Text of the determination
Determination
Case number 633314
Financial firm QBE Insurance (Australia) Limited
Determination | Case number: 633314 Page 2 of 13
Case number: 633314 26 March 2020
1 Determination overview
1.1 Complaint
The complainants lodged a claim for property damage following a storm on
31 January 2019.
The financial firm (the insurer) accepted the claim but denied a large portion of the
damages saying all the claimed damage was not caused by the storm. The insurer
made settlement proposals which included a cash settlement of $43,000 which was
rejected by the complainants. A further offer of $185,000 was made which represents
50% of the sum insured of $370,000. This offer was also rejected.
The complainants provided independent reports to refute the insurer’s findings about
causation and seek a total loss settlement sum to resolve the complaint.
1.2 Issues and key findings
Is the insurer’s offer fair and in accordance with policy terms?
The insurer has not shown its offer adequately discharges its policy obligations. This
is because the insurer has not provided a quotation to repair the property as per its
agreement with the complainants. The agreement was to obtain a quotation pursuant
to the scope of works provided by the complainants’ engineer. Moreover, the
quotation it has obtained is not actionable.
Are the complainants entitled to temporary accommodation?
The complainants are entitled to past and future temporary accommodation if the
insurer has not already settled the complainants for this. The insurer is to obtain an
estimate of building time based on the correct scope of works. The estimate should
include a fair allowance of an additional eight weeks for time taken to obtain relevant
building permits, other local council approvals and the location of the property. This
will assist the parties to resolve the future temporary accommodation issue.
Are the complainants entitled to compensation?
The available information establishes a n award of compensation is warranted. The
insurer is also to pay the cost of the complainants’ engineers’ reports and interest.
Determination | Case number: 633314 Page 3 of 13
1.3 Determination
This determination is substantially in favour of the complainants.
Should the complainants accept this determination then within 14 days of notification
of acceptance the insurer is to:
settle the claim pursuant to the mechanism in the determination described under
the heading “fair resolution of the complaint”
pay the complainants for temporary accommodation as set out in section 2.2
pay the complainants $5,000 compensation
pay for or reimburse the complainants for their engineers’ costs
If the engineers have been paid, the insurer is also to pay statutory interest
pursuant to section 57 of the Insurance Contracts Ac t (the Act) on the engineers’
costs from the date the invoices were paid until the date of settlement.
Otherwise, the insurer is not required to take any further action in relation to the claim
or the complaint.
Determination | Case number: 633314 Page 4 of 13
2 Reasons for determination
2.1 Is the insurer’s offer fair and in accordance with policy terms?
Policy covers storm damage and outlines the scope of cover
The policy covers insured events including loss or damage caused by a storm.
The insurer does not dispute the property suffered storm damage and accepted the
claim. The dispute is about the extent of the damage caused by the storm and the
resultant cost of storm damage repairs.
The basis of settlement is set out in the policy as follows:
At our option we will:
(a) repair your home; or
(b) replace your home to a condition substantially the same as, but not
better than, when new; or
(c) pay the reasonable cost of its repair or replacement to a condition
substantially the same as when new; or
(d) pay up to the sum insured shown in your Policy Schedule.
Experts provided differing opinions
On lodgement of the claim, the insurer appointed a loss adjuster to determine the
cause and extent of damage. The loss adjuster engaged engineer C to confirm the
extent of damage caused by the storm and prepare a scope of works.
C said items such as the metal roof sheets, timber members of the roof framing, and
flue vent of the chimney had been affected due to high wind, but said the remaining
damage was not caused by the storm event. Rather, C said the flooring movement,
internal cracking and jamming doors were caused by long term ground movement
and expansion of the floating floorboards due to reactive clay soils.
C noted the complainants purchased the property some four years prior, and the
home was approximately 50 years old.
Regarding the flooring, C said:
… in a wind event, the maximum deflection and movement occurs to the higher
section of the walls, and the minimum deflection and movement occurs to the
lower sections of the dwelling, i.e. subfloor area and floating floorboards. Hence,
Determination | Case number: 633314 Page 5 of 13
in our opinion, the wind as described has not caused damage to the floating
floorboards which are located at lower level of the structure.
The floorboards have expanded due to the initial less amount of moisture in the
flooring boards, and the boards gained moisture over time. In our opinion, this
expansion has pushed the floorboards and caused tenting of the floorboards at
the centre of the dwelling.
C made several observations about the property including evidence of previous
repairs to cracks in plaster walls, new timber battens and recent restumping.
On the basis of his analysis of damage caused by storm as compared with other pre -
existing damage, C provided a scope of works to the insurer.
