Insurer declined storm claim for front fence, under-house slab and masonry walls as long-term damage
Summary
The complainant claimed storm damage to a fence, under-house slab and masonry walls, which the insurer excluded as long-term ground movement and corrosion. AFCA upheld the denial but ordered $500 compensation for delay in the final response and engineer's report.
Once the insured shows a storm loss, the insurer must prove an exclusion applies, and the unrebutted engineering evidence established settlement, corrosion and gradual deterioration.
Issues
- Claim denial primary · not upheld“The insurer is entitled to decline the claim for damage to the front fence, the under-house slab and masonry walls.”
- Delay secondary · upheld“There was some delay in providing its final response and obtaining the engineer's final report.”
Subjects and remedies
home or building damagenatural disasterpay non financial loss
Related
Text of the determination
Determination
Case number 636220
Financial firm Insurance Australia Limited
Determination | Case number: 636220 Page 2 of 14
Case number: 636220 7 April 2020
1 Determination overview
1.1 Complaint
The complainant lodged a claim with the financial firm (the insurer) following a storm
which occurred on 31 January 2019.
Following assessment of the claim, the insurer cash settled the complainant for
damaged contents but declined to cover the damage to the front fence, the under-
house slab and masonry walls. The insurer said the damage was not caused by the
storm and was excluded from cover.
The complainant disputes the insurer’s decision and is seeking it to cover the damage
to the claimed items.
1.2 Issues and key findings
Has the complainant established a valid claim?
The insurer accepts and the panel is satisfied the complainant has established a valid
claim.
Is the insurer entitled to rely on policy exclusions to deny the claim?
The available evidence establishes on the balance of probabilities the damage has
been occurring over time and was not caused by the storm event but rather by factors
excluded under the policy.
Accordingly, the insurer is entitled to decline the claim for damage to the front fence,
the under-house slab and masonry walls.
Is the complainant entitled to compensation?
An award of $500 compensation is warranted.
1.3 Determination
This determination is mainly in favour of the insurer.
Should the complainant accept this determination then within seven days of
notification of acceptance of the determination, the insurer is to pay to the
complainant $500 compensation.
Otherwise, the insurer is not required to take any further action in relation to the
complaint.
Determination | Case number: 636220 Page 3 of 14
2 Reasons for determination
2.1 Has the complainant established a valid claim?
Insurer accepts complainant has established a valid claim
The complainant must establish on the balance of probabilities he has suffered a loss
caused by an event to which the policy responds. This is known as a prima facie
claim.
The complainant has a home and contents policy with the insurer. The policy provides
cover for insured events, including earthquake or tsunami, fire, impact, landslide or
subsidence, lighting, storm, flood, rainwater or wind and water or liquid damage.
The insurer accepts the complainant has established a prima facie claim because it
accepts a storm occurred on 31st January 2019 and the complainant identified
damage following the storm.
The panel is satisfied that the complainant has established a valid claim.
2.2 Is the insurer able to rely on policy exclusions to deny the claim?
Insurer relies on expert opinion
The onus shifts to the insurer to establish it is entitled to decline the claim for damage
to the front fence, under house slab and masonry walls.
The insurer arranged for experts to inspect the damage. The insurer says the experts
support its position as they did not identify any damage to the insured property at the
time of the inspection that could be attributed to the storm.
The insurer ’ s reports are summarised in supporting Section 3.3 of this determination.
The insurer points out no expert evidence to the contrary has been provided to refute
the information upon which it relies being the professional opinion of an appropriately
qualified structural engineer.
The complainant’s policy does not cover accidental damage and specifically excludes
loss or damage caused by:
settling, shrinkage or any movement of earth
erosion, rust, corrosion, gradual deterioration, depreciation, wear or tear.
The relevant terms of the policy are set out in supporting section 3.2 of this
determination.
Determination | Case number: 636220 Page 4 of 14
Complainant made lengthy submissions but provided no expert opinion
The complainant has provided no expert material. He says he had difficulty arranging
expert evidence as experts he approached were reluctant to be involved with an
insurance claim.
The complainant made lengthy submissions supported by annotated pho tographs.
