Building repair settlement for water escape damage, including base plates and temporary accommodation
Text of the determination
Determination
Case number 634586
Financial firm Insurance Australia Limited
Determination | Case number: 634586 Page 2 of 11
Case number: 634586 14 February 2020
1 Determination overview
1.1 Complaint
The complainant holds a home and contents policy with the financial firm (insurer). On
12 September 2018, the complainant lodged a claim after discovering a burst pipe.
The insurer accepted the claim and has settled the claim for the contents, which is not
in dispute. The disputed component of the claim is the building damage. The insurer
initially offered $54,051.71 for the building damage which the complainant rejected.
The insurer has subsequently offered $72,362.05, which includes 20% contingency
and temporary accommodation for five months , of $7,500. The complainant has
declined that offer and she is seeking the insurer pay $152,669 for the repairs.
1.2 Issues and key findings
Have the base plates been damaged by the subject leak?
Based on the available information, on balance, the panel is not satisfied the base
plates around the property have been damaged by the leaking pipe. Accordingly, the
insurer is not liable to cover that damage.
What is the insurer’s liability ?
The insurer ’s offer of $72,362.05 to settle the claim is fair and reasonable. The Panel
notes the insurer has already paid this sum. The insurer is to pay temporary
accommodation from 1/1/2020 until the payment of the above sum, plus an additional
10 weeks of temporary accommodation from the date of that payment.
Is the complainant entitled to compensation?
The insurer has already paid $2,500 as compensation plus it has waived the claim
excess of $1,000. In these circumstances, the panel is satisfied the complainant has
been adequately compensated.
1.3 Determination
This determination is substantially in favour of the insurer.
If the complainant accepts this determination, the insurer is to pay $72,362.05 (if it
has not already done so), temporary accommodation from 1/1/2020 until the payment,
plus a further 10 weeks of temporary accommodation from the date of that payment.
All payments are to be made within fourteen days of acceptance of this determination.
Determination | Case number: 634586 Page 3 of 11
2 Reasons for determination
2.1 Have the base plates been damaged by the subject leak?
Complainant has established a valid claim
There is no dispute the complainant’s property was damaged by a pipe which was
leaking under the concrete slab on the south side of the dwelling. The pipe leaked
approximately 115,000 litres of water over a period of four to six months.
The insurer has accepted the claim and has offered the complainant a cash
settlement of $72,362.05 to repair the building damage and for temporary
accommodation. The insurer has also settled the claim for the contents damage
which is not in dispute.
Accordingly, the panel accepts the complainant has established a valid claim.
Crack in the bathroom slab is not due to the water leak
The insurer appointed a builder (JG) to inspect the property and quote on the
damage. JG reported the damage sustained to the residence is a direct result of the
water leak.
JG says it cannot undertake the repairs because there is a crack in the bathroom slab
which is unrelated to the claim. JG says the crack needs to be repaired by the
complainant prior to it starting the claim related repairs. The crack in the bathroom
was initially in dispute as the complainant believed that it was due to the leak.
However, following the review of engineering reports, the complainant accepts the
crack in the bathroom slab is not due to the water leak and that damage is not in
dispute.
IL noticed several factors contributing to the moisture presence
The insurer ’s engineer (IL) attended on 28 October 2018 and reported it could not see
any signs of a vapour barrier installed along the edge of the concrete slab. IL found
no cracks in the tiles in the bathroom and kitchen. IL measured the floor levels around
the property and found no signs of movement.
IL observed a disconnected downpipe along the rear of the property, which would
discharge water directly onto the paving next to the house. No downpipe or a gutter
was present at the front of the property to direct the water away from the property.
IL reported the original cause of moisture presence around the property is due to the
insufficient drainage, unpaved perimeter soils along with the absence of, or an
incorrectly installed vapour barrier under the concrete slab. IL states if the vapour
barrier was present, it would not have allowed the moisture to penetrate the concrete
and reach the surface of the slab.
Determination | Case number: 634586 Page 4 of 11
IL recommended the insurer appoint a geotechnical engineer to confirm if a vapour
barrier is present.
The geotechnical engineer (CT) attended the site on 5 December 2018 and did not
comment on the vapour barrier being present or absent under the concrete slab. CT
agreed with IL about the property having no foundation movement related damage.
