The complainant claimed for storm and leaking-pipe damage to her home, including a support post. AFCA upheld the insurer's partial denial but ordered reimbursement of a conditional $1,500 make-safe cost and $1,000 non-financial loss.

The evidence did not show the leaking pipe was the proximate cause of the post's movement, which was more likely caused by lateral loads from a retaining wall.

Issues

Subjects and remedies

home or building damagepay claimpay non financial loss

Related

All IAG determinations · Find similar determinations

Text of the determination

Determination Case number 625920 Financial firm Insurance Australia Limited Determination | Case number: 625920 Page 1 of 7 Case number: 625920 20 November 2019 1 Determination overview 1.1 Complaint The complainant lodged a claim with the financial firm (insurer) for damage she says was caused by a leaking storm water pipe at the base of a support post. The insurer accepted damage to the patio roof beam under the insured event of storm. The insurer denied the remainder of the damage because it says it was not caused by an insured event. The complainant disputes this decision. She also says the make safe works carried out by the insurer were defective and caused additional damage. Further, the complainant says the insurer acted deceitfully. 1.2 Issues and key findings Can the insurer partially deny the claim? The insurer can partially deny the claim because the information does not show the post moved because of the leaking pipe. Did the insurer cause further damage due to inadequate make-safe works? The information does not show the insurer’s make -safe works were inadequate or caused further damage. The complainant may have incurred $1,500 in doing additional make-safe works. This is payable subject to certain conditions set out in section 2.2 being met. Should the insurer pay non-financial loss? The insurer should pay $1,000 in non-financial loss due to an inappropriate email and the fact it provided unclear information as to what was payable under the policy. 1.3 Determination This determination is substantially in favour of the insurer. The insurer can partially deny the claim. The insurer is to reimburse the complainant the sum of $1,500 subject to the conditions set out in section 2.2 being satisfied. The insurer is to pay $1,000 in non-financial loss. Determination | Case number: 625920 Page 2 of 7 2 Reasons for determination 2.1 Can the insurer partially deny the claim? Complainant must establish a valid claim The complainant is required to show that, on the balance of probabilities, she suffered a loss caused by an event she is insured for under the policy (insured event). This is known as a prima facie, or valid, claim. The complainant’s policy covers her for loss or damage to her home if it is caused by a number of insured events. Relevant to this dispute is ‘Water and oil leaks’. Therefore, in order for the complainant to establish a valid claim, the evidence must show the damage being claimed was caused by this event. Parties dispute as to whether a leak caused the damage to the pole The insurer accepted liability for a damaged patio beam on the basis it was likely caused by strong winds. The insurer did not accept liability for the movement of a timber post, which supported an upper level deck at the rear, or any resultant damage from this. The resultant damage included the bowing of an inner timber bearer. The insurer says it is not liable because the damage was not caused by the leaking pipe. The insurer has relied on reports from DF, SG, PC and DB. The complainant has disputed the insurer’s position on several bases. This included saying the experts are not qualified to make the opinions provided and are not reliable. She has also provided reports from JD, an email from DW and previous valuation reports in support. It is not in dispute that a broken stormwater pipe was identified near the support post that moved. The parties disagree as to whether the leaking pipe was t he proximate cause of this movement. Proximate cause is the dominant, efficient or operative cause of the loss. It is not required to be last in time or the sole cause. It is a question of fact that depends on the circumstances of each case. It requires a common sense evaluation of the evidence. Summary of relevant evidence I do not propose to reiterate the contents of these reports and documents in detail given they have been exchanged between the parties. I will summarise their main findings and comments. Determination | Case number: 625920 Page 3 of 7 DF, an engineer, noted that a pre-existing retaining wall structure was imposing lateral loads onto the bottom of the post. DF concluded that this, and the removal of pergola rafters, likely caused the post to move. Building consultant SG also agreed that the retaining wall likely caused the movement of the post. Both DF and SG also noted that the retaining wall should not be imposing lateral loads to the support posts. DF said that given the concrete slab under the support post, the concrete backfilling and the steep natural slope of the ground, it is unlikely the pipe’s break has caused the movement. An email from geotechnical