A company relied on a conditional loan approval to buy land and incur about $75,000 in design costs, then the bank withdrew the approval after a flood. AFCA found the bank did not mislead the company about funding and dismissed the compensation claim.
A conditional pre-approval subject to stated conditions and a final credit assessment is not a representation that the loan will be funded, so reliance on it was not reasonable.
Subjects and remedies
natural disastersmall businessno remedy
Text of the determination
Determination
Case number 628426
Financial firm Bendigo and Adelaide Bank Limited
Determination | Case number: 628426 Page 1 of 8
Case number: 628426 15 November 2019
1 Determination overview
1.1 Complaint
The complainant applied for a business loan (the loan) from the financial firm (the
bank) to build a car-wash. The complainant’s appointed representative (Mr J) has the
authority to bring the complaint on behalf of the company. Therefore, I have referred
to the complainant’s representative as the complainant in this determination.
The complainant says he was provided with an approval in principle and verbally told
by the bank that the loan would be approved. He relied on the misrepresentation and
incurred engineering, structural and other associated costs of $75,000 as a result.
The bank says the loan was only conditionally approved and the complainant did not
meet the required conditions for formal approval to be made. The bank then made a
credit decision to withdraw the conditional approval.
1.2 Issues and key findings
Did the bank represent that the loan would be approved?
On the available information, I am satisfied the bank did not misrepresent to the
complainant that the loan would be approved. The loan was conditionally approved
only, and the complainant was on notice that certain conditions were to be met for
formal approval. The bank made a commercial decision to withdraw the conditional
approval when the conditions were not met, and other external factors impacted its
credit assessment.
Should the complainant be compensated by the bank?
As I have found the complainant was not misled by the bank, he is not entitled to
receive compensation.
1.3 Determination
This determination is in favour of the bank.
The bank is not required to pay compensation to the complainant or take any further
action.
.
Determination | Case number: 628426 Page 2 of 8
2 Reasons for determination
2.1 Did the bank misrepresent that the loan would be approved?
The complainant must establish misleading conduct
To succeed in a claim of misleading conduct, the complainant must show:
the bank made a statement or engaged in conduct that was false or misleading,
including by omission (the misrepresentation)
the complainant relied on the bank’s misrepresentation to his detriment in
circumstances where it was reasonable for him to do so, and
because of the reliance, the complainant has suffered a loss.
The complainant says the bank misled him
The complainant approached the bank in August 2018 about his plans to purchase
land and build a carwash. I have prepared a timeline of relevant events at section 3.2
of this determination. The complainant says the bank led him to believe from verbal
discussions and email correspondence that the loan for the project would be
approved.
Specifically, he says he was getting close to a contract for the land and asked the
bank to provide some certainty about the loan. He arranged for his accountant to
provide cash flow forecasts for the proposed business and a valuation for the land. He
was given in approval an principle and says he was verbally approved for the loan
required to purchase the land and construct the carwash. This led him to take further
steps in the process and incur costs about the viability and construction of the
carwash.
The bank provided conditional approval
AFCA will look to the overall impression conveyed to the complainant, including the
contractual terms (if any) and statements made when the parties dealt with each
other. The complainant relies on verbal representations and correspondence made
by the bank representatives he was dealing with. The timeline shows there were
many interactions between the parties about the proposal. I have reviewed the emails
and the statements provided by the relevant parties to prepare the timeline.
AFCA is not a court of law. We do not have the power to take or test evidence on
oath, nor require third parties to give evidence. If there is no documentation, we will
decide what is most likely to have occurred based on the available information. If the
parties have conflicting recollections which are evenly weighted, we may find that the
claim is not established.
As can be seen in the emails outlined in the timeline, the bank was positive about the
loan approval. However, the complainant was i nformed early in the process that with
Determination | Case number: 628426 Page 3 of 8
such a long lead in time it would not be able to provide a guarantee of approval. From
the outset of the discussions the bank told the complainant that external factors or a
change in policy settings could influence t he bank’s credit decision . The complainant
was intending to contribute the first $1.5 million towards the transaction from his
existing cash reserves which was to include the land purchase ($620k) and the initial
$850k of the build before the bank funds would be advanced. Also, the complainant
had proceeded to enter into the contract for the land prior to obtaining the conditional
approval.
