Summary

The complainants said the bank approved their construction loan without a signed fixed-price building contract and later supplied incomplete contract pages, and sought compensation for bankruptcy and an unfinished home. AFCA found the bank approved too early and made a clerical error, but the loss arose from a different cost-plus building contract, so nothing was ordered.

A lender's procedural error causes compensable loss only if it caused the loss, and here the complainants' loss flowed from a different building contract.

Issues

Subjects and remedies

no remedy

Related

All ANZ determinations · Find similar determinations

Text of the determination

Determination Case number 627275 Financial firm Australia and New Zealand Banking Group Limited Determination | Case number: 627275 Page 1 of 8 Case number: 627275 26 June 2020 1 Determination overview 1.1 Complaint In May 2006, the complainants (Mr A, Mrs S and Mr P) obtained home loan account no. *9836 from the financial firm (bank). The purpose of the loan was to refinance the complainants’ existing loans *6657 and *2725 and provide additional f unds for the construction of the complainants’ home. The complainants say:  the bank approved the loan without ensuring it held a signed fixed-price building contract  when they requested a copy of the signed building contract in 2010 from the bank, the bank provided them with a copy that was not signed by the builder and with pages missing. The complainants say that when they pressed the bank for the complete contract, the bank provided pages from a different building contract  the bank’s conduct has caused them loss because there were extended legal proceedings between Mr A and Mrs S (who had signed the building contract) and the builder. The complainants say this led to Mr A and Mrs S’s bankruptcy, as well their house remaining incomplete. On 27 February 2020, an AFCA case manager provided the parties with a preliminary assessment that was substantially in favour of the financial firm. The complainants reject the preliminary assessment. 1.2 Issues and key findings Was the bank’s decision to provide the loan appropriate? The bank’s decision to provide the loan to the complainants was appropriate. However, the bank approved the loan too early – it should have waited until all relevant parties had signed the fixed price building contract in late May 2006 before approving the loan. Did the bank’s conduct cause the complainants any loss for which he should be compensated? The bank’s decision to provide the loan did not cause the complainants’ loss. While the bank approved the loan before the fixed price building contract was signed by all relevant parties, Mr A, Mrs S and the builder constructed the complainants’ home under an entirely different building contract than that presented to the bank. The complainants’ loss arises from the problems they experienced wi th the builder under that different building contract, not from the bank’s decision to provide the loan to them. Determination | Case number: 627275 Page 2 of 8 Should AFCA vary the credit contract? After AFCA’s preliminary assessment, the parties entered into a financial hardship arrangement which expires on 1 October 2020. Under this arrangement, the financial firm has agreed to defer the complainants’ required loan repayments for six months. As an arrangement is currently in place to address the complainants’ financial hardship, it is not appropriate for AFCA to further vary the credit contract. 1.3 Determination This determination is in favour of the bank. If the complainants remain in financial hardship at the end of their current hardship arrangement, the complainants should complete a statement of fi nancial position for the bank and contact the bank to discuss a repayment arrangement. The parties should work together to try and come to an arrangement for the complainants to overcome their financial hardship and repay the loan. In doing so, the financial firm should have regard to its obligations for dealing with customers in hardship. If the parties are unable to reach an agreement and the complainants are in financial hardship, the complainants can lodge a further complaint with AFCA about that issue. Determination | Case number: 627275 Page 3 of 8 2 Reasons for determination 2.1 Was the bank’s decision to provide the loan appropriate? The complainants say the bank made an error when approving the loan The complainants say the bank should not have approved the loan without holding a signed fixed price building contract. There was a fixed price building contract The bank and complainants have not provided a copy of a signed fixed price building contract between the complainants and builder. However, I am satisfied on the available information that the complainants (or one or more of them) and builder did enter into a fixed price building contract on 22 May 2006. This is because a residential building work insurance certificate was issued which provides that: This Certificate in respect of Insurance is issued for the building contract dated 22 May 2006 for the contract sum of $630,000 It is more likely than not that the insurer would not have issued the insurance certificate without a copy of the building contract. The bank thought it held a copy of the signed fixed price building contract The bank’s