The complainant disputed the insurer's storm damage cash settlement and sought $65,255.01 for further roof, internal and contents damage. AFCA found most of the claimed damage was not caused by the storm and ordered an additional $2,500 payment.
The proximate cause of the disputed damage was wear and tear, poor maintenance and defects, which are excluded, so the insurer is liable only for the storm-related works plus a modest top-up for cash settlement risk.
Issues
- Claim denial primary · not upheld“The insurer is not liable for any further repairs. The remaining damage is wear and tear, gradual deterioration, maintenance-related issues and defective workmanship.”
- Claim amount dispute secondary · not upheld“I am not persuaded, on the evidence, that the scope of works on which the insurer based its cash settlement was inadequate or incorrect.”
Subjects and remedies
home or building damagenatural disasterpay claim
Related
Text of the determination
Determination
Case number 631607
Financial firm Westpac General Insurance Limited
Determination | Case number: 631607 Page 1 of 10
Case number: 631607 21 April 2020
1 Determination overview
1.1 Complaint
The complainant holds a home and contents insurance policy with the financial firm
(insurer). He lodged a claim with the insurer for damage sustained to his property
following a storm in late December 2011.
The insurer accepted the claim and agreed to cover certain areas of damage. The
complainant is unhappy with the insurer’s scope of works and its assessment of the
extent of the storm-related damage. He believes the insurer should repair the roof and
other internal damage as well. He is seeking $65,255.01 for the outstanding damage.
1.2 Issues and key findings
Is the insurer ’s cash settlement for the storm damage fair?
The insu rer’s costed scope of works is a reasonable basis for cash settlement and, on
reflects the extent of the storm-related damage.
However, it is fair in the circumstances that the insurer pays the complainant an
additional $2,500 to factor in the transfer of risk to the complainant, and any
unforeseeable damage which might become apparent in the course of claim-related
repairs; to acknowledge the considerable time taken for the cash settlement to be
made, and to allow for the possibility of further minor contents damage (although the
complainant has not clearly established insured storm damage to all contents
claimed).
The insurer is not liable for any further repairs. That is because the evidence shows
the remaining damage claimed by the complainant is, on balance, the result of wear
and tear and gradual deterioration, maintenance-related issues and some defective
workmanship, all of which is excluded under the policy.
1.3 Determination
This determination is substantially in favour of the insurer.
The insurer is required to pay the complainant an additional $2,500.
It is not required to take any further action.
Determination | Case number: 631607 Page 2 of 10
2 Reasons for determination
I have decided this case on the basis of what I consider fair in all the circumstances,
having regard to the relevant law, good industry practice, codes of practice and
previous AFCA decisions.
I have taken into account all the material submitted by the parties. I am satisfied that
the documentation I have relied on has been provided to both parties. For the
purposes of this determination, I will deal with only those points considered relevant.
2.1 Is the insurer’s cash settlement for the storm damage fair ?
Policy covers storm damage, subject to exclusions
The complainant is required to show, on the balance of probabilities, he has suffered
a loss caused by a risk insured against under the policy. This is known as a prima
facie claim.
If the complainant is able to establish a prima facie claim, then the onus shifts to the
insurer to show that, on the balance of probabilities, it can rely on an exclusion under
the policy or that it is otherwise entitled to deny the claim.
The complainant ’s policy provides cover for damage caused by the insured events
listed in the policy (including storm), subject to certain conditions and exclusions.
There is no dispute the complainant has established a valid claim under the policy for
storm damage. The insurer has already cash settled the complainant for what it
accepted as storm- related damage, in accordance with its builder’s scope of works.
However, the parties disagree about the extent of the damage for which the storm
itself was responsible, and the complainant believes the insurer should cover
additional damage he has identified, including to the roof (for a full roof replacement),
internal areas and some contents.
Insurer’s liability for disputed damage depends on proximate cause
In order to dete rmine the extent of the insurer’s liability for the disputed damage, it is
necessary to identify the proximate cause of the damage.
The proximate cause is the dominant, effective or operative cause of the damage. It is
not required to be the sole cause, or the first or the last in time. The identification of
the proximate cause is a question of fact that depends on the circumstances of each
particular case.
