Determination 627668
claim_denial
Summary
The insurer's contractors caused further damage to the complainant's hardwood floors during accepted repairs, and failed rectification sanded the floor three times. AFCA refused to order replacement of the whole floor, but required further repairs by a suitable repairer and awarded $5,000 for non-financial loss.
The insurer is liable for its contractors' avoidable damage and delay, but the evidence did not establish a significant reduction in floor lifespan, so replacement was not ordered.
Issues
- Claim denial primary · not upheld
“As it has not been established the insurer's actions resulted in a loss the insurer is not liable for the cost of installing a new floor.”
- Delay secondary · upheld
“An unfortunate failure of the repair process caused excessive delays.”
- Repairs or contractors secondary · upheld
“Subsequent repairs, and any alleged reduction in lifespan, were avoidable and are a result of the actions of contractors engaged by the insurer.”
Subjects and remedies
home or building damagepay non financial lossrepair or rectify
Text of the determination
Determination | Case number: 627668 Page 1 of 7
Determination
Case number: 627668 26 September 2019
1 Determination overview
1.1 Complaint
The complainant lodged a claim for accidental damage to hardwood floors. The
financial firm (insurer) accepted the claim and agreed to arrange repairs. In the
process of conducting repairs, further damage was caused to the floor.
Two attempts to rectify the damage failed, with each attempt involving sanding and
polishing of the floorboards. Consequently, the floorboards were sanded and polished
three times. The complainant is concerned this has reduced the lifespan of the floor,
and the floor will require replacement sooner than it otherwise would have.
The insurer says any reduction in lifespan is minimal, and as such it is not required to
replace the entire floor. The insurer agrees that it is liable for the outstanding
rectification work to restore the floor to its pre -loss condition.
1.2 Issues and key findings
Is the insurer liable for the cost of installing a new floor?
The available evidence does not establish that the lifespan of the floor has been
significantly reduced. As it has not been established the insurer’s actions resulted in a
loss the insurer is not liable for the cost of installing a new floor.
Is the complainant entitled to compensation?
The insurer has made efforts to resolve the claim in a timely manner, yet an
unfortunate failure of the repair process caused excessive delays. Consequently, the
complainant did not enjoy a seamless and prompt resolution. The complainant is
entitled to compensation.
1.3 Determination
This determination is substantially in favour of the insurer.
The insurer is not liable for replacement of the entire floor. The insurer is required
engage a suitable qualified professional for the outstanding repairs. The insurer must
ensure the complainant is satisfied with the chosen repairer.
Determination | Case number: 627668 Page 2 of 7
The insurer is required to pay the complainant $5,000 in compensation for non-
financial loss.
Determination | Case number: 627668 Page 3 of 7
2 Reasons for determination
I have decided this case on its merits, having regard to the relevant law, good industry
practice, codes of practice and previous decisions. I have considered all the material
submitted by the parties. I am satisfied the documentation I have relied on has been
provided to both parties.
2.1 Is the insurer liable for the cost of installing a new floor?
Complainant established a valid claim within policy terms
The policy provides cover for listed events and accidental damage or loss which occur
during the policy period. It is not disputed that the claim arose as a result of accidental
damage, and that this occurred during the policy period. The complainant established
a valid claim, and the insurer accepted the claim as such.
The loss occurred after a steam mop was used on wooden floors at the insured
property, causing streaks and marks. The insurer accepted the claim and arranged for
the floor to be sanded and repolished, with these repairs taking place on 9 July 2015.
Insurer’s contractors cause d further damage
Following completion of the repairs, contractors engaged by the insurer dropped a
stone tabletop, causing damage to floorboards. In order to repair this additional
damage, replacement of some floorboards was required, and the entire floor structure
was again sanded and polished.
It was later realised that floorboards of an incorrect type of wood were utilised during
rectification work, and that they were face nailed rather than secret nailed. These
floorboards were removed, replaced with the correct type and sanded and polished
again.
Gaps and excessive caulking between new and existing floorboards were then
identified. This required removing and replacing floorboards, and another sanding and
polishing of the entire floor. At this point rectification work ceased due to the
complainant’s concerns that the lifespan of the floor had been reduced.
Insurer is liable for the actions of its contractors
Where an insurer engages a contractor to act on its behalf, it is accepted that the
insurer is liable for the actions of such a contractor. This is not in dispute, and the
insurer has shown regard for this principle by arranging repeated rectification works.
The sanding and polishing as a result of the initial claim was unavoidable as this was
required to rectify the damage caused by the original claimed event. Regardless of
whether these repairs reduced the lifespan of the floor, the insurer cannot be said to
be liable.
Determination | Case number: 627668 Page 4 of 7
Subsequent repairs, and any alleged reduction in lifespan, were avoidable and are a
result of the actions of contractors engaged by the insurer. If these actions have
resulted in loss or damage, the insurer is liable for any such loss.
Complainant says the lifespan of the floor has been reduced
The complainant’s floor has now been sanded and polished three times, and another
sanding and polishing is required to complete the rectification works. The complainant
says the number of times a wooden floor can be sanded and polished is limited.
The consensus of expert reports is that after sufficient thickness has been removed
from a floor due to repeated sanding, the floor is deemed to be at ‘end of life’. The
complainant estimates that his floor is close to end of life as a result of the insurer’s
actions. This estimate is based on the following:
new flooring has 6mm wearing thickness at time of manufacture
installation of a new floor removes 1 to 1.5 mm of available wearing thickness
sanding as part of repair and rectification work equates to a loss o f 0.5 mm wearing
thickness per sanding
after the final rectification works 2.5mm wearing thickness will remain.
