Home / QBE / Determination 622094
Determination 622094
Claim declined for ceiling water damage attributed to structural defect, faulty workmanship and long-term leaking
Summary
The complainants claimed for water damage to their lounge ceiling after a December 2017 storm. AFCA found the damage had been leaking for years from structural and workmanship faults, including a 2011 leak, so the policy exclusions applied.
The insurer proved the excluded causes of structural defect, faulty design or workmanship and gradual deterioration, after the complainants established a storm-related valid claim.
Issues
- Claim denial primary · not upheld“the water damage which had been occurring over an extended period, was more likely than not caused by structural defect or faulty design/workmanship.”
Subjects and remedies
home or building damageno remedy
Related
Text of the determination
Determination
Case number 622094
Financial firm QBE Insurance (Australia) Limited
Determination | Case number: 622094 Page 1 of 5
Case number: 622094 18 October 2019
1 Determination overview
1.1 Complaint
The complainants hold a home and contents insurance policy with the financial firm
(insurer). On 5 December 2017, the y lodged a claim after noticing water damage to
their property.
They advised the insurer that water was leaking from the lounge room ceiling, causing
damage to the building and contents. After assessing the damage, the insurer
declined the claim, saying the damage was due to construction defects as well as
poor and faulty workmanship, and had been occurring over a prolonged period.
The complainants believe the damage should be covered.
The case manager provided the parties with a recommendation on the issues in
dispute. The recommendation was in favour of the (complainant/financial firm). A copy
of the recommendation is attached to this determination.
1.2 Issues and key findings
Were the findings of the recommendation correct?
The findings contained in the recommendation were correct and are adopted in this
determination. Further submissions provided after the recommendation have been
considered.
Is the insurer entitled to decline the claim?
The available evidence indicates, on balance, the damage has been occurring since
as early as April 2011 and was not caused by the storm event but rather by factors
excluded under the policy. That means the insurer is entitled to decline the claim.
1.3 Determination
This determination is in favour of the insurer.
It is not required to take any further action.
Determination | Case number: 622094 Page 2 of 5
2 Reasons for determination
2.1 Were the findings in the recommendation correct?
I have decided this case on the basis of what is fair in the circumstances, having
regard to the relevant law, good industry practice, codes of practice and previous
AFCA decisions. I have taken into account all the material submitted by the parties,
both before and after the recommendation. I am satisfied that the documentation I
have relied on has been provided to both parties.
I am satisfie d that the case manager‟s recommendation contains an accurate
summary of the complaint, the issues to be determined, any applicable paragraphs of
the Rules and any relevant law.
I agree with the case manager‟s reasons for the recommendation and the
recommended outcome.
2.2 Is the insurer entitled to decline the claim?
Complainants have established a valid claim
The policy covers loss and damage caused by storm (including a named cyclone),
rainwater, flood or wind. The policy also covers loss and damage caused by water or
liquid escaping from a fixed gutter.
There is no dispute that a storm occurred on or about 2 December 2017 and there is
water damage to the property.
I am satisfied the complainants have established a valid claim.
Insurer says the cause of the loss is excluded
The onus then shifts to the insurer to establish it is entitled to decline the claim.
The complainants‟ p olicy does not cover accidental damage, and specifically excludes
loss or damage caused by storm or escape of liquid when water enters the building:
Because of a structural defect, faulty design, or faulty workmanship.
The policy also excludes loss or damage which is caused directly or indirectly by
erosion, rust, corrosion, gradual deterioration, depreciation, wear or tear.
The insurer has declined the claim as it says it is clear from the nature and extent of
the damage that it has been occurring over an extended period of time and is due to a
combination of structural defect, faulty design or faulty workmanship.
Determination | Case number: 622094 Page 3 of 5
Assessment identified maintenance and other faults
The insurer appointed a building assessor (PA), to assess the damage , and roofing
plumber (BP) also then attended the property to locate the source of the leak. BP‟s
testing identified a leak in the rendered wall and box gutter. They recommended
resealing all joints and pulling up the timber balcony to assess the balcony.
