Home / ANZ / Determination 627275
Determination 627275
Loan approved before signed fixed-price building contract; incomplete contract pages provided
Summary
The complainants said the bank approved their construction loan without a signed fixed-price building contract and later supplied incomplete contract pages, and sought compensation for bankruptcy and an unfinished home. AFCA found the bank approved too early and made a clerical error, but the loss arose from a different cost-plus building contract, so nothing was ordered.
A lender's procedural error causes compensable loss only if it caused the loss, and here the complainants' loss flowed from a different building contract.
Issues
- Administrative error primary · upheld
“Bank approved the loan too early, before a signed fixed price building contract was held, and mistakenly provided a schedule from an earlier contract.”
- Misleading conduct secondary · not upheld
“Available information does not support misleading conduct; the bank's error was a clerical mistake, not a deliberate act.”
Subjects and remedies
no remedy
Text of the determination
Determination
Case number 627275
Financial firm Australia and New Zealand Banking Group Limited
Determination | Case number: 627275 Page 1 of 8
Case number: 627275 26 June 2020
1 Determination overview
1.1 Complaint
In May 2006, the complainants (Mr A, Mrs S and Mr P) obtained home loan account
no. *9836 from the financial firm (bank). The purpose of the loan was to refinance the
complainants’ existing loans *6657 and *2725 and provide additional f unds for the
construction of the complainants’ home.
The complainants say:
the bank approved the loan without ensuring it held a signed fixed-price building
contract
when they requested a copy of the signed building contract in 2010 from the bank,
the bank provided them with a copy that was not signed by the builder and with
pages missing. The complainants say that when they pressed the bank for the
complete contract, the bank provided pages from a different building contract
the bank’s conduct has caused them loss because there were extended legal
proceedings between Mr A and Mrs S (who had signed the building contract) and
the builder. The complainants say this led to Mr A and Mrs S’s bankruptcy, as well
their house remaining incomplete.
On 27 February 2020, an AFCA case manager provided the parties with a preliminary
assessment that was substantially in favour of the financial firm. The complainants
reject the preliminary assessment.
1.2 Issues and key findings
Was the bank’s decision to provide the loan appropriate?
The bank’s decision to provide the loan to the complainants was appropriate.
However, the bank approved the loan too early – it should have waited until all
relevant parties had signed the fixed price building contract in late May 2006 before
approving the loan.
Did the bank’s conduct cause the complainants any loss for which he should
be compensated?
The bank’s decision to provide the loan did not cause the complainants’ loss. While
the bank approved the loan before the fixed price building contract was signed by all
relevant parties, Mr A, Mrs S and the builder constructed the complainants’ home
under an entirely different building contract than that presented to the bank. The
complainants’ loss arises from the problems they experienced wi th the builder under
that different building contract, not from the bank’s decision to provide the loan to
them.
Determination | Case number: 627275 Page 2 of 8
Should AFCA vary the credit contract?
After AFCA’s preliminary assessment, the parties entered into a financial hardship
arrangement which expires on 1 October 2020. Under this arrangement, the financial
firm has agreed to defer the complainants’ required loan repayments for six months.
As an arrangement is currently in place to address the complainants’ financial
hardship, it is not appropriate for AFCA to further vary the credit contract.
1.3 Determination
This determination is in favour of the bank.
If the complainants remain in financial hardship at the end of their current hardship
arrangement, the complainants should complete a statement of fi nancial position for
the bank and contact the bank to discuss a repayment arrangement. The parties
should work together to try and come to an arrangement for the complainants to
overcome their financial hardship and repay the loan. In doing so, the financial firm
should have regard to its obligations for dealing with customers in hardship.
If the parties are unable to reach an agreement and the complainants are in financial
hardship, the complainants can lodge a further complaint with AFCA about that issue.
Determination | Case number: 627275 Page 3 of 8
2 Reasons for determination
2.1 Was the bank’s decision to provide the loan appropriate?
The complainants say the bank made an error when approving the loan
The complainants say the bank should not have approved the loan without holding a
signed fixed price building contract.
There was a fixed price building contract
The bank and complainants have not provided a copy of a signed fixed price building
contract between the complainants and builder.
