Home / Westpac / Determination 631612

Determination 631612

Claim denial and settlement amount for water leak damage

FirmWestpac
Decided2020-05-25
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$1,499
Non-financial loss—
Amount claimed$7,249
SourceAFCA PDF

Summary

After a bathroom water leak, the insurer initially denied the claim and later offered only $1,001 for damaged joists and bearer. AFCA found the insurer liable under the policy, ordered a further $1,499 (total $2,500) for that work, and refused the claim manager's fees.

Escape of liquid cover extends to resulting water damage, and claim manager fees are not payable where the complainant could reasonably have handled the claim himself.

Issues

Subjects and remedies

home or building damagepay claim

Related

All Westpac determinations · Find similar determinations

Text of the determination

Determination Case number 631612 Financial firm Westpac General Insurance Limited Determination | Case number: 631612 Page 2 of 6 Case number: 631612 24 April 2020 1 Determination overview 1.1 Complaint The complainant made a claim under his home and contents insurance policy held with the financial firm (insurer) after a water leak in the bathroom. Because the insurer’s assessor could not attend immediately, the complainant commenced repairs w ith the insurer’s consent . When the insurer’s building consultant did later attend, he said he found no claimable damage from the escape of water. A damaged joist underneath the property was identified, but the insurer said the cost to replace that was less than the policy excess of $1,000. The insurer has since accepted the claim and paid for repairs to the bathroom ($11,154) and for the complainant’s builder’s report ($760). The complainant believes the insurer should also cover fees for his privately appointed claims manager, and $7,249 for the replacement of the damaged underfloor joists/bearer. 1.2 Issues and key findings Is the insurer liable for further costs? It was fair in the circumstances for the insurer to pay for the bathroom repairs and the complainant’s builder’s report , as it has done. It is also liable under the policy for the water damaged underfloor area (joist/bearer) adjoining the bathroom slab. However, it should increase its proposed settlement for that work to allow for possible cost increases since the work was first quoted, and for contingencies. The insurer is not liable for the complainant’s claim manager’s costs, as he should reasonably have been able to handle the claim and complaint without that extra expense. 1.3 Determination This determination is substantially in favour of the complainant. The insurer is required to pay the complainant a total of $2,500 for the work to the joists/bearer (that is, a further $1,499 if the quote amount of $1,001 has already been paid). It is not required to take any further action. Determination | Case number: 631612 Page 3 of 6 2 Reasons for determination I have decided this case on the basis of what I consider fair in all the circumstances, having regard to the relevant law, good industry practice, codes of practice and previous AFCA decisions. I have taken into account all the material submitted by the parties, both before and after the preliminary assessment. I am satisfied that the documentation I have relied on has been provided to both parties. For the purposes of this determination, I will deal with only those points considered relevant. 2.1 Is the insurer liable for further costs? Policy covers escape of liquid, subject to conditions and exclusions The policy covers certain specified insured events, including ‘escape of liquid’: Loss or damage caused by the sudden and accidental escape of liquid from any fixed pipe, fixed tank, waterbed, fish tank, or fixed item used to hold liquid. We will also pay reasonable exploratory costs in locating the source of the damage, provided we have agreed to pay for the loss or damage caused by the escape of liquid. However, cover for that event excludes loss or damage to the item from which the water escaped, as well as loss or damage resulting from liquid escaping from a shower recess. When lodging the claim, the complainant is reported as saying there was a leaking pipe in the shower, as well as a broken pipe from the waste in the floor under the house. Complainant established a valid claim The complainant lodged a claim for repairs to his property after his tenants notified him of a water leak in the bathroom. As the earliest date for one of the insurer’s assessors to attend was ten days away, he obtained authority from the insurer to have a plumber rectify the leak. It was agreed the assessor would then attend as planned to confirm what damage was covered. I am satisfied the complainant acted reasonably in attending to repairs before that assessment, since the property was tenanted (and this was the only bathroom in the house ), and he had specifically obtained the insurer’s consent to proceed with the repair work. However, a fter the insurer’s building consultant (M) attended and reported on the cause of loss, the insurer declined the claim for the bathroom on the basis the report confirmed there was no resultant damage caused by the leak. Determination | Case number: 631612 Page 4 of 6 I am not satisfied the insurer was correct in denying the claim for damage to the bathroom as it initially did. I am satisfied the complainant established a prima facie cl aim. The insurer’s assessor report does not establish an exclusion should apply ; it merely comments on the likely quantum of repairs for the bearer/joist under the floor. The report does not make any relevant comment on the initial cause of the leaking or the extent of water damage