Text of the determination
Determination
Case number 620884
Financial firm AIG Australia Limited
Determination | Case number: 620884 Page 1 of 11
Case number: 620884 11 February 2020
1 Determination overview
1.1 Complaint
The complainant lodged a claim under his home insurance policy held with the
financial firm (insurer) for damage to a retaining wall. The complainant says the wall
partially collapsed following heavy rainfall in October and November 2018.
The insurer declined the claim on the basis that the damage was caused by factors
which are excluded under the policy, including subsidence, heave or landslide to
retaining walls.
The complainant disputes this and says the damage was caused by storms. He wants
the insurer to cover the cost of repairing the wall, quoted at $203,500 (including GST),
along with reimbursement of $9,762.50 paid for urgent repair works, and the cost of
the complainant’s engineering report , $2,183.50.
The complainant also says that the insurer’s agent told him the policy covered the
retaining wall, inspected the wall and did not notify him of any issues with it.
1.2 Issues and key findings
Is the insurer entitled to deny the claim?
The insurer is not entitled to deny the claim, as the evidence indicates the damage
was accidental (caused by storm events), and the application of an exclusion has not
been established.
Did the insurer mislead the complainant about the policy cover?
The available evidence does not show the insurer misled the complainant about the
scope of his insurance cover, nor that he suffered any detriment as a result.
1.3 Determination
This determination is in favour of the complainant. The insurer is required to accept
and settle the claim either by promptly authorising repairs or cash settling (as set out
in section 2.2), and otherwise in accordance with the policy terms and conditions. It
must also cover the cost of the complainant’s engineer’s report and the make safe
works carried out. The insurer is required to pay statutory interest on those costs
already paid by the complainant (calculated from the date each was paid), and on any
cash settlement calculated from 15 March 2019 (the date the insurer denied the
claim) until the date of settlement.
Determination | Case number: 620884 Page 2 of 11
2 Reasons for determination
2.1 Our approach to this dispute
This determination is made by a pa nel consisting of the Ombudsman together with a
consumer representative who has extensive experience in consumer claims and an
industry representative who has extensive experience in the insurance industry.
There has been a full exchange of materials between the parties and each party has
had the opportunity of addressing the issues that arise from the information
exchanged.
This determination follows consideration of all the information provided and is based
on what is fair in all the circumstances, having regard to relevant law, the terms of the
policy, good industry practice (including codes of practice) and prior determinations as
relevant.
The complainant has appointed a representative to assist in this complaint. For ease
of reference, both the complainant and his representative are referred to as the
‘ complainant ’ in this determination.
2.2 Is the insurer entitled to deny the claim?
Onus on complainant to establish a valid claim
General insurance policies do not cover all eventualities. The terms under which an
insurer agrees to provide cover are set out in the applicable policy schedule and
product disclosure statement (PDS).
It is well established in insurance law that the onus is on an insured party to show, on
the balance of probabilities, a claim falls within the cover provided by the policy. If the
insured party is able to establish this, the onus transfers to the insurer to show an
exclusion applies or that it is otherwise entitled to deny the claim.
Policy covers accidental damage to the insured ‘building’
The complainant’s policy provides cover for accidental damage, subject to the
conditions and exclusions set out in the policy.
‘Accidental’ is not defined in the policy , in which case the usual and ordinary meaning
applies. The panel is satisfied that accidental damage can reasonably be taken to be
damage that is unforeseen and unintended.
While there is no specific separate provision for storm cover, the panel is satisfied that
unforeseen and unintended damage caused by storm events would fall within the
scope of accidental damage cover.
Determination | Case number: 620884 Page 3 of 11
There is no dispute that significant and prolonged rainfall occurred in the weeks prior
to the damage being identified.
There is also no dispute that retaining walls form part of the ‘ building ’ insured, as
defined in the policy.
Complainant has established a valid claim
The identified damage was to the eastern boundary retaining wall, and involved
collapsed/broken sections of the lower level of sandstone blocks, bulging of that
section of the wall, lateral movement and some cracking of the concrete block upper
section of the wall, and resulting settlement of pavers above and behind the wall (in
the pool area).
