A homeowner's claim for a collapsed ceiling was denied as not caused by an insured event, but AFCA ordered the insurer to pay $800 for kitchen bench and couch damage and $500 for non-financial loss. The ceiling denial was upheld.

A listed-events policy requires a single event, and expert evidence showed gradual deterioration from water entering through roof screws rather than one event.

Issues

Subjects and remedies

home or building damagepay compensationpay non financial loss

Related

All Suncorp Group determinations · Find similar determinations

Text of the determination

Determination Case number 633361 Financial firm AAI Limited Determination | Case number: 633361 Page 1 of 3 Case number: 633361 7 October 2019 1 Determination overview 1.1 Complaint The complainant lodged a claim for a collapsed ceiling with the financial firm (insurer). The insurer denied the claim on the basis it was not caused by an insured event. The complainant disputes this as she says the ceiling could have been affected by a claim in 2016. The complainant a lso says the insurer‟s contractor caused damage to a kitchen bench and a two-seater couch whilst making the area safe. The case manager provided the parties with a recommendation on the issues in dispute. The recommendation was substantively in favour of the insurer. A copy of the recommendation is attached to this determination. 1.2 Issues and key findings Were the findings of the recommendation correct? The findings contained in the recommendation were mainly correct and are adopted in this determination. Further submissions provided after the recommendation have been considered. Can the insurer deny the claim? The insurer can deny the claim because the information does not show it was caused by an insured event. Did the insurer’s contractors cause any dama ge? The insurer should pay for half the cost to the benchtop as part of the damage was due to the contractor. The insurer should also pay for the couch as it was ripped, and this is unlikely to be due to the ceiling collapse. Should the insurer pay non-financial loss? The insurer should pay $500 in non-financial loss given the misinformation provided. 1.3 Determination This determination is substantially in favour of the insurer. The insurer is not liable for the collapsed ceiling. The insurer should pay $800 for the benchtop and for the repair of the two -seater couch. The insurer should also pay $500 in non-financial loss. Determination | Case number: 633361 Page 2 of 3 2 Reasons for determination 2.1 Were the findings in the recommendation correct? I have decided this case on its merits, having regard to the rele vant law, good industry practice, codes of practice and previous AFCA decisions. I have taken into account all the material submitted by the parties, both before and after the recommendation. I am satisfied that the documentation I have relied on has been provided to both parties. I am satisfied that the case manager‟s recommendation contains an accurate summary of the complaint, the issues to be determined, any applicable paragraphs of the Rules and any relevant law. 2.2 Can the insurer deny the claim? Information does not show the damage was caused by an insured event The complainant‟s policy only covers them if the damage to the buildings is caused by an insured event. An insured event is always a single event, accident or occurrence. The available experts do not show the cause was due to an insured event. Several of the insurer‟s experts say the fixings have failed over time. The complainant‟s expert says water droplets through the roof screws over time have caused the collapse. Based on this, I am not satisfied the information shows the damage was caused by an insured event or was from a single event, accident or occurrence. The complainant says this damage could have been related to the 2016 claim. There is insufficient evidence to support this. The i nsurer‟s contractor who was engaged at the time of that claim disagreed. Given he inspected the area contemporaneously, his evidence is most persuasive. The complainant‟s expert says „previous work and damage to roof space cannot be ruled out‟. This is equ ivocal. It is not persuasive in establishing, on the balance of probabilities, the previous claim did cause the damage being claimed. Therefore, I agree the insurer can deny the claim for the collapsed ceiling. 2.3 Did the insurer’s contractors cause any damag e? Insurer to pay for couch and contribute 50% for the benchtop Following the recommendation, the complainant submitted the following:  there were many items damaged from the ceiling collapse which she did not claim for – however, she does believe the benchtop and couch were damaged by the insurer‟s make safe contractor (JL) Determination | Case number: 633361 Page 3 of 3  the damage to the couch involves obvious tears – this could not have been caused by the ceiling collapse. The photos show the ceiling has collapsed on the kitchen bench. JL noted this fell with force along with screws. The complainant did provide evidence from an expert (F) who stated the damage to the benchtop was from „impact and excessive dragging of falling debris‟. Therefore, I agree with the case manager‟s recommendation that a 50% contribution is appropriate for the benchtop. This is because the photos and F accept the impact from the collapse contributed to the damage. For the lounge, the complainant provided photos showing there was a rip. This does not appear consistent with impact from a collapse. Instead, it is consistent with the dragging of plasterboard. I accept the insurer should pay for the cost of repairing this. 2.4 Should the insurer pay for non-financial loss? Insurer should pay $500 in non-financial loss The complainant o bjected to the case manager‟s award. She said the lack of transparency led her to believe that she had to wait for a resolution before completing the repairs. She says the six-month delay with the claim and process is not reasonable. I do not accept this argument. The insurer made it clear that it was denying the claim and has maintained this