Home / IAG / Determination 637958
Determination 637958
Flood damage limit - further claim declined
Summary
A funeral business claimed water damage from a 2019 Northern Queensland rain event and sought more than the $50,000 flood limit. AFCA found the damage beyond that was caused by floodwater, not independent stormwater, so no further payment was ordered.
Water mixing with stormwater is still floodwater, and the complainant did not show stormwater inundated the building before floodwaters arrived, so the flood limit applies.
Issues
- Claim denial primary · not upheld“The insurer is not required to make any further payments in relation to this claim.”
Subjects and remedies
natural disastersmall businessno remedy
Related
Text of the determination
Determination
Case number 637958
Financial firm Insurance Australia Limited
Determination | Case number: 637958 Page 2 of 7
Case number: 637958 19 December 2019
1 Determination overview
1.1 Complaint
The complainant holds a business insurance policy with the financial firm (insurer).
In February 2019 the complainant lodged a claim with the insurer for water damage
following a heavy rainfall event in January and February 2019 in Northern
Queensland.
The insurer accepted part of the claim, in respect of damage to the ceiling in an office
at the rear of the building.
The insurer determined that the balance of the damage was caused by flood and paid
the complainant $50,000, being the maximum entitlement for flood damage under the
policy.
The complainant disputes this outcome and says that at least some of the additional
damage is caused by stormwater ingress and stormwater runoff.
1.2 Issues and key findings
Is the insurer obliged to make any further payments towards the claim?
The insurer is not required to make any further payments towards the claim. This is
because the available information supports that the insurer has indemnified the
complainant for the portion of the damage that was caused by stormwater ingress.
The panel is satisfied the remainder of the damage was caused by flood.
1.3 Determination
This determination is in favour of the insurer.
The insurer is not required to make any further payments in relation to this claim.
Determination | Case number: 637958 Page 3 of 7
2 Reasons for determination
2.1 Is the insurer obliged to make any further payments towards the claim?
The Authority has considered it appropriate to expedite this complaint in accordance
with the Operational Guidelines to the AFCA Rules, due to the nature of the
complaint. Accordingly, this complaint has not been the subject of a preliminary
assessment and has proceeded directly to determination.
The determination is made by a panel consisting of the ombudsman together with a
consumer representative who has extensive experience in consumer claims and an
industry representative who has extensive experience in the insurance industry.
The Ombudsman, who has had extensive experience with flood complaints, viewed
the general area and specific site in November 2019.
This determination follows consideration of all the available information and is based
on what is fair in all the circumstances, having regard to the relevant law, good
industry practice, codes of practice and previous decisions (which are not binding).
There has been a full exchange of all material information relied on for the purposes
of this determination and each party has had the opportunity to address any issues
raised by the other. All of the material provided by the parties has been reviewed and
considered.
While the parties have raised numerous issues in their submissions, for the purposes
of this determination, commentary has been restricted to those issues considered
directly relevant to the outcome only.
The complainant has been represented by its insurance broker. Any reference in this
determination to the complainant includes reference to submissions made on behalf
of the complainant.
Circumstances of the loss
The complainant operates a funeral business out of a rented building in Hyde Park,
Queensland. The complainant holds a business policy with the insurer which covers
the fit-out and contents within the building. Damage was incurred during a heavy
rainfall event in Northern Queensland in January and February 2019.
The complainant lodged a claim with the i nsurer for water damage following what it
described as monsoonal rain.
The exchanged material confirms that the complainant reported it was raining on the
morning of 2 February but there was no water in the streets at this time and the drains
appeared to be coping. The complainant advised it had placed sandbags along all
doors, entries and roller doors on the evening of 1 February 2019 and the morning of
2 February 2019.
Determination | Case number: 637958 Page 4 of 7
The complainant left the premises on the morning of 2 February and did not return
until the morning of Monday 4 February, at which time the complainant found the
building had been inundated with water sometime over the weekend.
Insurer partially accepted the claim
The insurer engaged hydrologist BM to attend the complainant’s business and
complete a report on the rainfall event and cause of damage . BM found that the
building had been inundated by floodwater to a depth of 0.11m . BM concluded any
damage via the roof was a result of stormwater ingress and the damage at floor level
up to 0.11m was a result of flooding from the nearby Ross Creek and Ross River.
Based on this, the insurer determined a small portion of the damage (to the ceiling in
an office at the rear of the building) was due to stormwater inundation and accepted
this portion of the claim.
The insurer concluded the remainder of the damage at ground level up to 0.11m was
due to flood. The insurer accepted this part of the claim and paid the maximum
entitlement of $50,000 for damage caused flood under the policy. It says the cost of
repair beyond this is not covered given the policy limit of $50,000 for damage caused
by flood stipulated in the certificate of insurance.
The panel has reviewed the certificate of insurance and is satisfied cover for damage
caused by flood is limited to $50,000 under the policy.
Complainant says stormwater ingress, run-off contributed to remaining damage
The complainant accepts that some of the damage at ground level up to 0.11m was
caused by flood, but considers other factors also contributed. The complainant says
water entered through two whirlybirds on the roof, as well as through an external wall.
The complainant says this wall previously housed two box air-conditioning units and
when these were removed and replaced with split systems, the holes were boarded
up. The complainant says stormwater entered through these openings.
The complainant further notes the land at the back of the building has a downward
slope and considers stormwater run-off travelled towards the building via this slope.
