case number: 641965 Page 1 of 13
Case number: 641965 20 December 2019
1 Determination overview
1.1 Complaint
The complainant is represented by his solicitor (AH). For simplicity, the determination
will refer to both the complainant and AH as ‘the complainant’.
The complainant holds a commercial material damage policy with the financial firm
(insurer). The complainant lodged a claim for damage sustained to his balcony as a
result of a storm event on 18 August 2017.
The insurer assessed the claim and subsequently denied indemnity. In doing so, its
engineer says the damage to the balcony is as a result of long term fatigue and
structure dilapidation.
The complainant disagrees and says the storm is the main proximate cause of the
damage. Further, during the repairs of the damage, a further cause of the damage
was discovered, being inadequate footings to support the column as a result of a dug-
up pit by a telecommunications provider.
1.2 Issues and key findings
Is the insurer entitled to deny the claim?
Yes. This is because:
the storm is not the proximate cause of the damage but rather the long -standing
rot, decay and corrosion damage to the balcony
the policy expressly excludes any physical loss, destruction or damage by rust,
corrosion, wear and tear and gradual deterioration.
1.3 Determination
This determination is in favour of the insurer.
The insurer is entitled to deny the claim and is not required to take any further action.
Determination | Case number: 641965 Page 2 of 13
2 Reasons for determination
2.1 Is the insurer entitled to deny the claim?
The complainant carries the initial onus to establish any loss or damage arising from
an event is covered by the terms and conditions of the policy. This is known as a valid
claim.
Once established and if the insurer seeks to deny the claim, the onus shifts to it. In
such a case the insurer bears the onus to establish, on the balance of probabilities, it
is entitled to:
rely upon a policy exclusion
otherwise deny the claim.
The complainant’s policy provides cover in the event of any physical loss, destruction
or damage subject to the policy’s exclusions.
The complainant says a piece of verandah post fell in strong winds landing on a third
party’s vehicle. The complainant’s building sustained severe damage which he
attributes to the wind.
Given the broad scope of cover provided under the policy, the panel is satisfied the
complainant has established a valid claim for the damage sustained to the verandah.
Accordingly, it falls to the insurer to demonstrate that the proximate cause, being the
main dominant, causative and operative cause of the loss, is excluded under the
policy or it is otherwise entitled to deny the claim.
The balcony has been subject to long standing deterioration
Two years prior to the loss, the complainant engaged an engineer (TK) to report on
the possible causes of the balcony’s damage.
In addressing the damage to the balcony structure, TK says in its report dated
11 April 2018 (based on previous inspections):
the perimeter decking boards and timber fascias have severe timber rot
the western end of the timber floor bearers has severe rot
the existing balcony level cast iron posts have rusted and have inadequate
connections to the balcony
ground floor steel posts have severe rust at the top and bottom connection plates
one pad footing has settled
it appears that one ground floor post has been hit by a car.
Determination | Case number: 641965 Page 3 of 13
TK attributed the observed rotten timber to the ongoing exposure to driven rain
entering the balcony.
In addressing the causation of the cast iron rust, TK says the exposure to weather
over a long period of time has resulted in the paint wearing off and rusting. Further,
the cast iron posts have lost their connection to the balcony floor structure. TK says
most of the base connection has separated where the decking boards have rotted
through.
In addressing the subsided footing, TK says the subsidence is adjacent to the
telecommunication provider’s pit which was likely installed after the original footings
were constructed. Further the footing is also at the location of a down pipe storm
water from the balcony discharging onto the street.
TK opines the footing appears to be inadequate in size based on the current
standards. Further, TK says it is likely a combination of the service pit installation,
down pipe and footing size which have contributed to the settlement.
TK originally inspected the property on 29 January 2015, which predates the subject
event. Relevant to the complaint, the policy was incepted on 31 March 2016. There is
no evidence the complainant has addressed any of the damage and issues which TK
identified in his reports.
