Home / Auto & General / Determination 635416
Determination 635416
Bamboo flooring water damage claim denied as gradual or lack of maintenance
Summary
Following storm and rain events, the complainants claimed for water damage to bamboo flooring, which the insurer declined as long-term damage from lack of maintenance. AFCA found the storm-related roof leak covered, ordered $46,000 cash settlement and $1,000 for non-financial loss.
The policy covers storm and rainwater damage without a multiple-event exclusion, and the lack of maintenance exclusion did not apply because the defect was not known or reasonably knowable.
Issues
- Claim denial primary · upheld
“the insurer is to settle the claim for $46,000 to cover the costs to repair or replace the damaged bamboo flooring.”
- Poor claim handling secondary · upheld
“It was not until five months later that the claim for water damage was recorded... It was left to the complainants to employ their own builder.”
- Product terms interpretation secondary · upheld
“This is not how the policy reads... there is no exclusion that relates to multiple rainwater events.”
Subjects and remedies
home or building damagepay claimpay non financial loss
Text of the determination
Determination
Case number 635416
Financial firm Auto & General Services Pty Ltd
Determination | Case number: 635416 Page 1 of 5
Case number: 635416 18 November 2019
1 Determination overview
1.1 Complaint
The complainants held a Home and Contents Policy with the financial firm (insurer) .
They lodged a claim in August 2018 for water damage to some bamboo flooring
following a storm event.
The insurer denied the complainants claim saying the damage to the bamboo flooring
occurred over an extended period of time and was not the result of one event. The
insurer says the damage occurred over several months due to multiple rain events.
The complainants maintain the damage was caused as a result of a storm event -
including possible impact with water entering the property through a broken roof tile.
This dispute has been subject of a recommendation. The recommendation was
partially in favour of the complainants. The recommendation was rejected by the
insurer.
1.2 Issues and key findings
Is the insurer liable to meet the cost to repair or replace the damaged bamboo
flooring?
For the reasons set out under Section 2.1 of this determination, the insurer is to settle
the claim for $46,000 to cover the costs to repair or replace the damaged bamboo
flooring, in accordance with the terms of the policy.
Are the complainants entitled to compensation for non-financial loss?
The complainants are entitled to compensation for non-financial loss of $1,000, in
accordance with Section D. 3.3 of the Australian Financial Complainants Authority
(AFCA) Rules.
1.3 Determination
This determination is in favour of the complainants.
The insurer is to pay the complainants $46,000, inclusive of interest for damage to the
bamboo flooring, roof tile and temporary accommodation. In addition, the Insurer is to
pay the complainants $1,000 compensation for non-financial loss pursuant to Section
D3.3 of the AFCA rules.
Determination | Case number: 635416 Page 2 of 5
2 Reasons for determination
There has been a full exchange of material between the parties and each party has
had the opportunity of addressing the issues that arise from the i nformation
exchanged.
In rejecting the recommendation, the insurer says that the water damage to the
bamboo flooring occurred sometime after the discovery of several roof leaks
throughout the property. The insurer maintains the damage was not the result of a
one-off rain event, but rather the result of damage which occurred over several
months and multiple rain events.
This determination follows consideration of all the information available. It is based on
what is fair in all the circumstances, having regard to the relevant legal principles,
terms of the policy, good industry practice including codes of practice and prior
determinations where relevant.
2.1 Is the insurer liable to meet the cost to repair or replace the bamboo
flooring?
Insurance policy is an insured events policy
The complainants Home and Contents policy provided cover for a series of insured
events including loss or damage due to storm, rainwater, lightening and impact. The
complainants had not taken out the optional accidental damage cover.
The insurer says the damage is only be covered if it was the result of a one -off rain
event rather than occurring over several months, or multiple rain events.
This is not how the policy reads. Under part one of the cover, insured events, cover is
provided for loss or damage caused by storm and rainwater. Whilst some exclusions
apply, there is no exclusion that relates to multiple rainwater events.
The same applies to damage caused by lightening or impact. If the property had been
damaged and water entered the property due to multiple rain events, the damage
arising from the rain events would be classified as a series of occurrences arising
from the one single incident. Cover would still be provided under the terms of the
policy.
Insurer notified of water damage in March 2018.
The complainants initially said they notified the insurer on 8 January 2018, that their
bamboo flooring had sustained water damage because of three months of heavy rain.
Telephone call recordings provided by the insurer indicate the complainants did not
notify the insurer during the first call. Rather, they first notified the insurer on 22 March
2018 of water damage to the bamboo flooring.
Determination | Case number: 635416 Page 3 of 5
There is no dispute that there was a series of significant storm/rainfall events from
October 2017 through to March 2018. The heaviest rainfall was recorded in March
2018, with serious storms and lightning happening from 20 March 2018 to 23 March
2018.
The insurer did not record a claim for water damage at that time. It was not until 28
August 2018, that the insurer recorded the complainants ’ claim.
Exclusion relating to lack of maintenance does not apply
The policy does not cover loss or damage caused by lack of maintenance under the
insured event of storm and rainwater. Lack of maintenance, however, is defined as, ‘A
defect that you knew about or should reasonably have known about and did not fix.’
This does not apply in the current case as there is no indication that the complainants
knew or a reasonable person, in the circumstances, would have known of any
particular defect.