However, I am satisfied on the available information that the complainants (or one or
more of them) and builder did enter into a fixed price building contract on 22 May
2006. This is because a residential building work insurance certificate was issued
which provides that:
This Certificate in respect of Insurance is issued for the building contract dated 22 May
2006 for the contract sum of $630,000
It is more likely than not that the insurer would not have issued the insurance
certificate without a copy of the building contract.
The bank thought it held a copy of the signed fixed price building contract
The bank’s loan assessment notes refer to the bank receiving a copy of the signed
fixed price building contract on 8 May 2006. However, it is more likely than not that
the bank officer reviewing the contract made a mistake, and that the bank only
received a copy of the fixed price building contract that was signed by Mr A but not by
the builder. I have formed this view because:
the contract date referred to in the building work insurance certificate is 22 May
2006. If the fixed price building contract was dated 22 May 2006, the bank could
not have received a signed copy on 8 May 2006
a copy of the fixed price building contract that was faxed to the bank on 4 May
2006 has been provided to AFCA. That copy is signed by Mr A but not by the
builder. However, a bank officer makes a file note on 8 May 2006 that includes the
following:
Recvd: Signedfixed price builders contract for amount of $627K
As there is no information to show that bank received a further copy of the fixed
price building contract after 4 May 2006, it is more likely than not that the bank
officer’s reference to a signed fixed price building contract in the 8 May 2006 file
note is a reference to the copy of the building contract that the bank received on 4
May 2006.
Determination | Case number: 627275 Page 4 of 8
the bank was unable to locate a copy of the signed fixed price building contract that
when the complainant requested a copy from the bank in 2010. In responding to
the complainant’s request, the bank provided a copy of the contract that it rec eived
on 4 May 2006 – the copy that was signed by Mr A only.
The bank’s decision to provide the loan was still appropriate
A prudent banker would have obtained a copy of the fixed price building contract that
was signed by all the relevant parties before approving the loan. This is also what the
bank’s lending policy required.
Despite the bank’s mistake, I am satisfied the bank’s decision to provide the loan to
the complainant was still appropriate. This is because:
the complainants do not say the loan was unaffordable
the loan was not inappropriate for the complainants needs and objectives. Rather,
the loan the bank provided (a loan to refinance the complainants’ existing loan and
provide funds during construction via progressive drawdown while their home was
being constructed) matched the purpose for which the complainants wanted the
loan.
In my view, what happened during the bank’s approval of the complainants’ loan
application is an example of the bank providing its loan approval too soon - that is,
before it was provided with a copy of the fixed price building contract dated 22 May
2006. It is not an example of the bank approving a loan that should not have been
approved at all.
Instead of the loan being approved by the bank in mid May 2006, a prudent banker
waiting for a copy of the fixed price building contract dated 22 May 2006 would have
approved the loan in late May 2006 instead of early May 2006.
2.2 Did the bank’s conduct cause the complainants loss for which they
should be compensated?
The bank’s conduct did not cause the complainants loss
While the bank did not hold a signed copy of the fixed price building contract when it
approved the loan, this did not cause the complainants loss. The reasons for this are
outlined below.
Determination | Case number: 627275 Page 5 of 8
There was another building contract – a “cost plus” contract
The available information shows that Mr A, and Mrs S and the builder also entered
into a building contract that did not have a fixed price - a “cost plus” building contract.
This is clear from the court’s judgmen t in legal proceedings between Mr A, Mrs S and
the builder in 2011. The court’s judgment in those proceedings noted that:
By written "Cost Plus" contract dated 26 April 2006 [the builder] contracted to
construct a home for [Mr A & Mrs S]
The house was constructed under the cost plus building contract
The bank’s loan assessment notes make clear that the bank approved the loan based
on a fixed price building contract. However, the court judgment makes clear that the
complainants’ home was constructed under a cost plus building contract.
The available information does not show the complainants making the bank aware
that the cost plus building contract (rather than the fixed price contract provided for
the loan approval) was to be the relevant building contract for their home. However,
the available information does show that before the fixed price building contract was
provided to the bank, the bank had told the complainants that it would not accept a
cost plus building contract.
The available information also shows that the complainants were aware that it was
the cost plus contract that was the contract under which their home was being
constructed. In a letter to the builder dated 21 June 2007, the complainant says:
Re HIA Contract
As agreed we will continue according to HIA contract [the cost plus contract] till all
committed parties/quotes have been fulfilled as per banks requirements we will need to
renegotiate a contract to complete the house. Our suggestion as stated earlier is to end
the HIA contract and draw up a new one on fixed cost, which will be acceptable by our
[bank], principle lending authority otherwise they will not finance beyond that stage
which is completed ground floor level.