If the proximate cause of the damage is an insured event (in this case, storm), then
the insurer is liable for that. However, if the proximate cause is a factor that is
excluded under the policy, then the insurer is not liable.
Determination | Case number: 631607 Page 3 of 10
Parties have disagreed over successive scopes of work of repairs
The insurer engaged a loss adjuster (LAC) to assess the storm damage to the
property. In his report of 6 February 2012, LAC says the property sustained hail
damage to the cement tiling, air-conditioner, pergola and boundary fence , and also
reported minor water ingress in the rear hallway, with staining evident around the
ceiling.
LAC organised for a quote from builder TC, which totalled $9,609.
When the complainant disagreed with the proposed scope of works, the insurer
arranged for a second builder (KS) to assess the damage and complete repairs.
The complainant disagreed with KS’ proposed scope of works (29 March 2012) too,
as he believed the whole roof needed to be repainted as a result of the hail event. He
did not allow KS to undertake the work which the insurer had authorised.
The insurer then engaged a roofing specialist (HQ) to provide a second opinion on the
nature of the damage to the roof in June 2012. HQ concluded the roof damage was
due to both hail and age but could not apportion that. The insurer then agreed to
cover the cost of repainting the roof.
However, it appears the complainant would still not allow the work to proceed, despite
the insurer’s assessor expressing concern about the risk of further damage in the
meantime; and the insurer says it was not until February 2013 that the complainant
was contactable or responded to attempts at communication, so the matter could
progress.
Due to the complainant’s ongoing disagreement with the insurer’s scope s of works
and his refusal to allow the insurer to undertake repairs, the i nsurer offered to cash
settle the claim. On 22 October 2013, approximately 22 months after the storm event,
the insurer offered the complainant $22,094 for the total cost of repairs.
In response, in March 2014 the complainant himself compiled a costed scope of
works totalling $63,060.48. The scope was not prepared or supported by a builder.
Some of the damage included in that scope of works relates to the building, while
some relates to contents. However, I not satisfied the complainant has established all
the damage claimed should be covered under the policy, since there is no substantive
supporting evidence.
The insurer engaged a new loss adjuster (DL) to attend the property and resolve the
scope of works issues.
Following DL’s assessment in June 2014 (delayed because of the complainant being
overseas for some time) , the insurer accepted some of the complainant’s scope of
works. However, DL noted that some of the damage in the complainant’s scope had
Determination | Case number: 631607 Page 4 of 10
arisen because of the delays in attending to repairs (which might have progressed
had the complainant allowed that).
DL recommended the appointment of an engineer to assess causation and the extent
of the storm damage for the disputed items.
Evidence does not establish storm was the proximate cause of the roof damage
The insurer engaged an engineer (JM) to assess the extent of the hail damage to the
property. JM noted that 2 mm of rain fell on the reported day of the storm and 28 mm
fell on the next day.
In his comprehensive and detailed report of December 2014, JM says the property
had been poorly maintained, particularly the concrete tiled roof. JM assessed in detail
the complainant’s own scope of works and considered causation in respect of each
item.
In addressing the roof tiles, JM says the y:
have reached their usable life expectancy
are severely lacking maintenance, such as the repointing of the hip and ridge
are chipped and broken to a great extent; this is due to the substantial foot traffic
over the brittle tiles in the process of fitting the solar panels.
JM says the maintenance neglect on the roof has been long-term; that neglect caused
the tiles to become brittle as water penetrated the cement matrix of the tiles. JM
concludes that with respect to the hail damage, over many years concrete tiles of this
type generally perform much better in hail conditions. JM noted there was no
evidence of any attempts to replace the previously damaged tiles.
JM also says the following maintenance work should have taken place 10 years ago,
which is well before the storm:
the damaged roof tiles should have been replaced
the entire tiled roof area should have been water pressured with chlorine additive
to kill moss and recoat it.
It is also significant to note the Laserlite sheeting was not damaged by hail. JM
argues that if the hail damage was not significant enough to cause penetration in this
sheeting, abrasion damage could not have been inflicted on the concrete tiles ; there
is no evidence of any hail puncture marks or damage to these sheets as might be
expected if the hail was intense.
As well, over the 50 years of the life of the roof/building, JM suggests many hail
storms would have occurred. He adds, had the tiles’ coating been maintained, the
concrete tiles would have had additional protection against possible hail damage.