loan assessment notes refer to the bank receiving a copy of the signed fixed price building contract on 8 May 2006. However, it is more likely than not that the bank officer reviewing the contract made a mistake, and that the bank only received a copy of the fixed price building contract that was signed by Mr A but not by the builder. I have formed this view because:  the contract date referred to in the building work insurance certificate is 22 May 2006. If the fixed price building contract was dated 22 May 2006, the bank could not have received a signed copy on 8 May 2006  a copy of the fixed price building contract that was faxed to the bank on 4 May 2006 has been provided to AFCA. That copy is signed by Mr A but not by the builder. However, a bank officer makes a file note on 8 May 2006 that includes the following: Recvd: Signedfixed price builders contract for amount of $627K  As there is no information to show that bank received a further copy of the fixed price building contract after 4 May 2006, it is more likely than not that the bank officer’s reference to a signed fixed price building contract in the 8 May 2006 file note is a reference to the copy of the building contract that the bank received on 4 May 2006. Determination | Case number: 627275 Page 4 of 8  the bank was unable to locate a copy of the signed fixed price building contract that when the complainant requested a copy from the bank in 2010. In responding to the complainant’s request, the bank provided a copy of the contract that it rec eived on 4 May 2006 – the copy that was signed by Mr A only. The bank’s decision to provide the loan was still appropriate A prudent banker would have obtained a copy of the fixed price building contract that was signed by all the relevant parties before approving the loan. This is also what the bank’s lending policy required. Despite the bank’s mistake, I am satisfied the bank’s decision to provide the loan to the complainant was still appropriate. This is because:  the complainants do not say the loan was unaffordable  the loan was not inappropriate for the complainants needs and objectives. Rather, the loan the bank provided (a loan to refinance the complainants’ existing loan and provide funds during construction via progressive drawdown while their home was being constructed) matched the purpose for which the complainants wanted the loan. In my view, what happened during the bank’s approval of the complainants’ loan application is an example of the bank providing its loan approval too soon - that is, before it was provided with a copy of the fixed price building contract dated 22 May 2006. It is not an example of the bank approving a loan that should not have been approved at all. Instead of the loan being approved by the bank in mid May 2006, a prudent banker waiting for a copy of the fixed price building contract dated 22 May 2006 would have approved the loan in late May 2006 instead of early May 2006. 2.2 Did the bank’s conduct cause the complainants loss for which they should be compensated? The bank’s conduct did not cause the complainants loss While the bank did not hold a signed copy of the fixed price building contract when it approved the loan, this did not cause the complainants loss. The reasons for this are outlined below. Determination | Case number: 627275 Page 5 of 8 There was another building contract – a “cost plus” contract The available information shows that Mr A, and Mrs S and the builder also entered into a building contract that did not have a fixed price - a “cost plus” building contract. This is clear from the court’s judgmen t in legal proceedings between Mr A, Mrs S and the builder in 2011. The court’s judgment in those proceedings noted that: By written "Cost Plus" contract dated 26 April 2006 [the builder] contracted to construct a home for [Mr A & Mrs S] The house was constructed under the cost plus building contract The bank’s loan assessment notes make clear that the bank approved the loan based on a fixed price building contract. However, the court judgment makes clear that the complainants’ home was constructed under a cost plus building contract. The available information does not show the complainants making the bank aware that the cost plus building contract (rather than the fixed price contract provided for the loan approval) was to be the relevant building contract for their home. However, the available information does show that before the fixed price building contract was provided to the bank, the bank had told the complainants that it would not accept a cost plus building contract. The available information also shows that the complainants were aware that it was the cost plus contract that was the contract under which their home was being constructed. In a letter to the builder dated 21 June 2007, the complainant says: Re HIA Contract As agreed we will continue according to HIA contract [the cost plus contract] till all committed parties/quotes have been fulfilled as per banks requirements we will need to renegotiate a contract to complete the house. Our suggestion as stated earlier is to end the HIA contract and draw up a new one on fixed cost, which will be acceptable by our [bank], principle lending authority otherwise they will not finance beyond that stage which is completed ground floor level. The completion of