CT conducted soil test investigations in which it dug two boreholes, one close to the
pipe leak and the other hole slightly away from the property. It confirmed the soil
moisture had returned to the pre-water escape condition.
Vapour barrier is present at the property
The complainant disagreed with IL’s findings about the vapour barrier being absent at
the property. She appointed an independent engineer (AC) to inspect the property
and comment on the likely causes of the moisture condition at the property.
AC observed plastic membrane in two locations , during its attendance of 24 July
2019, which it says is a vapour barrier. AC says a vapour barrier’s is designed to
prevent moisture penetrating through to the concrete slab. It says the vapour barrier is
not designed to prevent water penetration in a saturated condition like that of the
subject leak.
The insurer does not dispute AC’s findings of the vapour barrier being present.
Accordingly, the panel is satisfied that a vapour barrier is present at the property.
AC does not agree with CT’s soil test results
AC acknowledges the drainage at the property is not in accordance with good
practice. AC also says the stormwater system has not been installed in accordance
with the building standards because:
there is inadequate cover to the pipes
pipes located immediately adjacent to the building
a pipe discharging water to the ground outside the back door.
AC believes the inadequate site drainage would cause moisture issues only to the
slab edges. It says the rainwater would quickly disperse down through the sand away
from the slab.
AC disagreed with the results of CT’s soil tests. AC says the tests are not conclusive
about the soils being dried out sufficiently under the slab. It says the ground under the
slab is completely enclosed which will take more time to dry out as compared to the
area exposed to the atmosphere.
AC did not conduct any soil testing to support its view. In the absence of contradicting
information about the soil moisture, the panel accepts CT’s finding s about the
moisture level returning to equilibrium.
Determination | Case number: 634586 Page 5 of 11
Parties disagree about damage to the base plates
In JG’s initial report and quote, it reported damage sustained to the property is due to
the pipe leak. Accordingly, it included the removal and replacement of bottom base
plates for 150 m2 and eve lining for 25 m2. However, IL did not observe any bottom
plates damaged in the kitchen area where the leak was located.
IL says the water will flow outwards and downwards through the soil rather than
horizontally as the slab is built on sand which is considered as a free draining
material. Accordingly, IL says the bottom plates in the property have not been
damaged by the leak.
The complainant says the base plates in the property have been damaged from the
subject leak. AC reports the increase in moisture of the slab due to the leak caused
the wetting of the bottom wall plates which further resulted in mould growth.
The panel is satisfied, on balance, the base plates in the property have not been
damaged due to the leak. In reaching this view, the panel considers:
the base plates in the kitchen have not been damaged which were the closest to
the leak
the base plates in the bathroom and laundry are damaged, however, that area is
on the opposite side of the leak
there is no information to support the base plates in the living/dining room have
been damaged
on balance, it would be expected for the bottom plates to be damaged in areas
between kitchen and bathroom, which has not happened.
Accordingly, the insurer is not liable for damage to the base plates.
2.2 What is the insurer’s liability ?
Claim amount
JG initially provided a quote for $89,983.76, however, it included the replacement of
the bottom base plates. As it has been established the bottom base plates have not
been damaged by the subject leak, the panel is satisfied that quote does not
accurately establishes the insurer’s liability.
JG subsequently provided a quote for $54,051.71 which only included claim related
repairs. JG says the complainant needs to repair the damage to the bathroom slab
prior to it starting the repairs.
IL also recommended the complainant to undertake the following maintenance works
before the damage is repaired:
all adequate drainage to be installed around the entire perimeter of the building
Determination | Case number: 634586 Page 6 of 11
all perimeter soils must be paved and graded away from the building
The insurer has offered an additional 20% of $54,051.71 and increased its cash
settlement offer to $64,862.05 for the building repairs.
The complainant obtained a quote from BT equating to $150,040 which does not
include any replacement of the bottom base plates.
The panel is satisfied JG’s quote is fair and reasonable as it is actionable, and the
builder is able to undertake the repairs. If the complainant wants JG to undertake the
repairs, she is required to complete the maintenance works and the repairs in the
bathroom prior to JG starting the repairs. If the complainant chooses to undertake the
repairs through her builder and opts to take the cash settlement, then the insurer’s
offer of $64,862.05 is fair and reasonable in those circumstances.
