Home / AIG Australia Limited / Determination 622567

Determination 622567

Storm water damage to strata units declined under design and seepage exclusions

FirmAIG Australia Limited
Decided2020-02-03
ProductGeneral Insurance · Strata
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

A strata body claimed for storm water damage to eight units, which the insurer declined citing defective roof drainage and seepage exclusions. AFCA found the defective drainage was the proximate cause, upheld the decline, and rejected the section 46 and good faith arguments.

The proximate cause was non-compliant roof drainage, which falls within the blanket design, seepage and structural defect exclusions, and section 46 does not assist where exclusions are not framed by reference to a time before the policy.

Issues

Subjects and remedies

home or building damagenatural disasterno remedy

Related

All AIG Australia Limited determinations · Find similar determinations

Text of the determination

Determination Case number 622567 Financial firm AIG Australia Limited Determination | Case number: 622567 Page 1 of 12 Case number: 622567 3 February 2020 1 Determination overview 1.1 Complaint The complainant holds strata insurance with the financial firm (insurer) for cover of a residential unit complex located in Canberra, ACT. On 25 February 2018, a storm occurred in Canberra. Water came into the building causing damage to eight units within the complex. The complainant lodged a claim with the insurer for the damage. The insurer declined the claim on the basis the policy excludes loss or damage to the building caused by:  error or omission in design, plan or specification or failure of design  rain or stormwater seeping or percolating through walls, roofs or floors or entering because of structural defects, faulty design or faulty workmanship in the building. The complainant disputes the decline of its claim and says the damage occurred in a single significant weather event and therefore the water did not seep or percolate. The complainant also relies on Section 46 of the Insurance Contracts Act and says the insurer is not entitled to deny the claim because the body corporate was unaware the roof drainage was defective until the storm occurred. 1.2 Issues and key findings Is the insurer entitled to decline the claim? The available information establishes on the balance of probabilities the proximate cause of damage was defective and inadequate roof drainage. As this cause of damage is excluded from cover, the insurer is entitled to decline the claim. 1.3 Determination This determination is in favour of the insurer. The insurer is not required to take any further action in relation to the claim or the complaint. Determination | Case number: 622567 Page 2 of 12 2 Reasons for determination 2.1 Is the insurer entitled to decline the claim? Subject to exclusions, the policy covers accidental damage The complainant is required to show, on the balance of probabilities, it suffered a loss caused by a risk insured against under the policy. This is known as a prima facie or valid claim. If the complainant can establish a valid claim, the onus shifts to the insurer to show, on the balance of probabilities, it is entitled to rely on an exclusion under the policy to deny the claim or limit cover. Subject to conditions and exclusions, the complainant‟s policy provides cover for accidental loss or damage to the building. As there is no dispute the building was damaged in a sudden and unexpected storm on 25 February 2018, the panel is satisfied the complainant has established a valid claim. Insurer says proximate cause of damage is inadequate roof drainage In determining the proximate cause of damage to the building, the insurer relies on expert information provided by engineer H. H reports a large amount of water entered the top floor of the building in the storm and worked its way down through the building, causing damage to several units. H reports the primary cause of water ingress is the poor construction of the roof drainage. Specifically, H says the overflow provisions of the box gutters are grossly inadequate, with the overflow slots being only 40mm deep, which is about 35% of their required size as stipulated in the 2003 AS3500 drainage code. During the heavy rainfall H says water could not discharge from the gutters because the overflow slots are too small and were partially blocked with leaves and debris. H says this caused the box gutters to fill with water and overflow into the building. H also identifies two other defects with the roof drainage. The first is the lack of sumps to the downpipes and the second is the installation of a weir between the box gutter and the overflow slot. H says while the first defect is negated by the installation of an excessively deep box gutter, the second defect requires rectification. H confirms the damage would not have occurred to the building if the overflow slots were compliant. H says this is because leaves and debris would not catch in the slots and block them up, and because the slots would have had the hydraulic capacity to discharge large volumes of water without the box gutters filling up and overflowing. Determination | Case number: 622567 Page 3 of 12 Insurer says it is entitled to rely on exclusions to decline the claim Given H's findings, the insurer says it is entitled to decline the claim. The insurer says this is because H determined the proximate cause of damage is inadequate or non-compliant roof drainage, and the policy explicitly excludes cover for loss or damage caused by:  error or omission in design, plan or specification or failure of design  rain or stormwater seeping or percolating through walls, roofs or floors or entering because of structural defects, faulty design or faulty workmanship in the building. Complainant says the proximate cause is storm, and exclusions do not apply While the complainant does not dispute the roof drainage was defective, it does not agree the defect was the proximate