The completion of ground level stage will endeavour all parties concerned, completed
their work (breach as per stated in our letter dated 6 June 2007 which gives ten (10)
days notice to remedy) and the contract will be nullified which exists between us namely
HIA signed on 26 th April 2006
The complainants’ los s flow from the cost plus building contract
In the above circumstances, the complainants’ loss from the issues they had with the
builder and the completion of their home cannot be said to be caused by the bank’s
conduct during its assessment and approval of the complainants’ loan application.
Determination | Case number: 627275 Page 6 of 8
While the bank was unable to locate a copy of the signed fixed price building contract
when the complainant requested a copy in 2008 [the copy the bank provided to the
complaint was unsigned and missing pages], this did not cause the complainants any
loss. This is because, as outlined above, the complainants home was being
constructed under an entirely different building contract - the cost plus contract -
rather than the building contract provided to the bank during the loan application
process.
The bank provided the complainants’ with a page from an earlier building
contract
The complainants raise an issue about the bank providing a “Schedule 2. Progress
Payments” page of a building contract to them in 2010 that di d not relate to the fixed
price building contract that was provided to the bank on 4 May 2006. The bank
referred to the “Schedule 2. Progress Payments” page when it responded to a claim
by the complainants that the bank did not hold a copy of the fixed price building
contract that was signed by the builder.
The “Schedule 2. Progress Payments” page outlines progress payments for a fixed
price building contract for $750,000. In the bank’s loan assessment notes there are
entries on 28 and 29 March 2006 that say:
28 March 2006:
FPBC [fixed price building contract] held, COST price $750k
29 March 2006:
fpbc [fixed price building contract] is for $750k however after loan payoffs
balance will be asprrox $627k for construction. where are the balance of funds
coming from??
The loan application notes go on to record that the $750,000 fixed price building
contract was reduced by $130,000 when the complainant agreed to supply that value
of building materials to the builder.
On the available information, I am satisfied that the bank, in answering the
complainants’ question about whether it held a signed fixed price building contract,
has mistakenly referred to, and provided, a schedule from the earlier fixed price
contract for $750,000.
Determination | Case number: 627275 Page 7 of 8
The complainants describe the bank’s conduct as misleading and that the “…Bank
provided pages which were not part of the Fixed Price Contract. Embezzled them
thereby committed fraud”. However, the available information does not support a
conclusion that it was anything other than a clerical type mistake by the bank. I also
note that it was the complainants (and not the bank) who were aware their home was
to be constructed under an entirely different building contract than the one provided to
the bank on 4 May 2006.
The complainants are not entitled to compensation
For the reasons outlined above, I am satisfied the complainants have not suffered a
loss as a result of the bank’s conduct for which they should be compensated.
2.3 Should AFCA vary the credit contract?
A hardship arrangement is currently in place
After AFCA issued its preliminary assessment, the parties entered into a hardship
arrangement for the loan. Under the hardship arrangement, the bank has agreed to
defer loan payments for six months expiring 1 October 2020.
As a hardship arrangement is already in place for the loan, it is not appropriate to
further vary the loan.
Whether the complainants should be provided with further assistance should they
remain in financial difficulty when their current arrangement expires will depend on
their circumstances at that time.
Determination | Case number: 627275 Page 8 of 8
3 Supporting information
3.1 The determination is made under the AFCA Rules
This complaint has been determined based on what is fair in all the circumstances,
having regard to factors such as legal principles, good industry practice, codes of
practice and previous decisions (which are not binding).
There has been a full exchange of all material information relied on for the purposes
of this determination and each party has had the opportunity to address any issues
raised by the other. All material provided has been reviewed and considered.
While the parties may have raised numero us issues in their submissions, for the
purposes of this determination, commentary has been restricted to those issues which
are considered directly relevant to the outcome.
3.2 A complaint about a credit card facility has not been considered
The complainants say the bank should not have provided a loan to them with credit
cards attached. However, the terms of the complainants’ loan do not include a credit
card facility.
If the complainants have an issue about the bank providing them with credit cards, the
complainants should raise this with the bank. If the parties are unable to resolve the
matter, the complainants can lodge a new complaint with AFCA about that issue.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.