The insurer’s assessor (WW) identified rising damp had discoloured the flooring
where two concrete slabs met. WW identified a box gutter and the overflow pipe from
the box gutter was in line with the meeting of the two slabs.
The complainants confirmed the property was renovated approximately 18 years ago
and the area was the junction between the new and the old parts of the house.
WW thought the water was seeping along the join of the two concreate slabs causing
the dampness. The water was entering the home through either side with the garden
bed on the right of the property being above the floor height. The complainant is a
qualified structural engineer. He has noted several inconsistencies with WW ’s report.
He also notes that the concrete pathway slopes away from the house which would
take water away from the house.
The insurer’s engineer (JHA) agrees that water penetration has caused damage to
the floorboards. JHA says that this was not due to a single eve nt but had been
occurring over a long period of time. JHA says there was a maintenance issue.
Photographs of the property suggest that the property was well maintained. The
complainants say there was no sign of damage until 2018.The insurer does not
dispute that the complainant did not become aware of the damage until 2018. There
is no suggestion that the complainant knew of any maintenance issue or defect.
There is no suggestion the complainants should have reasonably known of any defect
in the property at that time.
Damage most likely caused by storm or rainwater.
The complainants provided a report from a builder CTI who inspected the house
including the tiled roof. CTI identified a cracked tile on the roof which would have let
water into the lower cavity. Hail during the storm could have also blocked the box
Determination | Case number: 635416 Page 4 of 5
gutter. CTI says water would have tracked down the sarking, to a point where the
electrical wires enter the cavity, then to the bottom of the cavity. The water would then
have tracked along the timber battens and with nowhere to go, would have pooled
until it dried. With each shower, the stain would get darker at the end of the property.
CTI repaired the roof tile and the leak ceased.
There is no dispute that a series of storms impacted on the complai nants’ property
during late March 2018. While JHA says the damage to the flooring occurred over a
long period, JHA did not inspect the property until November 2018 . JHA has now
confirmed that the damage could have occurred within three to six months of moisture
contact. This is consistent with the complainants’ statements that the damage was
first identified in or about March 2018, but that there had been a prolonged period of
heavy storms prior to that date.
I accept, based on the available information, that damage most likely occurred during
a storm or impact event causing the damage to the roof tile. I accept, that as a result
of this damage, rainwater has been able to enter the property leading to the damage
to the floor.
In so far, as there is damage to two parts of the floor, mainly the construction joint and
the kitchen area, I accept that most likely, this was caused as result of the
storm/rainwater entering the property.
Insurer is to cash settle the claim
The policy provides the insurer with the discretion whether to repair, replace or cash
settle the complainants for the loss or damage sustained. In exercising this discretion,
the insurer must do so fairly, reasonably and consistent with the principles of utmost
good faith.
The policy provides, that when settling a claim, the insurer will pay to repair or replace
floor covering but only in the same room, hallway, passageway where the loss or
damage occurred. Damage has been identified to two areas of the floor, namely the
construction joint and an area in the kitchen. It appears that the damage to the kitchen
area is as not as severe as the damage to the construction joint area, where rot has
been identified.
The damage has occurred in an open plan area. According to the complainant and
not disputed by the insurer, it would be necessary to replace the entire floor to repair
the property to the same specification quality standards as it was when new.
I agree, that in these circumstances, it would be necessary to replace the entire floor.
The complainant has provided a quote from CTI dated 8 July 2019, for $41,600. The
complainant has also provided an invoice from CTI for the repair of the damaged
roofing tiles for $605 and an estimate for temporary accommodation during the repair
process for $1,500. The insurer has not disputed these quotes.
Determination | Case number: 635416 Page 5 of 5
I believe a 5% increase in the cost of replacing the timber floor should be applied to
allow for the transfer of risk to the complainants. Rounding this up, I consider it fair in
the circumstances that the insurer pays the complainant $46,000 to cover the cost to
repair and replace the damaged bamboo timber flooring , repair of the roof tile and
likely temporary accommodation costs.
2.2 Is the complainant entitled to compensation for non-financial loss?
Complainant is entitled to compensation for non-financial loss
Under the AFCA Rules, AFCA may award compensation to a complainant of up to
$5,000, for non-financial loss, where the complainant has suffered an unusual degree
of inconvenience or time taken to resolve a claim.
The available information suggests the complainant first informed the insurer on 22
March 2018, of the likely damage. Despite this, no claim was lodged on behalf of the
complainants for water damage, nor did the insurer suggest that arrangements be
made to have the property inspected.
It was not until five months later that the claim for water damage was recorded. At that
time, the insurer’s assessor did not identify the cause of the damage. When the
complainant sought a review of the dispute, the insurer’s engineer did not inspect the
roof.
It was left to the complainants to employ their own builder, who not only identified the
cracked tile, but repaired the tile and fixed the leak.
The insurers claim that the damage was due to lack of maintenance, is not supported
by the information provided.
In my view, the complainants have suffered an unusual degree of inconvenience in
resolving their dispute. I consider it fair, in the circumstances, that the insurer pays the
complainant $1,000, compensation by way of non-financial pursuant to Rule D. 3.3 of
the AFCA Rules.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.