It was noted by the insurer’s engineer FE that ‘the original unreinforced gravity
sandstone retaining walls’ were expected to have been constructed about 100 years
ago as part of the original construction of the property.
The engineers engaged respectively by the complainant (MC) and the insurer (FE)
differ in their view of the proximate cause of the damage - that is, the dominant,
effective or operative cause - and whether it was sudden (as in MC ’s opinion ) or
occurred over a prolonged period of time (in FE ’s view ). Both experts accept,
however, that the recent significant rainfall was capable of triggering the partial
collapse of the retaining wall.
On this basis, the panel is satisfied that a valid claim for accidental damage to the
retaining wall has been established by the complainant. The panel accepts this
accidental damage arose as a result of significant rainfall.
The onus therefore transfers to the insurer to show why it should not be liable for the
loss.
Insurer relies on several exclusions to decline claim
While the policy provides cover for accidental damage, it is still necessary to consider
the proximate cause of the loss. For the insurer to successfully deny the claim, it must
establish one or more of the exclusions relied on is the proximate cause. It is not
sufficient for the exclusions to be mere consequences of the event: one or more of the
exclusions must be established, on balance, to have caused the event or materially
affected the level of damage.
The insurer maintains that it is not liable for the damage on the basis of the following
exclusions:
wear, tear or gradual deterioration
inherent defects and/or faulty design
Determination | Case number: 620884 Page 4 of 11
loss or damage which happens gradually
earth movement
settling, cracking, bulging or expansion of the building
subsidence, heave or landslide to retaining walls.
Several possible causes were identified
The insurer’s engineer FE reviewed the cause of the loss and suggested, in their 26
November 2018 report:
The damage to the subject retaining wall is consistent with damage caused by the following long
term contributing factors:
(1) Inadequate structural design and construction of the wall.
(2) Insufficient drainage and filter media behind the wall.
(3) Excessive loading on the retaining wall from the following:
- Lateral earth pressure of the retained soil.
- Hydrostatic pressure caused by rain waters and the runoff water entering behind the retaining
wall structure in the abs ence of adequate drainage to the back of the ret aining wall.
(4) Presence of the substantial trees immediat ely adjacent to the top of the retaining wall.
FE ’s conclusion is relatively broad. It does not identify a dominant cause or apportion
the relative contribution of these suggested factors. In omitting to specify the relative
contribution of, or interaction between, each identified contributing factor, FE’s report
offers limited insight into which factor/s had the most direct or substantial impact on
the loss. Just because the damage is ‘consistent with’ all or any of tho se factors, does
not establish which, if any, was the dominant or effective cause.
While maintaining a combination of long term factors contributed to the loss, FE
acknowledges it is plausible that the prolonged rainfall event in October 2018 would
have produced a substantial discharge of stormwater which may have increased the
lateral loading onto the retaining wall triggering the collapse.
The complainant’s engineer MC (in its structural inspection report of 16 November
2018) also identified several contributing factors as follows:
The main cause of the bulging of the retaining wall can be attributed to cont ributing factors of:
- Tree root heave,
- Excessive build-up of hydrostatic pressure at the back of the wall.
- Lack of adequate drainage at the back of the wall
Also, there may be some localised slip failure where the base of the sandstone blocks are
founded onto the sloping bedrock. This has to be further investigated.
MC later issued an addendum report which specifically clarifies:
… the major contributing factor to the failure of the wall is the build-up of hydrostatic pressure
behind the wall resulting in the sudden movement of the wall
Determination | Case number: 620884 Page 5 of 11
The various storm events and sustained period of rainfall has resulted in the build-up of
hydrostatic pressure behind the wall and caused its sudden movement
MC also noted that an asset protection appraisal had been carried out in April 2018,
and there was no mention in that report of pre-existing damage or risk to the wall in
question. MC also took from that, that the wall movement had not occurred at that
point in time.
