Determination 637048

Claim decline for ground movement damage allegedly caused by leaking pipes

FirmSuncorp Group
Decided2020-05-29
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$350
Non-financial loss$5,000
Amount claimed—
SourceAFCA PDF

Summary

The complainants claimed under their home policy for cracking damage they attributed to leaking water pipes, which the insurer declined as ground movement. AFCA found the leaks were the proximate cause and the exclusion did not apply, ordered an independent engineer to scope the covered damage, reimbursement of $350 leak detection, interest, and $2,500 non-financial loss each, but refused cover for front west damage.

The insured bears the onus to show a prima facie covered event, after which the insurer must prove an exclusion; the proximate cause is the effective or dominant cause, here the escape of water from the leaking pipes.

Issues

Subjects and remedies

home or building damagepay claimpay interestpay non financial lossreassess claim

Related

All Suncorp Group determinations · Find similar determinations

Text of the determination

Determination Case number 637048 Financial firm AAI Limited Determination | Case number: 637048 Page 1 of 19 Case number: 637048 22 May 2020 1 Determination overview 1.1 Complaint The complainants lodged a claim on 27 December 2017, with the financial firm (insurer) following the discovery of damage to their property caused by a leaking pipe in 2016 or by work been conducted in the neighbouring terrace house. The insurer accepts the pipe was leaking, however submits the leak would not have caused all damage observed at the property. The insurer says the complainants ha ve not established the proximate cause of movement to the property, nor that movement is a result of an insured event. Rather the insurer says damage was caused by ground movement, which is excluded under the policy. The complainants disagree and request the insurer accepts the claim. 1.2 Key Issues and findings Is the insurer entitled to decline the claim? The insurer is not entitled to decline the claim because the available information establishes:  on balance, the leaks at the rear of the property were the proximate cause of the damage  the insurer has not established any policy exclusions apply. The claim is to be settled as set out in the determination under the heading “Parties are to agree on an independent engineer to assess damage .” Are the complainants entitled to other payments? The insurer is required to reimburse the costs identified in section 2.2 of this determination. The insurer is also required to pay each complainant $2,500 compensation. Determination | Case number: 637048 Page 2 of 19 1.3 Determination This determination is in favour of the complainants. The claim is to be settled as set out in the determination under the heading “Parties are to agree on an independent engineer to assess damage .” Should the complainants accept this determination then within 14 days of notification of acceptance of the determination, the parties are to agree on an independent engineer to attend the property to identify and assess the damage caused by the leaks at the rear of the property. The independent engineer is then to prepare a scope of works. The insurer is to arrange for the scope of works to be assessed and prepare a quotation for repairs and settle the claim and temporary accommodation (as assessed by the engineer) in accordance with the policy terms and conditions. The insurer is also to:  reimburse the complainants for the cost of all expert reports subject to the complainants providing a copy of the invoices  reimburse the complainants $350 for the cost of the leak detection report  if the complainants have paid for the reports, the insurer is to pay interest pursuant to section 57 of the Insurance Contracts Act on the cost of the reports from the date of payment until the date of settlement  pay the complainants $2,500 each compensation. Otherwise, the insurer is not required to take any further action in relation to the claim or the complaint. Determination | Case number: 637048 Page 3 of 19 2 Reasons for determination 2.1 Is the insurer entitled to decline the claim? Complainants have onus of establishing a valid claim The complainants carry the initial onus to establish any loss or damage arose from an event covered by the terms and conditions of the policy. Only once this is established does the onus shift to the insurer to show, on the balance of probabilities, the loss claimed falls within an exclusion of the policy. The complainants‟ policy is an insured events policy. Therefore, the policy only responds where one or more of the listed events causes the damage, subject to any exclusions. Among these listed events, the policy provides cover for damage caused by an „escape of liquid‟ which includes liquid leaking, overflowing or bursting from any drain, fixed pipes, roof gutters or guttering and rainwater downpipes, drainage and sewage systems. The insurer accepts there was a leak in 2016 at the insured property, however the insurer says the leak was not significant enough to cause the identified damage. As the insurer was unable to establish the cause of damage, it says the complainants have not established a valid claim. History of the claim On 27 December 2017, the complainants lodged a claim for internal and external cracking to their property. The complainants initially believed the damage was due to a leak or renovations being conducted to the neighbouring property which shares an adjoining wall with the complainan ts‟ property . On 20 February 2018, the insurer engaged its engineer MC to inspect the property and report on the cause of damage. MC arranged for a plumber to