The available information shows the bank assessed the loan application even though
the complainant was not ready to commence construction. The complainant was
informed the loan was conditionally approved for three months only. He was required
to have the approval validated every three months. The bank also recommended that
the complainant include a finance clause in the contract for the land purchase. The
complainant decided not to include the finance clause when the signed the land
contract.
On 26 October 2018, the bank provided conditional approval for a loan for $700,000
(the conditional approval). The conditional approval made it clear the loan was pre-
approved subject to:
formal, fixed price building contract to be provided, including final costings for all
plant and equipment
progress payment schedule must be in line with industry standard. Panel Valuer or
Quality Surveyor is to complete progress inspections prior to advance of funds
council approved plans and building permit, along with confirmation of Material
change of use for site
client to contribute his funds prior to any bank advance
100% net sale proceeds for any sale of 466 Woolcock St to be applied as
permanent debt reduction
Updated Valuation for 1-3 Auscan Cres required.
I consider the bank informed the complainant in earlier emails that the conditional
approval was for three months only.
The bank withdrew the conditional approval
Unfortunately, the location of the proposed carwash experienced severe flooding in
January 2019. The three months for the conditional approval had expired. However,
the bank decided to withdraw the conditional approval in March 2019. At the time of
the withdrawal, the bank says the first two conditions had not been met by the
complainant. The complainant confirmed in a meeting with the bank on 21 March
2019, that council approval, building permits and material change in use for the site
had not been approved.
Determination | Case number: 628426 Page 4 of 8
I am satisfied on the available information the conditions for the conditional approval
were not met by the complainant. Despite the conditions not being met by the
complainant, there were other external factors that caused the bank to withdraw the
conditional approval as outlined below.
The bank did not mislead the complainant
Under its responsible lending obligations, the bank is obliged to verify its customer
financial information and make further enquiries as required. Being pre -approved for a
loan is not a promise or guarantee the loan will be funded. Until a bank has provided
unconditional approval, and loan contracts are signed, a bank is entitled to review its
commercial lending decision.
I am satisfied the conditional approval was not misleading because it made it clear
that the offer of finance was pre-approved only, the conditional approval would only
be valid for three months, and that conditions were to be met before a formal credit
assessment and approval could take place.
I understand the complainant’s disappointment at the bank withdrawing the
conditional approval, especially when he had already entered into a contract to
purchase the land and incurred costs. However, this was a business risk that the
complainant was undertaking, and the bank had no fiduciary duty to advise the
complainant about the viability of the project. A fiduciary duty arises only where the
lender’s role is seen t o extend beyond that of credit provider and into the area of
advice.
There is nothing in the available information to show the bank misrepresented to the
complainant that it would fund the project – it was always subject to meeting all the
conditions and final credit assessment. The flood event impacted the bank’s risk
exposure and in accordance with its responsible lending obligations, it was not
prepared to continue to offer conditional approval for the project. It is a matter for the
lender as to what lending risk it will accept and how much it is prepared to lend. The
bank was not acting for the complainant and did not have to put his interests above its
own, nor act in his best interests.
2.2 Should the complainant be compensated by the bank?
The complainant is not entitled to compensation
The complainant has incurred costs in paying the deposit for the land, and
engineering and structural designs for the proposed carwash. The complainant paid
the deposit for the land on 12 September 2018 and incurred other design costs before
the conditional approval was provided by the bank.
The bank did not mislead the complainant about funding the project and therefore did
not cause or contribute to these costs. It made it clear in correspondence early on that
any valuations the complainant was to obtain would be at his own expense. There is
Determination | Case number: 628426 Page 5 of 8
no information to show the bank agreed to pay for the costs claimed by the
complainant, or that the complainant could reasonably have expected it to do so.
The complainant is still able to seek alternative funding with another lender and
continue with the project if he chooses to do so. The bank itself told the complainant it
may be prepared to reconsider a revised application in 12 to 18 months. The
complainant is not entitled to compensation payable by the bank in these
circumstances.