The panel is satisfied, on balance, the expert evidence supports the view that the
substantial and sustained storm events preceding the collapse had the most direct
and substantial impact on the localised collapse of the retaining wall. That is, the
proximate cause of the loss was storm/high rainfall in late 2018.
Insurer has not established application of exclusion for wear and tear
Page 34 of the PDS sets out general exclusions that apply to the policy, and says the
policy does not cover loss or damage caused by wear, tear, rust, corrosion or gradual
deterioration.
The panel is not satisfied the evidence shows the damage was caused by wear and
tear. It is well established in insurance law that ‘ wear and tear ’ exclusions apply to
deterioration caused by ordinary use.
The available evidence indicates that while there had been some previous repointing
of mortar, the retaining wall partially collapsed due to hydrostatic pressure caused by
a period of storm/prolonged heavy rain events: this damage is separate from and
additional to any natural on-going deterioration of the wall, which had apparently
remained structurally sound and in place for many years up to that point.
No evidence inherent defects or faulty design affected the loss
FE’s report refers to current building codes and states that preliminary structural
analysis suggests that the wall is structurally inadequate and substantially under-
designed. FE acknowledges that the requirements in the current building codes and
standards would not have been applicable at the time of the construction of the wall,
however says the configuration of the wall is substantially inadequate for the minimum
requirements to resist the currently imposed lateral pressure.
The retaining wall is estimated to be around 100 years old. While it appears that some
mortar repairs have occurred at some point (the extent of which is not specified), the
wall has stood the test of time until the recent partial collapse triggered by excessive
rainfall over 15 days preceding the collapse.
The panel does not accept it is reasonable to apply modern building codes or
standards to a construction of such age. The fact that it has stood so long is testimony
Determination | Case number: 620884 Page 6 of 11
to the strength of its original construction. The panel further accepts it is reasonable to
accept some deterioration occurred over time.
The key issue is whether this deterioration was critical to the wall’s failure or whether
that failure was due to the ‘accidental damage’ event itself. As stated previously, th e
onus is on the insurer to establish this. In this case, the extent of the impact of any
inherent defects or faulty design (if any) on the partial collapse of the wall has not
been established.
Based on the material provided, the panel remains satisfied storm was the proximate
cause of damage rather than any alleged design defects.
Collapse not caused by earth movement or subsidence
The policy provides cover for accidental loss or damage, as well as allowing for a
number of other events also covered. Amongst these is ‘subsidence’ , where the policy
specifically states the insurer:
will not provide cover for any loss or damage caused by or resulting from the
movement of the Building at The Situation including settling, cracking, shrinking,
bulging or expansion unless caused by Subsidence. (My underlining)
Subsidence is defined in the policy as:
the downward movement of the ground on which the building stands by a cause
other than the weight of the house itself.
However, General Exclusion 26 excludes subsidence when it occurs to certain items,
including retaining walls.
In the panel’s view, the policy definition is broad and difficult to accurately assess. It is
not clear why the insurer offers cover for accidental loss or damage, only to provide
such a specific additional cover for subsidence (which it also defines in an unusual
way) – but then to exclude it in relation to retaining walls.
The panel is not satisfied the loss in this case was caused by ‘ subsidence ’ , as that
word might normally be interpreted. For insurance purposes, ‘subsidence’ is often
considered the independent movement of the property, which is not covered within
the scope of a policy. It is usually associated with natural settlement or downward
movement, often associated with a change of conditions.
The most direct and relatable cause of the complainant’s loss was the rainfall and
hydrostatic pressure build up behind the retaining wall. Any ‘subsidence’ which
occurred was more likely than not a consequence of the rainfall event and not an
independent proximate cause of the loss.
Determination | Case number: 620884 Page 7 of 11
In any case, considering ‘subsidence’ in its usual or natural meaning, the panel is not
convinced this was the cause of the loss.