PA provided a further report dated 27 June 2018, which referred to the need to
ensure the roof below the balcony was sealed and watertight. PA noted the water
entry points were maintenance-related but subsequently also clarified that the issue
was a „design and construction fault‟, with the „box gutter, flashing and sump
design…overflowing during heavy rain periods due to the high volume o f
water…particularly given the above roof downpipe discharging onto affected area‟.
In their report, PA also noted the complainant had said the original builder had
previously tried to fix the issues, but that had not been done correctly, and the home
building warranty period had now expired.
The insurer denied the claim on the basis that the proximate cause of the damage
was not the storm event in December 2017, but instead structural defects, faulty
design or faulty workmanship.
C omplainants’ plumber /building inspection reports do not assist
The complainants engaged an independent plumber (QC), to assess the damage. QC
provided two reports dated 27 March 2019 and 3 May 2019.
QC found issues such as gaps in silicone, loose cladding, missing flashing and
severe water damage above the west facing window, with water entering the wall
space. I consider those issues, on balance, represent faulty design and/or faulty
workmanship, compounding by a likely lack of maintenance.
The complainants say that after QC applied silicone over the area above the window
that was leaking, there was no further leaking. The complainants also specifically
commented that that „was a great relief after years of leaking through the sealing‟. I
consider that also reasonably indicates the issues have been long-term.
They believe this work to the window area shows that BP‟s findings (about the box
gutter being the problem) are wrong. The complainants have said the gutter and
water leaks are about 3 metres apart.
It is worth noting, however, that the independent building inspector (IB) engaged by
the complainants recommended in his report (dated 15 May 2019) that the balcony
gutter be upgraded to a larger size in order to avoid further overflow issues during
adverse weather conditions.
IB concluded the water damage was „ purely due to storm activity occasioned around
19 December 2017 ‟. They did no t explain, however, how they reached the conclusion
Determination | Case number: 622094 Page 4 of 5
that in the preceding twenty years since the building was constructed, it was that
single storm event which was responsible for the damage identified in the loungeroom
ceiling (below the balcony), the balcony flooring and arising from the balcony gutter
backflow.
Issues with water ingress before the 2017 storm
The complainants had previously lodged a claim in April 2011. The insurer‟s claim
notes from 2011 identify damage to the roof, ceiling, windows, flooring and furniture.
In the course of that investigation, builders LBG assessed the damage and reported:
> the gutters have no overflow system and the rain entered into the ceiling
> suggest the insured either install over flows or as the dwelling is under sevens
[sic] years old go back to original builder and they may do that for them.
LBG‟s quote for the necessary repair work refers to the complainants reporting „the
upstairs third level balcony over flowed causing internal damage to plaster ceiling in
family room‟.
That claim was declined on the basis of faulty workmanship.
The insurer‟s assessment notes from 27 December 2017 (referring back to the 2011
claim) state that the complainant told the assessor the house had been under
warranty up to 2015 and the builder had tried to fix the issue but was unsuccessful.
The complainants have elsewhere said the 2011 water leak was fixed by the builder,
and that there were no further leaks until December 2017. The complainants say the
2011 issues were in a different location and for a different reason, however the
available evidence does not appear to support that.
The complainants also suggest the plumber BP was not qualified to comment on
structural defects or faulty design or workmanship. As well, they have said they
engaged LD plumbing services to „check the storm water leak and report‟. They have
not provided LD‟s report and so it is not clear what their qualifications are either, but
the complainants say that report indicates the storm water was leaking over the
south/south western window and not from the box gutter. In the absence of any
specific or compelling evidence to support these assertions, they do not change the
outcome.
Whether the water was entering because of overflow from the box gutter or through
openings over the window, or a combination of both, it is clear that there had been
water ingress issues in 2011 which the complainants were aware of, and the evidence
indicates, on balance, they had not been completely or adequately fixed.
