Home / AIG Australia Limited / Determination 640037

Determination 640037

Scope of ceiling replacement, repair costs and temporary accommodation after water damage

FirmAIG Australia Limited
Decided2020-03-02
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded$118,551
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The insurer accepted a storm water damage claim but disputed the ceiling scope, repair costs and temporary accommodation. AFCA ordered further repair costs, accommodation costs and part of the professional costs, with interest.

The insurer must cover reasonable costs to restore the home to near its pre-loss condition, and it had not shown the complainant's works were unnecessary.

Issues

Subjects and remedies

home or building damagepay claimpay compensationpay interest

Related

All AIG Australia Limited determinations · Find similar determinations

Text of the determination

Determination Case number 640037 Financial firm AIG Australia Limited Determination | Case number: 640037 Page 2 of 10 Case number: 640037 28 February 2020 1 Determination overview 1.1 Complaint The insured property suffered damage as a result of water entry following a storm on 14 December 2018. The financial firm (insurer) accepted the claim. However, a dispute remains about the scope of work for the ceiling and cornices, and the extent of the insur er’s liability in relation to the remainder of the repairs, temporary accommodation and professional fees. 1.2 Issues and key findings What is the insurer’s liability regarding the ceiling and cornices? Based on the expert evidence presented, the panel considers it is fair in all the circumstances that the insurer cover the complainant for the removal and replacement of the ceiling and cornices in the affected areas. What is the insurer’s liability regarding repair costs? The insurer should pay for the complainant’s repair costs. This is because it has not shown that these costs were not necessary to repair the claim related damage. What is the insurer’s liability regarding the temporary accommodation? The available information does not show the complain ant’s temporary accommodation costs were unreasonable at the time they were incurred. Therefore, the insurer is to reimburse these costs. What is the insurer’s liability regarding professional costs? The panel is not satisfied the complainant’s claim mana gement costs were reasonably incurred. These are not payable. The insurer should pay for the other professional costs as set out in section 2.4 as they were reasonably incurred and assisted the complainant’s position. 1.3 Determination The insurer should pay the complainant the following in settlement of this dispute (minus any payments it may have made whilst the complaint was with AFCA):  $59,952.94 plus interest for the repair costs as set out in section 2.2  $52,240.20 plus interest for temporary accommodation as set out in section 2.3  $6,358 for professional costs as set out in section 2.4. Determination | Case number: 640037 Page 3 of 10 2 Reasons for determination 2.1 What is the insurer’s liability regarding the ceiling and cornices? Engineering evidence shows it was appropriate to replace ceiling and cornices Both the complainant and insurer obtained reports from engineers about whether the plasterboards and cornices needed to be removed and replaced. The complainant’s engineer (KM) says it spoke to a plasterer who informed it that it is more cost efficient to remove the sheets and the cornices, rather than attempt to remove the cornice whilst leaving the sheeting intact. FM advised that the cornices could be removed without damaging the plasterboard linings and that it had made enquiries with a plasterer that had confirmed it could manufacture the bespoke plaster cornices. However, FM does not advise how practical it would be to remove the cornices in this manner or the likelihood of the plasterboard being accidentally damaged during this process. Given KM said they spoke to a plasterer, it appears there is a real possibility for the plasterboard to be damaged during the process. Therefore, the panel does not accept that FM’s scope of works would guarantee to repair the claim related damage on this point. KM also made important points that the content of ceiling sheeting in various locations was unclear, and that sheets should be replaced in order to inspect the roof cavity and check for mould growth. KM also recommended that sheeting be removed and replaced due to the possible compromising of adhesives used to fix the sheeting. FM believed that the structural integrity of the ceiling had not been compromised by the event, as there were no visible signs of water damage to ceiling linings, fixing or backing boards. FM supplied photographs of its inspection of the cavity around the retreat room (where there was a lot of damage). The photos demonstrate that there are no visible signs of water damage to the ceiling linings or fixings. However, as all the areas have not been exposed, it remains unclear if this was the case in other places. There were also numerous parts of the home that had mould growth. The panel acknowledges a plan to address all the mould was agreed upon by the parties at a site visit. However, the panel agrees with KM that without replacing the ceiling and wall sheeting, it is unknown whether there is mould growth in other parts of the home. The photograph on page 21 of KM’s report shows mould growth to timber, which would not have been evident if the sheeting had not been removed. Determination | Case number: 640037 Page 4 of 10 Conclusion – ceiling and cornices Based on all of the expert evidence presented, the panel considers that it was reasonable for the complainant to have replaced the ceilings and cornices in the affected areas. The available information shows there was uncertainty as to what extent the ceilings were affected by the water entry. There was also a likelihood that the plasterboard would be affected by simply removing the cornices. Further, the insured property is of high value, given it was insured for over $5.3 million. The policy is designed for a particular group who ‘provide insurance exclusively for individuals requiring the highest standard of care’. In context of this, it is reasonable to expect the affected areas would be restored to as close as reasonably practicable to their pre-existing condition. The panel is satisfied that the works in KM’s report would more likely result in this outcome. 