Determination 627967
Settlement for cyclone damage to yacht
Summary
The complainants sought the total sum insured for a yacht damaged by Cyclone Debbie, then sold it for $10. AFCA upheld the insurer's $43,288.30 settlement, which excluded electrolysis and lack of maintenance damage, and found the expert's water blasting caused no additional damage.
Most of the damage was caused by electrolysis and pre-existing maintenance issues, which the policy excludes, so the insurer could limit its liability to the accepted cyclone damage.
Issues
- Claim denial primary · not upheld“the insurer is entitled to rely on the exclusion for loss or damage caused by electrolysis to limit its liability”
- Third-party or outsourcing failure secondary · not upheld“the panel is satisfied the actions of E did not cause additional damage to the yacht”
Subjects and remedies
natural disasterpay claimpay interest
Related
Text of the determination
Determination
Case number 627967
Financial firm QBE Insurance (Australia) Limited
Determination | Case number: 627967 Page 2 of 14
Case number: 627967 31 October 2019
1 Determination overview
1.1 Complaint
The complainants lodged a claim under their pleasure craft insurance policy held with
the financial firm (insurer). The complainants’ yacht sustained damage as a result of
Cyclone Debbie.
The insurer arranged for the damage to be assessed and offered a settlement of
$43,288.30 for the damage sustained as a result of Cyclone Debbie.
The complainants were dissatisfied with the settlement amount stating the offer did
not account for all the damage. Due to the state of the yacht, the complainants sold
the yacht for $10. The complainants are seeking the total sum insured for the yacht.
The insurer maintains its offer is fair and reasonable in the circumstances, as the
majority of the damage was related to electrolysis which is excluded under the policy.
The complainants say the actions of the assessor caused additional damage to the
yacht.
1.2 Issues and key findings
Whether the settlement offer is fair and reasonable?
The available information establishes some damage to the yacht was caused by
Cyclone.
The cause of the majority of the damage to the complainants’ yacht is electrolysis.
The available information shows the electrolysis was the cause of the water ingress
into the yacht.
Accordingly, the insurer is entitled to rely on the exclusion for loss or damage caused
by electrolysis to limit its liability.
Whether the actions of the marine services expert, E caused additional
damage?
The available information shows the actions of E did not cause additional damage.
The information shows the majority of the damage was present prior to the water
blasting and the complainants’ failed to mitigate their loss.
1.3 Determination
This determination is in favour of the insurer.
Determination | Case number: 627967 Page 3 of 14
Upon acceptance of this determination by the complainants, the insurer is required to
raise payment of $43,288.30 within 14 days.
The insurer is to pay interest on this amount, in accordance with the Insurance
Contracts Act 1984 (the Act), from the date of the insurer’s settlement offer, until the
payment is made.
The insurer is not required to take any further action.
Determination | Case number: 627967 Page 4 of 14
2 Reasons for determination
There has been a full exchange of all material information relied on for the purposes
of this determination and each party has had the opportunity to address any issues
raised by the other.
This decision has been made by a panel consisting of the panel chair Ombudsman, a
representative with extensive insurance experience and a representative with
extensive consumer experience. The decision follows consideration of all the material
exchanged. It is based on what is fair in all the circumstances having regard to the
relevant legal principles, terms of the policy, good industry practice including codes of
practice and previous decisions where applicable.
While the parties have raised numerous issues in their submissions, for the purposes
of this determination, commentary has been restricted only to those issues
considered directly relevant to the outcome.
2.1 Whether the settlement offer to the complainants is fair and reasonable?
Policy provides cover for accidental damage subject to exclusions
The complainants are required to show, on the balance of probabilities, they have
suffered a loss caused by a risk insured against under the policy. This is known as a
valid claim.
If the complainants are able to establish a valid claim, the onus shifts to the insurer to
show, on the balance of probabilities, it is entitled to rely on an exclusion under the
policy or is otherwise entitled to decline the claim.
The complainants’ policy provides cover for accidental loss or damage to their boat,
subject to the conditions and exclusions set out in the policy.
For the purposes of the policy, an accident is an incident that is unforeseen and
unintended and that causes loss or damage. This includes, a series of accidents
arising out of the one event.
Complainants have established a claimable loss
There is no dispute the yacht has suffered damage. The experts (E and A) appointed
by the insurer, confirmed there is damage to the yacht sustained from Cyclone
Debbie.
The complainants appointed an expert (S) to provide a report in response to the
findings of E and A. S confirmed the yacht had sustained damage from Cyclone
Debbie.
Determination | Case number: 627967 Page 5 of 14
All experts confirmed the damage sustained to the yacht was to the exterior, in
particular to the starboard side of the vessel and transom.
