Home / Financial Firm (Unknown - Insurer) / Determination 620768

Determination 620768

Home cracking damage claim declined as not linked to an insured event

FirmFinancial Firm (Unknown - Insurer)
Decided2019-08-29
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The complainant claimed for cracking in her home, which she attributed to 2013 flooding, and the insurer declined it as not linked to an insured event. AFCA found the complainant established loss from insured events and ordered the insurer to meet the claim under the policy, without stating an amount.

The insurer's expert reports were inconsistent and it did not establish a basis to refuse a loss shown to flow from covered flood and storm events.

Issues

Subjects and remedies

home or building damagenatural disasterpay claim

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination | Case number: 620768 Page 1 of 8 Determination Case number: 620768 20 August 2019 1 Determination overview 1.1 Complaint The complainant holds a home and contents insurance policy with the financial firm (insurer). The complainant lodged a claim for cracking in the property in July 2016. The complainant states the damage was a result of Cyclone Oswald in January 2013. The insurer declined the claim for the damage as it concluded the damage was not the result of an insured event. 1.2 Issue and key findings Is the insurer entitled to decline the claim? The complainant has established loss and damage covered by the terms and conditions of the policy. The insurer has not demonstrated why it is otherwise entitled to deny the claim. 1.3 Determination This determination is in favour of the complainant. The insurer is required to meet the complainant‟s claim under the terms and conditions of the policy. Determination | Case number: 620768 Page 2 of 8 2 Reasons for determination There has been a full exchange of all material information relied on for the purposes of this determination and each party has had the opportunity to address any issues raised by the other. The decision follows consideration of all the material exchanged. It is based on what is fair in all the circumstances having regard to the relevant legal principles, terms of the policy, good industry practice including codes of practice and previous decisions where applicable. While the parties have raised numerous issues in their submissions, for the purposes of this determination, commentary has been restricted to those issues considered directly relevant to the outcome. 2.1 Is the insurer entitled to decline the claim? Complainant is required to establish a valid claim It is accepted insurance law, the complainant is required to show on the balance of probabilities, a loss occurred as a result of an insured event covered under the terms and conditions of the policy. This is known as establishing a valid claim. If the complainant can establish a valid claim, the burden shifts to the insurer to establish it is entitled to decline the claim, if it seeks to do so. The policy provides cover for damage to the insured property caused by listed insured events, subject to certain exclusions and conditions. The policy provides cover for the listed events of flood, storm and leaks. Circumstances of the loss The complainant lodged a claim for cracking in her property in July 2016. The complainant advised at claim lodgement, that since the floods from Cyclone Oswald in January 2013, she had noticed a few minor cracks. She advised the cracks had grown really large in the cornices, walls and in the three bedrooms. She advised that during the floods, the water came up to the floors, but there was no damage at that time. The insurer appointed (C) to attend the property to undertake an inspection and report on the cause of the damage at the property. An engineer (S) was also appointed to assist with determining the cause of the damage. The reports provided by C and S concluded that the damage was not linked to an identified event. Therefore, the insurer declined the claim. The complainant disputed the insurer‟s decisio n and provided her own engineer‟s (M) report. M found that the stormwater network had been inundated with flood water. M Determination | Case number: 620768 Page 3 of 8 states the „backing up‟ of the system restricted the rainfalls ‟ means of escaping the catchment and this resulted in localised ponding within the catchment. M concluded the damage to the property has resulted from a leaking sewer that was damaged when moisture conditions became abnormal from the ponding of the rainwater that fell on 27 January 2013. The insurer maintained its decision to decline the claim on the basis the damage was not linked to an insured event and that the cracking has not occurred from a single event. The insurer relies on the reports provided by S. Within its first report, S expressed the opinion that the damage to the property was not related to foundation movement. S detailed that the cause of the damage to the cornices is due to a prolonged damp environment causing high moisture content within the roof space causing excessive expansion and contraction movement in the cornices. S concluded that the damage is not attributable to any single weather event, but a prolonged wet period in the order of months. The insurer obtained a subsequent report from S to consider whether there were issues with the drainage at the property. S noted a defect was found in the sewer line on the western side of the property. However, S stated it was not of a level to have caused movement in the floor slab. In complete contrast to the first report, S considered that if the movement was continuing, it must be concluded that the damage is being caused by foundation movement. The insurer investigated the sewer lines and appointed