conduct a leak detection test. The plumber conducted a camera investigation of the sewer and stormwater lines. Although the tests failed, the plumber concluded the issues identified were not causing any problems. MC did not identify any pre-existing issues with the property, nor could it identify the proximate cause of damage. MC identified issues with the neighbour‟s house and movement developing from the front south west corner of the building. MC suggested three possible causes for this movement being:  movement caused by the works undertaken at neighbouring property which affected the footing system to the common wall possibly damaging the footing Determination | Case number: 637048 Page 4 of 19  seasonal variations in the soils  a possible leak within the neighbour‟s building. The complainants notified the insurer of a water leak at the back of their property which was repaired in late March 2016. The complainants say this leak caused the rear south east of the building to settle, causing damage to the internal walls and ceilings. To support their view, information was provided to show the water usage at the property increased by a significant amount in a three-month period in early 2016. Upon further investigation to identify the cause of the damage, and after the complaint came to AFCA, the complainants provided information about the adjoining property. An invoice dated 29 June 2016 and photographs show a plumber also attended the adjoining property in 2016 to replace sections of a broken sewer pipe. It is also suggested the work conducted by the neighbours at the time of the claim related to another leaking pipe within their property. Despite requests, nothing further has been provided by the complainants from the neighbours in this regard. Whilst the insurer recognises there are several contributing factors, including a leak, it maintains there is insufficient information to establish (what it says is) a relatively minor leak caused significant cracking to the property. Complainants have established a valid claim The insurer says the onus is on the complainants to establish the damage under the event they are claiming, and the complainants have not fulfilled their obligation in this regard. The parties are not in dispute as to whether a leak has occurred, however the insurer says the leak would not have caused the extent of damage seen at the property. Having reviewed the material provided, I am satisfied a burst cold-water pipe was repaired in the complainants‟ premises in March 2016 and a broken sewer pipe was repaired at the ne ighbour‟s premises in June 2016. In the circumstances, I am satisfied at least one insured event has been established consistent with „escape of liquid‟. I am satisfied the complainants have established a prima facie claim. Insurer says damage caused by factors excluded under the policy It is not in dispute between the parties that movement damage has occurred. The parties are in contention about the cause of the movement damage. As the complainants disagreed with the insurer‟s view, they obta ined reports from experts (CS) and (HG). Determination | Case number: 637048 Page 5 of 19 The reports relied on by the parties have been summarised and are set out in supporting section 3 of this determination. CS reviewed the leak detection report and the receipt for the repairs of the burst pipe in March 2016. He also inspected and photographed the property on 19 March 2018. He described the pattern of cracking as being horizontal which he said suggested settlement at either the south east or south west corners of the property. Because of the cracking noted in the kitchen he said the most likely movement is in the south- east corner which he says spirit level measurements confirm. He referred to the recent construction works in the neighbour‟s property but says this kind of work causes minor cracks due to vibration and was unlikely to have caused the movement and cracking he saw. CS agrees with the insurer‟s plumber. The drainage system is not the cause of the foundation movement. He notes all the plumbing is at the rear of the property. He refers to the leak to the underground water supply repaired in March 2016. The pipe was under the rear concrete pavement and because of this it was not known how long the pipe was leaking prior to it being repaired. CS attributes the change in the soil to the leaking pipe and says once the leak was fixed it caused the subsoil to dry out. He says this caused settlement to the south east corner of the building resulting in subsequent cracking and movement damage. At first, CS also said as the pipe was repaired he would not expect further substantial movement and the cracks could be cosmetically repaired. He suggested there might be minor movement still occurring in the future. HG noted there was wall rotation and cracking of brickwork occurring on the rear wall of the house particularly around the narrow section of the east facing wall. HG investigated the existing footings and dug some boreholes and confirmed the soil type was highly reactive clay soil. Because of the soil profile and nature of the cracking he thought the foundation movement was due to a combination of the footings being of insufficient depth for the structure to accommodate the reactive soil and due to a volumetric change in the highly reactive soil. He offered a list of possible causes for the change including possible leaking pipes and blocked drains. MC reviewed these opinions but did not change his view saying the reports did not explain the damage to the front west façade. He also commented the shallow footings may result in differential movement. Determination | Case number: 637048 Page 6 of 19 CS further reviewed the