engineer DW did not add much to the issue. DW noted that without appropriate testing and investigations, it would be impossible to identify the likely mechanism. He noted a ‘Hydro excavation’ would be the best method. He does not identify how this would assist in identifying the cause. JD provided two reports. JD said the retaining wall had no bearing on the post’s movement. He did not provide any reasoning to support this conclusion. This is difficult to accept as it is apparent a wall retaining about 1.2 metres of soil would have lateral loads on it. It is also clear the support post was not designed to take this lateral load whilst also supporting a deck. JD says the broken pipe caused the movement. He does not expand on this. JD also said he conducted hydro-excavation of the pole footing. However, he does not identify what was found in this excavation or how it supports the conc lusion that the leaking pipe was the cause of movement. Information does not show proximate cause is the leaking pipe Having carefully reviewed the available information, I am not satisfied the evidence shows the proximate cause of damage to the support post was the leaking pipe. DF and SG provide compelling evidence that the retaining wall was likely causing lateral loads to the support post. Further, I consider it unlikely that this support post was designed to take such lateral loads. Therefore, it is plausible and logical to accept this additional load caused the post to move. It is also consistent with the fact the movement was coming from the bottom of the post. DF also provided persuasive reasoning as to why the leak was unlikely to have caused the m ovement. JD’s report does not address this reasoning. Given this, I am not persuaded the evidence shows the proximate cause of damage to the support post was the leaking pipe. Neither am I satisfied the evidence shows the proximate cause was another event insured under the policy. Determination | Case number: 625920 Page 4 of 7 Therefore, the insurer is entitled to deny liability for the damage to the support post and any resultant damage being claimed. Complainant’s arguments do not assist her The complainant raised numerous arguments in challenging th e insurer’s position. This included the following:  the insurer admitted during a conciliation conference that the support post moved due to the leak  DB had changed his assessment reports  DF and SG’s reports are based on incorrect information provided by DB and PC  no other poles have moved except the one that had the broken pipe nearby  two previous property reports showed no essential repairs were required  no testing was done for lateral loads from the retaining wall  the experts were not qualified to make the opinions I do not accept these arguments assist her for the following reasons. The insurer’s alleged admission in a conciliation conference is inconsistent to its submissions made and the expert evidence it provided. Neither has there been anything in writing from the insurer to confirm it now accepts the post moved due to the leak. As I have not relied upon DB’s evidence, any alleged change to his reports was immaterial to the outcome. The main compelling points from DF and SG were the lateral loads from the retaining wall and the fact the leak was unlikely to be the cause of the post’s movement. The evidence shows, and it is not disputed, the retaining wall was leaning against the post. Therefore, I do not accept their conclusions on these material points was based on incorrect information. I acknowledge the one pole has moved. On this factor alone, this supports the complainant’s position. However, when this is weighed with the rest of the evidence, I am not satisfied the leak was the proximate cause . Particularly given:  the lateral loads being applied by the retaining wall  DF’s explanation as to why the leak could not cause the damage  JD not providing any evidence to show what moisture was identified in the soil to cause the post to move to the extent it did The two property reports are valuations and are brief. No mention or analysis is made about the support posts or the lateral loads being imposed by the retaining wall. Therefore, they add little weight to the issue. Determination | Case number: 625920 Page 5 of 7 I accept it is apparent the retaining wall would be adding lateral loads given it is retaining about 1.2 metres of soil. I also accept DF and SG are qualified to make the opinion they have. DF is a qualified engineer and SG is a building consultant. Insurer not liable for the cost of moving the retaining wall The complainant is claiming $3,000 for the removal and relocation of the retaining wall. The complainant says she only incurred that cost because the insurer advised she was required to move it away from the support post. She notes that DF told her this was not necessary. DF’s report says otherwise. He concluded the retaining wall was a likely cause of the support post moving. SG agreed. JD says the moving the wall was not necessary. This is difficult to accept as there is nothing to indicate that it was appropriate for the post, which is a supporting structure for an upper level deck, should also take the