Text of the determination
Determination
Case number 622567
Financial firm AIG Australia Limited
Determination | Case number: 622567 Page 1 of 12
Case number: 622567 3 February 2020
1 Determination overview
1.1 Complaint
The complainant holds strata insurance with the financial firm (insurer) for cover of a
residential unit complex located in Canberra, ACT.
On 25 February 2018, a storm occurred in Canberra. Water came into the building
causing damage to eight units within the complex.
The complainant lodged a claim with the insurer for the damage. The insurer declined
the claim on the basis the policy excludes loss or damage to the building caused by:
error or omission in design, plan or specification or failure of design
rain or stormwater seeping or percolating through walls, roofs or floors or entering
because of structural defects, faulty design or faulty workmanship in the building.
The complainant disputes the decline of its claim and says the damage occurred in a
single significant weather event and therefore the water did not seep or percolate.
The complainant also relies on Section 46 of the Insurance Contracts Act and says
the insurer is not entitled to deny the claim because the body corporate was unaware
the roof drainage was defective until the storm occurred.
1.2 Issues and key findings
Is the insurer entitled to decline the claim?
The available information establishes on the balance of probabilities the proximate
cause of damage was defective and inadequate roof drainage. As this cause of
damage is excluded from cover, the insurer is entitled to decline the claim.
1.3 Determination
This determination is in favour of the insurer.
The insurer is not required to take any further action in relation to the claim or the
complaint.
Determination | Case number: 622567 Page 2 of 12
2 Reasons for determination
2.1 Is the insurer entitled to decline the claim?
Subject to exclusions, the policy covers accidental damage
The complainant is required to show, on the balance of probabilities, it suffered a loss
caused by a risk insured against under the policy. This is known as a prima facie or
valid claim.
If the complainant can establish a valid claim, the onus shifts to the insurer to show,
on the balance of probabilities, it is entitled to rely on an exclusion under the policy to
deny the claim or limit cover.
Subject to conditions and exclusions, the complainant‟s policy provides cover for
accidental loss or damage to the building.
As there is no dispute the building was damaged in a sudden and unexpected storm
on 25 February 2018, the panel is satisfied the complainant has established a valid
claim.
Insurer says proximate cause of damage is inadequate roof drainage
In determining the proximate cause of damage to the building, the insurer relies on
expert information provided by engineer H.
H reports a large amount of water entered the top floor of the building in the storm
and worked its way down through the building, causing damage to several units.
H reports the primary cause of water ingress is the poor construction of the roof
drainage. Specifically, H says the overflow provisions of the box gutters are grossly
inadequate, with the overflow slots being only 40mm deep, which is about 35% of
their required size as stipulated in the 2003 AS3500 drainage code.
During the heavy rainfall H says water could not discharge from the gutters because
the overflow slots are too small and were partially blocked with leaves and debris. H
says this caused the box gutters to fill with water and overflow into the building.
H also identifies two other defects with the roof drainage. The first is the lack of
sumps to the downpipes and the second is the installation of a weir between the box
gutter and the overflow slot. H says while the first defect is negated by the installation
of an excessively deep box gutter, the second defect requires rectification.
H confirms the damage would not have occurred to the building if the overflow slots
were compliant. H says this is because leaves and debris would not catch in the slots
and block them up, and because the slots would have had the hydraulic capacity to
discharge large volumes of water without the box gutters filling up and overflowing.
Determination | Case number: 622567 Page 3 of 12
Insurer says it is entitled to rely on exclusions to decline the claim
Given H's findings, the insurer says it is entitled to decline the claim.
The insurer says this is because H determined the proximate cause of damage is
inadequate or non-compliant roof drainage, and the policy explicitly excludes cover for
loss or damage caused by:
error or omission in design, plan or specification or failure of design
rain or stormwater seeping or percolating through walls, roofs or floors or entering
because of structural defects, faulty design or faulty workmanship in the building.
Complainant says the proximate cause is storm, and exclusions do not apply
While the complainant does not dispute the roof drainage was defective, it does not
agree the defect was the proximate cause of damage to the building.
Rather, the complainant says the storm was so significant the damage would have
occurred regardless of the defective drainage, and therefore the proximate cause of
damage is „storm‟. The complainant points out there were no issues with the design of
the roof for 13 years before the storm event.
Further to this, the complainant says the insurer cannot rely on the policy exclusions
to decline the claim.
The complainant says this is because:
the body corporate was unaware of the defects (and says a reasonable person in
the circumstances could not have been aware of the defects) and therefore section
46 of the Insurance Contracts Act prevents the insurer from declining the claim
seeping or percolating indicates slow or gradual leaking, but the damage was the
result of water „pouring‟ into the property in a single significant storm event.