Wind is not the proximate cause of the damage
Following the claim’s lodgement, the insurer engaged an engineer (CD) to assess the
cause and the extent of the damage. In his report, CD notes:
severely dilapidated timber floor boards. Nailed connections are protruding from
the decking
the support post on the southeast corner of the balcony has negligible connection
at the base. Rotted timber decking around the base screw fixing which is no longer
embedded into the timber flooring
corrosion to the decorative infill panel and extensive corrosion to the base infill
railing
nail fixings have popped out of the timber floorboards and are severely corroded
the base of the column support has completely rotted out such that the column is
not physically connected to the timber floorboards. Corrosion debris is seen in the
cavity beneath the column
longstanding rot and decay of the timber floorboards
split cast iron column where corrosion is evident to the split surface.
CD argues the maximum speed wind recorded on the day of the loss (72km/h), is not
the highest in the year. CD says on 22 February 2017 the wind speed was 80km/h.
Determination | Case number: 641965 Page 4 of 13
Having the blinds lowered in the western and southern end of the balcony, the SWS
wind would have incurred the greatest load on the subject balcony. CD says the
lowered position of the blinds has increased the solidity of the structure and therefore
increased the wind loading acting on the structure.
CD is unable to comment on whether the balcony is compliant with the current
building standard given the age of the balcony is unknown. In noting this, CD says the
damaged observed to the balcony would not have been as a result on a one-off storm
event with a maximum wind speed of just over 70 km/h.
CD argues the subject balcony is considered to have been in a dilapidated state prior
to the reported date of loss. The observed damage being movement damage, timber
decay and iron corrosion are long term and pre-existing. Further, the connections of
the balcony members are considered to have been in a compromised state and
susceptible to movement prior to the event.
CD provided a number of google images from 2010 for the subject structure. CD says
the photos depicts several structural damage such as corrosion to the column,
cracking of the timber and movement of the balcony structure.
CD argues the balcony may have suffered further damage during the claimed event,
however, the storm is not considered to be the proximate cause of the damage to the
structure.
CD argues the structural capacity of the balcony structure has been adversely
affected by the long-term rot and decay (predominantly the timber decking) which has
compromised the structural capacity of the connections. Particularly at the base of the
column making these connections highly susceptible to movement.
Similarly, the historic pre-existing cracking and corrosion damage evident to the cast
iron column and connections is considered to have significantly reduced its capacity.
CD says the balcony structure was structurally unstable prior to the event.
CD concludes the storm may have caused further damage to the balcony, however, is
not considered to be the proximate cause of the damage. In CD’s opinion, the
proximate cause of the damage is the long-term dilapidation and fatigue. CD says the
damage to the balcony is partially due to the poor human judgement by lowering the
blinds which were secured to brittle cast iron column supports.
The panel notes, the complainant has not provided any expert reports to refute CD’s
findings. The panel accepts the subject wind is not the proximate cause of the
damage.
The complainants’ arguments do not advance his position
Having reviewed both TK’s’ reports, the panel is not satisfied these reports either
assist the complainant nor advance his position. This is because:
Determination | Case number: 641965 Page 5 of 13
this causation and the structure settlement damage was noted by TK prior to the
claimed event
there is no evidence the complainant has addressed the reported damage in TK’s
initial report
the pit installation and subsequent settlement predates the policy inception.
The exchanged information does not establish the exact date of the pit installation.
However, the footing settlement associated with the excavated pit was noted in 2015.
It is reasonable to conclude the pit installation predates the policy inception.
The complainant says the insurer inspected the property prior to the policy inception.
The insurer says the complainant was aware of the condition of the property and the
works required to be carried out hence the restricted use of the area being the
balcony. The panel notes the insurer is not arguing or seeking to rely on any non-
disclosure breaches (if any) by the complainant.
The complainant says:
the normal upkeep does not apply to the subject property being heritage listed
to avoid damage and further deterioration, he restricted access to the subject area
and being closed to the public for years
he provided a condition report along with photographs to the insurer prior to the
policy inception
the deteriorated condition of the property since 2010 has not changed and this is
evident in the subsequent assessments
the only exception is the storm damage.
The complainant says given the heritage nature of the property he was unable to
carry out any works and restricting the area was the most reasonable solution which
was successful until the storm event.
In addressing the wind damage, the complainant says the weather station is 11kms
away and not 8kms as mentioned by CD. Further, there are differences in the
surroundings at the two locations, one being an open area and one being in an area
which could create wind tunnels. The complainant has not provided any evidence to
substantiate this assertion. Further, the complainant says previous storms might have
c ontributed to the structural integrity of the building which is consistent with CD’s
conclusion.