insurer‟s reports and plumbing invoices and reiterated his opinion that the water supply pipes, and sewer pipes have been leaking for a period, and ultimately caused settlement to the south east corner of the building and subsequent cracking. CS says movement has continued since he first inspected the property and structural underpinning of the rear wall is now required. As for MC‟s observations to the cracking to the front western façade, CS agrees this is not caused by the movement to the south east corner of the building. The insurer says the information in MC and HG‟s reports is persuasive evidence the reactive clay soil and insufficient footings are the contributing factor to the movement. The insurer says these, rather than leaks, caused the damage to the property. Based on the information, the insurer maintains cracking damage to the property is the result of ground movement over time which it says is excluded under the policy. Insurer has not established application of policy exclusion The policy contains several exclusions from cover. Relevant to this complaint, the policy excludes loss or damage caused by, arising from or involving subsidence, shrinkage or any other earth movement. When considering whether the exclusion applies to defeat the claim, it is appropriate to first determine the proximate cause of the loss. The proximate cause of the loss is a question of fact depending upon the circumstances of each case. It is well established at law that a proximate cause is not necessarily the first or the last or the sole cause of the loss. It is the effective or dominant or operative cause of the loss. If there are several causes operating contemporaneously, then each must be examined for the qualities of predominance and efficiency as the active, efficient cause that sets a relevant train of events in motion. Courts have said that if one cause would have resulted in the harm in any case and the other would not have done so in the absence of the first, then the first is the proximate cause. Having reviewed the available material, I am not satisfied the insurer has shown the proximate cause of loss is ground movement. Rather, on balance, I am persuaded the available material shows the leaking cold-water pipe and the leaking sewer pipe were the proximate cause of damage. This is because:  MC‟s initial report suggests the leak was a symptom of the movement  MC did not provide an explanation why the leak is not severe enough to cause damage to the complainants‟ property Determination | Case number: 637048 Page 7 of 19  CS‟s report is more persuasive than MC‟s because it explains in detail how the leak contributed to the damage and why damage occurred in the identified time, whereas MC‟s report does not  water accounts show a substantial increase in water usage by the complainants between June 2015 and March 2016  a plumber repaired a burst water pipe under concrete at the back of the complainants‟ premises in March 2016  a plumb er repaired a broken sewer pipe at the neighbour‟s property in June 2016 and correspondence indicates this issue arose as early as May 2016  Based on the fall of the property and type of cracking and the cracking in the kitchen, CS says movement has occurred to the south east corner of the property near the pipes.  the fall and photographs show cracking damage at the rear of the property  i n view of the soil profile I accept CS‟s view if water does not readily drain away, it would pool in the subsoils resulting in damage being identified later  MC physically inspected the property and did not identify any pre -existing issues  MC‟s focus seem ed to be on damage at the front of the building  even if the existing footings were of insufficient depth based on current design standards, or if partial underpinning was a factor, the available evidence suggests the footings were performing up until the time of the water leaks. Having reviewed the available material, I am not persuaded the damage would have occurred in the absence of water discharging from the pipes. The insurer has not provided sufficiently compelling evidence to show why a significant escape of water overtime failed to contribute to the damage. The insurer has been unable to persuasively identify any other proximate cause. Based on the information provided, I am not satisfied the insurer has shown how normal ground movement was the dominant cause of damage independent of the leaks at the complainants‟ and neighbour‟s property. I accept there was ground movement, but I am satisfied the available information establishes the proximate cause of the ground movement was the leaking pipes. I am not satisfied the insurer has established the policy exclusion for ground movement entitles it to decline the claim. Insurer not liable for some of the damage The complainants are seeking indemnity for significant and extensive damage. The insurer says there has been no reasoning provided as to the cause of damage to the front west end and other areas of the building. Determination | Case number: 637048 Page 8 of 19 CS accepts the front west damage is unrelated to the leaks at the back of the property. I am satisfied the available information establishes the insurer is not required to indemnify the complainants for the front west damage. I accept the available information does not establish the neighbour‟s works caused damage to the co mplainants‟ property. T here is a suggestion this work was done to identify a leak in the neighbour‟s property. The available information is insufficient to establish with sufficient certainty there was a third leak and if it caused damage to the complainants‟ property. Further site inspection required to establish the extent of damage caused by leaking