Home / Financial Firm (Unknown - Insurer) / Determination 633033

Determination 633033

Bathroom water damage claim declined under shower recess leak exclusion

FirmFinancial Firm (Unknown - Insurer)
Decided2019-07-24
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The complainant's bathroom was damaged by slow water leakage from a spa bath, and the insurer declined the claim under a shower recess exclusion. AFCA accepted that the spa bath was a shower recess, so the exclusion applied.

Applying the ordinary meaning of shower recess, the spa bath served as a shower, so the policy's exclusion for leaks from a shower base or recess applied.

Issues

Subjects and remedies

home or building damageno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination | Case number: 633033 Page 1 of 5 Determination Case number: 633033 24 July 2019 1 Determination overview 1.1 Complaint The complainant lodged a claim with the financial firm (insurer) for damage to her bathroom. The insurer declined the claim because it says the damage was due to failed waterproofing within the shower recess, which is excluded under the policy. 1.2 Issue and key findings Was the insurer entitled to decline the claim? Whilst I am satisfied the complainant was unaware of the leak, the damage occurred due to a leak from a shower recess. As the policy excludes damage in these circumstances, the insurer was entitled to decline the claim. 1.3 Determination This determination is in favour of the insurer. The insurer was entitled to decline the claim and is not required to take any further action. Determination | Case number: 633033 Page 2 of 5 2 Reasons for determination 2.1 Was the insurer entitled to decline the claim? Complainant has initial onus to establish prima facie claim The initial onus is with the complainant to establish the loss is covered by the policy. This is known as a valid, or prima facie , claim. Once the complainant has established a prima facie claim, the onus shifts to the insurer to establish, on balance, the application of a policy exclusion or that it is otherwise entitled to decline the claim under the policy. The complainant lodged a claim for repairs to her bathroom after the bath collapsed, causing some tiles to come off the wall. The complainant says the damage is a result of water leaking over a period of time, of which she was unaware. The complainant seeks the maximum benefit payable under this section of the policy. Policy provides cover for escaping water damage, subject to exclusions The complainant holds a home policy, providing cover for a number of insured events, including escaping water. Under this insured event, the complainant has cover for damage from escaping water that occurs suddenly and without warning, or slowly over a period of time, if you could not have been reasonably aware of it. However, there is a specific exclusion under this insured event for damage caused by water escaping from a leak in a shower base, recess or cubicle. Insurer says damage due to leak from a shower recess The insurer provided a report from a builder (OS), which states:  water has been entering the framework of the spa bath for a significant amount of time and rotted away sections of the framing  water entry could be entering through the tiles above the tub as they are starting to delaminate  the waterproofing has been compromised and a full strip out would be required to rectify the rotten framing. OS stated the cause of damage was waterproofing breakdown to wall tiles. The insurer then provided a report from a plumber (TOP), which states:  it found water was penetrating through the tiles, indicating the existing waterproofing membrane has failed Determination | Case number: 633033 Page 3 of 5  the cause of the bath collapse was from the failed waterproofing membrane behind the shower, which would have been occurring over a long period of time for the timber framing to have rotted. The insurer says the information confirms there were no leaking pipes in the vicinity of the damage, and the cause of damage was failed waterproofing in the shower recess. It says the policy excludes damage caused by water escaping a shower recess. Complainant says slow leak should be covered under policy The complainant provided a report from a plumber (TNP), which states the waterproofing membrane has been compromised, causing water to pool under the spa bath and caused the timber support frame to rot and partially collapse the bath. The complainant says it was the failed waterproofing which caused the damage, however this cause of damage is not excluded under the policy. She says the insurer refers to the shower recess, however she says she does not have a shower recess. Insurer entitled to decline the claim There is no dispute the damage occurred due to water escaping the shower slowly over a period of time and the complainant could not have been reasonably aware of it. The complainant has therefore established a prima facie claim and the onus shifts to the insurer to show an exclusion applies or that it is otherwise entitled to decline the claim. Both parties agree the failed waterproofing caused the damage, however there is a dispute as to whether this cause of damage fits within the exclusion relied upon by the insurer. The insurer says the spa bath has been constructed with the intent of serving the function of both a spa bath and a shower recess. It says the spa bath is therefore a shower recess. The complainant disputes the insurer’s interpretation of ‘shower recess’. As the policy does not define shower recess, it is appropriate to consider it by reference to the ordinary everyday usage of the term. The Macquarie Dictionary provides the following definition: ‘ a small closed-off area, especially in a bathroom, in which a shower is fitted ’ . I am satisfied the complainant’s spa bath serves the purpose of both a bath and a shower, based on its construction and usage. Having regard to the intention of the policy and the definition above, I also consider it meets the definition of a shower recess. As the damage occurred due to water leaking from the s hower recess, the insurer was entitled to rely upon the exclusion to decline the claim. Determination | Case number: 633033 Page 4 of 5 3 Supporting information 3.1 Relevant policy wording What is covered? Loss or damage to the insured property caused by escaping water that occurred: • suddenly and without w arning; or • slowly over a period of time and you could not have been reasonably aware of it. - If you have buildings cover the most we will pay after excess is $7,500 in total for all buildings damage that occurs in a contract period. - If you have contents cover, the most we will pay after excess is $7,500 in total for all contents damage that occurs in a contract period. If a building claim is accepted, we will pay the reasonable cost to find the source of the escaping water. This cost is based on using the most appropriate method to find the source and we will also restore the damage caused while doing so. What is not covered? Loss, damage or legal liability which was: • caused by water escaping: - slowly over a period of time and you could reasonably have been aware of it; - from a leak in a shower base, recess or cubicle; - from a bath, shower or basin as a result of splashing while in use; - from a pipe that is designed to leak (such as an agricultural pipe); or - from a plant pot, vase, terrarium, beverage container, saucepan, bucket or watering can and watering systems or hoses; • sustained by the item (such as a shower base, pipes, cisterns) from which the water escaped, whether or not we accept a claim for loss or damage caused by the escaping water; • ca used by rain water; • caused because the insured proper ty is not in good condition; or • caused by rising damp or seepage of water from the ground. 3.2 AFCA approach to this complaint This complaint has been determined based on what is fair in all the circumstances, having regard to the relevant law, good industry practice, codes of practice and previous decisions of AFCA or its predecessor schemes (which are not binding). A full exchange of the relevant information has taken place between the respective parties. Each party has had the opportunity of addressing any issues raised. Determination | Case number: 633033 Page 5 of 5 All of the provided material has been reviewed and considered. The parties have raised numerous issues in their submissions to AFCA. However, commentary in this determination is restricted only to those issues considered relevant to the outcome.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.