The complainant says the age on the balcony is unknown and therefore the
applicable building standard is also unknown. The complainant argues there is no
evidence that the storm was not significant enough to cause damage or the structure
was not compliant with the relevant code. The panel accepts the exchanged
information does not ascertain the relevant building code. However, the panel accepts
Determination | Case number: 641965 Page 6 of 13
the complainant was aware that the balcony was not compliant with the current
standards in light of TK’s pre -loss report.
The complainant says he was not aware the pit installation and the storm water
seepage into the ground caused the foundational damage. Whilst the panel accepts
the complainant was not aware of the causation to the settlement and subsidence, the
pan el does not consider the insurer’s liability extends to cover this damage. This
damage occurred prior to the policy inception.
The complainant argues the wear and tear issues identified are superficial in nature
and could not have resulted on the claimed damage. The panel does not accept this
argument. It is clearly evidence from TK’s and CD’s respective reports the damage
sustained to the balcony prior to the storm event was so severe to the point which
prompted the complainant to restrict public access for safety concerns.
Conversely, the panel considers the identified wear and tear issues to be significant in
light of TK’s and CD’s reports.
The complainant has not provided any expert evidence to refute CD’s findings. The
panel does not accept the complai nant’s argument that the deteriorated state of the
balcony had no relevance to the performance of the building during the storm event.
The complainant says further assessment by the engineers and builders engaged for
the repairs found there was no severe timber rot and the original report could not
have made such an assessment without the removal of the decking board. The
complainant has not provided any evidence to substantiate his assertion. The panel
does not accept this argument given both TK and CD comments on the severity of the
rotting and decaying.
The complainant asserts that following the removal of the steel posts rust was mainly
to the surface and the posts were structurally sound. Further upon carrying out
repairs to the veranda and balcony the structure was at nowhere near the level of
dilapidation that the engineers have reported.
Unfortunately, the complainant has not provided expert material to support his
position. A position which is directly challenged by TK and CD.
The insurer is entitled to deny the claim
Having carefully considered the exchanged information and parties arguments, the
panel is not satisfied the complainant has established that the storm is the proximate
cause of the damage.
There is no dispute the insurer was aware the insured property is heritage listed.
Further, the panel accepts the heritage nature of the building caused difficulties to the
ongoing maintenance of the property as outlined by the complainant.
Determination | Case number: 641965 Page 7 of 13
In noting that, the panel considered the loss in light of the terms and conditions of the
policy. The panel considers the storm was sudden and unexpected from the
complainant’s point of view. Further the panel accepts the storm may have
exacerbated the degree of damage to the already deteriorated structure.
Further, the panel accepts the building performed poorly when impacted by the wind
due to its deteriorated structure. It is evident the balcony structure was not adequately
connected to the posts. This is evident in TK’s pre -loss report.
The panel accepts CD’s fi nding and finds his report logical and persuasive. Further,
his report is consistent with TK’s report commissioned in 2015. The panel notes at the
time of CD’s inspection and subsequent reporting, TK’s report was not available to
him. The panel accepts the subject balcony structure was in a dilapidated state prior
to the claimed event which would have required the claimed substantial repair works.
TKs’ pre -loss findings conclude the balcony structure has severely decayed and
corroded. The panel considers that had the balcony been maintained and of good
repairs at the time of the event, further damage would not have occurred.
The panel accepts that substantial repairs were required to address the long-standing
timber decay and corroded posts prior to the claimed event as early as 2010, based
on the google images supplied by CD. It is evident the complainant was aware of the
deteriorated state of the balcony based on TK’s causation report.
There is no evidence to suggest the complainant took any reasonable steps to
address noted damage and mitigate further losses. The panel does not accept
restricting public access was adequate to mitigate further losses.
The balcony was out of operation for any commercial purposes two years prior to
when TK reported that the balcony posts were rusted and had inadequate
connections to the balcony.
The panel accepts the storm may have exacerbated the damage to the already
deteriorated and fatigued structure.