pipes at the rear of the property Whilst the complainants are unable to supply information regarding the exact location of the rear leak, based on the building plans provided by the complainants , I accept the relevant pipe reaches the rear of the property. CS also confirmed the leaking cold-water pipe is within five meters of the property. CS‟s first report has provided several photographs which show cracking damage. While I note the complainants require all damage to be repaired, the available material does not establish which of the cracking and movement damage in the complainants‟ property was probably caused by the leaks at the rear of the property. I note the insurer has requested to inspect the property further, b ut the complainants have declined as the leak has been repaired and the soils have dried. MC also agrees a further site inspection would not assist. While I agree a further site inspection is not necessary to determine the cause of the damage, I am satisfied a further site inspection is required to establish the extent of damage caused by leaking pipes at the rear of the premises. Both parties accept the scope provided by the insurer on 30 January 2018 is not reflective of the current damage at the property. The complainants say they will work out the scope of repairs once AFCA has determined liability. In March 2019, CS indicated movement had continued and structural underpinning of the rear wall was now required. While I am satisfied there is damage to the insured property caused by the leaks at the rear of the property, I am not satisfied there is sufficient material to establish a Determination | Case number: 637048 Page 9 of 19 current scope of works required because of damage caused by the leaks at the rear of the property. Parties are to agree on an independent engineer to assess damage Should the complainants accept this determination then within 14 days of notification of acceptance of the determination, the parties are to agree on an independent engineer to attend the property to identify and assess the damage caused by the leaks at the rear of the property. The independent engineer is then to prepare a scope of works. The insurer is to arrange for the scope of works to be assessed and prepare a quotation for repairs. The policy states the insurer can choose how it wishes to settle the claim. It is possible a cash settlement would be appropriate given the cost of repairing the damage may not all be payable under the policy. If this is the case, then the insurer‟s cash settlement should be based on an actionable quote available to the complainants and consider any possible variations. The cost of repairs is to reflect the true market rate that a builder would charge the complainants to complete the actual repairs caused by the leaks at the rear of the property. The insurer may then elect to cash settle the complainants for the damage to the property based on the amount quoted and should allow an additional amount to cover contingencies which may arise in the repair process and transfer of risk. The parties are encouraged to work together to resolve the claim and complaint, but should they be unable to agree, they can bring a further complaint to AFCA to resolve the quantum of the claim. 2.2 Are the complainants entitled to other payments? Complainants claim for temporary accommodation The complainants are also claiming for temporary accommodation as they say the property is uninhabitable due to the events. The policy covers temporary accommodation in certain circumstances. This benefit is activated where the insurer accepts the claim for loss or damage to the building. Where the insurer agrees the house cannot be lived in, it will pay up to 4 weeks in short term accommodation then if necessary up to another 48 weeks in residential accommodation of a similar standard to the building. The scope of works submitted on January 2018 indicated the repairs would take one to two weeks and declared the house liveable. Determination | Case number: 637048 Page 10 of 19 The complainants provided information on 14 January 2020 identifying reasons which would deem the house uninhabitable. This included:  the ceiling collapse above the stairwell  the first-floor bathroom is unsafe due to ceiling debris falling in  the shower recess waterproof membrane is damaged due to movement a nd water penetrates below into the kitchen causing the power to trip the circuit breaker. As set out above, I am not satisfied the available information establishes the extent of damage caused by the leaking pipes at the rear of the property. I accept the information suggests the first-floor bathroom is not usable and would contribute to further damage if used, however the building plan provided also suggests the property contains a second bathroom which appears in usable condition. Engineer to assist in establishing if property uninhabitable due to the rear leaks However, if the independent engineer agrees the ceiling collapse above the stairwell was damage caused by the leaking pipes at the rear of the premises, and the property is otherwise uninhabitable due to the leaks, the insurer will also be liable to pay accommodation costs and will be required to assess accommodation costs pursuant to the terms and conditions of the policy. If upon further inspection to prepare a scope of works and repair the damage to the building caused by the leaks at the back of the property the property is deemed unliveable while repairs are undertaken, the insurer is to arrange accommodation in line with the terms and conditions of the policy. The parties are encouraged to work together to resolve the claim and complaint about temporary accommodation, but should they be unable to agree, they