position. Whilst I agree that some confusion arose due to B‟s email and conversation, this was clarified by the insurer shortly afterwards. There has been nothing in t he insurer‟s correspondence after this to indicate the complainant must wait for a resolution before completing the repairs. Therefore, the inconvenience the complainant suffered in pursuing this dispute would fall within the normal degree suffered when a problem arises. Regarding the overall claims experience, I agree the timeframes was within industry standards and the general insurance code of practice. I do accept the misinformation about the claim would have caused distress. I agree with the case manager that $500 in non-financial loss for this is reasonable. Recommendation Case number 633361 Financial firm AAI Limited Recommendation | Case number: 633361 Page 1 of 6 Case number: 633361 10 September 2019 3 Overview 3.1 Complaint The complainant holds a home policy with the financial firm (insurer). In March 2019 the ceiling in her open plan area collapsed. The insurer sent out contractors to perform a make safe by way of removing the collapsed plaster. The claim was subsequently denied as the insurer states there was no listed event that had occurred. It says the ceiling collapsed due to failed glue fixings. The complainant says the ceiling was affected by water which could have occurred under a previous claim in 2016 and should not be declined by the insurer. She further says damage was caused to her kitchen bench and two -seater couch due to the actions of the make safe contractor. 3.2 Issues and key findings Was the insurer entitled to deny the claim? The complainant has not shown a prima facie claim, the insurer is therefore entitled to deny the claim. The damage was caused by gradual deterioration due to water entering the roof space over time and not due to a single event. Is insurer liable for any damage caused by make safe contractors? The complainant has provided a quote from a qualified repairer stating the damage to the kitchen bench top is from impact as well as dragging of the plaster. The insurer must therefore pay half the repair cost, being $800. The complainant has provided photos of damage to her leather couch. The damage is not consistent with any actions of the make safe contractors. The insurer is not required to make a contribution towards this. Is the complainant entitled to any non-financial loss compensation? The insurer is required to pay $500 in compensation due to the misinformation given to the complainant from their representatives. 3.3 Recommendation This recommendation is substantially in favour of the insurer.  The insurer is not required to make any contribution to repairs to the ceiling or leather lounge.  The insurer is required to pay the complainant $1,300, being $800 towards the kitchen bench repairs and $500 for non-financial loss compensation. Recommendation | Case number: 633361 Page 2 of 6 4 Reasons for recommendation 4.1 Has the complainant established a prima facie claim? Complainant has initial onus to establish prima facie claim The initial onus is with the complainant to establish the loss is covered by the policy. This is known as a valid, or prima facie, claim. Once a valid claim is established, the onus shifts to the insurer to establish the application of a policy exclusion or that it is otherwise entitled to decline the claim. The complainant holds a home and contents insurance policy, covering a number of insured events. Findings of the reports are generally consistent The insurer had four different contractor‟s repairers attend or inspect the property and the complainant has submitted a report from her builder. The insurer‟s make safe builder (A) determined that the probable cause of the ceiling collapse was a failure of the glue fixings due to humidity/heat in the roof space. The insurer‟s initial building assessment report (B) determi ned that there was no evidence of water damage in the roof cavity and suggested it believed the glue fixings had failed. The expert says it may have been faulty application of the glue, a bad batch of glue or gradual deterioration of the glue. The first roof report (C) conducted by the insurer concluded that the roof was not leaking and had not contributed to the collapse of the ceiling. At the complainant‟s request, the insurer sent out a different builder (D) to assess the damage and provide a roof report. D concluded that the ceiling collapse was not related to any roof issues and that there was no evidence of a listed event causing the damage. The assessment further concluded that the glue and screw patterns met building standards at the time of construction. The complainant‟s builder (E) reported that the screw fixings along the valleys and ridges across the entire roof were not penetrating the wooden structure of the roof. Due to this construction error, water was leaking down the screws and slowly dripping onto the ceiling battens and plaster. The report describes visual warping of the ceiling batten wood which has caused the glue to be pulled away from the back of the plaster, ultimately causing the collapse. They noted specifically that every winter rain will contribute to the water presence in the ceiling and every summer will assist drying of the water, causing the wood warp now present. Although the insurer‟s experts did not identify the construction issues with the complainant‟s roof, the opinions are consistent with the insurer‟s expert. E identified Recommendation | Case number: 633361 Page 3 of 6 the water leaking in via the screw penetrations and that gradual deterioration of the glue fixings caused the collapse of the ceiling. The reasons for the collapse is fairly consistent amongst the experts. Complainant has not shown a prima facie claim The insured‟s policy is a listed events policy. The experts concluded that the cause of damage is gradual deterioration of the glue ceiling fixings. The complainant‟s expert determined that a gradual water leak through a construction defect was the cause of the deterioration. The policy held by the complainant