Given the policy provides accidental damage cover, and specifies it covers
subsidence as well, the panel is of the view it would not be fair or appropriate in the
circumstances of this case to rely on the general exclusion cited. This is particularly
so as the policy purports to cover ‘subsidence’ (as defined) in more than one area of
the policy but then exclude it for retaining walls in one of the general exclusions.
The panel is satisfied the insurer is liable for the claim, as it is for accidental damage
and the insurer has not shown exclusions apply, or that is it otherwise entitled to
decline it.
Insurer to indemnify complainant for the loss, in accordance with policy terms
The policy sets out the available methods of settlement.
The insurer can authorise its preferred repairers to repair the wall, but the policy also
contemplates that the complainant may nominate his own repairer, in which case
however, the work cannot commence without the insurer first authorising the repairs
and the quoted cost. Alternatively, the insurer may cash settle the reasonable cost of
the repair works.
In exercising its discretion as to settlement, the insurer must act fairly and reasonably.
The complainant has provided an estimated cost of $185,000 plus GST ($203,500),
which is stated to be subject to the engineer ’s approval of the repair method, and not
including relevant authority and consultant fees. The insurer has not commented
specifically on that.
The insurer may obtain its own quote for the necessary work, in order to assess the
current suitability/sufficiency of the complainant’s quote (which the panel notes is
already about ten months old), and to assist in its decision as to the most appropriate
means of settlement. The complainant may also obtain an updated quote from his
preferred repairer, and the parties will need to agree the scope of work and
reasonable cost.
If the claim is to be cash settled, the complainant would be assuming the risk of
unforeseen issues and costs arising, and loses the benefit of the insurer’s ongoing
responsibility for the quality of its work. To fairly account for those risks and
contingencies, any cash settlement is to be based on a current quote (which would
need to be actionable by the complainant as a retail customer of the repairer), but
increased by a further 15% of the quoted cost.
In addition to the costs of repair, the PDS states (page 23) the insurer is liable for
relevant ‘professional fees’ (such as surveyor’s, engineer’s, architect’s, and legal
Determination | Case number: 620884 Page 8 of 11
fees), and costs for the removal of debris – the policy limit for each of those benefits is
20% of the building sum insured. The insurer is also responsible for covering ‘building
escalation costs’ (if any) which arise due to delays by the local council or other
authority (page 24).
So, as well, a cash settlement needs to adequately provide for these additional likely
costs, or the insurer is to otherwise accept and pay those costs when they arise,
subject to the complainant providing reasonable evidence at the time.
Insurer to pay for t he complainant’s engineer report s and make safe works
The complainant also claims $2,183.50 for the report from his engineer, and
$9,762.50 for urgent make safe works (as recommended by MC following their
inspection and report of 16 November 2018, in which they identified the issues with
the wall as posing ‘a major safety hazard that requires immediate attention’ ).
Since the damage to the retaining wall is covered by the policy, and the claim should
have been accepted at the time, the insurer would have had to deal with those make
safe works itself. It is fair and appropriate in the circumstances that the insurer
reimburse the complainant for the cost of the urgent recommended make safe works,
in line with the invoice provided.
Pursuant to the AFCA rules, we may also decide an insurer is to contribute to the
professional costs (capped at $5,000) incurred by the complainant during the course
of a complaint.
The panel is satisfied it is fair the insurer covers the cost of the complainant’s
engineer ’s report. This is because the technical issues in dispute were complex and
required expert engineering opinion, and the complainant’s report assisted the panel
in reaching its decision.
If the complainant has paid for the report and make safe works already, the insurer is
also required to pay statutory interest on those costs incurred (pursuant to section 57
of the Insurance Contracts Act 1984), calculated from the date of payment of each
until the date of settlement.
Complainant’s legal costs, if any, not payable by insurer
The panel notes the complainant’s representative in this dispute is a legal practitioner.
Although the complainant has not specifically requested this, for completeness the
panel has considered whether any fees he may have incurred in using the services of
his representative should also be recovered from the insurer under the relevant AFCA
Rules.
