The estate of a deceased landlord claimed loss of rent and compensation for delays in settling a washing machine water damage claim. AFCA found the insurer's claims management delayed the claim by about three months, and ordered $3,000 compensation for loss of rent and $250 for non-financial loss, in addition to the $4,000 settlement offer.
Where an insurer unreasonably delays a claim, it is liable for the direct financial loss caused by that delay, and non-financial loss is available for unusual time taken to resolve a situation.
Issues
- Delay primary · upheld
“The insurer's conduct delayed the claim by about three months; the claim should have been admitted on 20 December 2018.”
- Claim denial secondary · upheld
“It was not reasonable to deny the claim on 20 December 2018; the insurer admitted it on 11 January 2019.”
Subjects and remedies
deceased estatehome or building damagepay compensationpay non financial loss
Text of the determination
Determination | Case number: 528118 Page 1 of 9
Determination
Case number: 632144 19 September 2019
1 Determination overview
1.1 Complaint
The complainant represents the estate of a deceased relative. For the sake of clarity
and brevity, the complainant and the estate will be referred to as the complainant in
this determination.
The complaint relates to a claim for water damage to the insured investment property
following a leak from a tenant’s washing machine.
Initially, the claim was declined but then accepted. The claim for loss of rent was also
accepted up to the policy limit of $520.
The complainant claims compensation for loss of rent due to delays by the insurer to
finalise the claim. The complainant seeks loss of rent from November 2018 to April
2019. The complainant also says he was not provided with timely updates.
The complainant says the unit located under the insured property sustained ceiling
damage because of the water leak. The insurer advised the complainant to instruct
the property owner to lodge a claim for damages under their own insurance policy or
claim on the body corporate insurance.
The insurer has offered $4,000 to settle the claim and compensation and says this is
adequate.
The case manager provided the parties with a preliminary assessment on the issues
in dispute. The preliminary assessment was partly in favour of the complainant.
As the complainant did not accept the preliminary assessment, the complaint has
been referred to me for determination .
1.2 Issues and key findings
Has the insurer fulfilled its obligations under the policy terms?
Save for any further claim which may arise from damage to the neig hbour’s unit, t he
insurer has fulfilled its obligation under the policy terms.
Determination | Case number: 528118 Page 2 of 9
Is the complainant entitled to compensation?
The complainant is entitled to compensation because the insurer’s claims
management caused delays and loss. The complainant is also entitled to non-
financial loss compensation because there has been an unusual amount of time taken
to resolve the situation which would have interfered with the complainant’s
expectation of enjoyment or peace of mind.
1.3 Determination
This determination is substantially in favour of the complainant.
Should the complainant accept this determination, then within seven days of
notification of acceptance, the insurer is to pay to the complainant $3,250
compensation in addition to the settlement offer of $4,000 already made.
Determination | Case number: 528118 Page 3 of 9
2 Reasons for determination
I have decided this complaint based on what is fair in all the circumstances, having
regard to legal principles, applicable industry codes or guidance, good industry
practice and previous relevant determinations of AFCA or predecessor schemes
(which are not binding). I have considered all the material submitted by the parties,
both before and after the preliminary assessment. I am satisfied that the
documentation I have relied on has been provided to both parties.
While the parties have raised numerous issues in their submissions, for the purposes
of this determination, commentary has been restricted to those issues considered
directly relevant to the outcome only.
No submissions or new material provided after the preliminary assessment.
After the preliminary assessment was rejected, neither party made any further
submissions or provided any new material.
2.1 Has the insurer fulfilled its obligations under the policy terms?
Insurer has fulfilled its obligations under the policy
The complainant must establish on the balance of probabilities that he has suffered a
loss caused by an event to which the policy responds. This is known as a prima facie
claim. Once so established, the onus shifts to the insurer to prove on the balance of
probabilities that an exclusion applies if it seeks to deny or limit its liability for the loss.
It is not in dispute damage was caused to the insured property by a leaking washing
machine. The insurer has assessed the damage caused by the washing machine in
the sum of $3,226.61. The complainant does not dispute this amount.
The policy also provides cover for loss of rent. It is not in dispute the most the insurer
will pay under the terms of the policy is 10% of the home sum insured. The
comp lainant has landlord’s fixtures and fittings cover in the sum of $5,200.
Therefore, the insurer has offered to the complainant $520 for loss of rent. The
complainant does not dispute this amount.
The dispute relates to the time taken by the insurer to assess and address the claim
and the loss suffered by the complainant because of this delay.