describes an „Insured event‟ as: The insured events on pages 16 to 25. In addition, an insured event is always a single event, accident or occurrence which you did not intend or expect to happen. As the dominant or effective cause of the damage is the gradual and repeated water leak into the roof cavity over time, the claim does not fall under the policy definition of a listed event. The complainant has therefore not established a prima facie claim. Previous 2016 claim unrelated to the current damage On review of the previous claim assessment reports, I am satisfied that the leak which caused the damage was localised to a leaking vent seal. This loss in 2016 affected two rooms and is unrelated to the current damage. The insurer submitted comments from its experts confirming that this would not have contributed to the current damage, due the location of the leak. The complaint‟s expert has suggested it cannot be ruled out. Considering the findings of the complainant‟s expert, I agree with the insurer that the collapse of the ceiling is unrelated to the 2016 claim. 4.2 Is the insurer liable for any damage caused by make safe contractors? The damage to the two-seater lounge is not related to the make safe Photos provided by the complainant and the insurer of the damaged leather lounges show two kinds of damage. One, that the complainant says is due to the ceiling collapsing, and one she says is from the rough handling of the debris by the make safe contractors. No expert reports have been submitted about the cause of damage. The insurer denies liability. Considering each party states opposing perspectives and there is no expert report submitted, I have relied on the photos provided to assess the merits of this issue. In Recommendation | Case number: 633361 Page 4 of 6 my view, the damage observed does not seem consistent with dragging or the penetration of plaster sheeting and is therefore not the liability of the insurer. Kitchen bench damage partially from make safe contractors Both parties disagree as to the cause of the damage to the kitchen bench top. The complainant has submitted a quote from a repairer (F) which states damage is from “impact and excessive dragging of falling debris”. I accept this is a likely cause of at least some of the damage observed. As the actions of the contractors likely contributed to the bench top damage, I consider it reasonable that the insurer contributes half of the repair costs, being $800. 4.3 Is the complainant entitled to any non-financial loss compensation? AFCA will only award compensation for non-financial loss where there has been an unusual amount of physical inconvenience, time taken to resolve a situation, or interference with the complainant‟s expectation of enjoyment or peace of mind. The complainant states she was advised by the insurer‟s building assessors that the resultant damage should be covered. She further received an email from the insurer‟s building assessors (B) stating: …please find attached a copy of our roof report outlining maintenance repairs required to be completed before we are able to warrant our internal, insurable, resultant damage repairs. This email and the conversation with them on site gave the complainant reassurance that the claim would be accepted. This resulted in distress when being advised by the insurer that the claim would not be accepted. I accept the overall time for the claim to be assessed and a decision to be made was well within industry expectations. The communication implying cover interfered with the complainant‟s pe ace of mind and caused her unreasonable distress. In the circumstances, I am of the view the insurer should compensate the complainant $500. Recommendation | Case number: 633361 Page 5 of 6 5 Supporting information 5.1 Key documentation Record Key points Insurer’s expert (A) Report 10 March 2019  Afterhours callout to secure collapsed ceiling  Possible cause glue failure or from the humidity/heat getting into roof space causing ceiling to fall. Insurer’s expert (B) Report 14 March 2019  No indication that damage is the result of an insured event.  No signs of storm damage or any obvious points of water ingress.  The adhesive to the plaster ceiling has failed, resulting in the collapse of the ceiling.  The damage to the ceiling is a result of gradual deterioration caused by failure of the adhesive, either due to a faulty batch or poor application of the adhesive Insurer’s expert (C) Report 18 March 2019  No evidence of storm damage to the roof or any areas of water ingress. Insurer’s expert (D) Report 10 April 2019  Damage is due to glue failure, there is no evidence of liquid damage in ceiling cavity, the roof is in good condition.  The house was built to the current code of the time, glue and screw patterns appear to be correct.  The cause of the ceiling collaps e is not a roof related problem and may be due to insufficient fixings to the ceiling during construction Complainant’s expert (E) Report 16 June 2019  Visual ceiling battens show twist/warp in line of wood  The twist/warp in wood is severe which has torn the paper backing from the gyp rock sheeting whi ch therefore the structural properties of the sheet has failed  Water droplets present on roof inspection  Water marks present on roof timbers  Roof sheet fastenings screws not entering wood frame work  Water visually running down shanks of screws and dropping on to ceiling and surrounding structure  These water droplets have caus ed moisture build up over eac h winter rains which have entered the roof space via the roof screws then the ceiling joists have dried and twisted/ warped over summer, hence tearing the paper structure to the ceiling sheets which has led to the ceiling letting go and dropping.  Water has been constantly entering the roof space which as caused the ceiling to drop Complainant’s expert (F) Quote  Resurfacing kitchen benchtop to repair damage caused by impact and excessive dragging of falling debris. Recommendation | Case number: 633361 Page 6 of 6 Record Key points 24 July 2019

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.