Section 46 does not assist the complainant
The complainant says section 46 of the Insurance Contracts Act (the Act) prevents
the insurer from declining the claim. It says the building was certified by local
authorities. It also says it maintained the roof and was never advised there were
problems with the roof.
Section 46 of the Act prevents an insurer from relying on a policy exclusion to deny a
claim which operates by reference to a defect in a thing which existed before the
policy was taken out, in circumstances where the insured was not aware (and a
reasonable person in the circumstances could not be expected to have been aware)
of the defect at the time the policy was taken out.
The meaning of Section 46 of the Act has been judicially considered. Courts have
confirmed section 46 only applies to assist the insured in circumstances where the
Determination | Case number: 622567 Page 4 of 12
insurer relies on an exclusion which operates by reference to the time at which the
relevant defect arose – that is, where the exclusion expressly refers to the defect
having been present before the policy was taken out.
As the exclusions cited in the complainant‟s policy are blanket exclusions without
reference to a point in time, the panel does not consider section 46 of the Act
operates to assist the complainant in all the circumstances of this claim.
Damage was caused by inadequate roof drainage
The panel accepts the storm event in February 2018 was significant. However, the
panel is satisfied the available material establishes the proximate cause of damage to
the building is defective or non-compliant roof drainage and not storm.
This is because:
the overflow slots to the box gutters were not compliant with the 2003 AS3500
drainage code and were far smaller than required
according to the code, the design flow of an internal box gutter is determined by
the design rainfall intensity of a particular area, based on a „1 in 100 -year storm
event‟ – for Canberra this is 200mm of rainfall per hour
the maximum rainfall at (or near) the complainant‟s building was 124mm over a six -
hour period (the maximum rainfall at the complainant‟s building for a single hour is
therefore expected to be less than this)
while the weather bureau and local media report the storm was a 1 in 100-year
event, this is based on meteorological definitions or categories and not on AS3500
code definitions or categories, with which the box gutters must be compliant
if the box gutters were built in line with AS3500 code requirements they would have
withstood up to 200mm of rainfall per hour, which is a far greater amount of rai nfall
than that fell at the complainant‟s property in the storm (124mm over six hours).
Further, the engineer H specifically confirms the damage to the complainant‟s building
would not have occurred as a result of the subject storm if the overflow slots we re
compliant because leaves and debris would not have caught in the slots and blocked
them up, and the slots would have had the hydraulic capacity to discharge the
rainwater without the box gutters filling up and overflowing.
No other expert material or opinion has been provided to contradict the evidence of
the engineer H.
Insurer is entitled to decline the claim
A review of the policy shows the complainant is not covered for loss or damage
caused indirectly or directly by:
an error or omission in design, plan or specification or failure of design
Determination | Case number: 622567 Page 5 of 12
rain or stormwater seeping or percolating through walls, roofs or floors or entering
because of structural defects, faulty design or faulty workmanship in the building.
While the complainant argues the terms „seeping‟ and „percolating‟ indicate gradual or
long-term leaking and therefore do not apply in this claim, the panel does not agree.
The panel is also not satisfied this argument has merit given the exclusion also
extends to rain or stormwater „entering be cause of structural defects, faulty design or
faulty workmanship in the building‟, which the expert evidence establishes is the case
in the circumstances of this claim.
Given the available material establishes the proximate cause of damage to the
building is defective or non-compliant drainage and the rainwater entered the building
because of defects and faulty design, the panel is satisfied the insurer is entitled to
rely on the policy exclusions and is entitled to decline the claim.
Insurer did not fail to act in good faith
The complainant argues the insurer did not act in good faith because:
it failed to alert the complainant to the design defects in the building
it offered insurance and collected a premium without any intention of covering the
building for storm damage given the inherent defects with the roof drainage.
The insurer says it was not aware of the defect in the building until the claim was
investigated. Further, the insurer confirms the complainant is still covered for storm
damage if the proximate cause of damage is in in fact storm (such as damage caused
by a storm created opening).
On the information provided, the panel is not satisfied the complainant has
established the insurer was aware of the building ‟ s defects prior to the loss, or that the
insurer has breached its duty of good faith to the complainant.
Determination | Case number: 622567 Page 6 of 12
3 Supporting information
3.1 AFCA approach
This complaint has not been the subject of a recommendation. Due to the nature of
the complaint, it has been referred directly to a panel for determination, in line with the
Operational Guidelines to the AFCA Rules. The panel consists of an Ombudsman
and two representatives with consumer and insurance experience.
The panel has decided this complaint based on what is fair in all the circumstances,
having regard to legal principles, applicable industry codes or guidance, good industry
practice and previous relevant determinations of AFCA or predecessor schemes
(which are not binding).
There has been a full exchange of all material information re lied on for the purposes
of this determination and each party has had the opportunity to address any issues
raised by the other.