In response to the insurer’s initial denial of the claim, the complainant said:
he arrived home on 15 February 2019 after a 3-week site visit
he first noticed movement of the front fence
movement was about 5-7mm as identified via google maps dated 2017
an annotated photograph of the front fence shows a clear line between the pre-
existing movement and movement since the event
since the event, there has been movement in the fence of 45 to 50mm
the insurer’s engineer did not explore the historical evidence available via Google
and evidence of recent movement from the opposite side of the fence
photographs from Google maps show the pre -existing movement
the insurer’s builder identified hairline cracks in the blockwork and cracking of one
of the columns
the insurer’s engineer observed damage to the pillar but only included the lower
portion of the column and incorrectly identified concrete cancer
the engineer did not ask him questions relating to the timeframe when the
movement in photo 7 occurred and did not ask him when the ramp was made but
made an assumption to justify a conclusion
photographs taken on 20 June 2019 and 16 July 2019 show some of the cracks
and separation since the event
the insurer’s expert did not carry out the task it was assigne d, and the report is
based on opinion as there is no soil testing, analysis and quantifiable data
The insurer carried out further soil testing. After receiving the insurer’s further report,
the complainant provided a further submission in which he reiterated some earlier
submissions and made some further comments which included:
his house was built in the 1930- 40’s and has had work done since the original build
and has had significant time for settlement to occur
significant flood events to affect the house were Cyclone Althea (24 December
1971), Night of Noah (10-11 January 1998), Cyclone Yasi (3 February 2011) and
the floods of 27 January 2019 and 8 February 2019
these events, with the exception of Yasi, caused increased water which possibly
damaged the property, but the property was well and truly settled
the movement in the under-house slab was measured against the width of a pencil
Determination | Case number: 636220 Page 5 of 14
photographs of the ramp were annotated approximately December 1988 and
existing slab movement dated prior to September 1988
photographs (including lichen growth) taken of the front fence on 19 July 2019 and
30 December 2019 are evidence of the movement of 45-50mm
photographs provided of the masonry fence include an annotated photograph
showing displacement in the footing which was said to be typical of signs of
subsidence as compared with settlement
the insurer's engineer has not provided all photographs or has modified images
the engineer spent time on concrete cancer and did not consider other causes of
damage to the walls and stumps such a spalling
Soil testing results are summarised excluding critical information to justify the result
Claimed damage was not caused by the storm event
The panel has carefully considered the submissions made by both parties, the expert
reports and the photographs.
The complainant has made lengthy submissions, but they are not supported by
independent expert material.
The panel is not satisfied the available information establishes the contentions made
by the complainant about the independence of the insurer’s expert reports.
The panel has considered the expert reports carefully. The reports are provided by a
structural engineer. The panel is satisfied the engineer has the expertise to comment
on the issues in dispute. Moreover, the opinions are supported by the photographs.
The available evidence does not establish the reliability of the photographs can
persuasively be challenged.
The panel agrees the insurer's builder noted the claimed damage but the issue in
dispute is the cause of the damage. The builder states the movement was pre-
existing and consistent with movement over time in a building of its age.
The builder’s opinion was supported by the engineer who inspected and
photographed the property with the complainant not long after the damage in early
April 2019. The report was peer reviewed.
The engineer was appointed to assess ground movement and the panel is satisfied
his report addresses the issues in dispute. He notes the damage but says the
damage is typical of long-term ground movement, inadequate construction methods
and corrosion which occurred over an extended period of time.
The panel is satisfied these findings are supported by the photographs and images
provided.
Determination | Case number: 636220 Page 6 of 14
The complainant says the cracks in the floor are worse after the storm event.
However, the panel accepts if the cracks were new, there would be movement at the
grout ramp which is not evident.
The complainant challenges findings made by the soil analyst. The panel does not
accept these contentions are made out by the objective material provided.
The geotechnical findings confirm the site is a problem site of low bearing capacity
and hence long-term movement was likely because of incorrectly designed and
constructed footing systems.
The engineer considered the complainant’s submissions. In view of the content of the
reports and the photographs, the panel considers the engineer’s rebuttals have merit.
The engineer is unequivocal in his opinion. The structural damage to the property was
not caused by the flood event. The damage identified to the fence, concrete slab and
masonry walls are as a result of long-term ground movement.
In the absence of any expert independent evidence to the contrary, the panel accepts
the available information establishes the claimed damage was not caused by the
storm event but was caused by poor construction, long-term ground movement,
corrosion and gradual deterioration.
As these causes of damage are excluded from cover, the panel is satisfied the insurer
is entitled to decline the claim for damage to the front fence, under house slab and
masonry walls.
2.3 Is the complainant entitled to compensation?
Compensation assessed conservatively and paid in some circumstances only
AFCA’s Rules allow the payment of compensation (capped at $5,000) for
compensation. The panel may decide an insurer should compensate a complainant
only where there has been an unusual amount of physical inconvenience, time taken
to resolve a situation, or interference with the complainant’s expectation of enjoyment
or peace of mind.