In response to these issues raised by the complainant, the insurer had its assessor C
attend the building. In its report dated 26 September 2019, C advised repairs had
already been completed prior to its attendance. C advised, however, the external wall
where the box air-conditioning units had previously been located was patched with
fibro cement and did not appear to be adequately sealed. C noted the complainant
was claiming for water penetration via this wall into the wall cavity servicing the front
office, coffin display room, second office, kitchen and two bathrooms.
C advised there was no evidence of damage to the gyprock internal wall and the
complainant had not provided any photos to show damage prior to repairs being
undertaken.
Determination | Case number: 637958 Page 5 of 7
C reported there was no patching evident to this wall and staff had not reported
saturation to the carpet in this area prior to the flood. The staff had reported, however,
wind driven rain entering through glass louvered windows into the three rooms at the
rear of the external wall (kitchen and two bathrooms) and water pooling on the floor in
the days prior to the flood.
The complainant is also said to have reported water entering through the concrete
mezzanine level directly above the reception area, however staff are reported to have
indicated this issue has been ongoing over time and is pre-existing.
While the insurer was of the view that some of this damage was due to pre-existing
issues, it cash settled the complainant $6,195.50 for these repairs. The insurer also
cash settled the complainant $11,073.51 for costs relating to removal of debris.
The insurer maintained its position that all other damage at ground level up to 0.11m
was caused by flood.
Available information supports flood caused the remaining damage
The complainant accepts some of the damage at ground level was caused by flood,
but considers other factors also contributed.
The panel notes that if floodwater mixed with water from other sources (such as
stormwater run-off) then this is considered floodwater.
In order for the policy to respond to the damage at ground level (beyond the $50,000
flood limit already paid by the insurer), it needs to be established that water from
another source caused this damage before floodwater arrived. The panel is not
persuaded the available information supports this is the case.
Although BM was unable to say exactly when initial and peak inundation occurred, the
information available does not support that stormwater inundation occurred
independent of floodwater at any point in time.
BM notes the persistent intermittent rainfall bursts throughout Saturday 2 February, to
which water levels in Ross Creek are most responsive. The data provided shows that
by 12PM on 2 February water levels at Roone y’s Bridge (located on Ross River about
1.9km south-east of the site) had risen to 4.0m Australian height datum (AHM). AHM
is used to relate recorded water levels to ground levels.
Significantly, BM notes that Townsville City Council flood mapping indicates this
correlates with a greater than 1 in 500-year event. In other words, water levels this
high in the Ross River are exceedingly uncommon. BM says flood mapping indicates
an event of this magnitude would result in water from Ross River overtopping its
ban ks upstream of Rooney’s Bridge causing water to flow into the Ross Creek
catchment where the building is located.
Determination | Case number: 637958 Page 6 of 7
The panel is satisfied that this, in conjunction with the land around the site being flat
and therefore unlikely to cause stormwater inundation, means the cause of the water
inundation to the building to a depth of 0.11m was floodwater from the Ross River and
Ross Creek.
The panel accepts there is a small downward slope in the land at the back of the
building, however it is not persuaded this is enough to cause stormwater inundation to
the building independent of floodwater. The land around the building is largely flat and
the ground level of the building sits above this.
Likewise, the panel accepts the staff in the building noted some rain coming in
louvered glass windows at the back of the building in the days leading up to the flood.
However, the panel is not persuaded the amount of water coming through the window
would have been significant enough to inundate the building prior to floodwater
arriving.
Finally, the panel notes the complainant reported water bubbling in drain in a nearby
street up to three days after floodwaters had receded. The panel does not consider
this to be evidence of the water that inundated the building being stormwater or
otherwise.
Insurer is not obliged to make any further payments towards the claim
The complainant accepts flood contributed to the damage but considers there were
other factors involved and requests that the insurer contribute towards 50% of the
remaining repairs. If flood water mixed with other sources of water and then inundated
the property, this is considered flood.
In order for the insurer to be liable for further costs beyond the $50,000 policy limit for
flood, it needs to be established that stormwater inundated the property independent
of flood, prior to the later arrival of flood waters.
Having reviewed all of the available information, the panel is not persuaded that
stormwater inundation occurred prior to floodwater arriving.
The insurer has settled the complainant for the $50,000 limit for damage caused by
flood under the policy, and also paid $6,195.50 for damage caused by stormwater
ingress and $11,073.51 for removal of debris. The insurer is not required to make any
further payments towards this claim.
Determination | Case number: 637958 Page 7 of 7
3 Supporting information
3.1 Policy wording
Product disclosure statement (PDS) page 3:
General definitions
In this Policy the following general definitions will apply to all Sections. Where they appear in the
Policy, they are shown with a capital letter. The singular shall include the plural and vic e versa.
…
PDS page 5:
Flood means the covering of normally dry land by water that has escaped or been released from
the normal confines of any of the following:
a lake (whether or not it has been altered or modified)
a river (whether or not it has been altered or modified)
a creek (whether or not it has been altered or modified)
another natural wat ercourse (whether or not it has been altered or modified)
a reservoir
a canal
a dam.
PDS page 11:
Section 1
Property
About thi s cover section
This cover section of the Policy covers physical loss of or damage to Your Property Insured during
the Period of Cover. It does not cover the theft or breakdown of Your Property Insured.
Your insurance under this cover section
Provided ‘Business Property’ is shown under ‘What’s Covered’ in the Schedule, We will cover You
up to the Sum Insured for accidental loss or damage to Your Property Insured at the Premises
during the Period of Cover.
PDS page 17:
Optional extensions
1. Flood
When ‘Flood’ is shown in the current Schedule, We will cover loss of or damage t o the Property
Insured caused by Flood.
…
Policy section exclusions
…
2. We will not cover You for loss or damage caused by:
...
(m) Flood
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.