Determination | Case number: 622094 Page 5 of 5
Insurer is entitled to decline the claim
I am satisfied, on the available evidence, that the water damage which had been
occurring over an extended period, was more likely than not caused by structural
defect or faulty design/workmanship.
That means the insurer has shown exclusions apply and it is entitled to decline the
claim.
Recommendation
Case number 622094
Financial firm QBE Insurance (Australia) Limited
Recommendation | Case number: 622094 Page 1 of 8
Case number: 622094 7 August 2019
3 Overview
3.1 Complaint
The complainants hold a home and contents insurance policy with the insurer. The
policy responds to listed events and is subject to the terms and conditions of the
policy.
On 5 December 2017, the complainants lodged a claim after noticing water damage
to their property.
The complainants advised the insurer that water was leaking from the lounge room
ceiling causing damage to the building and contents. Following assessment of the
damage, the insurer declined the claim, saying the damage was due to construction
defects as well as poor and faulty workmanship.
The complainants dispute the declinature and are seeking for the damage to be
covered by the insurer.
3.2 Issues and key findings
Have the complainants established a valid claim?
The policy responds to loss or damage caused by listed events in the Product
Disclosure Statement (PDS). There is no dispute that a storm occurred on or around
2 December 2017 and as such, I am satisfied the complainants have established a
valid claim.
Is the insurer entitled to decline the claim?
The available evidence indicates the damage to the complainant‟s ceiling has been
occurring since as early as April 2011 and was caused as result of the exclusions
relied upon by the insurer.
Accordingly, I am satisfied the insurer is entitled to decline the claim.
3.3 Recommendation
The recommendation is in favour of the insurer.
The insurer is not required to take any further action.
Recommendation | Case number: 622094 Page 2 of 8
4 Reasons for recommendation
4.1 Have the complainants established a valid claim?
The complainants have onus to establish a claimable loss
The complainants carry the initial onus to establish any loss or damage arising from
an event which is covered under the terms and conditions of the policy. This is known
as establishing a valid claim.
Once this is established, the onus shifts to the insurer to show, on the balance of
probabilities, the loss claimed falls within an exclusion of the policy or it is otherwise
entitled to decline the claim.
Policy covers storm and water/liquid damage
The policy covers loss and damage caused by storm (including a named cyclone),
rainwater, flood or wind.
The policy also covers loss and damage caused by water or liquid escaping from a
fixed gutter.
Complainants have established a valid claim
There is no dispute between the parties that a storm occurred on or about 2
December 2017. Therefore, the complainants have established a valid claim and
accordingly, the onus rests with the insurer to establish it is entitled to decline the
claim based on policy exclusions.
4.2 Is the insurer entitled to decline the claim?
The insurer says the cause of the loss is excluded
The insurer says that it appears that the subject damage to the complainants‟ unit has
occurred over an extended period of time and is due to a combination of structural
defect, faulty design or fault workmanship.
For these reasons, the insurer has declined the claim.
The policy excludes loss or damage caused by the above listed events when water
enters a building:
Because of a structural defect, faulty design, or faulty workmanship.
The policy also excludes loss or damage which is caused directly or indirectly by
erosion, rust, corrosion, gradual deterioration, depreciation, wear or tear.
Recommendation | Case number: 622094 Page 3 of 8
Assessment identified maintenance issues
Following notification, the insurer appointed a building assessor (PA), to assess the
damage. PA arranged for a roofing plumber (BP) to attend the complainants‟ property
and undertake an assessment of the roof to locate the source of the leak.
On 20 June 2018, BP reported:
whilst undergoing a site inspection a spray test was taken out around the down
pipe discharge and sump pickup for the box gutter on the balcony
spray test was conducted with hot water so that leak couple [sic] be detected with
thermal image camera
whilst spraying rendered wall and box gutter leak occurred on thermal imaging
camera from underneath.
BP recommended to reseal all joints and pull up rest of timber balcony to assess the
balcony.