O to complete a leak detection test. The report found a crack in the sewer pipe where some tree roots had entered. S provided a further supplementary report. S considered the leak detection report and concluded:  the leak detection report did not record any water leakage issues with either the water or stormwater lines, they passed the inspection  the internal damage is not attributable to leaking reticulation  leaking pipes are not considered to be the cause of the damage  the underlying soils are susceptible to movement from seasonal variations in moisture and movement will be on ongoing occurrence  unable to attribute the damage to a one-off weather event. The complainant provided a work invoice from a drainage expert (NF) dated 31 July 2017, which confirmed a leaking joint in the sewer drains that was starting to allow the tree roots through. Determination | Case number: 620768 Page 4 of 8 At subsequent inspection and hydrostatic testing on 24 April 2019, NF confirmed that the pipework was not watertight and water is leaking from the pipes at 2 points where the tree roots are gaining access. On the basis of the information provided by NF, I am satisfied that water has been leaking from the sewerage system on to the site, at least from 31 July 2017 and continuing. As stated, M (within his report of 9 January 2019) was of the view that the rain which fell on 27 January 2013, created abnormal conditions which caused the ground to swell and a sewer line beneath the ground was damaged by the expansion. M concluded that after the ponding on site receded, what remained was a damaged leaking pipe that went unnoticed. Further, M was of the view that the effect of the leaking pipe showed up as damage to the dwelling from 2013, to the present time and because the footing system of the structure is very rigid, it took some time for the damage to appear. Whilst S independently addressed a number of the issues raised by M, I am concerned by the about face from S, who in the first report says the damage is not related to foundation movement, but in the second report says the information provided supports the premise that the damage is related to foundation movement. Of even more significance is the fact that the insurer has not sought to have S respond to the report and conclusions of M. Noting that the property has been occupied since 1981, but cracks were not obser ved until 2013, I am satisfied that the complainant has established loss and damage from the insured events covered by the terms and conditions of the policy. The insurer has not established a basis on which it is otherwise entitled to deny the claim. The insurer is to meet the complainant‟s claim under the terms and conditions of the policy. Determination | Case number: 620768 Page 5 of 8 3 Supporting information 3.1 Relevant policy wording General exclusions – pages 61 - 63 These general exclusions apply to ally of the cover we provide under your policy We don‟t cover you under your policy for loss or damage to your home or contents or for legal liability which is caused by or arises in connection with any of the following items, events or circumstances. Loss not linked to event – page 63  Loss to your h ome or contents which can‟t be linked to any identifiable event (but we do cover you if you have an optional benefit under „ Items away from home‟ – see page 57).  Items which you have misplaced (b but we do cover you if you have an optional benefit under „Items away from home‟ – see page 57). 3.2 Expert reports Expert report s Key points insurer’s expert (C ) First Report 12 July 2016  Complainant advised on 1 July 2016 severe storms developed and passed through the region which caused damage to the property as a result of strong winds, heavy rains.  Complainant advised within one year following a 2013 weather event, she noticed minor cracking to the cornicing and concrete wall in bedroom 1.  Complainant said it was minor, and though nothing of it and since the cracking has gradually got wors e and damage is now severe.  Complainant formed the view that the cracking is somehow relat ed to the rainwat er runoff that surrounded the home during the p rolonged weather event. insurer’s expert (C ) Second Report 5 August 2016  Observed cracking cornicing to all rooms of the property.  Observed cracking to the concrete wall in bedroom 1 and bathroom.  As instructed, we have engaged a engineer to provide a causation report and scope of works for further review and consideration. insurer’s expert ( S ) Engineer‟s report 2 3 August 2016  The presenc e of mould growth under the roof sheeting indicates that at times the air within the roof sp ace is humid (moist).  Air flow within the roof space is restricted due to the presence of the verandah roof around the perimeter sealing the lower edge.  The presenc e of solar panels covering the majority of the roof with Determination | Case number: 620768 Page 6 of 8 Expert report s Key points a nort herly facing as pect would a lso contribute to the high humidity die to the lack of sunlight heating the roof spac e.  The most severe damage to the cornices coincides with the area where ply wood flooring has been installed in the roof space.  The plywood may have the effect of further restricting airflow to the cornices lying underneath.  The cracking in the walls is related to normal stresses arising through expansion and contraction, and brick growth and is not related to foundation movement or any single weather event.  The cause of damage to the cornices as observed is due to a high moisture content within the roof space causing excessive expansion and contraction m ovement in the cornices, and that it is not attributable to any single weather event but a prolonged wet period in the order of months.  