Storm damage to western wall claim denied as gradual deterioration

FirmFinancial Firm (Unknown - Insurer)
Decided2019-08-29
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$7,946
Non-financial loss—
Amount claimed$19,866
SourceAFCA PDF

Summary

The complainant claimed for wall damage after high winds in May 2018 and the insurer denied it as gradual deterioration. AFCA found a storm event contributed to the loss and ordered the insurer to pay 40% of the $19,866 repair cost, being $7,946.40, with no interest.

The complainant established a covered storm loss, so the onus shifted to the insurer to prove the gradual-deterioration exclusion, which it did not fully discharge.

Issues

Subjects and remedies

home or building damagenatural disasterpay claim

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination | Case number: 626405 Page 1 of 5 Determination Case number: 626405 2 August 2019 1 Determination overview 1.1 Complaint The complainant’s claim is made under a home insurance policy, held with the financial firm (the insurer), in respect of damage to a wall at the property. The insurer has denied the claim on the basis it says there is no evidence of a single wind event causing the damage and the evidence indicates more of a gradual deterioration overtime due to the substantial age of the property and a consequence of the lesser building standards of the day. 1.2 Issues and key findings Is the insurer entitled to deny the comp lainant’s claim? The insurer is not entitled to deny the complainant’s claim completely and must contribute to the cost of repairs to the damaged wall, in accordance with the terms of this determination. 1.3 Determination This determination is partially in fa vour of the complainant. Upon acceptance of this determination by the complainant, the insurer is required to pay the complainant the sum of $7,946.40. The insurer is not required to pay interest on this amount. Determination | Case number: 626405 Page 2 of 5 2 Reasons for determination I have carefully considered all of the exchanged material in the preparation of this determination. This determination follows consideration of all of the exchanged material and is based on what is fair in the circumstances, having regard to the relevant legal principles , terms of the policy, good industry practice and where applicable, prior determinations. 2.1 Is the insurer entitled to deny the complainant’s claim? Coverage of the policy The coverage provided by the complainant’s home insurance policy is in regard to loss or damage caused by insured events, which includes storm. The coverage provided by the policy is subject to exclusions which are detailed within the Product Disclosure Statement (PDS). The PDS details that: 1. YOU ARE NOT COVERED UNDER ANY POLICY FOR: a) Loss, damage or liability which arises gradually over time, not as a result of a single event or occurrence. b) Any event causing loss, damage or liability, which does not occur during the Period of Insurance. c) Loss, damage or liability caused by, arising directly or indirectly from or in any way connected with depreciation, wear, tear, rust, fading, mould, rising damp, mildew, rot or corrosion. … It is accepted insurance law that the insured carries the initial onus to establish a loss which is covered by the terms and conditions of the policy. Once the insured has established a loss which is covered by the terms and conditions of the policy the onus transfers to the insurer to establish the application of an exclusion or otherwise why the claim should not be paid. Circumstances of the loss The exchanged material confirms that the complainant lodged a claim with the insurer on 29 August 2018. The claim form lodged by the complainant refers to recent high winds and cracking in the western wall of the house. On the claim form, the date and time of the incident are left blank. Determination | Case number: 626405 Page 3 of 5 The complainant says that on or about 10/11 May 2018, damage was caused to the wall at the complainant’s home as a result of high winds. The complainant arranged for an engineer (PS) to attend the property on 4 June 2018. PS provided a report dated 18 June 2018. Subsequently, the complainant arranged for the attendance of a builder and bricklayer and repairs were completed in the total amount of $19,866. The exchanged material confirms that the repairs were completed prior to the complainant lodging his claim with the insurer. Within his report, PS says:  there is major shear tear cracking of the north end of the west side wall at its junction with the not connected to the north end gable wall (sic)  the movement is consistent with wind outwards push on the wall, push on a wall which is not connected to the floor or roof structure with consequent little resistance to outwards movements (sic)  there is shear tear cracking of the north passage cross wall and centre wall at passage  neither the floor structure nor the roof are connected to the moved north gable wall and the floor joists parallel to the wall on both ground and attic floors  the roof ridge has dropped causing outwards push on the side walls but there is no sign of present movement and later stud walls in the attic have likely prevented further movement  there is an open joint in the roof rafter landing plate in the centre of the west side wall. The plate on the east side was not accessible but, given the shear tear cracking in the passage wall at this location, the rafter landing plate on this side is likely to have an open joint  there is no cracking at the south end gable. In a subsequent email to PS from senior loss adjuster (JP) for the insurer, JP confirms part of a telephone conversation JP had with PS, on 15 October 2018. In particular, the email from JP:  a cknowledges PS’ s advice that the home was built in accordance with accepted building practice that existed at the time of construction  the design/method adopted would be sufficient for the structure to withstand wind gusts in the vicinity of 70Km/h  the structure as designed and built has withstood the test of time until now  JP confirmed PS’ s opinion that in the past five years the local area had experienced wind gust in the vicinity to 100Km/h on a regular/frequent basis Determination | Case number: 626405 Page 4 of 5  the ongoing stresses/age of the building would have caused the joints to become loose. The wind gusts encountered on 10/11 May 2018 may have been the straw that broke the camel’s back  the resultant damage would have been an amalgam of the storm event, previous wind events and ongoing deterioration of the joints. The insurer has not provided its own expert report and seeks to rely upon the advice of PS and statements of its own claims risk and compliance technical officer. Given the original statement from PS, to the effect that the movement of the west side wall is consistent with winds outwards push on the wall, I am satisfied that the complainant has met his onus to establish a loss which is covered by the terms and conditions of the policy. As such, the onus shifts to the insurer to show the application of an exclusions or otherwise why it says it is entitled to deny the claim. Having reviewed all of the exchanged material and in particular the report from PS and JP’s confirmation of the statements m ade by PS, I am satisfied that the wind event which occurred on 10/11 May 2018, has contributed to the loss suffered by the complainant. In this regard, I note the Bureau of Meteorology confirmation that the maximum wind speed gusts on 11 May 2018, were 76Km/h. Whilst PS has said that the design and method of construction would be sufficient for the structure to stand wind gusts within the vicinity of 70Km/h, he also says that the wind gust encountered on 10/11 May 2018, may have been the straw that broke the camel’s back. The insurer says that there is no evidence of a single wind event causing the damage. I do not agree. As stated, PS is of the view that the wind event on 10/11 May 2018, may have been the straw that broke the camel’s back. PS also refers to previous wind events and in this regard I note the complainant observed cracking to the wall some two to three weeks before the crack widened. This may be as the result of an earlier wind or storm event. In my view, the fact there was more than one wind or storm event does not enliven the insurer’s exclusion. Each wind or storm event resulting in damage would entitle the complainant to make a separate claim. Determination | Case number: 626405 Page 5 of 5 However, I do accept that given the age of the property there is likely to have been some deterioration of the joints, as detailed by PS. Having considered all of the exchanged material, I am satisfied that it is appropriate that the insurer contribute to 40% of the costs incurred by the complainant in the repair of the wall. Upon acceptance of this determination by the complainant, the insurer is to pay the complainant the sum of $7,946.40. The insurer is not required to pay interest on this amount.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.