can bring a further complaint to AFCA to resolve this issue. Insurer is to reimburse the complainants’ expert costs The complainants are seeking to be reimbursed for the engineering reports provided by CS and HG. The complainants have not provided invoices to support the costs. AFCA may require an insurer to contribute to a complainant‟s professional costs. In doing so, AFCA considers the complexity of the dispute and whether the expert assisted the complainant‟s position. I accept the issues required the assistance of a technical expert. Further, the reports assisted the complainants‟ position given the logical responses to the insurer‟s arguments about the proximate cause of movement and provided reasoning as to how the leak has contributed to damage. Determination | Case number: 637048 Page 11 of 19 Under its Rules, AFCA may decide a financial firm must contribute to the professional costs incurred by a complainant during a complaint. This is normally capped at $5,000 per claim unless exceptional circumstances apply. The issue here was identifying whether an event damaged the property. The reports provided were particularly detailed as they addressed all the items with comments and photographs in support. This information assisted the complainants‟ position as the reports provided information on how the leaks contributed to the damage. I agree that exceptional circumstances apply in such a context and it is fair for the insurer to reimburse the complainants for the cost of their expert reports. Should the complainants accept this determination then within seven days of acceptance, they should provide to the insurer the invoices for the expert reports. The insurer is then to pay for the reports or reimburse the complainants for payments of the reports. If the complainants have paid for the reports, then the insurer is to pay interest pursuant to section 57 of the Insurance Contracts Act 1984 (the Act) on the cost of the reports from the date of payment until the date of settlement. Insurer to reimburse complainants $350 and interest for leak detection The complainants also claim for reimbursement of costs incurred to detect a leak and to repair the leaking pipe. The insurance policy provides it will pay the reasonable cost of locating at the insured address the source of the escape of liquid. The policy does not provide the cost of repair or replacing the item from which the liquid escaped. The available information shows the complainants paid $350 to detect the leak. The insurer is to reimburse the complainants $350. The insurer is also to pay interest pursuant to section 57 of the Act on $350 from the date of payment until the date of settlement. AFCA may award compensation for non-financial loss AFCA may award compensation (capped at $5,000) for non-financial loss where a complainant has suffered an unusual degree or extent of physical inconvenience, time taken to resolve the situation or interference with their expectation of enjoyment or peace of mind. Determination | Case number: 637048 Page 12 of 19 We take a conservative approach to compensation for non-financial loss. It is not awarded when a person suffers the normal degree of inconvenience when a problem occurs. Insurer to pay $2,500 compensation to each complainant The complainants are seeking maximum compensation for the physical inconvenience of not being able to live in their property, and for the extreme length of time it has taken to pursue the claim. Due to the insurer‟s actions, the complainants incurred financial stress due to requiring alternate accommodation which needed to be suitable for their dogs. In reviewing the handling of the claim, I accept the claim could have been handled in a better manner including a better level of communication from the ins urer and assessing the correct area of damage. I also accept the complainant lodged a valid claim on 27 December 2017, which was not considered correctly due to the reasons above. Given this, and considering our conservative approach, I consider it fair in all the circumstances that the insurer pays $2,500 compensation to each complainant. Determination | Case number: 637048 Page 13 of 19 3 Supporting Information 3.1 Our Approach As advised to the parties, we have considered it appropriate to expedite this complaint in accordance with the Operational Guidelines to the AFCA Rules, due to the nature of the complaint. Accordingly, this complaint has not been the subject of a recommendation and has proceeded directly to determination. This complaint has been determined based on what is fair in all the circ umstances, having regard to legal principles, applicable industry codes or guidance, good industry practice and previous relevant determinations of AFCA or predecessor schemes (which are not binding). There has been a full exchange of all material information relied on for the purposes of this determination and each party has had the opportunity to address any issues raised by the other. All the material provided by the parties has been reviewed and considered for the purposes of this determination. While the parties have raised numerous issues in their submissions, for the purposes of this determination, commentary has been restricted to those issues considered directly relevant to the outcome only. It is an accepted principle of general insurance law that the insured bears the onus to establish on the balance of probabilities that they have suffered a loss caused by an event to which the policy responds. This is known as a prima facie claim. Once so established, the onus shifts to the insurer to prove on the balance of probabilities that an exclusion applies if it seeks to deny or limit its liability for the loss. 3.2 Extracts