The complainants say that all the damage, including the water ingress was caused by
Cyclone Debbie and the actions of the insurer and E.
The insurer says the majority of the damage, including the water ingress is due to pre -
existing issues, including electrolysis.
The insurer relies on the reports from E and A which confirmed that the majority of the
damage was caused by electrolytic degradation and the issues identified by A which
related to multiple hatches missing their seals which predated Cyclone Debbie.
S also confirmed the electrolysis damage to the hull appears to be a possible
contributor to the water ingress.
On this basis, the insurer says the majority of the damage is not caused by ‘accident’,
as required to establish a claimable loss for accidental damage under the policy.
However, it is accepted that some of the damage was caused by Cyclone Debbie. In
these circumstances, the panel is satisfied the complainants have established a
claimable loss.
Insurer says majority of the damage is caused by excluded factors
As the complainants have established a claimable loss, the insurer bears the onus of
establishing, on balance, it is entitled to rely on a policy exclusion to limit its liability.
The insurer says it is entitled to rely on exclusions under the policy for:
loss or damage including sinking caused by rusting, electrolysis or other forms of
corrosion
loss or damage including sinking caused by lack of maintenance.
Electrolysis is the cause of the majority of the loss
On review of the available information, the panel is satisfied that the cause of the
majority of the damage is electrolysis.
E and A both concluded that the majority of the damage was caused by electrolysis.
In E’s reports, it was stated the extent of the electrolysis in the yacht demonstrates it
had been occurring for some time and prior to Cyclone Debbie. E also noted in his
report, that the complainants had advised of a bolt repair to stop a small leak prior to
Cyclone Debbie. The panel is also satisfied that this confirms the presence of
electrolysis prior to Cyclone Debbie.
Determination | Case number: 627967 Page 6 of 14
Lack of maintenance is a contributing factor
In A’s report, it was noted there were issues relating to multiple hatches missing their
seals which predated Cyclone Debbie. In his report, A concluded, the missing seals
was a possible cause of the water ingress.
It is further noted, the photographs provided by the complainants are quite similar to
those included in A’s report. Therefore, this supports the insurer’s submissions in
relation to pre-existing issues.
Insurer entitled to limit its liability
The complainants are seeking a total loss payment for the yacht. The complainants
advised that due to the severe damage to the yacht, it was unrepairable. The yacht
was sold for $10.
The insurer obtained information regarding a quote for accepted Cyclone Debbie
damage. The insurer offered the complainants $43,288.30. This offered was rejected.
The available information shows the majority of the damage was caused by pre-
existing issues, such as electrolysis and lack of maintenance.
On this basis, the panel is persuaded the insurer’s offer for the accepted damage is
fair and reasonable in the circumstances.
Upon acceptance of this determination by the complainants, the insurer is required to
raise payment of $43,288.30 within 14 days, together with interest.
2.2 Whether the actions of E caused additional damage?
Complainants say the water blasting caused additional damage
The complainants argue that the additional damage to the yacht was occasioned
when E upset the hull of the yacht by water blasting it. They say that the reports of E
do not make mention of the water blasting pressure and given that the process took
considerably longer due to marine growth, the operator had an incentive to use a
higher than normal water blasting pressure.
The complainants submit there is no evidence from the individual who water blasted
the yacht that their processes meet industry standards . They note water blasting can
cut through steel. The complainants argue it is important to consider whether the
water pressure and cleaning met industry standards for the type and age of the yacht.
They submit that water blasting caused holes to the hull and if the hull was in such a
deteriorated state (as the assessor asserts) he was either negligent in causing the
loss, or he caused the holes in the hull through water blasting.
Determination | Case number: 627967 Page 7 of 14
Complainants’ report does not assist with this allegation
On review of the available information, the panel is not satisfied the actions of E
caused additional damage to the yacht by the water blasting. The information
provided shows E acted in accordance with the complainants’ instructions and
preferences. It is further established in the reports provided by E that E was, at all
times, concerned with both assessing the current damage and preventing further
damage.
In his report dated 31 May 2017, E observed significant marine growth on the yacht.
In order to assess all the damage, instructions were obtained to water blast the yacht.
The report provided by S comments on the water blasting. S, in particular noted, it is
possible to cut metal with water pressure, however, the equipment to do so is
significantly different in design, use and application and not in use to remove growth
from vessels.
S said that it is commonly understood that the process of water blasting a vessel will
likely be to the detriment to the longevity of foul release / antifoul coatings. However,
S says this does not suggest this process affects the hull plating or other aspects of
the vessel relating to watertight integrity.