However, the panel is satisfied that the storm is not the dominant, operative and
proximate cause of the damage but rather the deterioration, decaying and corrosion
which the policy clearly excludes.
The policy clearly and unequivocally excludes any loss or damage through rus t or
oxidation, corrosion, wear and tear, gradual deterioration or developing flaws, normal
upkeep or making good
The panel is satisfied the insurer is entitled to deny the claim and is not required to
take any further action.
Determination | Case number: 641965 Page 8 of 13
3 Supporting information
3.1 Policy Wording
SECTION ONE
MATERIAL LOSS OR DAMAGE
THE INDEMNITY
In the event of any physical loss, destruction or damage (hereinafter in Section 1
referred to as
‘damage’ with ‘damaged’ having a corresponding meaning) not otherwise
excluded happening
at the situation to the Property Complainant described in Section 1 We will,
subject to the
provisions of this Policy including the limitation on Our liability, indemnify You in
accordance
with the applicable Basis of Settlement.
…
EXCLUSIONS
APPLICABLE TO ALL SECTIONS
PROPERTY EXCLUSIONS
This Policy does not cover physical loss, destruction of or damage to the following
property or
loss under Section 2 resulting therefrom:
….
PERILS EXCLUSIONS
We shall not be liable under Sections 1 and/or 2 in respect of:
….
4. Physical loss, destruction or damage occasioned by or happening through:
a) moths, termites or other insects, vermin, rust or oxidation, mildew, mould,
contamination or pollution, wet or dry rot, corrosion, change of colour, dampness
of
atmosphere or other variations in temperature, evaporation, disease, inherent vice
or
Determination | Case number: 641965 Page 9 of 13
latent defect, loss of weight, change in flavour texture or finish, smut or smoke
from
industrial operations (other than sudden and unforeseen damage resulting
therefrom);
b) wear and tear, fading, scratching or marring, gradual deterioration or
developing flaws,
normal upkeep or making good;
3.2 Key documents
Record Key points
Complainant’s engineer (TK)
30 - 01 - 2015
The central post (4 th in from East) appears to have dropped. The
associated balcony floor and roof beams connected to the post
have noticeable sag to them.
A storm water down pipe is connected to this post discharging roof
stormwat er to the street
It is likely (although diffic ult to tell due top paving restricting
inspection) that overtime, stormwater discharge from the down
pipe has perc olated through the sandy soils surrounding the post
footing leading to minor settlement of the footing
It is difficult to comment on whether f urther settlement of the
footing is likely to occur without knowing details of the foundation
soils and footing size
Corrosion is evident to steel plates connecting the tops of the
columns to floor beams
The steel plat es are exposed to constant weat her and the paint
coating does not appear to be adequate in providing corrosion
protection
Given the current condition of the plates, we would recommend
replacement or extensive treatment to slow down/prevent furt her
corrosion from occurring
The edges of the deck ing has severe timber rot
The rot appears to be concentrated around upper level posts
bases
The unprotected hardwood decking will likely continue to rot if left
untreated
Of significant concerns is the detached base of one of the upper
level posts supporting the balcony roof
Although difficult to see from pictures, the base of the post is no
longer supported by the floor beam below
The post can easily be removed when leaned on and sways
significantly when leaning on the existing handrails
We conclud e that the current condition of the balcony posts and
framing is in poor condition
Due to the lack of support to part of the upper level roof and
balustrade, we recommend that this area is not used by the public
or large crowds until repaired.
Determination | Case number: 641965 Page 10 of 13
Record Key points
Insurer’s e ngineer (CD )
26 - 09 - 2017
The original building was constructed in 1870 and is heritage
listed.
An extension to the original building occurred which includes the
balcony.
The complainant installed café blinds to the balcony 10 years ago.
The complainant says an engineer inspected the balcony 2 years
ago and noted rotted timber decking on the balcony.
The balcony has been out of operation for commercial purposes
two years prior.
The maximum wind speed was recorded at 72km/h on 18 August
2017, 74 km/h on 10 August 2017 and 74 km/h on 16 August
2017.
The highest wind gust of the year was 22 February 2017 at 80
km/h.
Of particular importance in the case is the direction the wind was
coming from as the insured has claimed the wind acted on the
blinds in a manne r similar to that of a sail.