The insurer arranged for the scopes to be assessed by two builders. The insurer’s
building evaluator reviewed the assessments and recommended settlement options to
the insurer which included a cash settlement offer of $43,481.33 (including GST) less
any applicable excess.
The insurer and the complainants were unable to agree about the extent of the storm
damage. The complainants obtained an independent report from engineer D.
D concluded the home experienced high wind loads from the storm event and the
roof, wall and floor has been affected. D did not agree there were pre-existing issues
with the roof, wall and floor.
D reported:
The dwelling is located on a rural property, with flat generally open surroundings,
which would be considered terrain category 2.0 for wind loading to AS 1170.2.
It is understood the dwelling is in excess of 50 years old and was constructed with
building approval at the time, meaning the structural framing members installed
have been sized and constructed to meet the building requirements at the time of
construction.
…The bureau of meteorology at the time issued reports to media indicating
severe thunderstorms with some areas experiencing wind gusts around 100km/hr.
Roof:
The south/west roof cladding was ripped off during the storm with wind and rain
allowed to enter the roof cavity. Some timber members have been dislodged
including
Determination | Case number: 633314 Page 6 of 13
roof struts, which support the roof structure vertically. We note that should the roof
struts be removed, the rafters would deflect vertically and also impose a
horizontal load on the external walls.
…. recommend a new roof structure be installed.
Walls:
The walls in some areas of the building around the damaged roof section appear
to have become out of-plumb. Given the damage to the roof members which can
impose a horizontal force to the top of the walls, it is likely some of the movement
observed in the wall framing could be attributed to the storm.
…. recommend the existing walls be re -straightened when the roof has been
removed
Floor:
Given no survey of floor levels is available prior to the storm event, it is difficult to
evaluate if the floor structure has deflected. Local damage was observed after the
storm event to the floating floor where the foam underlay has come through to the
surface. The wind loads within a building which is effectively sealed (below ceiling
level) can cause a negative pressure internally. This means a load upwards can
develop within a building causing upward loads on the floating flooring system.
D recommended substantial works would be required to restore the building to
structural adequacy. Given the water ingress from the storm event, he also
recommended all water damaged linings and fixtures be replaced. He noted a
building permit was required and said the work was to be costed by a builder or
quantity surveyor.
The insurer disagreed with the findings and did not find the report conclusive.
Because the engineers’ reports conflicted, the insurer recommended the fairest
approach to settling the claim was to agree to the complainants engaging their own
engineer at their own cost.
The complainants chose engineer L on the advice of their local council.
L substantially agreed with D. Because there was more than 50% damage to the
building, L agreed a planning permit needed to be obtained. He described the work to
be done which included removal of mould. He provided a scope of works and said the
costs were likely to be significant because there was major damage which had a
significant effect on the structural performance of the building.
Costings needed to be obtained.
Determination | Case number: 633314 Page 7 of 13
L’s report noted the areas of damage and described the cause of damage as follows:
Damage due to severe windstorm event :
a. Damaged floating floorboards system.
b. Damaged roof sheeting (partially blown off) and displacement of roof members.
c. Damaged wall structure and plasterboard wall lining.
Failure Mechanism:
The severe storm can cause an uplift force to be applied on the base of the dwelling.
The absence of the roof cladding due to being ripped will cause further defects to the
roof system as the wind is allowed to enter and create a positive/negative pressure to
the ceilings and walls. Roof members being dislodged will reduce the racking capacity
of the walls and impose a horizontal load on the external walls causing the walls to
move out of plumb.
Observations:
Note that the floating flooring system used in the dwelling is supported on a
conventional floor structure. We note that a conventional floor framing of hardwood
timber joists and bearers supported by concrete stumps can be easily adjusted for to
obtain a level platform and would expect that the floor was levelled as part of the
recent renovations completed on the building. Based on survey floor levels conducted
after the storm event conducted by previous consultant, a non-consistent floor level
can be seen. We do not rule out the possibility of the site being highly reactive and
thus creating movement on the floor levels due to its movement of the foundations,
however, we do believe that severe wind storm event is the Proximate Cause.
…
(as for termite damage) …the ceiling battens are used to support the ceiling plaster
and the damaged ceiling batten was found to have old non-reactive termite damage
l eft over from the previous owner’s bathroom renovations. This ceiling batten has
minimal structural influence on the ceiling support and did not cause or contribute to
the indicated failure of the building.
Insurer accepted L’s findings
On consideration of L’s report and photographs which the complainants said showed
no damage prior to the storm, the insurer accept ed L’s proposed scope of works to
repair the storm damage. It asked the complainants to provide a quote for cash
settlement purposes.
The complainants were unable to locate a builder willing to repair the property. They
provided a quote from G which said the scope necessitated full demolition and
rebuilding of the home as this was a more economical option. The rebuild quote for
the home came to $335,000. The quote did not include demolition of the old property
or removal of debris.