The complainant refers to a report prepared by a timber floor specialist, JT, which
says timber floors are near the end of their service life when about 2.5 mm to 3.5 mm
thickness remains. Timber splitting occurs at 1.5 mm which is considered the end of a
floor’s lifespan at which point it must be replaced.
The complainant concludes that his floor has 1 mm available thickness for all future
repairs or coatings, and as a coating has a life expectancy of 5 to 7 years, the lifespan
of his floor has been significantly reduced. The complaint says on this basis he has
suffered a loss in the form of reduced usable lifespan.
Available evidence does not establish loss or damage has occurred
The insurer relies on a report prepared by a building consultant (SBC) who engaged a
timber flooring specialist (BS) for expert opinion. SBC says when a floor is first
manufactured, wearable thickness is 5.5 mm to 6 mm of which 0.75 mm to 1.5 mm is
lost on initial installation. This is in line with a consensus among expert reports that
the bulk of available thickness is lost on installation. SBC says the initial repairs, an
unavoidable consequence of the claimed event, would have reduced the thickness by
a further 0.5 mm. From this, I would expect a remaining minimum thickness of 3.5
mm.
JT measured the remaining thickness across the floor structure, finding the remaining
thickness ranged from approximately 3 mm to 5 mm. The 3 mm of remaining
thickness measured by JT is 0.5 mm below the expected minimum thickness. As
such, I am satisfied the floor has lost 0.5 mm of thickness at most (in some localised
Determination | Case number: 627668 Page 5 of 7
areas) as a result of avoidable rectification work. However, for reasons discussed
below, I am not satisfied this constitutes loss or damage.
JT says it is considered likely the remaining thickness of the wear layer will allow the
floor to withstand further sandings and still maintain structural integrity. JT points to
the subfloor structure offering greater support, and thus allowing for more sanding
than a floor laid directly onto a joist and bearer subfloor.
BS found the floor had approximately 4 mm remaining thickness and was laid over an
aged floor and structural sheet floo ring. BS reflects JT’s opinion that as the floor was
laid over an aged floor and structural sheet flooring, it is not required to support
weight in any significant way. BS says this allows the opportunity for numerous future
sanding efforts.
BS refers to Australian Timber Floor Association (ATFA) literature which says once a
floor is flat, future work to refurbish the coating will often not require the floor to be
sanded back to bare timber. SBC estimates the current thickness will allow at least
another four attempts at sanding and polishing over 40 years, although does not
provide the basis for this conclusion. Regardless, no information has been supplied
which establishes that the lifespan of the floor has been significantly reduced. Nor is
there any suggestion that the outstanding rectification work will cause any significant
reduction in lifespan.
As such, I am not persuaded that the lifespan of the floor has been significantly
reduced. Therefore, I do not consider the insurer liable for replacing the e ntire floor.
Further rectification to be completed by a proficient and confident repairer
The insurer is required to complete rectification works to the existing floor. Prior
attempts at rectification have subjected the complainant to an unusually long claim
process. The claim remains unresolved as the complainant has lost faith with the
repair process and contractors engaged by the insurer.
BS concludes that the current situation is suitable to further repair, yet makes a
specific recommendation that “ the repairer of the floor needs to be proficient and
confident that they can bring the current floor back to acceptable standard, and
therefore final guidance should be sought from those who are undertaking the work” .
The insurer is required to utilise a r epairer who meets BS’ recommendations for
further rectification. The insurer should engage with the complainant to ensure the
complainant is satisfied with the chosen repairer. If necessary, the insurer should
engage a suitable specialist and its decision should not be limited to traditional or
preferred repairers.
Determination | Case number: 627668 Page 6 of 7
2.2 Is the complainant entitled to compensation?
Complainant is entitled to compensation for non-financial loss
Repairs were initially completed in July 2015; however further damage was caused by
contractors operating on behalf of the insurer. The later failures of rectification work
led to significant delays before the complainant requested work cease.
While the failures do not appear to be related to negligence of any kind, it remains
that the complainant has suffered an unusual level of inconvenience and delay. The
insurer has recognised this and had previously offered to compensate the
complainant for this.
Under the Australian Financial Complaints Authority (AFCA) Terms of Reference,
compensation may be awarded for non-financial loss (capped at $5,000).
We may decide the insurer compensate a complainant when the insurer caused them
to suffer an unreasonable degree of physical inconvenience, time taken to resolve a
situation, interference with their peace of mind or loss of enjoyment of an asset.
Compensation is awarded conservatively.
Compensation is not awarded for the normal degree of inconvenience a person would
expect to suffer when lodging this type of claim or having a problem with the insurer.
Compensation can be awarded though if the insurer’s handling of the claim was
unreasonable.
The insurer is required to provide compensation of $5,000 in recognition of a claim
experience that has not met the reasonable expectations of the complainant.
Determination | Case number: 627668 Page 7 of 7
3 Supporting information
3.1 Flooring expert reports
Floor Inspection Report (BS)
Floor Inspection Report (JT)
Repair Audit Report (SBC)
3.2 Relevant sections of policy wording
Accidental Damage (page 69)
What is covered
You are covered for loss or damage to your building and/or contents cased by an
accident at your insured address.