in the bathroom. Insurer has now paid complaint’s repair costs and builder’s report The complainant arranged for plumber PP to investigate the source of the leak and make necessary repairs. PP’s invoice of 8 March 2019 totalled $8,635, which included investigation, repairs and remedial work. PP issued a second invoice dated 27 March 2019 for $3,146 for completing the repairs and reinstatement in the bathroom. The total cost of PP’s work was $11,781. I appreciate that the repairs undertaken by PP involved substantial work, including installing a waterproof membrane, in accordance with the current applicable Building Code, which the policy provides for as an ‘additional benefit’. I am also satisfied the insurer was liable for exploratory work, although there was initially some misunderstanding about how that cover would apply when the complainant was first in contact with the insurer. I consider it fair in the circumstances that the insurer has now accepted and paid the complainant $11,154 for the bathroom repairs, including exploratory work. I understand the cost of the complainant’s builder’s inspection report ($726) has also been paid by the insurer, which is fair and appropriate. Insurer liable for replacement of damaged joist and bearer With regard to the under-floor issues, t he insurer’s building consultant, M, reported on 8 March 2019 that one joist under the bathroom was heavily water stained, and a small section of it was flaking, although the structural integrity had not been compromised. M said the cost of repairing the resultant damage to the one water- damaged joist would be less than the policy excess of $1,000. The complainant’s builder, JT, however reported on 25 June 2019 that he believed the bearer should be completely replaced in the section where there were existing joins, and that any blocking with signs of decay should also be replaced. He noted that work would involve propping the existing subfloor and removing and replacing existing timbers members, then reloading those onto existing brickwork. The complainant says he has a quote for $7,249 from the time for that work (although the quote itself has not been provided). The complainant has since said he would obtain a current updated quote but that has also not been provided after some months, so it remains unclear exactly what work the quote covers. Determination | Case number: 631612 Page 5 of 6 On 12 July 2019, the insurer did however confirm it believed an engineer should be appointed (at its cost) to review and comment on the structural integrity of the bearers/joists and whether the bearer needs replacing. It has provided a report dated 10 December 2019 from engineers EIS , based on their instructions ‘to attend the property to inspect the level of damage to the subfloor joists and make comment on what repairs may be required ’. EIS reported the following: Four floor joists (100x50 hardwood) show signs of minor water damage at the intersection between the timber floor and the bathroom slab (towards the front side of the house). One floor bearer (100x75 hardwood) shows signs of minor damage at the intersection between the timber floor and the bathroom slab. EIS explained: Whilst the timber bearers and joists visually show signs of water staining / damage, our detailed inspection revealed that only the edges / surface of timber bearers / joist are affected by water. By eliminating the source the water (from the leak) the damage / decay from the water will stop. Since the damage is not severe, we would recommend the most cost effective solution would be fixing new floor joists/bearer to the existing. EIS recommended that would restore the structural integrity of the building. On that basis, the insurer has indicated it would pay for the work in line with the quote it had received for $1,001. However, it appears that quote is essentially the same as the quoted amount the insurer gave when the claim was first investigated, which is now over a year ago. It is also worth noting that EIS’s recommended work was ‘the most cost effective solution’, and it is not clear that reasonably reflects the safest, most reliable, or industry- recommended solution in the circumstances. At the same time, however, the complainant has not provided a detailed quote or further specific submissions to justify his position, apart from builder JT’s brief report. It is also not clear whether he has already carried out the work himself. In the particular circumstances, I consider a fair outcome is for the insurer to pay $2,500 for the joist/bearer work. That takes account of the likely increase in costs since the insurer’s quote was first prepared, as well as allowing for contingencies which might arise in the course of the repairs. I understand the insurer has already paid the complainant $1,001 for this part of the claim. If that is the case, it is only required to pay a further $1,499. Determination | Case number: 631612 Page 6 of 6 I nsurer not liable for complainant’s claim manager’s costs The complainant has explained that while he first started handling the claim himself, it reached a point where he felt out of his depth and wanted the assistance of someone with industry and legal experience to help him get the right outcome. I can appreciate that concern, and I also acknowledge that working through a claim can be time-consuming. However, I am not satisfied the insurer should be liable for the complainant’s claim manager’s fees in this case. The complainant could have continued to manage the matter himself (although it may understandably have been difficult), and he had the option of bringing his complainant to AFCA at no cost to himself.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.