S further commented that in this particular case it appears the process of water
blasting has removed marine growth and rust scaler with the effect that damage and
deterioration to the plating due to corrosion and electrolysis, became visible. S also
noted, this growth and rust scale may have served to limit or block water ingress via
underlying issues.
S confirmed the practice of water blasting is widely used and accepted as the most
viable method for cleaning growth from the hull.
On consideration of the complainants’ own expert report, the panel is satisfied the
actions of E did not cause additional damage to the yacht. The informa tion provided
from both parties, supports the method of water blasting to remove marine growth.
Complainants say the actions of E caused further damage
The complainants say E and the insurer should not have:
placed the yacht back in the water after carrying out only temporary repairs
placed the yacht back into the water knowing there was a lack of hard stand
availability.
The yacht was required to be moved from the marina in order for a full assessment.
Arrangements were made for the yacht to be moved to A Beach, as the marina
refused to take the yacht due to its condition.
Determination | Case number: 627967 Page 8 of 14
Shortly after the move, the assessment was completed and the clean-up of the yacht
commenced. At the time of the assessment, a hole near the main engine was causing
water ingress. E arranged a temporary patch and minimal water ingress was
observed.
The yacht was later moved to H Boatyard as requested by the complainants. This is
where the water blasting took place and the electrolysis became visible. H Boatyard
was not able to complete any repairs to the yacht for several months. The yacht had
another temporary patch and was returned to the water.
The complainants submit the yacht should not have been placed in the water with
only temporary repairs.
Complainants failed to follow E’s recommendations
The insurer submits, E advised the complainants the repairs arranged were intended
to be temporary in nature and that they had a duty to mitigate further damage and
carry out repairs to the yacht as soon as possible and take control of the yacht.
The panel notes that after the yacht was returned to the water, the complainants had
the responsibility to mitigate damage to the yacht. The complainants were advised of
this on or around 24 May 2017. The information provided shows the complainants did
not follow the recommendations provided by E and the yacht remained in the water
until they were instructed to remove it by Marine Safety in August 2017.
The panel is satisfied, the complainants failed to mitigate their loss, by not following
the recommendations from E, which included take control of the yacht. Therefore, the
insurer is entitled to limit its liability in respect to the settlement amount as detailed
above.
Determination | Case number: 627967 Page 9 of 14
3 Supporting information
3.1 Relevant policy wording
Section 1: Cover for your pleasure craft – page 24
What is covered
We will cover your pleasure craft as described in the Policy schedule while it is navigating or in transit
within mainland Australia and Tasmania and including Australian and inland coastal waters of up to
250 nautical miles (unless otherwise stated in your Policy Schedule), and including while the pleas ure
craft is at any marina, slipway or location when laid -up ashore or engage in any rescue work.
What you are covered for – Loss of or damage to your pleasure craft
We will cover you for:
(a) Accidental loss or damage to your pleasure craft or part of it caused by:
an accident during use or while stored ashore or moored;
sinking provided it was in seaworthy condition at the time of sinking;
malicious damage or vandalism;
a latent defect within the hull, motors/machinery of the pleasure craft (excluding the cost and
expense of replacing or repairing the defective part), provided the loss or damage has not resulted
from lack of due diligence (c are) by you;
negligenc e of skipper, master and/or crew provided the loss or damage has not resulted from lack
of due diligence (care) by you;
negligenc e of the repairers (excluding you) provided the loss or damage has not resulted from a
lack of due diligence (care) by you;
an accident during transit on its own trailer by road, rail or ship within mainland Australia and
Tasmania including loading and unloading provided your pleasure craft is designed to be
transported on a boat trailer and you are complying with all statutory requirements.
What you are not covered for – Loss of or damage to your pleasure craft – page 26
We will not cover you for:
…
loss or damage including sinking caused by normal wear and tear including gradual deterioration;
loss or damage including sinking caused by timber rot, delamination, osmosis, gradual
deterioration, vermin or marine growth;
loss or damage including sinking caused by rusting, electrolysis or other forms of corrosion;
loss or damage including sinking caused by lack of maintenance.
Care and maintenance – page 42
You must take reasonable care to prevent damage, injury or loss. We won’t pay for damage, injury,
loss or your liability to which your failure to take reasonable care is a contributing factor. At all times,
you must:
Determination | Case number: 627967 Page 10 of 14
Prevent damage to property insured, as well as to other and their property
Minimise the cost of any claim under your Policy
Comply with all laws.
Claims – page 43
This section describes what you must do, as well as conditions that apply when you make a claim and
at the time loss or damage occurs which is likely to give rise to a claim.