The panel has reviewed and considered all the material provided by the parties. While
the parties have raised numerous issues in their submissions, for the purposes of this
determination the panel has restricted its commentary to those issues that it considers
directly relevant to the outcome only.
It is an accepted principle of general insurance law that the insured bears the onus to
establish on the balance of probabilities that they have suffered a loss caused by an
event to which the policy responds. This is known as a prima facie claim. Once so
established, the onus shifts to the insurer to prove on the balance of probabilities that
an exclusion applies if it seeks to deny or limit its liability for the loss.
3.2 Relevant policy provisions
PDS page Relevant Section
5 Significant Risks
Exclusions
The Policy will not provide insurance cover under certain circumstances. The
following is a list of some of the circumstances where the Policy will not provide
insurance cover. For full details of all the exclusions that apply, please read the
Policy in full.
Section 1 - Property Insured
We will not be liable for any physical loss or damage caused directly or indirectly to:
> retaining walls resulting from storm;
> Property Insured as a result of construction, erection, demolition, alteration or
addition other than where the value of such work does not exceed $50 0,000;
Determination | Case number: 622567 Page 7 of 12
PDS page Relevant Section
> the Building(s) by rain water or storm water seeping or percolating through walls,
roofs or floors or entering as a result of structural defects, faulty design or faulty
workmanship in the Building(s).
25 - 26 Section 1 - Property Insured (cont’d)
7. Exclusions
We will not be liable in respect of any physical loss, destruction or damage directly or
indirectly caused by or arising out of or in consequenc e of or contributed to by:
…
7.16 wear, tear, fading, gradual corrosion or gradual deterioration, concrete or brick
„cancer‟, wet or dry rot, rust, oxidation, chipping, scratching or marring, normal
upkeep, making good or any developing flaws;
7.17 error or omission in design, plan or specification or failure of design;
7.18 faulty materials or faul ty workmanship;
…
3.3 Relevant law
Section of ICA Description
46 Pre - existing defect or imperfection
(1) This section applies where a claim under a contract of insurance (other than
a contract of ins urance that is included in a class of contracts declared by the
regulations to be a class of contracts in relation to which this section does not
apply) is m ade in respect of a loss that occurred as a result, in whole or in part,
of a defect or imperfection in a thing.
(2) Where, at the time when the contract was entered into, the insured was not
aware of, and a reasonable person in the circumstances could n ot be expected
to have been aware of, the defect or imperfection, the insurer may not rely on a
provision included in the contract that has the effect of limiting or excluding the
insurer's liability under the contract by reference to the condition, at a t ime
before the contract was entered into, of the thing.
3.4 Relevant expert material
Record Key Points
Engineer (H)
Report
15 - 03 - 2018
Overview
During a heavy storm a large amount of water entered the top floor of the
building across all units on the top floor and worked its way down in the building
also causing damage to the lower floors.
Reportedly it was discovered after the storm there was significant accumulation
of leaves and debris in the box gutters and the gutters were cleared.
Determination | Case number: 622567 Page 8 of 12
Record Key Points
Observations
Roof draining consists of:
> Roof area 33m x 14m
> Single box gutter (350 wide x 300 deep)
> 4 downpipes, approx. 95 int ernal diameters
> Box gutter has falls to downpipes, approx. 1:180 falls
> No sumps
> 2 overflows – one at each end of gutter
> Overflow details:
- Weir appr oximat ely 200mm high
- Weir 50mm from end of box gutter
- Both weirs were full of leaves and de bris at time of the inspection.
- Overflow slot 40mm x 300mm
- Base of overflow slot approximately 70 up from base of box gutter
Assessment of roof draining to AS3500
Drainage assessment:
> Area of roof draining to box gutter approx. 460sqm
> Rainfall intensity 1 in 20 years (140mm/hr), 1 in 100 years (200mm/hr).
> Box gutter adequate size for catchment.
> Overflow slot too small, should be minimum 110mm deep, whereas it‟s only
40mm deep.
Summary of assessment:
> There is no sump at the downpipes . This is a requirement of AS3500. Refer to
Note 1 below.
> Overflow slot is far too small, being around only 35% of required size.
> It is not permissible to install a weir between the bo x gutter and overflow slot.
> Note 1: B ox gutter is much deeper than required and could be interpreted as
being effectively the same hydraulically as having a box gutter and sump
combined into being a single deep box gutter. If assessed this way, Item 1
woul d be considered as adequat e. This means however that during storms
there would be a much greater depth of water in the box gutter than would
occur if it was a conventional box gutter with sumps .
Opinion on cause of overflow of box gutter
I consider the downpipes became blocked by leaves and debris which meant
that the stormwater was required to drain out via the overflow slots.