Determination | Case number: 628426 Page 6 of 8
3 Supporting information
3.1 The determination is made under the AFCA Rules
This complaint has been determined based on what is fair in all the circumstances,
having regard to the relevant law, good industry practice, codes of practice and
previous decisions of AFCA or its predecessor schemes (which are not binding).
A full exchange of the relevant information has taken place between the respective
parties. Each party has had the opportunity of addressing any issues raised.
All the provided material has been reviewed and considered. The parties have raised
numerous issues in their submissions to AFCA. However, commentary in this
determination is restricted only to those submissions considered relevant to the
outcome.
3.2 Timeline of relevant events
Date Event
9 August 2018 The com emailed the bank requesting it forw ard him the information about
the loan enquiry
9 August 2018 The bank emailed the com saying:
it had discussed his proposal with the credit team
as it is likely to be up to 12 months before he requires any funding from
the bank, it is too early to be seeking formal approval. E xternal factors or a
change in policy settings can influence credit decisions, however, given
what it currently knows, it belie ves there is a strong chance he will obtain
approval
15 August 2018 The com emailed the bank :
he would have the cont ract on the block of land by the end of the week
he understood that the bank was unable to provide approval
he asked whether he should contact someone at the bank who had
authority to give him certainty regarding approval as he felt uneasy moving
forward with the project
15 August 2018 The bank emailed the com saying it unde rstood his position and would
speak to someone at the bank to see if there was anything further it could do
at that point.
16 August 2018 In an internal email, the bank said:
the com was seeking reassurance regarding finance before he purchased
the land, so it would complete an application and ask the credit team for
formal approval
if construction begins more than three months from the approval date, it
would need to go back to the credit team after three mont hs to get the
finance re - approved
Determination | Case number: 628426 Page 7 of 8
Date Event
16 August 2018 The bank emailed the com saying:
the only way to provide him with more cert ainty from the bank would be to
seek formal approval from its credit department which could take a couple
of weeks
it would need to have the approval validated every three mont hs until
required
if he is happy with this and wanted to proceed with the purchase of the
block at that time, he could include a financ e clause in the contract such
as 21 days. By that time, the bank should be able to provide him with the
certainty that he was seeking
5 September 2018 The bank emailed the com saying:
the credit team want ed a valuation completed
other areas that might require further investigation included:
how long the carwash equipment would last
accountant prepared cashflows
5 September 2018 The com emailed the bank asking if the bank would pay for the valuation
5 September 2018 The bank emailed the com saying the valuations would be at his expense
22 October 2018 The bank emailed the com saying:
it required him to sign and date the application it had attached
it needed to receive the signed documentation from him as soon as
possible so it could complet e the checks and searches and then submit
the application for decisi on to its Credit Team
due to a policy change, it could not submit an application for dec ision
without the signed documents
26 October 2018 The bank provided conditional approval for a loan of $700, 000
The bank says the approval was subject to quite an ex tensive list of
conditions at this time, given there is still a number of things to be finalised
in relation to the proposal
Conditions are listed in the email
7 January 2019 The bank emailed the com saying:
the annual review of your facilities is due 31/1
so that it could consider his request to change the existing loan from
principal and interest repayments to interest only repayments, it required
him to complete and return the enclosed form.
7 January 2019 The com se nt the bank an email attaching th e signed consent forms.
25 February 2019 The bank sent the com an email:
requesting he sign attached forms
it needed to complet e updated credit checks before the Credit Team would
read the rest of the application
25 February 2019 The com sent the bank a n email with the signed forms.
Determination | Case number: 628426 Page 8 of 8
Date Event
26 February 2019 The bank sent the com an email saying:
it had located an error in the bank’s prior servicing calculations for the
original approval from October 2018 and it needed to rework the
calculations
4 March 2019 The bank emailed the com saying its Credit Team had requested further
information from its specialists as it was concerned the timing was not right,
given rec ent events (flooding)
7 March 2019 The bank emailed the com saying:
it understood you wished to p roceed with the loan
its email of 26 October 2018 set out conditions that would be included in a
formal offer if the application was approved
having reviewed the available information and considered the surrounding
circumstances since its email of 26 Octob er 2018, it has decided that it will
not be making a formal offer to provide a loan facility
the floods have significantly altered the business case for the loan and the
bank is not in a position to approve the loan