2.2 What is the insurer’s liability regarding the remaining repair costs? Insurer to pay for amounts that are undisputed In an email dated 25 November 2019, the insurer confirmed there was an amount of $41,300.40 not in dispute. This included an allowance for temporary accommodation ($38,700), which will be addressed later. The balance was for the electrical works paid to a provider ALS ( $1,896.40 ) and another electrical invoice for $704 . Given these are not in dispute, the panel accepts those amounts should be included in any cash settlement payable. Insurer had overpaid on certain costs The complainant has provided a spreadsheet of his costs, including invoices in support. The insurer has already provided two cash settlements of $66,818.55 and $15,453.95. The basis of these two amounts were explained in the insurer’s email to t he complainant’s broker dated 14 May 2019. The panel will refer to these two main documents in reviewing the balance to be paid. Part of the complainant’s costs included the removal, return and storage of furniture as well as curtains removal and reinstallation. These totalled $5,172.80. Based on the figures set out in the insurer’s email, it appears the insurer paid $5,292.05 towards these. Therefore, the insurer has paid an additional $119.25 for these items, which should be considered in any final amount. Determination | Case number: 640037 Page 5 of 10 Insurer should pay for the difference in repair costs The main issue is the difference between what the complainant has paid for the building works (including electrical costs) and what the insurer has allowed. The difference between these amounts is $57,471.79. This is based on the following:  the costs paid to the builder (AP) $126,605.64  ALS electrical costs (invoice 1329) $ 7,744.00 minus  insurer’s allowance for repairs (PI revised quote) $ 74,981.45  insurer’s contribution to ALS invoice $ 1,896.40 The insurer’s position is that it has settled on the fair and reasonable costs set out in PI’s revised quote , that was based on FM’s revised scope of works. The insurer also noted that the complainant elected to authorise AP to do the works without its consent. The panel notes the insurer’s main argument about the complainant’s costs being unreasonable is the replacement of the ceilings and cornices. For reasons explained, the panel preferred AP’s works on this point. The insurer has not highli ghted what other aspects of the complainant’s costs were unreasonable. The policy provides the following cover to an accepted claim: If the Payment Basis is Additional Rebuilding Cost, We will pay the Reconstruction Cost of Your House … ‘ Reconstruction Cost ’ is defined to mean: the lesser of the amount at the time of the loss required to:  restore or repair a structure; or  replace or rebuild a structure at the same location. The complainant has submitted costs he has incurred to repair the structure at the same location. The insurer has not established there were works conducted by AP and ALS that were not necessary for this purpose. The panel also notes the insurer has not referred to any part of the policy which says it can reduce its liability by reference to what it would have paid its own contractors. In a submission dated 9 October 2019, the insurer alleged the complainant has not co-operated with it, as required by the policy and pursuant to his duty of utmost good faith. The insurer said this prejudiced it to properly assess the claim. Determination | Case number: 640037 Page 6 of 10 The panel disagrees. It is evident the insurer and its contractors were provided access to the property several times to enable it to assess the extent of the claim related damage. Even if the panel accepted the complainant failed to co-operate to an extent, the insurer has not shown how it was prejudiced regarding any aspect of the claim, given it has had access to the property and the complainant’s costings. In addition, the panel notes the insurer’s settlement is based on a builder’s revised quotation. There is no certainty that builder could have completed all the works without any requirement for a variation, particularly given the amount in question. Given all this, the panel does not accept the insurer has established a basis under the policy to reduce its liability to the amount it has. Alternatively, the panel does not accept it is fair for the insurer to do so for similar reasons. Therefore, the insurer is to pay an additional $57,471.79 for the complainant ’s repair costs. Insurer is to pay interest The insurer is to pay interest on the additional amount payable under this section. Interest is to be calculated pursuant to section 57 of the Insurance Contracts Act 1984. Interest is payable from 14 May 2019, being the date the insurer had received all the complainant’s costs and offered a partial settlement, until payment is made. 2.3 What is the insurer’s liability regarding the temporary accommodation? Insurer to compensate complainant for 43 nights of alternative accommodation The complainant is seeking to be paid for his temporary accommodation costs for the time the repairs were underway. The policy provides extra cover for ‘Alternative Accommodation’ in the following circumstances: If a covered loss makes Your Residence uninhabitable, We cover any reasonable increase in living