The service provided by AFCA is free to complainants, and it should not normally be
necessary for them to engage legal assistance. In this case, while the engineering
issues required expert input, the panel does not consider legal representation was
Determination | Case number: 620884 Page 9 of 11
required for the complainant to effectively and successfully pursue his claim or bring
his complaint. The insurer is not required in the circumstances to contribute to any
legal costs he may have incurred. (This is distinct from legal fees necessarily
incurred in the course of repairs, as provided for in the PDS and already considered
above.)
2.3 Did the insurer mislead the complainant about the policy cover?
No evidence of misrepresentation, or loss
The complainant says he entered into the policy in reliance on a representation by the
insurer’s agent that the retaining wall was included as part of the policy.
As outlined above, there is no dispute that the retaining wall is covered by the policy
as part of the insured ‘building’ . The appraisal report relevantly refers the complainant
to the PDS and policy wording for full details of the benefits, terms, conditions and
exclusions that apply under his cover, to ensure that it meets his needs and
objectives. The panel is not satisfied, on the available evidence, that there was any
misrepresentation relating to the cover of the retaining wall.
In any case, the panel notes that the policy was first taken out in 2013 and applied to
the current premises from 2016, a year and a half before the alleged
misrepresentation occurred. The panel therefore does not accept that the complainant
entered into the policy specifically on the basis of any representation made about
cover for the retaining wall. Nor does it accept that he has suffered any detriment in
any case.
Determination | Case number: 620884 Page 10 of 11
3 Supporting information
3.1 Policy provisions
Definitions
PDS pages 17-21:
Building … includes:
…
6. the following structural improvements:
…
b. paved terraces, paths, driveways, retaining walls, gates, domestic fences, masts, aerials, clothes
lines and tennis courts;
Heave means upward movement of the ground beneath the Building as a result of the soil
expanding.
Landslide means the downward movement of ground down a slope.
Subsidence means the downward movement of the ground on which the Building stands by a
cause other than the weight of the house itself.
Building cover
PDS pages 23-24:
We will cover You if there is accidental loss of or accidental damage, which occurs during the
Period of Insurance, to the Building described in the Insurance Schedule. This means We will,
at Our option, repair, replace or pay You the reasonable cost to repair or replace the Building
to its Replacement Cost.
We include cover for:
…
8. Subsidence: We will not provide cover for any loss or damage caused by or resulting from
the movement of the Building at The Situation including settling, cracking, shrinking, bulging
or expansion unless caused by Subsidence.
General exclusions
PDS pages 34-37:
These General Exclusions apply to all sections of the Policy. In addition to these General
Exclusions, sections of this Policy may be subject to specific exclusions.
Unless otherwise stated in the Insurance Schedule, this Policy does not cover:
1. loss of or damage to Your property which is caused by:
a. wear, tear, rust, corrosion or gradual deterioration;
Determination | Case number: 620884 Page 11 of 11
b. mechanic al breakdown, electrical breakdown, faulty workmanship, inherent defect,
omission, faulty design or faulty materials;
…
22. loss or damage caus ed by anything which happens gradually, including smoke or rising
damp;
23. We will not pay the cost of replacing or repairing any undamaged external parts of the
Building which form part of, a pair, set, suite or part of a common design or function
when the loss or damage is restricted to a clearly identifiable area or to a specific part;
24. subject to Exclusion 26, loss or dama ge caused by earth movement from any cause
unless due to an earthquake, Subsidence, Heave or Landslide.
25. subject to Exclusion 26, loss or damage caused by settling, cracking, shrinking, bulging
or expansion of the Building unless such movement is caused by earthquake,
Subsidence, Heave or Landslide. We do insure ensuing covered loss unless another
Exclusion applies;
26. notwithstanding and irrespective of the operation of Exclusions 24 and 25, there will be
no cover for loss or damage caused by Subsidence, Heave, Landslide or earthquake to
footpaths, gates, fences, swimming pools, walls including retaining walls, boat houses,
garages or outbuildings and other structures even if all of such structures so listed form
or do not form part of the Building.