from policy The relevant policy extracts are referred to in the correspondence between the parties and in the insurer‟s Notice of R esponse. Both the policy document and the Notice have been exchanged with the complainants. Page Action Escape of Liquid Page 22  Escape of Liquid  We cover  Loss or damage to the building caused by liquid  leaking, overflowing or bursting from any of the  following:  refrigerators, freezers, dishwas hers and washing  machines;  any drain, fixed pipes, roof gutters or guttering and rainwater downpipes, drainage and sewage systems;  fixed tanks; Determination | Case number: 637048 Page 14 of 19 Page Action  swimming pools or spas;  waterbeds;  baths, sinks, toilets and basins ;  fixed heating or cooling system;  water main, fire hydrant or wat er supply pipe;  an aquarium. General Exclusions Page 35 - 40 What we do not cover - general exclusions You are not covered under any section of your policy for damage, loss, cost or legal liability that is caused by, arises from or involves: Ground movement erosion, vibration, subsidence, landslip, landslide, mudslide, collapse, shrinkage or any other earth movemen t, but we will c over landslide or subsidence that is specifically covered under the following insured events: - „Storm‟; - „Flood‟ (but only if you have cover for insured event „Flood‟); - „Earthquake and Tsunami‟; - „Explosion‟. […] Wear, tear and gradual deterioration wear, tear, rust, fading, rising damp, mould, mildew, c orrosion, rot, action of light, atmospheric or climatic conditions or gradual deterioration such as, but not limited to :  tiles and their adhesive or grouting breaking down;  weat hering of roof tiles or roof ridge capping;  gradual weathering and breakdown of bricks, mortar or concrete. 3.3 Key Reports Date Action Water Leak Detection Services Invoice 23 - 03 - 2016  Water leak detection servic e detected burst cold - wat er pipe. G Plumbing Services Invoice 24 - 03 - 2016  Plumber called out to insured premises to fix burst water pipe in two sections under concrete at the back of the premises. A Plumbing Services Invoice 29 - 06 - 2016  Plumber attended neighbour at #278 to replace sections of broken sewer pipe. Insurer’s expe rt (AD) Report 14 - 02 - 2018  Inspected 14 February 2018. Carried out camera investigation to sewer and stormwater. Both failed.  Attached to the report our photographs and an annotated site map.  Two adjoining houses either side of the ins ured house. At the re ar east Determination | Case number: 637048 Page 15 of 19 Date Action side of the house the below down pipe for the nort h adjoining house, which uses the same rear veranda roof as the insured house, was completely blocked (appendix 2) this blockage would only cause water to back up and spill out of the gutter, which would then allow water to flow away from the house with the fall of the concrete.  Stormwater line from the insured house runs east towards the discharge outlet and was in good working order however, from the nort h neighbouring house which shares the same line, was a build - up of soil (appendix 3). The exposed outlet for the stormwater pipe has been driven over a few times and is clearly broken but not causing any issues (appendix 4).  PVC sewer line from the rear east side of the insured house runs north and joins in to the earthenware common sewer line from the neighbouring house, the pipe then runs east towards the boundary shaft external to the rear east side of the property where there were multiple minor root intrusions in the eart henware section (append ix 5) and a partial blockage in the lead off junction to the boundary shaft (appendix 6) which didn't seem to be causing any issues to the hous e.  At the rear east side of the hous e the small section of gutter falls away from the outlet and there's a large stain down the wall below the gutter (appendix 7) indicating that the gutters leaking but on to the roof of the rear veranda.  Recommended sewer and stormwater pipes in neighbouring property be cleared. Gutter to be repaired. Becaus e the houses are so close together, investigate plumbing to both north and sout h hous es. Insurer’s expert MC Report 20 - 02 - 2018 Inspected and photographed 7 February 2018 Property pre - existing retail premises converted to home with a party wall adjoining the neighbours‟ properties . Building 100 years old. Complainants bought the property 15 years ago, renovated 14 years ago and has been living there for about 10 years Renovations undertaken to the neighbouring corner property about six months ago and cracking to the party wall deve loped shortly thereafter. Complainant told him cracking developed and worsened since neighbours jackhammering and int ernal demolition works. Report describes and photographs the damage in the lower level lounge, the kitchen, stairwell, upstairs hallway, gy m, master bedroom, bathroom, external front west side of the property (property faces west) and external rear east side. New downpipes installed on east side. Upper guttering dripping water onto roof below. Stormwater drainage discharges to the rear lanewa y which has a broken stormwat er outlet. External movement also appears to be developing at #278 In my opinion, the movement appears to be developing from the subsidence to the front South West corner of the insureds building. A definable event emanating from the insureds property resulting in the building movement has not be determined. Possible causes of the building movement and subsidence developing from the front South West corner of the building, sharing the common wall with the sout hern neighbour‟s property may include:  - Building movement caused by the unknown works undertaken within the building at #278, affecting the footing system to the common boundary Determination | Case number: 637048 Page 16 of 19 Date Action wall. The works may have damaged or undermined the common footing.  - A leak within the building to #278 .  - Seasonal variations in the supporting soils resulting in the differential movement of the building footings that develops over a long period of time. There are no pre - existing issues. There are no particular warnings or concerns. Recommended #27 8 be approached to determine the extent of works undertaken which may affect the building footings and investigat e a possible leak wit hin the neighbours building Complainants’ Expert CS Report 14 - 05 - 2018 Reviewed the leak detection report the insurer‟s building report and receipt for a burst pipe (March 2016).) Inspected and photographed the property 19 March 2018. Cracking to plasterboard int ernal wall, ceiling linings and floor finishes. Cracking to external faç ade masonry wall. Photographs summarise some of the cracking. Pattern of cracking is such that the movements are more horizontal than vertical (refer photos 1 and 11 for typical examples noting the horizontal, but little vertical movement). This would suggest settlement at either the south - eas t or south - west comers of the property. Due to the cracking noted in the rear kitchen area and in photo 22, we would suggest that the most likely movement is in the south - east comer. Measurements with a digital spirit level appeared to confirm this, althou gh we cannot guarantee the levelness of the floor prior to any cracking. We note that you have reported rec ent construction works in the adjacent property to the south at the property. We understand that the works required some internal jackhammering and removal of a section of existing floor slab. Jackhammering can cause minor cracks due to vibration, but we are of the opinion that this type of construction works is unlikely to have caused the extent of movement and cracking viewed. As foundation moveme nts are normally associated with soil moisture variations, it is usual to check for leaks or repairs in drainage or supply pipes. We note that all of the plumbing is to the rear of the premises. The report by Australian Leak Detection did not reveal any l eaks to drainage pipes. We also note that the stormwater drainage system is via external eaves type gutters , so any blockages would caus e gutter overflows onto the rear paved surface, which falls away from the building to the rear laneway. We are of the op inion that the drainage system is not the cause of the foundation movements. You have reported that a leak to the underground water supply was discovered and repaired on 24 March 2016. This pipe was under the rear concrete pavement, and the leak was note d due to continual water coming through the pavement. It is not known how long this pipe was leaking prior to it being repaired. At the time of repair, the underground pipe was decommissioned, and the water supply was re - directed to above ground, and aroun d the fence line. Given the timeframe of the repair and the subs equent timeframe for cracking, we are of the opinion that the water supply pipe had been leaking for a period of time and, onc e repaired, the subsoils have dried out to a new Determination | Case number: 637048 Page 17 of 19 Date Action optimum moisture content, causing settlement to the sout h - east comer and the subsequent cracking. Now that the pipe has been repaired, we are not expecting further substantial movements, and the cracks could be cosmetically repaired, on the understanding that some minor m ovements could still occur in the future. Insurer’s expert MC Report 3 - 04 - 2019 Reviewed and comment ed on documentation including complainants‟ expert reports and water accounts and neighbour‟s plumbing invoice (June 2016). Further site inspection was not undertaken as the water leaks were below ground and a further site inspection would not readily det ermine the flow of surface water flowing up through concrete as has been described His earlier findings remain valid and he concluded further evidence to l ink the water leak to the movement and damage to the home has not been supplied. 4.8.1. The supplied engineering reports do not conclude nor explain the damage to the front West facade in relation to the water leak. 4.8.2. The presence of the underpinning to the bluestone footings is an indication of pre - existing issues to the premises. 4.8.3. The presence of underpinning may result in differential movement between various footing systems. 4.8.4. The shallow footing system is subject to building movement. 4 .8.5. Further investigation in relation to the works undertaken to the Southern neighbour‟s property has not been undertaken. Complainants’ Expert LC Report 30 - 01 - 2019 Inspected property 26 January 2019 because of ceiling collapse to the ceiling above the stairwell on the first floor. First floor bathroom unsafe due to ceiling debris falling in and shower recess membrane damaged and water penetrates into the kitchen below. Property is not safe for occupation. Complainants’ Expert HG Report 15 - 02 - 2019 Inve stigat ed 14 February 2019 to document existing footings and provide limited comment on possible causes of movement. Drilled two bore holes to expose footings in two locations. Site flat with poor surface drainage. Wall rotation and cracking of brickwork ha s occurred on the rear wall of the house particularly around the narrow section of east facing wall adjacent to #282. Boreholes encountered filling material to depths of 0.20m and 0. 