Determination | Case number: 633314 Page 8 of 13
Insurer obtained a comparison quote
The insurer requested a second opinion about the cost of repairs as it believed the
property was repairable. As it had accepted the scope of works submitted by L, it
offered to either appoint a builder to quote as per L’s scope and carry out the works or
pay the complainants 50% of the sum insured.
The complainants opted to accept the insurer’s offer to quote and proceed with
repairs in accordance with L’s scope of works.
The insurer appointed builder IP to attend the property. However, IP did not provide a
quote based on L’s scope. L provided a scope and costings based on C’s findings.
This was because L said he was of the same opinion as C regarding the sub-floor and
pre-existing issues.
The panel accepts there are old repairs. However, the insurer has not shown the
relevance or significance of these items in relation to the storm damage because:
L addressed evidence of old termite damage in the roof
the property is approximately 50 years old and would be expected to have had
some repairs done at some point
the complainants provided photos showing no damage to the floors or interior prior
to the claimed event
the various experts have commented there was evidence of recent renovations
and restumping, suggesting the property would likely have been in adequate
condition prior to the storm
the insurer has not shown the conditions leading to previous repairs caused or
contributed to the current damage, nor that the extent of the damage could not
have been caused by the storm event in any case
the comprehensive reports of two independent engineers are given more weight
than those of one engineer and a builder.
IP says the quoted figure is for academic (cash settlement) purposes only, and
significant variations could occur. IP refers to the requirement for another engineer
inspection and a further scope of works. He specifically says the extent of all works is
not yet fully clear and variations may arise should works proceed.
For these reasons, the panel considers IP’s quote is not actionable by the
complainants. The panel is not satisfied the available material establishes the
insurer’s offer represents the reasonable cost of repa ir of the storm damage.
Not fair for the insurer to derogate from its agreement
Whatever conclusion may be reached as to the existence or not of pre-existing
conditions, the insurer agreed to accept the scope of works from L but has not
obtained a quote for the cost of repairs based on that scope and pursuant to the
policy terms and including all policy benefits.
Determination | Case number: 633314 Page 9 of 13
In these circumstances, the panel considers it would not be fair to derogate from the
agreement it made with the complainants.
The complainant s sought to obtain a quote to repair the property in line with L’s scope
of works. They say these attempts were unsuccessful and, after contacting several
builders, were only able to obtain one quote which says the home is uneconomical to
repair and would cost $335,000 to rebuild.
The quote does not include demolition and removal of the current property.
The panel notes neither party has been able to obtain a quote to cost the actual
repairs as per L’s quote. The limited information from G is insufficient ly persuasive to
establish to the panel’s satisfaction the building is a total loss.
Fair resolution of the complaint
The panel considers a fair resolution is as follows:
In view of the breakdown of the relationship between the parties and the issue of pre-
existing conditions, it is fair the claim is cash settled.
Should the complainants accept this determination then within 14 days of notification
of acceptance the insurer is to arrange for two builders to quote to cost repairs as per
L’s Scope of Works.
The insurer is then to settle the complainants for the average of these quotes.
Because material from G is the only material whereby a builder has estimated costs
based on the correct scope of works, the panel considers it is fair the averaging
exercise includes the amount of $335,000.
Any settlement offer must also include a fair allowance of 20% for regional factors,
transference of risk, builders’ margin, GST and variations and contingencies which
may arise once repairs are commenced.
If the average of the three quotes plus the above fair allowances are higher than the
sum insured, then the insurer is to settle the complainants for the sum insured.
Any settlement offer must include other applicable additional benefits available under
the policy, including and not limited to removal of debris.
The insurer advised IP said it would take 12 to 14 weeks to complete the works.
However, the panel is not satisfied this estimate is made based on works required
pursuant to the correct scope of works.
Accordingly, the three builders should also be asked to provide an estimate of
building time. The estimate should include a fair allowance of eight weeks for time
taken to obtain relevant building permits, other local council approvals and the
Determination | Case number: 633314 Page 10 of 13
location of the property. This will assist the parties to resolve the temporary
accommodation issue.
The panel encourages the parties to work together to resolve the issues in dispute.
However, if the parties are unable to resolve the issues, then they can return to AFCA
to resolve any remaining issues.
2.2 Are the complainants entitled to the temporary accommodation?
Complainants entitled to temporary accommodation
The policy covers up to $20,000 or 20% of the sum insured, whichever is higher for
reasonable temporary accommodation, emergency storage of contents and
accommodation for pets. No maximum timeframe is given, and these benefits are
applicable where an insurable event has caused damage to the property and it cannot
be lived in.