What you must do
For us to consider you claim, you must:
Promptly take all reasonable and responsible precautions to prevent any furt her loss or damage to
your pleasure craft, including electrical equipment and components which have been submerged
and in the case of a motor, the flushing out and oiling of the motor and the drying out of its and all
other electrical equipment and components.
3.2 Expert reports
Report Key points
insurer’s expert (E )
Report
31 May 2017
the vessel has made contact with the rock wall primarily along the
starboard side in way of the midships/after sections and has
sustained some varying degree of hull plate set in as a result of
the rock wall contact
the paint ed hull surfaces between the deck line and waterline have
been abraded back to the steel plate in plac es and some similar
abrasive damage has occurred just below the waterline
the forestay carrying the furling headsail has come away at the
mast head and this appears to be as a res ult of the galvanised
wire stay havi ng suffered flogging and corrosion relat ed
deterioration beneath the foil section over time
the upper section has suffered distinct wind related deformation
and all signs of any covers have disappeared
this damage is most probably attributable to the stro ng wings and
gusting effects of the cyclone
after the removal of the vessel, a relief crew attended the vessel to
commence initial assessment of the int ernal areas and clean up
where possible
the vessel was found to have taken on board a substantial amoun t
of salt water to the extent the engine had been completely
inundated and water to a height above the floorboards had
ingressed
the relief crew commenced removal of the wat er via pumping
using the vessels onboard bilge pump and buckets and aft er some
fiv e hours managed to remove the bulk of the wat er
during this period it was noted that there was an ongoing influx of
water and a search for the ingress point was initiated
as a result of the search a hole was found in the lower section of
the transom in c lose proximity and below the main engine exhaust
Determination | Case number: 627967 Page 11 of 14
Report Key points
outlet and through which the water ingress was coming
as a result of the bulk of the water having by now been removed
from the vessel, the influx was greatly reduced and following
temporary patch repairs be ing made to the hole, all water via this
point was staunched at this time
a close monitoring of the water levels inside the vessel was
maintained throughout the rest of the day and it appeared that the
temporary patch to the transom had been successful wi th minimal
ongoing influx of water being observed
the relief crew returned the following day to check the remaining
areas of the vessel and complete an int erim assessment and at
that time there was little ’new’ influx noted
the starboard hull side which sustained the bulk of the abrasive
damages was washed and given a preservative coating of enamel
rust inhibiting paint to minimise the ongoing development of
corrosion as a stop gap measure pending opportunity to slip the
vess el for more permanent temporary repair and inspection
a further check on the temporary patches placed over the hole in
the transom was conducted and these appeared to be sound and
secure with no obvious influx of water occurring, the raised height
of the patch above the waterline directly due to the removal of the
water inside the vessel had been most influential on the
staunching of such ingress
the vessel was towed and removed from the water
on removal from the wat er it was immediately noticeable, apar t
from the cyclone related damages previously observed, the
vessel’s underwater sections had suffered and was suffering
severe electrolytic attack to the extent of deep pitting, weld seam
tracking and plate penetration particularly in way of the rudder
tra iling edge and foot plate
the entire subwaterline area was well covered with long term
marine and oyster shells which indicated the vessel had not been
out of water for a very considerable period of time
as the oyster shell and marine growth was very sub stantial an
instruction was issued to the boat yard to wat er blast and remove
same such that a proper inspection of the hull could be made and
permit assessment of the cyclone related damages
the actual water blast cleaning proc ess took considerably longe r
than normal due to the volume and size of the marine growth
on completion of the water blast cleaning process it was evident
that the vessel had been suffering some form of electrolytic type
attack in the subwaterlines over an extended period of time
com mencing well prior to the cyclonic event
the nature of the electrolytic attack is considered such that it has
been in evidence for quite some time as the owners have applied
a temporary patch and advised that this was to stop a little trickle
of water get ting into the boat
this was done well before the cyclone incident
the degree and the complexity of the electrolytic attack is very
Determination | Case number: 627967 Page 12 of 14
Report Key points
substantial to the extent that following the wat er blast there were a
number of penet rations through the hull plating, some sufficiently
large that a finger could be poked through from the outside to the
inside of the vessel
closer inspection of the underwater sections revealed many
electrolytic ‘burns’ in way of weld seams and other areas with
numerous small holes having appe ared in way of thes e burn
tracks
following the water blasting, a substantial number of smaller holes
appeared along with evidence of plate wastage at the base of the
rudder along the foot plate to the extent that water was noted to be
streaming out when t he vessel was initially removed from the
water and subsequently when a hose was placed inside one of the
holes in the rudder trailing edge section
there is minimal damage below the water line, apart from that
directly related to the plate work, that can b e attributed to cyclone
damage
during the course of the assessments, we have been in
communication with the ins ured’s and have on several occasions
recommended their earliest attendance at the vessel to mitigate
the damages occasioned and take possession of their property
rather than leave it to others
we have not sighted the insured’s at the vessel nor in the local
area and are not aware of any direct engagement with local
repairers or others relating to addressing either the cyclone relat ed
damages or o f much greater import, the matters concerning the
severe degradation of the subwaterline hull due to electrolysis .