Following BP‟s attendance, PA provided a further report dated 27 June 2018, which
noted that the water entry points are maintenance related and the complainants are
responsible for repairing these issues. Further, PA advised that these works would be
required prior to the resultant damage being repaired. Finally, PA stated:
due to the roof being covered with the balcony deck boards the Insured would not
have been reasonably aware of any issues until the water damage was seen inside.
Based on the above findings, the insurer denied the claim on the basis that the
proximate cause of the damage was not the insured event in December 2017, but
rather the damage was caused by structural defects, faulty design or faulty
workmanship.
The complainants’ plumber says loss caused by storm
In response to the insurer‟s denial, the complainants engaged an independent
plumber (QC), to assess the damage. QC has provided two reports dated 27 March
2019 and 3 May 2019.
In its first report, QC noted that the suspect area where the water was entering the
roof space was found where the cladding meets the timber stop end. It observed large
gaps in silicone and loose cladding on the west facing wall and water disappearing
into the wall.
In its second report, QC reported :
visual inspection and testing found severe water damage to timber frame above
west facing window caused by failed seal / non-existent flashing on raked cladding
above
Recommendation | Case number: 622094 Page 4 of 8
no flashing above aluminium window frame.
The complainants provided an independent building inspectors report (IB), dated 15
May 2019.
IB reported:
the resultant damage is purely due to storm activity occasioned around 19 December
2017.
Issues with water inundation prior to 2017
Prior to the current complaint, the complainants lodged a claim in or around April
2011 from damage to the plaster ceiling in the family room. During investigation of
this claim the insurer appointed LBG to assess the damage. At that time, LBG
reported:
the gutters have no overflow system and the rain entered into the ceiling
suggest the insured either install over flows or as the dwelling is under sevens [sic]
years old go back to original builder and they may do that for them.
Based on LBG‟s report it is evident that the complainant was aware that the damage
to the ceiling was occurring as early as April 2011.
Further, the assessment report notes from 27 December 2017, state that the insured
told the assessor the house had been under warranty to 2015 and the builder tried to
fix the issue but was unsuccessful.
Cause of loss excluded
IB‟s report has been consid ered with the other expert opinions.
While I am sympathetic for the complainants‟ loss, I am persuaded by QC‟s
conclusions that the damage was caused by a failed seal and non-existent flashing on
the raked cladding and no flashing above aluminium window frame.
Further, QC notes that there is severe water damage indicating the loss had been
occurring for an extended period of time. This supports the insurer‟s position that this
has been an ongoing leaking issue, and it is due to faulty construction and inadequate
repairs.
Insurer is entitled to deny the claim
Based on the available material and expert reports, the damage caused to the
complainants‟ ceiling is a result of structural defect, fault design or faulty workmanship
at the complainants‟ property.
Recommendation | Case number: 622094 Page 5 of 8
Accordingly, the insurer has established and is able to rely on the policy exclusions to
decline the claim.
5 Supporting information
5.1 ACFA approach
There has been a full exchange of relevant material between the parties and each
party has had the opportunity to address the issues raised.
I have reviewed and considered all the material provided by the parties. While the
parties have raised various issues in their submissions, for the purpose of this
recommendation, commentary is restricted to only those issues considered relevant.
5.2 Relevant Policy terms
Page Product Di sclosure Statement – 29 February 2016
Page 9 – Building cover
includes
A hotel, motel, nursing home, boarding house, display homes,
buildings of flats or units (strata title or company title) or buildings
subject to community title.
A building or structure in the course of construction, substantial
alteration or repair, or being demolished
Building materials to be installed.
Page 13 – storm,
rainwater, flood or wind
Building
We will cover
Loss or damage as a result of:
Storm (including named cyclone)
Rainwat er
Flood, or
Wind.