2.2 Is the complainant entitled compensation?
Compensation awarded if insurer’s conduct caused loss
The complainant says the claim was for a small amount, but the insurer delayed a
decision. He says the entire process should have taken weeks instead of months.
Determination | Case number: 528118 Page 4 of 9
Because of the delay, the property could not be rented out. He seeks compensation
above the policy limit of $520 for loss of rent because of the insurer’s delay.
The complainant advised the unit remains unoccupied until the claim was settled, and
the unit was repaired. In the conciliation on 26 June 2019 he indicated the repairs
were completed and the property was on the market again to be let.
The insurer apologised for the claims experience and has offered some
compensation.
The insurer acknowledges the delay but says it was not unnecessary because it had
to determine the full extent of the policy response and damage. It also says some
delays were caused by the complainant’s lack of availability and delay in the real
estate agent providing tenancy information.
The insurer also relies on policy term which says it does not cover for consequential
losses following an insured incident.
When considering if an insurer delayed processing an insurance claim, we will look at
whether:
the insurer acted fairly and promptly to resolve the claim
there has been an unreasonable delay
there were factors which were outside the control of the insurer or otherwise
unavoidable
the insured’s actions caused or contributed to the delay.
If we decide the insurer unreasonably handled or delayed the claim, we will look at
what loss (if any) stemmed from that conduct. We may decide the insurer is to
compensate the complainant for direct or indirect financial loss (capped at $5,000).
When deciding on a remedy such as compensation, we seek to place the complainant
in the position they would have been in if the conduct of the insurer had not caused
the loss or to compensate the complainant for the loss to the extent we hold the
insurer responsible for the loss.
Policy exclusion not relevant in the circumstances
We do not provide compensation in a dispute arising from a claim on a general
insurance policy which expressly excludes liability for such loss.
Whilst I acknowledge the policy term relied on by the insurer refers to the fact the
policy does not cover consequential losses, I am not satisfied the policy term prevents
an award of compensation under the Rules for loss caused because of the insurer’s
conduct.
Determination | Case number: 528118 Page 5 of 9
Insurer delayed in admitting and assessing the claim
A chronology of the relevant events is set out in supporting section 3 of this
determination. A leak detection report was promptly arranged. I acknowledge the leak
detection report refers to water leaking from the shower. However, the leak detection
report also clearly states damage around the washing machine was consistent with a
leaking washing machine.
In the circumstances, I do not accept it was reasonable to deny the claim on 20
December 2018. This was recognised by the insurer in its internal review and the
claim was admitted on 11 January 2019.
Further delay was caused by the assessment of the claim. Having reviewed the
available material, I do not consider it was acceptable for the claim to have only been
properly and fully assessed by 15 April 2019.
Although the insurer indicates some delay was caused because the complainant’s
agent did not provide material regarding the loss of rent claim, this information should
have been sought earlier by the insurer in view of the likely policy response.
Taking all matters into account, I consider the claim should have been admitted on 20
December 2018 and that a proper assessment should have been undertaken and the
claim settled in about 4-6 weeks. Taking all matters into account, I consider the
insurer’s conduct delayed the claim by about three months.
Fair the insurer pays the complainant $3,000 compensation
The available information establishes the rent on the property was $1,148 per
calendar month. Considering interest, the policy excess and the amount paid for loss
of rent I am satisfied it is fair the insurer pay to the complainant $3,000 compensation.
I consider it is fair in the circumstances the insurer covers this cost which would have
been avoided had the claims decision and assessment been made and
communicated more promptly.
Non-financial loss compensation paid in some circumstances
The complainant also complains about the service provided by the insurer. He says
the insurer was difficult to contact and calls were not returned.
Our Rules also allow for the payment of compensation (capped at $5,000) for non-
financial loss. We may decide an insurer should compensate a complainant for such
loss only where there has been an unusual amount of physical inconvenience, time
taken to resolve a situation, or interference with the complainant’s expectation of
enjoyment or peace of mind.
Determination | Case number: 528118 Page 6 of 9
Fair the insurer pays the complainant a further $250 compensation
We take a conservative approach to compensation for non-financial loss. In the
circumstances of this complaint, I consider there was an unusual amount of time
taken to resolve the situation which would have interfered with the complainant’s
expectation of enjoyment or peace of mind.
The insurer has apologised to the complainant for its claims management.
I am satisfied it is fair in the circumstances the insurer augments the amount offered
for compensation already by a further $250 compensation.
2.3 Is th e insurer liable for the damage to the neighbour’s unit?
Insurer to consider neighbour’s claim if body corporate denies the claim
The complainant says the property is located over another unit owned by a third party.