ground level stage will endeavour all parties concerned, completed their work (breach as per stated in our letter dated 6 June 2007 which gives ten (10) days notice to remedy) and the contract will be nullified which exists between us namely HIA signed on 26 th April 2006 The complainants’ los s flow from the cost plus building contract In the above circumstances, the complainants’ loss from the issues they had with the builder and the completion of their home cannot be said to be caused by the bank’s conduct during its assessment and approval of the complainants’ loan application. Determination | Case number: 627275 Page 6 of 8 While the bank was unable to locate a copy of the signed fixed price building contract when the complainant requested a copy in 2008 [the copy the bank provided to the complaint was unsigned and missing pages], this did not cause the complainants any loss. This is because, as outlined above, the complainants home was being constructed under an entirely different building contract - the cost plus contract - rather than the building contract provided to the bank during the loan application process. The bank provided the complainants’ with a page from an earlier building contract The complainants raise an issue about the bank providing a “Schedule 2. Progress Payments” page of a building contract to them in 2010 that di d not relate to the fixed price building contract that was provided to the bank on 4 May 2006. The bank referred to the “Schedule 2. Progress Payments” page when it responded to a claim by the complainants that the bank did not hold a copy of the fixed price building contract that was signed by the builder. The “Schedule 2. Progress Payments” page outlines progress payments for a fixed price building contract for $750,000. In the bank’s loan assessment notes there are entries on 28 and 29 March 2006 that say: 28 March 2006: FPBC [fixed price building contract] held, COST price $750k 29 March 2006: fpbc [fixed price building contract] is for $750k however after loan payoffs balance will be asprrox $627k for construction. where are the balance of funds coming from?? The loan application notes go on to record that the $750,000 fixed price building contract was reduced by $130,000 when the complainant agreed to supply that value of building materials to the builder. On the available information, I am satisfied that the bank, in answering the complainants’ question about whether it held a signed fixed price building contract, has mistakenly referred to, and provided, a schedule from the earlier fixed price contract for $750,000. Determination | Case number: 627275 Page 7 of 8 The complainants describe the bank’s conduct as misleading and that the “…Bank provided pages which were not part of the Fixed Price Contract. Embezzled them thereby committed fraud”. However, the available information does not support a conclusion that it was anything other than a clerical type mistake by the bank. I also note that it was the complainants (and not the bank) who were aware their home was to be constructed under an entirely different building contract than the one provided to the bank on 4 May 2006. The complainants are not entitled to compensation For the reasons outlined above, I am satisfied the complainants have not suffered a loss as a result of the bank’s conduct for which they should be compensated. 2.3 Should AFCA vary the credit contract? A hardship arrangement is currently in place After AFCA issued its preliminary assessment, the parties entered into a hardship arrangement for the loan. Under the hardship arrangement, the bank has agreed to defer loan payments for six months expiring 1 October 2020. As a hardship arrangement is already in place for the loan, it is not appropriate to further vary the loan. Whether the complainants should be provided with further assistance should they remain in financial difficulty when their current arrangement expires will depend on their circumstances at that time. Determination | Case number: 627275 Page 8 of 8 3 Supporting information 3.1 The determination is made under the AFCA Rules This complaint has been determined based on what is fair in all the circumstances, having regard to factors such as legal principles, good industry practice, codes of practice and previous decisions (which are not binding). There has been a full exchange of all material information relied on for the purposes of this determination and each party has had the opportunity to address any issues raised by the other. All material provided has been reviewed and considered. While the parties may have raised numero us issues in their submissions, for the purposes of this determination, commentary has been restricted to those issues which are considered directly relevant to the outcome. 3.2 A complaint about a credit card facility has not been considered The complainants say the bank should not have provided a loan to them with credit cards attached. However, the terms of the complainants’ loan do not include a credit card facility. If the complainants have an issue about the bank providing them with credit cards, the complainants should raise this with the bank. If the parties are unable to resolve the matter, the complainants can lodge a new complaint with AFCA about that issue.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.