We won’t cover
Water entering your buildings:
Through an opening made for any building, renovation or repair
work;
Because of a structural defect, faulty design or faulty
workmanship
Page 15 – water or liquid
damage building
We will cover
Loss or damage caused by water or liquid escaping from:
Recommendation | Case number: 622094 Page 6 of 8
Page Product Di sclosure Statement – 29 February 2016
a fixed pipe or an object attached to a pipe, fixed gutter, fixed
tank or a drain
a bath, basin, sauna, spa, shower base or shower wall, sink, toilet
or tiled floor that has drainage holes
a washing machine or dishwasher
an aquarium
a waterbed
a swimming pool
a standalone water tank.
Cost of finding where the water or liquid escaped from, including
the cost of repairing any damage that occurs while looking for the
cause.
We won’t cover
Your buildings for loss or damage caused by water or liquid
entering your buildings:
Through an opening made for any building, renovation or repair
work;
Because of a structural defect, faulty design or faulty
workmanship
Cost of repairing the item from which the water or liquid escaped.
Page 30 – storm,
rainwater, flood or wind
contents
We will cover
Loss or damage as a result of:
Storm (including named cyclone)
Rainwat er
Flood, or
Wind.
We won’t cover
Water entering your buildings:
through an opening made for any building, renovation or repair
work;
because of a structural defect, faulty design or faulty
workmanship
Page 31 – water or liquid
damage contents
We will cover
Loss or damage caused by water or liquid escaping from:
Recommendation | Case number: 622094 Page 7 of 8
Page Product Di sclosure Statement – 29 February 2016
a fixed pipe or an object attached to a pipe, fixed gutter, fixed
tank or a drain
a bath, basin, sauna, spa, shower base or shower wall, sink, toilet
or tiled floor that has drainage holes
a washing machine or dishwasher
an aquarium
a waterbed
a swimming pool
a standalone water tank.
Cost of finding where the water or liquid escaped from, including
the cost of repairing any damage that occurs while loo king for the
cause.
We won’t cover
Your buildings for loss or damage caused by water or liquid
entering your buildings:
Through an opening made for any building, renovation or repair
work;
Because of a structural defect, faulty design or faulty
workmanship
Cost of repairing the item from which the water or liquid escaped.
Page 40 – Exclusions We will not pay for any loss or damage which is caused
directly or indirectly by:
….
erosion, rust, corrosion, gradual deterioration, depreciation, wear
or tear
….
5.3 Expert Reports
Record Key points
Insurer’s building
asse ssor
Report
14 April 2011
the gutters have no overflow system and the rain entered into the
ceiling
the insured either install over flows or as the dwelling is under
sevens [sic] years old go back to original builder and they may do
that for them
Insurer’s roofing plumber
Report
20 June 2018
whilst undergoing a site inspection a spray test was taken out
around the down pipe discharge and sump pickup for the box
gutter on the balc ony
Recommendation | Case number: 622094 Page 8 of 8
Record Key points
spray test was conducted with hot water so that leak couple [sic]
be det ected with thermal image camera
whilst spraying rendered wall and box gutter leak occurred on
thermal imaging camera from un derneath.
Insurer building asse ssor
Report
27 June 2018
insured will need to ensure the roof below the balcony is sealed
and water tight prior to resultant damage repair starting.
water entry points are maintenance related and the insured is
responsible to remedy these issues.
due to the roof being covered with the balcony deck boards the
Insured would not have been reasonably aware of any issues
until the wat er damage was seen inside.
Complainants’ plumber
Report
27 March 2019
found suspect area where cladding meets timber stop end.
large gap in silicone and loose cladding on west facing wall
above and south of window.
Performed leak testing using water, found water “disappearing”
into wall but unable to observe water inside window.
Complainants’ plumb er
Report
3 May 2019
visual inspection and testing found severe wat er damage to
timber frame above west facing window caused by failed seal /
non - existent flas hing on rak ed cladding above.
There is also no flashing above aluminium window frame.
Complainants’
Independent Building
Inspector
Report
15 May 2019
The resultant damage is purely due to storm activity occasioned
around 19 th December 2017 where thunderstorms produced
wind gusts exceeding 90 kilometres per hour from the southern
part of Aus tralia.
Is in our opinion due to storm activity resulting in the damaged
lounge ceiling.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.