AFCA takes a conservative approach to awarding compensation for non-financial
loss. AFCA does not award compensation because the complainant has suffered
some inconvenience and anxiety. AFCA expects complainants to be moderately
robust and to bear the normal degree of inconvenience experienced when a problem
occurs and to take reasonable steps to manage the situation.
The complainant provided a lengthy submission and chronology of events not only
about matters the subject of this complaint but also about other matters involved in
the claim generally.
Determination | Case number: 636220 Page 7 of 14
The complainant says the claim was not handled professionally, that there were
delays and his repeated requests to progress and discuss his claim were ignored by
the insurer. Further, the complainant believes he has not been heard adequately
during the claims process.
The insurer says it claims management was reasonable. In its internal dispute
resolution response, it apologised if its level of service did not meet the complainant’s
expectations.
Insurer to pay to the complainant $500 compensation
The available information shows the claim was made on 4 February 2019.
A few weeks later the insurer had arranged for its contractors to attend and deal with
both the damaged contents and the damage to building. The builder provided a quote
to repair the accepted damage.
The insurer determined the policy response to damaged contents, the air-conditioner,
the hot water system and walls and doors in the downstairs enclosed storage area.
The complainant was cash settled in the sum of $23,943.43. The insurer says the
complainant was also reimbursed for costs incurred to have an e lectrician complete
the make safe and costs to remove and replace the damaged air-conditioner. This is
not disputed by the complainant.
On 12 April 2019, an engineer assessed the damage which is the subject of this
complaint and provided a report dated 25 April 2019. It was at this time the
complainant came to AFCA complaining about the insurer’s claims management.
The insurer’s final response to this complaint was provided on 9 July 2019. It said the
damage to the front fence, the under-house slab and masonry walls were not caused
by the storm event.
The insurer attended a conciliation on 26 September 2019. As a result, a further
report was obtained from the engineer after a further inspection and soil testing on 12
November 2019.
A further report was prepared and dated 30 November 2019.
Relying on the engineer’s report, by letter dated 3 December 2019, the insurer
maintained its denial of the claim for damage to the front fence, the under-house slab
and masonry walls.
While the complainant continued to d ispute the findings of the insurer’s builder and
engineer, the original findings were supported by the subsequent geotechnical
engineering opinion.
Having reviewed the available information, the panel is satisfied while there were
some delays in respondin g to the complainant, the insurer’s denial of this aspect of
Determination | Case number: 636220 Page 8 of 14
the claim was reasonable and timely. However, there was some delay in providing its
final response and obtaining the engineer’s final report.
Taking all matters into account and the conservative nature of an award of
compensation, the panel considers an award of $500 is warranted for the delay in
providing the final response and obtaining the engineer’s final report.
Determination | Case number: 636220 Page 9 of 14
3 Supporting information
3.1 AFCA approach
This complaint has not been the subject of a recommendation. Due to the nature of
the complaint, it has been referred directly to a panel for determination, in line with the
Operational Guidelines to the AFCA Rules. The panel consists of an ombudsman and
two representatives with consumer and insurance experience.
The panel has decided this complaint based on what is fair in all the circumstances,
having regard to legal principles, applicable industry codes or guidance, good industry
practice and previous relevant determinations of AFCA or predecessor schemes
(which are not binding).
There has been a full exchange of all material information relied on for the purposes
of this determination and each party has had the opportunity to address any issues
raised by the other.
The panel has reviewed and considered all the material provided by the parties. While
the parties have raised numerous issues in their submissions, for the purposes of this
determination the panel has restricted its commentary to those issues that it considers
directly relevant to the outcome only.
It is an accepted principle of general insurance law that the insured bears the onus to
establish on the balance of probabilities that they have suffered a loss caused by an
event to which the policy responds. This is known as a prima facie claim. Once so
established, the onus shifts to the insurer to prove on the balance of probabilities that
an exclusion applies if it seeks to deny or limit its liability for the loss.
3.2 Relevant Policy Terms
Page Product Di sclosure Statement
3 Listed events cover
We will cover your buildings and contents for loss or damage as a
result of the incidents listed on the following pages.
If you make a claim, you will need to pay any excesses that apply –
you will only need to pay the amount once.
Any co ver we provide is subject to exclusions.
4 Storm, flood, rainwater or wind
We will cover your buildings or contents for loss or damage as a
result of storm, flood, rainwater or wind.