insurer’s expert (E )
Email
16 August 2017
the electrolytic action and corrosion was obviously known to the
insureds, at least to some extent, as they had applied a ‘temporary
patch’ to the hull, starboard side below wat erline aft of midships, at
some time well prior to the cyclone
on the initial discovery of such electrolytic penetration the Insured
should have immediately had the vessel lifted and determine the
cause as such is of very serious concern and leads directly to the
current situation of left unattended .
insurer’s expert (A )
Report
13 October 2017
the interior has suffered some damage as a result of the cyclone
the electrolysis holes both existing and also those that have likely
been further developed by the vessel movement during the
cyclone would allow enough water ingress to fill t he bilge and
cover the main engine
the amount of water ingress would have been considerable and
we are of the opinion that the only reason the vessel did not sink is
because the vessel ended up in shallow water next to the marina
wall
the generally deter iorated hatches and lack of seals of the hatches
(whic h we believe have not been in place for many years ) has also
allowed a quantity of wat er to enter the vessel during the cyclone
Determination | Case number: 627967 Page 13 of 14
Report Key points
event contributing to the water ingress
however water ingress from the ha tches has also been occurring
an extended period of time prior of the cyclone which has been
causing internal areas of the vessel to gradually deteriorate
unable to rec ommend any settlement of the internal damage
directly as a result of the cyclonic condi tions based on the basis of
our inspections to date as we feel internal damage is primarily
resultant from the vessel’s pre - exisitng condition
the out of wat er images with the electrolysis holes confirm this to
be the case .
insurer’s expert (E )
Report
9 July 2018
through bold repair provides clear evidence that some sort of
subwaterline problem pre - existed and should have intiated an
immediat e slipping and inspection at the time of initial discovery
the statement provided suggests the bold was fitted after the
cyclone event, however it is our clear understanding from
discussions with the marina manager, that the weather conditions
were appalling and all personnel had been directed to leave the
marina
the condition of the bolt arrangement does not appear to be
consistent with a very recently fitted item as suggested
the matter of time when the bolt was fitted and the three years
seems disjointed as the ins ured advised that he had in fact
discovered a leak in the boat and had inserted the bolt prior to
leaving the boat well before the cyclone
the development of rust and corrosion are a result of long term
deterioration and do not appear ‘overnight’
the perforation due to heavy scale (rust) which is be lieved to be
the penultimate caus e of the water ingress has been entrained for
a lengthy period well prior to the cyclone
there is no mention of tear in the transom rather a rusted out
section which perforated at some time allowing substantial water
ingre ss and flooding of the vessels internal areas
the temporary repairs were purely and solely a stop gap to enable
the vessel to be cleared off the hardstand as quickly as possible
the insured has made statements regarding when the water
ingress occurred whi ch is puzzling as he was not in attendance, to
our knowledge for quite some time after the slipping and therefore
could not have known what was happening unless he had some
other party engaged of which we know nothing .
insurer’s expert (E )
Report
18 July 2018
the principal cyclone related damages are contained to the
starboard hull platework which has been scored and set - in,
paint work scoring in way of the transom area, cockpit bimini
covers and structure
the vessel had suffered an amount of hull damage and cockpit
damages and discounting the water related damages internally,
the vessel was and is fully repairable and therefore could not in
any circumstances be considered a total loss
the result of wat er i ngress has been detrimental to the internal
Determination | Case number: 627967 Page 14 of 14
Report Key points
areas of the vessel and we are uninformed as to the previous
history of the vessel or the internal condition, however, this area
could have been repaired as indicated in our reports .
complainant’s expert (S)
Report
24 May 2019
the exterior of the vessel was damaged during the events resulting
from TC Debbie
the damage relat es to the hull finish and plating in particular the
starboard side of the vessel and transom
there is significant damage due to water in gress to the interior of
the vessel
corrosion damage and electrolysis damage to the hull plating
appears to be a possible contributor to water ingress to the vessel
returning the vessel to water and keeping there for an extended
period of time has served to signific antly increase the risk to this
vessel.