The complainants say they were told to leave the premises for safety by the local
council. They rented an alternate property shortly thereafter. The insurer has not
disputed the complainants’ assertion that the property is uninhabitable nor their
entitlement to temporary accommodation.
The complainants say due to the remote location of the property, the works may take
a considerable amount of time to complete. However, the available information does
not allow the panel to accurately determine how long the repairs will take.
A rental agreement provided by the complainants shows they moved into the rental
property on 11 February 2019 for $1,170 per month. As such, the panel accepts the
insurer is to pay the complainants for temporary accommodation from 11 February
2019 to the current date, deducting any payments already made.
Once the relevant information is obtained and the parties agree to the time of repairs,
the insurer is to forthwith pay the complainants future reasonable temporary
accommodation costs.
In addition, the insurer is to pay or continue to pay the complainants any other
applicable policy benefits such as contents storage and pet accommodation.
2.3 Are the complainants entitled to compensation?
Complainants entitled to $5,000 compensation for non-financial loss
Under its Rules, AFCA may award compensation to a complainant of up to $5,000, for
non-financial loss, where the complainant has suffered an unusual degree of
inconvenience or time taken to resolve a claim.
The available information shows the complainants first contacted the insurer to lodge
a claim on 31 January 2019. The complainants have been in temporary
Determination | Case number: 633314 Page 11 of 13
accommodation since then and have made themselves and the property available for
attendance by many builders, engineers, loss adjusters and representatives of the
insurer and the local council.
Due to conflicting opinions, it was left to the complainants to engage their own
engineers and builders who have consistently supported their position. The panel is
satisfied the insurer ’ s claim most of the damage was not caused by the storm is not
supported by the available information.
In addition, the claim has been delayed because the insurer did not obtain a quotation
to repair the damage based on the correct scope of works even though it had agreed
to do so.
The panel also notes the insurer’s delays throughout the complaint process.
As a result, the complainants have been out of the home for longer than was
reasonable or necessary.
Based on the available information, the panel is satisfied the complainants have
suffered an unusual degree of inconvenience and time taken to resolve the matter
which would have caused stress and anxiety.
Taking all matters into account, the panel is satisfied an award of $5,000
compensation is warranted.
Insurer to pay enginee rs’ costs
The complainants engaged two engineers. The AFCA Rules allow professional costs
incurred during a complaint.
The insurer engaged an expert engineer. The issues in dispute were complex. The
reports provided by the complainants’ engineers were usef ul to the panel to help
resolve the issues in dispute.
The panel is satisfied it is fair the insurer pays the cost of the expert reports. The
engineers ’ invoices have been provided.
If the engineers have been paid, the insurer is also to pay statutory interest pursuant
to section 57 of the Act on the engineers’ costs from the date the invoices were paid
until the date of settlement.
Determination | Case number: 633314 Page 12 of 13
3 Supporting information
3.1 Our Approach
This complaint has not been the subject of a recommendation. Due to the nature of
the complaint, it has been referred directly to a panel for determination, in line with the
Operational Guidelines to the AFCA Rules. The panel consists of an Ombudsman
and two representatives with consumer and insurance experience.
The panel has decided this complaint based on what is fair in all the circumstances,
having regard to legal principles, applicable industry codes or guidance, good industry
practice and previous relevant determinations of AFCA or predecessor schemes
(which are not binding).
There has been a full exchange of all material information relied on for the purposes
of this determination and each party has had the opportunity to address any issues
raised by the other.
The panel has reviewed and considered all the material provided by the parties. While
the parties have raised numerous issues in their submissions, for the purposes of this
determination the panel has restricted its commentary to those issues that it considers
directly relevant to the outcome only.
It is an accepted principle of general insurance law that the insured bears the onus to
establish on the balance of probabilities that they have suffered a loss caused by an
event to which the policy responds. This is known as a prima facie claim. Once so
established, the onus shifts to the insurer to prove on the balance of probabilities that
an exclusion applies if it seeks to deny or limit its liability for the loss.
3.2 Relevant policy terms
The relevant policy extracts are referred to in th e correspondence between the parties
and in the insurer’s Notice of Response. Both the policy document and the Notice
have been e xchange d with the complainants .
3.3 Contents claim not the subject of this determination
The complainants also claim for damage to contents. The insurer has paid $5,800 to
the complainants for contents. This determination deals with the issues in this
complaint with AFCA which was about the cost of repairs to the building. The panel
notes the contents claim is the subject of a separate complaint with AFCA.
Determination | Case number: 633314 Page 13 of 13
3.4 Other relevant material considered and relied on
Parties’ submissions /emails and all attachments to all submissions/emails.
Parties’ expert reports.
Photographs.
Correspondence between the parties.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.