Temporary Accommodation
There is no dispute the property cannot be lived in currently and will remain
uninhabitable during the repairs. The insurer offered $7,500 for the temporary
accommodation from 30 July 2019 till 31 December 2019 at $50 per day. The insurer
should pay further temporary accommodation from 1/1/2020 until the building repair
cost is paid. The Panel notes that the insurer paid this amount during mid-January
2020.
JG estimated seven weeks for the repairs. Taking account what is fair in the
circumstances, if the complainant accepts this determination and opts for the cash
settlement, the panel is satisfied the insurer is to pay an additional 10 weeks
accommodation from the date the building repair costs were paid. This includes an
additional three weeks which has been allowed for the complainant to arrange the
trades.
2.3 Is the complainant entitled to compensation?
Compensation payable in some circumstances
Our Rules allow the payment of compensation (capped at $5,000) for non-financial
loss. The panel may decide an insurer should compensate a complainant for such
loss only where there has been an unusual amount of physical inconvenience, time
taken to resolve a situation, or interference with the complainant’s expectation of
enjoyment or peace of mind.
Insurer has paid reasonable compensation
The complainant says the insurer’s claims management was unsatisfactory. The
insurer has acknowledged its trades did not act promptly and has accepted the claims
experience fell short of the industry standards. Considering this, the insurer has paid
$2,500 as compensation to the complainant. Additionally, the insurer has offered to
waive the claim ’s excess of $1,000.
Determination | Case number: 634586 Page 7 of 11
The panel accepts the claims experience would have interfered with the
complainant ’s expectation of enjoyment and peace of mind. However, the panel
considers the insurer paying $2,500 as compensation and waiving the claim ’ s excess
is fair and reasonable in the circumstances. Accordingly, the panel is satisfied the
insurer is not required to pay any further compensation.
Determination | Case number: 634586 Page 8 of 11
3 Supporting information
3.1 AFCA’s Approach
A full exchange of the relevant information has taken place between the parties and
each party has had the opportunity of addressing any issue raised.
All of the provided material has been read and considered. The parties have raised
numerous issues in their submissions. For the purpose of this Determination
commentary is restricted to only those issues considered relevant.
3.2 Relevant Law
Prima facie claim
It is an accepted principle of general insurance law that the insured bears the onus to
establish on the balance of probabilities that they have suffered a loss caused by an
event to which the policy responds. This is known as a prima facie or a valid claim.
Once so established, the onus shifts to the insurer to prove on the balance of
probabilities that an exclusion applies if it seeks to deny or limit its liability for the loss.
3.3 Expert reports
Record Key points
Insurer’s expert ( JG ) Builder’s
Report and Quotation
1 9 March 201 9
The damages sustained to the residence are a direct
result of a broken pipe that has resulted in approximat ely
115,000 litres of water to discharged directly under the
concrete slab loc al to the kitchen, living area and dining
room.
This water has been drawn up through the concrete slab
causing dampness to the internal finishes.
Insurer’s expert ( IL )
E ngineering Report
2 2 November 2018
Natural topography of the land was found to be relatively
fla t with no major fall sighted ac ross the property.
Perimeter soils along the north and south elevation were
uncapped with a permeable gravel bas e sighted to the
south side and grass and vegetation to the nort h side.
Conc rete paving was visible along the west elevation of
the building with some grass to the nort h - west corner.
No distress or cracking of significance was sighted or
reported during our inspection.
No sign of a vapour or moisture barrier was visible along
the edge on the concret e slab.
Along the rear, we sight ed a disconnected downpipe
allowed to discharge directly onto the paving adjac ent to
Determination | Case number: 634586 Page 9 of 11
Record Key points
the dwelling.
The porc h located on the east elevation did not have a
gutter or downpipe connected in order to direct
stormwat er away from the building and into the
underground stormwater system.
Our inspection of the building internally did not find any
cracking or movement to the plasterboard lining or any
other int ernal finishes. We inspected the brittle tile
finishes in the bathroom and kitchen and could not sight
any cracks.
We found some staining to the tiles in the living area,
consistent with moisture presence.