cause of damage to the building. Rather, the complainant says the storm was so significant the damage would have occurred regardless of the defective drainage, and therefore the proximate cause of damage is „storm‟. The complainant points out there were no issues with the design of the roof for 13 years before the storm event. Further to this, the complainant says the insurer cannot rely on the policy exclusions to decline the claim. The complainant says this is because:  the body corporate was unaware of the defects (and says a reasonable person in the circumstances could not have been aware of the defects) and therefore section 46 of the Insurance Contracts Act prevents the insurer from declining the claim  seeping or percolating indicates slow or gradual leaking, but the damage was the result of water „pouring‟ into the property in a single significant storm event. Section 46 does not assist the complainant The complainant says section 46 of the Insurance Contracts Act (the Act) prevents the insurer from declining the claim. It says the building was certified by local authorities. It also says it maintained the roof and was never advised there were problems with the roof. Section 46 of the Act prevents an insurer from relying on a policy exclusion to deny a claim which operates by reference to a defect in a thing which existed before the policy was taken out, in circumstances where the insured was not aware (and a reasonable person in the circumstances could not be expected to have been aware) of the defect at the time the policy was taken out. The meaning of Section 46 of the Act has been judicially considered. Courts have confirmed section 46 only applies to assist the insured in circumstances where the Determination | Case number: 622567 Page 4 of 12 insurer relies on an exclusion which operates by reference to the time at which the relevant defect arose – that is, where the exclusion expressly refers to the defect having been present before the policy was taken out. As the exclusions cited in the complainant‟s policy are blanket exclusions without reference to a point in time, the panel does not consider section 46 of the Act operates to assist the complainant in all the circumstances of this claim. Damage was caused by inadequate roof drainage The panel accepts the storm event in February 2018 was significant. However, the panel is satisfied the available material establishes the proximate cause of damage to the building is defective or non-compliant roof drainage and not storm. This is because:  the overflow slots to the box gutters were not compliant with the 2003 AS3500 drainage code and were far smaller than required  according to the code, the design flow of an internal box gutter is determined by the design rainfall intensity of a particular area, based on a „1 in 100 -year storm event‟ – for Canberra this is 200mm of rainfall per hour  the maximum rainfall at (or near) the complainant‟s building was 124mm over a six - hour period (the maximum rainfall at the complainant‟s building for a single hour is therefore expected to be less than this)  while the weather bureau and local media report the storm was a 1 in 100-year event, this is based on meteorological definitions or categories and not on AS3500 code definitions or categories, with which the box gutters must be compliant  if the box gutters were built in line with AS3500 code requirements they would have withstood up to 200mm of rainfall per hour, which is a far greater amount of rai nfall than that fell at the complainant‟s property in the storm (124mm over six hours). Further, the engineer H specifically confirms the damage to the complainant‟s building would not have occurred as a result of the subject storm if the overflow slots we re compliant because leaves and debris would not have caught in the slots and blocked them up, and the slots would have had the hydraulic capacity to discharge the rainwater without the box gutters filling up and overflowing. No other expert material or opinion has been provided to contradict the evidence of the engineer H. Insurer is entitled to decline the claim A review of the policy shows the complainant is not covered for loss or damage caused indirectly or directly by:  an error or omission in design, plan or specification or failure of design Determination | Case number: 622567 Page 5 of 12  rain or stormwater seeping or percolating through walls, roofs or floors or entering because of structural defects, faulty design or faulty workmanship in the building. While the complainant argues the terms „seeping‟ and „percolating‟ indicate gradual or long-term leaking and therefore do not apply in this claim, the panel does not agree. The panel is also not satisfied this argument has merit given the exclusion also extends to rain or stormwater „entering be cause of structural defects, faulty design or faulty workmanship in the building‟, which the expert evidence establishes is the case in the circumstances of this claim. Given the available material establishes the proximate cause of damage to the building is defective or non-compliant drainage and the rainwater entered the building because of defects and faulty design, the panel is satisfied the insurer is entitled to rely on the policy exclusions and is entitled to decline the claim. Insurer did not fail to act in good faith The complainant argues the insurer did not act in good faith because:  it failed to alert the complainant to the design defects in the building  it offered insurance and collected a premium without any intention of covering the building for storm damage given the inherent defects with the roof drainage. The insurer says it was not aware of the defect in the building until the claim was investigated. Further, the insurer confirms the complainant is still covered for storm damage if the proximate cause of damage is in in fact storm (such as damage caused by a storm created opening). On the information provided, the panel is not satisfied the complainant has