The wind would have incurred the greatest wind load on the
balcony.
The lowered position of the blinds increased the solidity of the
structure and therefore increased the wind loading acting on the
structure.
The failure of the cast iron column support is due to a combination
of pre - existing damage (already dilapidated structural column
member) and due to insured securing blinds directly to the brittle
cast iron column supports with rope, causing the member to fail
when subjecte d to significant wind loading.
The wind speed 72 km/h is significantly lower than the design wind
speeds which current buildings are designed for.
The structural observed damage to the balcony would not have
been the res ult of a one - off storm event with a maximum wind
speed of just over 70 km/h.
The balcony has been in a dilapidated state prior to the reported
loss.
The majority of the damage has been caused by long term rot and
decay and pre - existing movement related damage to the cash iron
members.
The co nnections of the balcony members are therefore considered
to have been in a compromised state and susceptible to
movement prior to the event.
Desktop investigations with the use of Google Maps Street View
imagery from as early as January 2010 depicts the s ubject
balcony with several structural defects, such as corrosion to
column supports, cracking of timber elements and movement of
the balcony structure.
The storm event may have precipitated further damage to column
supports and caused further movement of the balcony structure.
The subject balcony was structurally unstable prior to the 'Event'
and posed a credible risk to the health and safely to whoever used
Determination | Case number: 641965 Page 11 of 13
Record Key points
the balcony prior to the 'Event.
T he fixing of cafe blinds to the cast iron column supports with th e
use of rope by the Insured enhanced the damage potential to the
structure, particularly under wind load conditions such as those
experienced on the date of loss (which were conducive to causing
most damage to the subject structure).
T he failure of the ca st iron column support is partly due to the
Insured securing the blinds to the brittle cast iron column supports
with rope, but mostly due to pre - existing, longstanding damages to
the balcony structure.
Complainant’s engineer (TK)
04 - 2018
TK has been engaged to provide comments on the possible
causes of the current deterioration of the existing balcony.
The perimet er decking boards and timber fascias have severe rot.
The western end of the timber floor bearers has severe timber rot.
Existing balcony le vel cast iron posts have rusted and have
inadequate connections to the balcony floor.
Ground floor steel posts have severe rust at top and bottom
connection plates.
One pad footing in particular has settled.
It appears that one ground floor post has previo usly been hit by a
car.
Timber rot observed in the timber decking boards and bearers and
fascias is likely due to ongoing exposure to driven rain entering the
balcony area and falling towards the ends of the decking.
Any surface water would likely penetrat e into the bearers over time
resulting in timber rot.
Existing painted cast iron posts have been exposed to the weather
for a long period of time resulting in some of the paint wearing off
and rusting the exposed iron.
The cast iron posts have lost their c onnection to the balcony floor
structure.
The previous connection consisted of two screws to the decking
boards which would not comply with current standards.
Most of the base connections have separated where the decking
boards have rotted through.
Existin g ground floor painted circular hollow section posts have
rusted at connection plates which is typical for painted steel
exposed to weat her over prolonged periods that have been
inadequate paint protective coatings.
The footing that has subsided is adjacent to a Telstra service pit
likely installed after the original footings were constructed.
The footing is also at the location of a down pipe collection
stormwat er from the balcony roof and discharging to the street.
The footing was exposed by the builder and appeared to be
inadequate in size based on current standards.
It is likely a combination of the service pit installation, down pipe
and footing size that has contributed to the settlement.
It is likely at some p oint a vehicle has reversed or driven into one
Determination | Case number: 641965 Page 12 of 13
Record Key points
of the posts whilst attempting to park on the street outside the
balcony. The damage has likely reduced the structural capacity of
this post.
Complainant’s engineer ( TK )
Report
29 - 04 - 2019
Pit removal and pre paration for new footing inspection.
The pit has been excavated and removed prior to TK’s arrival.
It appears during the construction and installation of the pit, the
existing footing at the balcony column was cut to accommodate
the pit.
The existing footi ng was cut to within 50 mm of the column and
obvious settling was apparent at the rear of the column closest to
the cut.
A combination of the inadequate footing and storm water seepage
into the foundation soil is likely to be the cause of the settled
colum n.