90m and highly reactive stiff silty clay to 2.0m. No groundwater int ercept ed in the borehole. Filling and natural soils were in a moist condition. Site is classified as P – clay soils highly reactive. Photographed foundations. Based on the subsurfac e profile and nature of cracking consider foundation movement is primarily due to a combination of the footings being of insufficient depth for the structure to accommodat e the reactivity of the site and due to a volumetric change in the highly reactive foundation zone soils. Change will occur with changes in soil moisture content. Site has a deep soil profile and large changes at therefore possible wit hin the soil profile. Moisture content will commonly vary with the presenc e of trees and plants, surface drainage, watering of gardens in close proximity to the house, Determination | Case number: 637048 Page 18 of 19 Date Action possible leaking service pipes or blocked drains, extreme weather conditions. Recommended underpinning of residence at the discretion of a structural engineer and controlling the soil moisture cont ent of foundations. Complainants’ Expert CS Report 12 - 03 - 2019 Reviewed ins urers‟ reports and plumbing receipts. Describes damage seen in 2018 and more recently in 2019 and says further movement and cracking has occurred. Reiterates pattern of cracking is such that movements are more horizontal and vertical suggesting settlement at either the south east or south west corners of the property. Kitchen suggest most likely movement is in the south east corner. Confirmed by digital spirit level. Stormwater drainage system not the cause of the foundation movements. Refers to leak repair ed March 2016 and leak in the sewer at the neighbours in June 2016. Not known how long pipes were leaking Further report of an underground water pipe repair next door. Given the time frame of the repairs and the subsequent time frame for cracking, water su pply and sewer pipes had been leaking for a period of time: once repaired subsoils dried out: caused settlement to the south east corner and subsequent cracking. Movement has continued over the past 12 months and structural underpinning of the rear wall is now required. Complainants’ Expert CS Report 20 - 05 - 2019  Reviewed report from insurer.  Acknowledge the cracking to the front (western) facade but are not suggesting that this has been caused by the movement to the south east corner of the building. Repairs to the front facade are not considered to be part of the insurance damages claim.  We do not mention "continual water coming up through the pavement". The water was noted, and the repairs were done almost immediately. By the supplied water usage acc ounts, we believe that the water supply pipe was leaking for up to 3 months prior to being discovered. In that time , some 30,000 litres of additional wat er (based on the normal 3 monthly use of 20,000 litres, spiking up to 51,000 litres in the period of 25 Dec ember 2015 to 23 March 2016). This is not considered to be a "small pinhole leak " as suggested by MC. The HG report notes the underlying clay subsoils as highly reactive stiff silty clay (Class H2). Water does not easily flow in clay soils, and we sugg est that the 30,000 litres of water saturated the clay soils until they could not take any more, resulting in the wat er finally coming through the pavement where it was noticed, and the leak repaired. Initially this would have caused some swelling of the c lay subsoils and, if over saturated , could have caused collaps e of the clay matrix. Once the leak was fixed, the subsequent drying out of the soils over time would then cause the settlements experienc ed. The time for clays to dry out is often one or two ye ars, depending on climatic conditions, and so the movements not being noticed until 2017 is consistent with this.  We agree that the existing footings are of insufficient depth, based on current design standards. Nevertheless, they were performing satisfact orily up to the time of the water leaks and subsequent cracking.  Agree that possible partial underpinning can result in differential Determination | Case number: 637048 Page 19 of 19 Date Action settlements. HG report not conclusive if the footing had been underpinned but the footing was performing well up to the ti me of the leaks and cracking.  Rear concrete path is within 5m of the south east corner of the insured property.  Disagree with the insurer‟s report. Given the clay subsoils water does not readily drain away. As noted above, a pipe could be leaking for some time until the ground is fully saturated and will not start seeping through the pavement joints until that time.  Did not observe the sewer waste but was described by the neighbour and we have no reason to doubt it as it was a trigger to engage the plumber to repair.  No evidence of internal water leak only verbal advice by the neighbour to the complainants. Still trying to source neighbours water usage accounts.  Provide copies of our measurements of floor levels for ground and first floor done 31 January 20 19.  You will note that the front section of the building is relatively level with the rear section falling by up to 88mm. This is consistent with settlement at the south east corner of the building.  Damage to the rear section of the property has been caus e d by one, or both of the two confirmed water leaks. The third reported water leak is unconfirmed at this stage, but should these circumstances change, the reported timing of this leak may also have some contribution to the damage. 3.4 Other relevant material considered and relied on  Parties‟ submissions/emails and all attachments to all submissions/emails.  Parties‟ expert reports.  Photographs, invoices and site plan.  Invoices from water companies.  Insurer‟s claim file notes.  Correspondence between the parties.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.