The third par ty’s ceiling was damaged by the leak. The third party is uninsured. The
complainant requests the insurer indemnify the third party by paying the cost of
repairing the damage in the third party’s unit in the sum of $1 ,300.
The insurer said the third party should contact the body corporate. If the body
corporate declined the claim, the insurer also said the third party should contact the
insurer to discuss legal liability cover.
Subject to terms and exclusions, the policy provides legal liability cover when an
insured has Landlords Fixtures and Fittings cover.
The available information does not establish whether the third party’s claim has been
met by the body corporate. If it has not, the complainant should arrange for the third
party to contact the insurer. The parties are encouraged to work together to resolve
this aspect of the complaint.
Determination | Case number: 528118 Page 7 of 9
3 Supporting information
3.1 Our Approach
It is an accepted principle of general insurance law that the insured bears the onus to
establish on the balance of probabilities that they have suffered a loss caused by an
event to which the policy responds. This is known as a prima facie claim. Once so
established, the onus shifts to the insurer to prove on the balance of probabilities that
an exclusion applies if it seeks to deny or limit its liability for the loss.
3.2 Relevant policy terms
The relevant policy extracts are referred to in the correspondence between the parties
and in the insurer’s Notice of Response. Both the policy document and the Notice
have been exchanged with the complainant.
3.3 Chronology
11.01.18 Landlord’s fixtures and fittings policy renewed. Insured sum $5,200.
Excess $100.
16.11.18 L oss event .
20.11.18 C laim made. W ater damage to the carpet in the hallway and the main
bedroom.
20.11.18 Assessor (A) appointed .
22.11.18 A ssessor attended. Noted real estate agent advised source of water
ingress unknown but believed to be washing machine.
23.11.18 Leak detection speciali st attended. Lino in bathroom and hallway lifted.
Wet and mouldy. Skirting board damaged and lifted. Silicon and grout
missing in shower. Shower screen failed.
Laundry (same room) hot and cold taps when in use leak as does trap
underneath. Hot and cold po ints from the washer machine sound. No
washing machine installed. Damage around the washing machine
consistent with a leaking washing machine.
30.11.18 R eport from assessor. Carpet and vinyl tiles non - salvageable. Arranged
Determination | Case number: 528118 Page 8 of 9
to dry and remediate. Reported claim was not to be accepted because
the policy did not cover damage caused by a leaking shower.
20.12.18 Claim denied .
10. 0 1.19 Scope of Works $900.90 .
11.01.19 Internal review identified the water damaged skirting and wall in the
laundry. Consistent with leaking washing machine. Policy covers this.
Insurer will now accept this damage under the claim subject to policy
terms and conditions.
22. 0 1.19 Complainant’s agent arr anged for repair of washing machine taps.
29.01.19 Complainant discussed loss of rent claim with insurer.
04.02.19 Insurer requested rental ledger and agreement.
25.02.19 Complainant’s agent provided information regarding loss of rent claim.
08.03.19 A ssessor advises insurer carpet damaged by maintenance rather than
leaking washing machine. Insurer asked for further scope of works to
include carpet.
15.03.19 Scope to remove and replace carpet and underlay in hallway and
bedroom .
08.04.19 Insurer aske d assessor for a further cash settlement quote not only for
the carpet replacement but to include damage to the wall and skirtings in
the laundry.
10.04.19 C omplainant reminded insurer bathroom floor had to be replaced: loss of
rent: downstairs unit dama ged.
12.04.19 I nsurer asked for a witness regarding the washing machine leaking event
or inspection reports. Maximum allowed for rent $ 5 20. Unit owner
Determination | Case number: 528118 Page 9 of 9
downstairs must lodge claim with their own insurer.
1 0 .0 4 .19 –
15.04.19
Insurer receives revised s cope s to remove and replace carpet in hallway
and bedroom: and flooring, carpentry and painting in laundry - $3,226.61 .
Insurer discusses with complainant.
15.04.19 Complainant accepts claim regarding replacement of the carpets and
bathroom floor and “ other minor things ” . Complainant accepts policy
response for loss of rent is $520. Complainant wants will rental loss from
November until April due to inability to settle simple claim in a reasonable
amount of time.
24.04.19 Settlement increased to $4,000 in re cognition of claims experience and
inclusion of loss of rent.
3.4 Other relevant material considered and relied on
p arties’ submissions /emails and all attachments to all submissions/emails
reports, photographs, and scopes of work
correspondence between the parties.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.