established the insurer was aware of the building ‟ s defects prior to the loss, or that the insurer has breached its duty of good faith to the complainant. Determination | Case number: 622567 Page 6 of 12 3 Supporting information 3.1 AFCA approach This complaint has not been the subject of a recommendation. Due to the nature of the complaint, it has been referred directly to a panel for determination, in line with the Operational Guidelines to the AFCA Rules. The panel consists of an Ombudsman and two representatives with consumer and insurance experience. The panel has decided this complaint based on what is fair in all the circumstances, having regard to legal principles, applicable industry codes or guidance, good industry practice and previous relevant determinations of AFCA or predecessor schemes (which are not binding). There has been a full exchange of all material information re lied on for the purposes of this determination and each party has had the opportunity to address any issues raised by the other. The panel has reviewed and considered all the material provided by the parties. While the parties have raised numerous issues in their submissions, for the purposes of this determination the panel has restricted its commentary to those issues that it considers directly relevant to the outcome only. It is an accepted principle of general insurance law that the insured bears the onus to establish on the balance of probabilities that they have suffered a loss caused by an event to which the policy responds. This is known as a prima facie claim. Once so established, the onus shifts to the insurer to prove on the balance of probabilities that an exclusion applies if it seeks to deny or limit its liability for the loss. 3.2 Relevant policy provisions PDS page Relevant Section 5 Significant Risks Exclusions The Policy will not provide insurance cover under certain circumstances. The following is a list of some of the circumstances where the Policy will not provide insurance cover. For full details of all the exclusions that apply, please read the Policy in full. Section 1 - Property Insured We will not be liable for any physical loss or damage caused directly or indirectly to: > retaining walls resulting from storm; > Property Insured as a result of construction, erection, demolition, alteration or addition other than where the value of such work does not exceed $50 0,000; Determination | Case number: 622567 Page 7 of 12 PDS page Relevant Section > the Building(s) by rain water or storm water seeping or percolating through walls, roofs or floors or entering as a result of structural defects, faulty design or faulty workmanship in the Building(s). 25 - 26 Section 1 - Property Insured (cont’d) 7. Exclusions We will not be liable in respect of any physical loss, destruction or damage directly or indirectly caused by or arising out of or in consequenc e of or contributed to by: … 7.16 wear, tear, fading, gradual corrosion or gradual deterioration, concrete or brick „cancer‟, wet or dry rot, rust, oxidation, chipping, scratching or marring, normal upkeep, making good or any developing flaws; 7.17 error or omission in design, plan or specification or failure of design; 7.18 faulty materials or faul ty workmanship; … 3.3 Relevant law Section of ICA Description 46 Pre - existing defect or imperfection (1) This section applies where a claim under a contract of insurance (other than a contract of ins urance that is included in a class of contracts declared by the regulations to be a class of contracts in relation to which this section does not apply) is m ade in respect of a loss that occurred as a result, in whole or in part, of a defect or imperfection in a thing. (2) Where, at the time when the contract was entered into, the insured was not aware of, and a reasonable person in the circumstances could n ot be expected to have been aware of, the defect or imperfection, the insurer may not rely on a provision included in the contract that has the effect of limiting or excluding the insurer's liability under the contract by reference to the condition, at a t ime before the contract was entered into, of the thing. 3.4 Relevant expert material Record Key Points Engineer (H) Report 15 - 03 - 2018 Overview  During a heavy storm a large amount of water entered the top floor of the building across all units on the top floor and worked its way down in the building also causing damage to the lower floors.  Reportedly it was discovered after the storm there was significant accumulation of leaves and debris in the box gutters and the gutters were cleared. Determination | Case number: 622567 Page 8 of 12 Record Key Points Observations  Roof draining consists of: > Roof area 33m x 14m > Single box gutter (350 wide x 300 deep) > 4 downpipes, approx. 95 int ernal diameters > Box gutter has falls to downpipes, approx. 1:180 falls > No sumps > 2 overflows – one at each end of gutter > Overflow details: - Weir appr oximat ely 200mm high - Weir 50mm from end of box gutter - Both weirs were full of leaves and de bris at time of the inspection. - Overflow slot 40mm x 300mm - Base of overflow slot approximately 70 up from base of box gutter Assessment of roof draining to AS3500  Drainage assessment: > Area of roof draining to box gutter approx. 460sqm > Rainfall intensity 1 in 20 years (140mm/hr), 1 in 100 years (200mm/hr). > Box gutter adequate size for catchment. > Overflow slot too small, should be minimum 110mm deep, whereas it‟s only 40mm deep.  Summary of assessment: > There is no sump at the downpipes . This is a requirement of AS3500. Refer to Note 1 below. > Overflow slot is far too small, being around only 35% of required size. > It is not permissible to install a weir between the bo x gutter and overflow slot. > Note 1: B ox gutter is much deeper than required and could be interpreted as being effectively the same hydraulically as having a box gutter and sump combined into being a single deep box gutter. If assessed this way, Item 1 woul d be considered as adequat e. This means however that during storms there would be a much greater depth of water in the box gutter than would occur if it was a conventional box gutter with sumps . Opinion on cause of overflow of box gutter  I consider the downpipes became blocked by leaves and debris which meant that the stormwater was required to drain out via the overflow slots.  