The floor level meas urements across the dwelling were
generally even, with no signs of movement.
Insurer’s expert (CT)
Report
1 7 December 201 8
The subsurface profile contains a clay layer from 500mm
– 600mm to 1300mm – 1400mm depth. The subs urface
profile is considered to be moderately reactive.
No structural or foundation movement damage was
identified in the external parts of the building.
The soil moisture has returned to equilibrium or the pre -
water escape condition. It is therefore considered that no
furt her foundation movement related damage, directly
associated with the water release, should be expected to
occur.
Insurer’s expert (IL)
E ngineering Report
02 May 2019
An external inspection of the dwelling confirmed that the
recommendation to install a concrete apron to drain water
away from the dwelling had not been carried out.
Sections of the east and west elevations were capped
with concret e paving.
Remediation works had commenced at the property
which included the removal of all the floor coverings and
lower sections of plasterboard throughout the dwelling.
An inspection of the concrete slab to the open space
living, dining and kitchen areas did not reveal any surface
cracking. No cracking was not ed within the bedrooms and
laundry.
The bottom plates to the bat hroom had extensive water
damage and rot.
The floor level meas urements across the dwelling were
slightly uneven, however, as the floor coverings were
removed (tiles and carpet), the surface of the slab was
not uniform due to the residual grout la yer left on the slab.
Determination | Case number: 634586 Page 10 of 11
Record Key points
The floor levels in the bathroom showed a low spot in the
north west corner which correlated to the section of the
slab which had cracked.
Internal dampness and the presenc e of mould have been
exacerbated by the escape of water event and the lack of
an adequate vapour barrier under the slab.
On - going moisture issues at the dwelling can be further
confirmed as being as a direct result of a defective or
inadequate external surface wat er drainage and
uncapped perimeter soils.
The escaped water would not have remained within the
sand layer but rather has dispersed and radiat ed
outwards and downwards towards the clay layer beyond
600mm from the surfac e, where it has no bearing or
impact on the dwelling’s slab foundations.
Complainant’s exp ert
Inspection Report
9 September 2019
A plastic membrane was noted under the slab in two
locations along the sout hern edge of the slab. The curved
shape of the bottom edge of the slab on the north wall
suggests a plastic membrane is present under the slab
although it is not generally visible at the edge.
No signs of ongoing movement were noted other than a
crack in the bathroom floor to the northwest of the
property.
No significant cracks were not ed to the internal ceiling,
walls or slab other than that no ted above.
The stormwater system appears not to have been
installed in accordance with Australian Standards with
inadequate cover to the pipes, pipes located immediately
adjacent to the building and a pipe discharging to ground
outside the back door on the west wall.
It is our opinion that the leak in the water pipe was most
likely the primary cause for the rec ent moisture damage
to the property.
The inadequate site drainage could cause moisture
ingress along the exposed slab edges, but the effect
would be limited to the perimeter of the building only and
would have occurred at a relatively constant rate from the
time of its construction. If this was a significant contributor
to internal moisture problems, problems would have been
expected to have been repor ted earlier.
The ground conditions are such that any water
permeating through the ground from rainfall would quickly
disperse down through the sand away from the slab.
The two moisture tests carried out by CT were taken from
Determination | Case number: 634586 Page 11 of 11
Record Key points
samples adjacent to the slab an d away from the slab
along the southern boundary.
The ground under the concrete slab is complet ely
enclosed, evaporation at the surface is not possible.
We do not believe that these tests prove conclusively that
the ground under the slab has dried out suff iciently so as
to no longer contribute to the internal moisture conditions
of the dwelling.
It is our opinion that the increase in moisture of the slab
due to the leak caused wetting of the bottom wall plates
and subs equent mould growth.
3.4 Key policy terms
Product Disclosure Statement
Pages Wording
1 0 - 12
Listed events cover
We will cover your buildings or contents for loss or damage as a result
of vandalism or a malicious act . ….
We will only cover loss or damage as a result of wat er or liquid
escaping from:
a fixed pipe or an object attached to a pipe, fixed gutter, fixed tank or a drain .
….
3.5 Other relevant material considered and relied on
Product Disclosure Statement and Certificate of Insurance
All submissions and emails from the complainant and the insurer
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.