expenses incurred by You to maintain Your household’s usual standard of living. The parties agree that the duration of 43 days is reasonable. In its email dated 25 November 2019, the insurer says the amount of $900 per day is reasonable. The insurer has referred to several examples of accommodation that match the complainant’s usual standard of living , that were included in its response to the complainant dated 26 June 2019. Determination | Case number: 640037 Page 7 of 10 The complainant disagrees. He had incurred costs of $1,200 per night, plus other incidentals. He says he had to book alternative accommodation during the prime tourist season in Melbourne, which included the Australian Open. The one offer provided by the insurer at the relevant time was a three bedroom apartment which did not have air-conditioning. This would not meet his usual standard of living. The panel notes it is not clear that the insurer’s examples set out in its letter dated 26 June 2019 were available at the relevant time. The one example that was put to the complainant at the relevant time was clearly not suitable. This is because the complainant’s property had five bedrooms, four bathrooms, study, retreat, library, sitting room, dining room, bar, gym, wine cellar, home theatre, sauna, outdoor kitchen, spa, swimming pool and basement garage. Therefore, the panel accepts it is fair that the insurer accepts the temporary accommodation costs incurred by the complainant. This is because the available information shows these were the costs incurred by the complainant, and the insurer has not shown there were more reasonable options available at the time that met the policy criteria. The insurer is to pay $52,240.20 . The insurer should also pay interest on this amount. This is to be calculated in the same way as set out in section 2.2. 2.4 What is the insurer’s liability regarding the professional costs? Professional costs may be awarded Under Rule D5, AFCA may decide a financial firm is to contribute to the professional costs incurred by a complainant in the course of a complaint. This is normally capped at $5,000, unless exceptional circumstances apply. This can be awarded when the costs were incurred by the complainant so they could understand or establish their claim. Insurer does not need to cover the complainant’s claim management fees The complainant says he had no choice but to incur claim management fees due to the insurer’s lack of response and mishandling of the matter. The panel does not agree. The complainant was represented by a broker, there is no basis for this cover under the policy and the insurer notes it advised the complainant several times that these costs would not be covered. Further, there were regular communications between the parties and it appears the complainant was intellectually capable of advocating his position in a reasonable manner. Determination | Case number: 640037 Page 8 of 10 Other professional costs KM’s expert report assisted the complainant and the panel on the issue of replacing the cornices and plasterboard at the property. The insurer should therefore reimburse this cost ( $1,650 ). The complainant also incurred a report fee from E for $3,080 . This was about a mould assessment. The insurer has not submitted this was unreasonably incurred. There were clearly some mould issues identified that required remediation. This should be reimbursed. AP had also submitted an invoice for $3,212, dated 1 April 2019. This charged the complainant for meeting with the insurer’s contractors and mould assessors. The panel considers the meetings with these contractors between 24 January and 7 February 2019 were costs reasonably incurred to manage the repair process and should be allowed. There was a meeting on 22 February 2019 with the insurer’s representative (PI) and LM ($396 incl GST). It is not clear what the purpose of this meeting was , or to what extent it was necessary or assisted the complainant’s position. Similarly, it is not clear the project report charged for by AP ($1,188 incl GST) was necessary or assisted the complainant. The insurer is not liable for these charges. Therefore, the panel considers it is fair the insurer only contributes $1,628 towards this invoice. Determination | Case number: 640037 Page 9 of 10 3 Supporting information 3.1 Key references Policy documents Document Provi sion Policy schedule 15 February 2018 HOUSE & CONTENTS COVER Payment Basi s Sum Insured Hous e Additional Rebuilding Cost $5,304,500 Cont ents Repair or Replacement Cost $652,553 Product Disclosure Statement – Privat e Client Group (PDS) 1 September 2016 Page 7 1.3 House & Contents You can select to insurer Your House and Your Contents under Part 1. Automatically included benefits … Under Part 1 extra automatic covers are available for both Your House and Your Cont ents, which are also in addition to the Sums Insured shown in Your Policy Schedule unless stated otherwise. These extra automatic covers for both Your Hous e and Your Content s include: Extra Covers – House & Contents Standard Limit Alternative Accommodation Costs of reas onable increase in living expenses Page 19 Section III – House and Contents Cover … 2. Payment of a Loss I. Amount of Cover for Your House The amount We will pay for each Hous e at each location is shown in Your Policy Schedule. Your Policy Schedule indicat es the Payment Basis: a. Additional Rebuilding Cost i If the Payment Basis is Additional Rebuilding Cost, We will pay the Reconstruction Cost of Your House, for each Occurrence, even if this amount is greater than the Sum Insured shown in Your Policy Schedule. However, You must repair or rebuild Determination | Case number: 640037 Page 10 of 10 Document Provi sion Your House at the same location. If not, the max imum payable is the Sum Insured shown for that location in Your Policy Schedule.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.