Determination | Case number: 636220 Page 10 of 14
Page Product Di sclosure Statement
We will not cover loss or damage as a result of flood within 14 days
(366 hours) of the start dat e of this policy, unless:
you took out your ins urance with us immediately after another
insurance policy covering flood and ins uring the same building or
conte nts expired, without a break in cover.
We will not cover loss or damage caused by a named cyclone within
48 hours of the start of your policy, unless:
you took out your ins urance with us immediately after another
insurance policy covering the same buildings or contents expired,
without a break in cover
you took out your ins urance with us immediately after the risk
passed to you as purchaser of your buildings
you took out your ins urance with us immediately after you signed
a lease contract for your b uildings
We will not cover:
swimming pool covers, including:
‒ solar covers and plastic liners.
water entering your buildings:
‒ through an opening made for any building, renovation or
repair work
‒ because of a structural defect, faulty design or faulty
workm anship when your buildings were constructed
free - standing fences made of corrugated fibrous material that do
not have a supporting frame, unless:
‒ they have been installed and constructed according to the
manufacture’s specifications
free - standing gat es, fe nces or walls that are made of timber and
are more than 15 years old
jetties, wharves, bridges or pontoons for damage by flood
9 Exclusions To Your Cover
Any cover we provide is subject to the following exclusions.
Listed events cover, additional cover and Strata Title
Determination | Case number: 636220 Page 11 of 14
Page Product Di sclosure Statement
Mortgagee Protection exclusions
We will not cover any loss or damage as a res ult of, or caused by:
settling, shrinkage, or any movement of earth
erosion, rust, corrosion, gradual deterioration, depreciation, wear
or tear
….
3.3 Expert Reports
Record Key points
Insurer builder asse ssment
(ABC)
Report
19 February 2019
Attended the property to inspect the damage to the downstairs
area of the high set home due to the monsoonal flooding event
which impacted the Towns ville area.
Insu red point ed out the damage to the assessor.
Downstairs storeroom has sheeted ply wood walls that are installed
onto the original concrete floor, there is no termite barrier installed
or weatherproofing and ABC cannot warrant the repairs to this
area.
Insure d said the concrete slab had moved and lifted. Builder noted
two sections of conc rete slab have lifted consistent with age of
building and design of the sectional concrete installation.
Movement appeared pre - existing and consistent with movement
over time of the aged building.
Insured also stated that the solid block fence at the front of the
property has moved and separated, this also appear pre - existing.
Builder noted front block fence has shifted / separated.
Recommend appoint an engineer to report on the structures.
Downstairs storeroom not built to code, no termite barrier, and the
room is built in below ground level.
Some i tems accepted. Repair cost s $4 , 978.91.
Insurer Engineer
Asse ssment (CFT)
Report
25 April 2019
Property inspected and photograp hed by structural engineer 12
April 20 1 9. Report peer reviewed by building consultant an
engineer. Engineer appoint ed to assess ground movement.
Hous e is high set building of timber construction on concrete
stumps about 1.8 metres high.
Front fence was of masonry construction
Fence had an inward lean of approximately 3 degrees
No dowel bars between each section of fence that would allow
differential movement between the fence panels to occur.
Joins between each fence panel could be ‘seen through’ as the
se alant had deteriorated
Using publicly available historical imagery able to identify that
Determination | Case number: 636220 Page 12 of 14
Record Key points
damage to fence at the front of the property pre - dated the event.
Photo 3 – shows view of front fence – October 2017. Photo 4 –
shows closer view of front fence – October 2017. Damage to fence
that pre - dates event.
As for ‘under - house’ concrete slab, observed a number of cracks
measuring less than 2mm in width.
Cracki ng displayed as examples of both shrink age cracks and
movement cracks. Photograph s 5 and 6 shows typical crack to
slab which occurred bec ause of ground movement /shrinkage
crack.
Ground floor slab has been constructed/poured as a series of
individual concr ete slabs as can been seen typically in Photo 7.
Most slab panels/pours have some differential movement between
each section as can be seen in Photo 7 and 9 indic ating there are
no dowel bars between each panel/pour.
Complainant confirmed the grout ramp se en in Photo 7 was
installed a ‘long time ago’ – prior to the event.
Masonry blockwork around the ground floor was infill masonry
blockwork which appears to have been constructed directly on the
ground floor slab.
Given the construction method used for the ground floor slab on
balance there is no footing system under the masonry walls.
Masonry walls typically showed signs of movement and cracking
cracks displayed as pre - existing the event as the colour of the
inside of the cracks did not show clean masonry as would be
expected had they been newer.