lateral loads from a retaining wall for about 1.2 metres of soil. Given this, I am not persuaded this is a cost the complainant could have avoided or should be payable by the insurer. Insurer has cash settled the accepted portion reasonably The insurer obtained a quote from HB for the accepted beam totalling $3,639.02. The insurer agreed to cash settle based on this quote plus a 20% uplift minus the excess. The complainant has raised concerns about this scope of works. However, there is no evidence to show this was insufficient regarding the accepted beam. I also note the insurer has allowed an additional 20%. This will factor contingencies such as possible variances and the risks of the work transferring to the complainant. Given this, I do not accept the insurer is required to pay more towards this claim. 2.2 Did the insurer cause further damage when undertaking the make-safe? Information does not show the make-safe works were inadequate The complainant says the insurer’s make -safe works caused further damage. JD’s report supports this. JD says faulty make -safe works to the support post resulted in further movement and damage. JD also said no make-safe works were done to the upper deck and this resulted in further damage to the upper decks beam, handrails, lattice inserts, upper deck beam and span-line roofing. JD does not identify what make-safe works were required for these areas. Determination | Case number: 625920 Page 6 of 7 It is important to note that a distinction should be made between make-safe works and repairs. As evident by its name, the purpose of make-safe works is to make the area is safe. It is not necessarily to prevent any possible further damage. DF was asked to comment on the make-safe works. He said the works could be improved. The complainant says this shows the works were faulty. I do not agree. DF was satisfied the works were sufficient for their purpose but agreed that they could be improved. This does not infer the original works were faulty. Given this information, I am not satisfied the complainant has shown the make-safe works were faulty or that this caused the additional damage being claimed. Insurer to pay $1,500 subject to certain conditions The complainant said she incurred additional costs to make the site safe. In her dispute form, she said she paid $3,219.72 plus $120. However, in a statement sent to AFCA on 4 June 2019, she referred to payments she made on the claim. The only one relevant to the make- safe was a payment for ‘make safe upper deck’ totalling $1,500 paid on 31 January 2019. This statement did not refer to any other payments that reconcile with the amounts sought in the dispute form. A copy of the invoice paid was not provided. Therefore, it is not clear what works were done for this sum. If the payment of $1,500 was for additional make -safe works, then this should be paid. This is because it was paid on 31 January 2019 which was during the time the insurer was still reviewing the claim. As such, make-safe costs would have normally formed part of the insurer’s cost to assess the claim. Accordingly, the insurer is to reimburse this amount subject to the complainant providing an invoice from the contractor showing:  what works were done,  why it was necessary for these works to be done to make the site safe, and  confirmation the amount was paid. I do not accept interest is payable on this given the insurer has not been able to assess whether these costs were reasonably required. 2.3 Should the insurer pay non-financial loss? Compensation is awarded conservatively Under the AFCA Rules, we may award compensation (capped at $5,000) for non- financial loss where a complainant has suffered an unusual degree or extent of Determination | Case number: 625920 Page 7 of 7 physical inconvenience, time taken to resolve the situation or interference with their expectation of enjoyment or peace of mind. We take a conservative approach to compensation for non-financial loss. It is not awarded when a person suffers the normal degree of inconvenience when a problem occurs. Insurer should pay $1,000 in non-financial loss The complainant has raised various concerns about the insurer’s claims handling. This included the following:  the insurer has acted deceitfully as it was describing its contractors as holding qualifications that they did not  the insurer initially accepted the claim for the post but reversed this decision  an email sent by DB contained inappropriate comments  the claim was not properly assessed or reviewed For reasons explained, I accept the insurer’s decision on the claim was reasonable. Further, I accepted the experts were qualified to provide the opinions offered. I do accept that DB’s email did contain comments that were inappropriate. It highlighted concerns about the complainant being difficult or was looking for someone to blame. It also indicates DB was prejudging the claim. The information also indicates the complainant was told the post would be covered and this was later reversed. This would have been distressing to the complainant who had an expectation that the claim was payable. Given all this, I accept it is fair the insurer pays $1,000 in non-financial loss.