Determination | Case number: 631607 Page 5 of 10
JM opines none of the tiles would have been broken by the hail, the pointing of the
ridge and hip tiles would have been completely unaffected, and only minimal damage
from hail, if any at all, would have occurred.
JM notes the installation of solar panels on the roof would have involved a substantial
amount of foot traffic on the brittle tiles, and that would have been responsible for
many of the tiles being broken.
In addressing the roof plumbing, JM says:
the roof plumbing has not been carried out by a roof plumber
there is inadequate plumbing to the south east corner of the garage
there is damaged spouting
excessive sealant is evident at the north west of the garage
an over flashing should have been fitted to prevent the moisture seeping through
the deteriorated mortar in the brickwork
inadequate join of the flashing at the eastern end of the garage.
JM identified a gutter opening in the spouting on the south side of the garage where
an excessive amount of roof rainwater runoff is directed to the outlet. Consequently,
the rainwater tank below would become overloaded on occasions of heavy rain.
I am satisfied, on the available evidence, and particularly JM’s compelling report, that
much of the damage claimed by the complainant was not the result of the storm (as
the proximate cause), but instead was from wear and tear, gradual deterioration, and
lack of maintenance.
Faulty roof structure was not damaged by the storm
The complainant says the hail has also caused damage and misalignment to the roof
structure, as well as to the tiles/sheeting.
JM says the misalignment on either side of a timber prop is caused by incorrect
original construction of the roof framing; there is inadequate propping and support; the
excessive sag in the rafter is caused by the excessive spanning.
JM noted a fairly recent skylight has been installed by cutting through a structural
support rafter and concludes the skylight installation has seriously weakened the roof
structure in this location. JM says such a structure is non-compliant and would appear
to have been built without a permit; had a permit been applied for, engineering
computation, correct sizing and spacing of the roof structure elements would have
been required.
The complainant has not provided any ev idence to refute JM’s findings. I accept that
defects have been identified in the roof structure, and these represent exclusions
under the policy.
Determination | Case number: 631607 Page 6 of 10
C omplainant’s engineer’s report does not advance his position
The complainant tendered a report from engineer AZ who assessed the roof in
August 2019. AZ notes the following damage:
hail impact damage to concrete roof tiles
chipped tiles from hail impact
possible repointing in part
polycarbonate roof damage.
AZ had access to several photos of the roof apparently taken in December 2011 but
notes that tiles and internal damage had been repaired by the time they inspected. AZ
says hail impact to tiles had caused them to become more brittle and this was evident
in the eight years since the storm. It appears AZ had also been informed by the
complainant that grit and sand from tiles had since blocked water tanks on several
occasions; AZ said that should be regularly be cleaned out.
AZ says:
the tiles should have been repaired immediately after the storm eve nt
he was informed pointing to the tiles was damaged in the hailstorm , however
photos cannot confirm this
current photos confirm the repointing is required and hail storm may have
contributed to this
the polycarbonate roof sheeting appears also to have sustained damage from
storm.
However, AZ ’s report only addressed the roof and none of the other disputed areas ;
nor did AZ specifically refute any of JM ’ s findings. AZ did not elaborate on the
mechanism and nature of the hail impact (if any) in light of the roof’s already
deteriorated condition, as observed and reported by JM. AZ’s report is not conclusive
of the scope or nature of the damage that occurred in the storm event (about eight
years before their inspection).
I accept the roof has shown a number of defects and maintenance/age-related issues
which I consider are not related to the storm-event, but which are likely to have made
it susceptible to further damage, including from storms.
I am not satisfied the evidence shows the proximate cause of the damage to the roof
was the storm. Instead, I am satisfied the roof was already at the end of its
serviceable life, and it was its age, long-term wear and tear, lack of appropriate
maintenance and defects in design or workmanship which was responsible for its
condition. The policy specifically excludes damage from those factors.
That means I do not consider the insurer is liable for any further damage to the roof.
Determination | Case number: 631607 Page 7 of 10
Water tank is faulty and regularly overflows
In his report, JM says the water tank installed outside the garage at the north west
corner of the house is faulty:
the filter on top of the tank limits the amount of water flowing into the tank
there is too much rainwater runoff from the roof having regard to the capacity of the
tank, causing spills on occasions of heavy rain
there is no concrete sub-base to support the tank
the paving around the tank is incorrectly graded and sheds any spillage directly
into the garage.