Observed separation of masonry walls from the columns that had
also occurred as a result of sealant det erioration and ground
movement.
Minor cracking of concrete columns was also noted as shown in
Photo 11. Cracki ng is a res ult of reinforcement corrosion which is
expanding resulting in concrete cancer.
Conc rete cancer occurs over an extended period of time and is not
the result of any one single event.
Findings
Damage to the fence, which consisted of conc rete panel s leaning
and visibility through the joins is a result of long - term ground
movement and long - term deterioration of the sealant to the joins.
The event may have contributed to any movement, just as any
change in moisture content in the soil would, this move ment is
only a result of a long - term soil movement process. Google Street
View also shows the lean was pre - existing.
Ground floor slab has been constructed as a serious of individual
panels/pours with no footing system and no dowel bars bet ween
adjoining panels. Some time ago an existing grout ramp was
constructed between two panels. No signs of recent movement at
the ramp.
Cracking to the ground floor slab was typically a result of both
ground movement and shrinkage and also the result of no footing
syst em being installed to provide the required stiffness.
Determination | Case number: 636220 Page 13 of 14
Record Key points
Movement that has occurred does not display to be recent. While
the event may have contributed to any movement, just as any
change in moisture content in the soil would, this movement is
only a result o f a long - term soil movement process. No recent
movement as evidenced by no movement of the grout ramp.
Cracking and movement of the masonry walls is directly linked to
movement of the slab on the ground supporting the walls. Not
sufficient stiffness in th ose slabs to resist ground movement as no
footing system or d owel bars in the slab panels.
Ground movement results in movement of the walls and thus
cracking and separation of joints.
Cracks did not appear clean and recent either.
Damage to the masonry walls is a result of long - term seasonal soil
movement.
Conc rete columns: cracking was only identified in 2 columns and
is a result of the reinforcement corroding inside the column and is
a typical issue that occurs in buildings of this construction type an d
age and is not the result of the event.
Did not identify any structural damage at the property at the time
of our Inspection that we would attribute to having been caused by
the event.
Insurer geotechnical
asse ssment (CFT)
Report
30 November 2019
Report prepared by s tructural engineer and peer reviewed by
building consultant an d engineer.
Site classification investigation was undert aken at the property on
12 November 2019. Investigation comprised the excavation and
logging of materials arising fro m exploratory h oles.
Investigation identified the top 600mm of material is a clayey sand,
with low to medium plasticity sand clay below.
Allowable bearing capacity in the top 1m of material is less than
100kPa.
Review of the bore logs indicates that in the top 1m of ground the
bearing capacity varies between 45kPa to 135kPa.
Geotechnical findings indicates/confirms that the site is a problem
site of low bearing capacity and hence long - term movement is
likely for incorrectly designed and constructed footing systems.
Reviewed additional information and comments provided by
complainant. The image of the deflected masonry wall joint does
not show a clear line between the alleged pre and post flood
movement. Historical evidence available f rom Google Street v iew
c learly shows movement existed prior to flood event. Concrete
pillar image show separation cracking as a result of long - term
building movement due to inadequate footings for the load bearing
capacity of the site. No assumption was made about the concret e
ra mp. The complainant advised the ramp work was done a long
time ago.
Did not identify any structural damage at the property at the time
of inspection caused by the Towns ville flood event.
Based on the geotechnical findings and additional information
supplied, confirms d amage identified to the fence, concret e under
Determination | Case number: 636220 Page 14 of 14
Record Key points
house slab and masonry walls is caused by long term seasonal
ground movement.
Damage to the concrete columns is a result of concrete canc er
that occurs over a period of time and not from on e event.
Based on the geotechnical findings and additional information
supplied confirm opinion the movement and cracking identified is
as a result of long - term movement.
3.4 Other matters
During the complaint, the complainant raised other issues (for example, mud
contamination). The insurer says issues such of this have been dealt with in the
builder’s scope of works.
This determination deals only with the subject matter of this complaint to AFCA being
the cause of the damage to the front fence, under house slab and masonry walls and
the insurer’s claims management of these issues.
If other issues remain outstanding, the complainant should raise those issues with the
insurer’s internal dis pute resolution process and if no resolution is reached in relation
to other issues, the complainant may bring those other issues to AFCA as the subject
of another complaint.
3.5 Other documents considered
Parties’ submissions/emails and all attachments to al l submissions/emails.
Parties’ expert reports.
Photographs.
Correspondence between the parties.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.