The overflo w slots are far too small to discharge all the water that falls on the
roof during a heavy storm and were partially b locked with leaves and debris.
This caused the box gutter to completely fill with water and overflow along its full
length int o the building causing extensive flooding.
It is expected tha t downpipes can become blocked and this is why overflow
provisions a re required for internal box gutters. Because the overflow provisions
are grossly inadequate, I consider the primary cause of the water entry is poor
construction of the roof drainage.
Rectification
The primary issue is the grossly inadequate overflow pr ovisions. I recommend
the owners engage a hydraulics consultant to design new overflow provisions
for the box gutter to comply with AS3500. Essentially this means removal of the
Determination | Case number: 622567 Page 9 of 12
Record Key Points
weir and increasing slots to be around 3 times bigger than they currently are.
The roof also requires regular clearing of box gutters. This should also include
removal of leaves and debris that accumulate on the roof cladding and trimming
back branches that overhang the roof.
Engineer (H)
Email
2 8 - 03 - 2018
Q: Can you please therefore confirm whether the gutters were constructed to
code at the time of installation?
A: Was not constructed to code
Q: Or have they always not met code requirements?
A: I assessed to the 2003 edition of the drainage code AS3500.3 - 2 003 that had
been the applicable for around 2 years prio r to construction of building. Does
not comply with the current code that is AS3500.3 - 2015.
Engineer (H)
Report
13 - 09 - 2019
Question 1: “Can you please have your engineer provide a copy of the
AS3500 building/plumbing code requirem ents referenced in its report”
Code referred to in my previous report is AS3500.3 “Plumbing and Drainage,
Part 3: Stormwater drainage”.
This is a copyright document, so I cannot provide a copy, however it is readily
available online. Both the current edition as well as the one that was applicable
at the time of construction of this building is available online.
I presume the issue that is of interest to you is the assessment of the overflow
slots. Extracts of this section are below:
Diagram showing dimension references for overflow slots
The following diagram shows the design graph for overflow slots. Comments on
graph:
> The blue line indicates the actual depth of the overflow slot (40mm)
> Note the blue line as at the bottom of the graph which makes it unsuitable for
any width slot or any design flow. That is, it is an unsuitable depth of overflow
slot for any roof.
> The red line shows the depth of overflow slot that should have been used in
this building. Note the required depth is around 108mm. In my first report I
describe the depth required as being around 110mm.
Determination | Case number: 622567 Page 10 of 12
Record Key Points
You may also be int erested to know where I get the design flow:
> The design flow is determined by the design rainfall intensity, which for an
internal box gutter is a 1 in 100 - year storm event. This requirement is
described in Section 3.3. 4 of the code.
> The design rainfall intensities are described in Appendix E – for Canberra this
is 200mm/hr.
> The catchment area is described in the first report, and the report descri bes
there being 2 overflow slots.
> The design flow is determined using the graph Figure I1, in Appendix I. This
gives the design flow as being 12l/s for this catchment and rainfall intensity.
Question 2: Please al so have your engineer confirm if thi s code was
relevant at the time the property was built in 2005
The code referenced was relevant at the time the property was built. There is
very little difference bet ween the current edition of AS3500.3:2015 and the one
issued in 2003, being AS3500.3: 2003. In particular, the requirements for the
overflow slots are the same.
I assessed to the code that was applicable at the time of construction.
Question 3: If it was not the rel evant code at the time the property was built,
please have your engineer provide the code that was rel evant (and have him
outline the specific provi sions of that code wi th respect to overflow slots
and weirs).
AS3500. 3:2003 was the relevant design code at the time of construction.
Engineer (H)
Email
24 - 09 - 2019
The damage would not have oc curred if the overflow slot was compliant
because having a code complying slot would mean that debris would not catch
in the slot and block it up, and because the slot would have the hydraulic
capacity to discharge the larger volume of water without the bo x gutter filling up
and then overflowing.
The critical time of conc entration for a box gutter is 5 minutes and not 6 hours.
Presenting the storm data as 124mm over 6 hours shows that whoever is
describing this storm as a 1 in 100 - year storm knows little a bout the design
rainfall int ensities for box gutters. There is no evidence that I am aware of that
Determination | Case number: 622567 Page 11 of 12
Record Key Points
would indicat e that this was a 1 in 100 - year storm for this roof.
Roofer (A)
Email
15 - 0 5 - 201 8
Before the storm event, it was not known by the roofer that the box gutters
overflows were inadequate in size.
Overflows are designed by hydraulic engineers.
3.5 Other relevant material considered and relied on
Parties‟ submissions /emails and all attachments to all submissions/emails.
Parties‟ reports before and after the storm event.
Photographs and invoices.
Claim file notes and adjuster‟s report.
Correspondence between the parties.