JM concludes any rainwater penetration into the garage has been a direct result of
the faulty tank installation, associated plumbing and the absence of appropriate
drainage and poor grading of the paving. That means damage to the tank, or caused
to contents, because of the defects in the tank’s installation are excluded.
No storm--related damage to garage/house wall
The complainant says due to the hail damage, underpinning is required for the south
wall of the garage, which is a common wall with the house. I note the complainant has
not tendered any expert evidence to elaborate on this claimed loss.
Engineer JM assessed this wall and notes it is structurally sound and does not
required underpinning. There are no cracks on the wall and there is no evidence of
any footing movement.
In the absence of any other information, I am not satisfied the wall has been damaged
by storm.
Engineer JM concludes claim largely untenable
JM concludes the majority of the complainant’s clai m for storm damage is ‘untenable’
and unsubstantiated on the evidence. In his findings, JM says he gave the
complainant the maximum benefit of the doubt, however the workmanship issues are
fairly widespread.
JM maintains there is no hail damage to the concrete tiles which has caused physical
damage, although the hail may have contributed to a slight further breakdown of
almost non-existent coating.
JM concludes the roof seriously lacks maintenance in recent years, long before the
subject storm, and the broken tiles needed replacement for many years. JM noted un-
tradesman like repair attempts at localised repointing of hip and ridge cappings and
says adequate complete repointing should always be carried out by a professional.
In concluding on the condition of the roof tiles, JM says a stage has been reached
where they need to be discarded for normal wear and tear and lack of the required
Determination | Case number: 631607 Page 8 of 10
periodic maintenance, as distinct from hail damage. As well, the intense foot traffic
associated with fitting of the solar panels has contributed to the number of damaged
roof tiles.
The policy allows for cash settlement
The policy states the insurer may choose to settle a claim by paying:
the reasonable cost of repairs
the reasonable costs of replacement to new condition
a cash amount.
The complainant is dissatisfied with the insurer’s decision to cash settle the claim in
this case. However, given the breakdown in communication between parties, and in
the interests of bringing this matter to a conclusion after many years, I consider it is
fair and appropriate that the claim was cash settled. That is further justified in the
circumstances since the complainant has apparently now proceeded with certain
repairs.
I am not persuaded, on the evidence, that the scope of works on which the insurer
based its cash settlement was inadequate or incorrect in accounting for the claim-
related damage. By March 2019, the insurer cash had settled the complainant
$25,846.75 based on KS’s scope of works, and other items which were accepted by
the various loss adjusters (including electrical works to the solar panels and plumbing
fees).
However, when an insurer undertakes the repairs itself, it guarantees the quality of
materials and workmanship of the repairs; while with a cash settlement, all the risk
associated with the necessary repairs (including the possibility of further unforeseen
damage or additional work) is transferred from the insurer to the complainant.
Fair to increase cash settlement by $2,500
I note the insurer had repeatedly revised its scope of works in response to the
complainant’s concerns about the extent of the insured loss. The insurer expressed
its willingness on numerous occasions to undertake the accepted repairs to the storm -
related damage. I also note that the very considerable delays in this claim being
finalised were largely due to the actions of the complainant.
The complainant also says some of his contents were also damaged during the storm
event. The complainant has not provided compelling evidence to substantiate his
claim. The complainant has provided one photograph of his terracotta duck sculpture
and a list of the claimed items. While I acknowledged the many photographs he
provided relatively recently, they have not been fully explained and I am not satisfied
they confirm the further damage as claimed.
Determination | Case number: 631607 Page 9 of 10
In the circumstances, however, I consider it fair the insurer pays the complainant an
additional $2,500 in settlement of the claim. This is to factor in any contingencies for
the repair of the accepted storm-related works; to acknowledge possible minor
contents damage, as well as the fact that it was not until some years after the storm
event that the cash settlement was made.
Determination | Case number: 631607 Page 10 of 10
3 Supporting information
3.1 Policy Wording
We do not insure you for any loss or damage that is caused by or arises from:
…
• wear and tear, gradual deterioration, or fading
…
• failure to keep the property insured in good condition
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.