The overflo w slots are far too small to discharge all the water that falls on the roof during a heavy storm and were partially b locked with leaves and debris. This caused the box gutter to completely fill with water and overflow along its full length int o the building causing extensive flooding.  It is expected tha t downpipes can become blocked and this is why overflow provisions a re required for internal box gutters. Because the overflow provisions are grossly inadequate, I consider the primary cause of the water entry is poor construction of the roof drainage. Rectification  The primary issue is the grossly inadequate overflow pr ovisions. I recommend the owners engage a hydraulics consultant to design new overflow provisions for the box gutter to comply with AS3500. Essentially this means removal of the Determination | Case number: 622567 Page 9 of 12 Record Key Points weir and increasing slots to be around 3 times bigger than they currently are.  The roof also requires regular clearing of box gutters. This should also include removal of leaves and debris that accumulate on the roof cladding and trimming back branches that overhang the roof. Engineer (H) Email 2 8 - 03 - 2018  Q: Can you please therefore confirm whether the gutters were constructed to code at the time of installation?  A: Was not constructed to code  Q: Or have they always not met code requirements?  A: I assessed to the 2003 edition of the drainage code AS3500.3 - 2 003 that had been the applicable for around 2 years prio r to construction of building. Does not comply with the current code that is AS3500.3 - 2015. Engineer (H) Report 13 - 09 - 2019 Question 1: “Can you please have your engineer provide a copy of the AS3500 building/plumbing code requirem ents referenced in its report”  Code referred to in my previous report is AS3500.3 “Plumbing and Drainage, Part 3: Stormwater drainage”.  This is a copyright document, so I cannot provide a copy, however it is readily available online. Both the current edition as well as the one that was applicable at the time of construction of this building is available online.  I presume the issue that is of interest to you is the assessment of the overflow slots. Extracts of this section are below:  Diagram showing dimension references for overflow slots  The following diagram shows the design graph for overflow slots. Comments on graph: > The blue line indicates the actual depth of the overflow slot (40mm) > Note the blue line as at the bottom of the graph which makes it unsuitable for any width slot or any design flow. That is, it is an unsuitable depth of overflow slot for any roof. > The red line shows the depth of overflow slot that should have been used in this building. Note the required depth is around 108mm. In my first report I describe the depth required as being around 110mm. Determination | Case number: 622567 Page 10 of 12 Record Key Points  You may also be int erested to know where I get the design flow: > The design flow is determined by the design rainfall intensity, which for an internal box gutter is a 1 in 100 - year storm event. This requirement is described in Section 3.3. 4 of the code. > The design rainfall intensities are described in Appendix E – for Canberra this is 200mm/hr. > The catchment area is described in the first report, and the report descri bes there being 2 overflow slots. > The design flow is determined using the graph Figure I1, in Appendix I. This gives the design flow as being 12l/s for this catchment and rainfall intensity. Question 2: Please al so have your engineer confirm if thi s code was relevant at the time the property was built in 2005  The code referenced was relevant at the time the property was built. There is very little difference bet ween the current edition of AS3500.3:2015 and the one issued in 2003, being AS3500.3: 2003. In particular, the requirements for the overflow slots are the same.  I assessed to the code that was applicable at the time of construction. Question 3: If it was not the rel evant code at the time the property was built, please have your engineer provide the code that was rel evant (and have him outline the specific provi sions of that code wi th respect to overflow slots and weirs).  AS3500. 3:2003 was the relevant design code at the time of construction. Engineer (H) Email 24 - 09 - 2019  The damage would not have oc curred if the overflow slot was compliant because having a code complying slot would mean that debris would not catch in the slot and block it up, and because the slot would have the hydraulic capacity to discharge the larger volume of water without the bo x gutter filling up and then overflowing.  The critical time of conc entration for a box gutter is 5 minutes and not 6 hours. Presenting the storm data as 124mm over 6 hours shows that whoever is describing this storm as a 1 in 100 - year storm knows little a bout the design rainfall int ensities for box gutters. There is no evidence that I am aware of that Determination | Case number: 622567 Page 11 of 12 Record Key Points would indicat e that this was a 1 in 100 - year storm for this roof. Roofer (A) Email 15 - 0 5 - 201 8  Before the storm event, it was not known by the roofer that the box gutters overflows were inadequate in size.  Overflows are designed by hydraulic engineers. 3.5 Other relevant material considered and relied on  Parties‟ submissions /emails and all attachments to all submissions/emails.  Parties‟ reports before and after the storm event.  Photographs and invoices.  Claim file notes and adjuster‟s report.  Correspondence between the parties.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.