The cause of damage to the cornices as observed is due to a prolonged damp environment within the roof spac e causing excessive expansion and contract movement in the cornices, and that it not attributable to any single weather event.  The cracking in the internal walls is related to stresses arising from normal expansion and cont raction in the walls and brick growth and is not weather related to a single weather event.  The damage is not relat ed to foundation movement insurer’s expert (C ) Third Report 29 August 2016  Engaged an engineer to provide a causation report for further claim consideration.  Engineer concluded the following:  The cause of damage to the cornices as observed is due to a prolonged damp environment within the roof s pac e causing excessive expansion and contract movement in the cornices, and that it not attributable to any single weather event.  The cracking in the internal walls is related to stresses arising from normal expansion and cont raction in the walls and bric k growth and is not weather related to a single weather event.  The damage is not relat ed to foundation movement.  The cause of the damage is “atmos pheric conditions and normal expansions/contraction in building mat erials”.  The damage cannot be attributed to an Insured Event and the claim is considered one for decline. c omplainant’s expert (D) Report Undated  Engineer had pointed out the problems may have been caused by lack of ventilation in the roof space  Was asked to install some ventilation.  A decision was made to install air vents in the roof  Replaced a couple of cracked floor tiles in bedroom1 ensuite doorway, adjusted three bedroom doors and the back screen door.  It was common to have some small amo unts of movement in the houses possibly due to the differential movement of the building Determination | Case number: 620768 Page 7 of 8 Expert report s Key points materials.  There is a considerable amount of movement within the ceiling and cornices, walls and door frames in the hallway wit h cracks having appeared in some walls and at the intersection of the timber framed heads and rendered brick walls above the built - in robes in bedroom 1 and bedroom 3.  The movement has continued even after the roof ventilation was installed (roof ventilation installed 7/10/2016).  Difficulty in identifying the cause of the abnormal movement, which in turn is causing the cracking in the he ads, door frames and also causing the cornice dislodgment. insurer’s expert (S ) Engineer‟s report 24 October 2017  Inspection of the sewer lines in July 2017 , a defect found in the sewer line on the western side of the dwelling near the sewer inspection opening, was not of a level to have caus ed movement in the floor slab.  If movement is still continuing, then it must be concluded that the damage is being cau sed by foundation movement , which is not manifesting itself in correspondence damage to the external brickwork and to an extent, the internal brickwork.  As the trusses are fixed to the external walls and the celling linings and cornices are attached to th e trusses, any movement in the foundation walls supporting the trusses would in turn cause separation of the cornices as the trusses move up and down.  The continuing evidence suggests ground movement, trans ferring the truss supporting wall on the northern side of the building, which would impact the ceilings supported on these trusses. insurer’s expert (O ) Leak det ection report 17 November 2017  CCTV inspection of sewer lines fail  Found a crack in the sewer pipe junction through whic h some tree roots had entered. insurer’s expert (S ) Supplement ary Engineer‟s report 5 January 2018  The leak detection report did not record any water leakage issues with either the water or stormwater lines i.e. they passed the inspection.  The sewer was re - inspected and th ere was no change to the findings from the inspection undertaken in July 2017.  T he internal damage is not attributable to leaking reticulation.  Leaking pipes are not considered to be the cause of the damage.  The underlying soils are susceptible to movemen t from seas onal variations in moisture and movement will be an ongoing occurrence.  unable to attribute the damage to a one - off weather event. complainant’s expert (M) Engineer Report 9 January 2019  On 27 January 2013, more than 250mm of rain fe ll.  Ordinarily, rainfall would make its way out of the catchment and into the river via the stormwater network.  During the 2013 flood event the stormwater net work was inundated with flood wat er.  The „backing up‟ of the system restricted the rainfalls means of Determination | Case number: 620768 Page 8 of 8 Expert report s Key points escaping the catchment and this resulted in localised ponding within the catchment.  What the complainant described to C as flood water lapping at the door on 27 January 2013 was not flood wat er; rather it was rain water that was unable to escape the catc hment as it ordinarily would do.  The ponding water created abnormal conditions in the extreme reactivity soil.  The abnormal condi tions caused the ground to expand and a sewer line beneath the ground was damaged by the expansion.  As flood waters receded and the storm water equalised, and there was no longer any ponding on site, what remained was a damaged leaking pipe went unnoticed.  The effect of the leaking pipe showed up as damage to the dwelling from 2013 to the present day.  Because the footing syst em of the structure is very rigid, it took some time for the damage to appear.  The damage to the residenc e has resulted from a leaking sewer that was damaged when moisture conditions became abnormal from ponding of rain wat er that fell on 27 January 2013.  Which otherwise would have drained had it not been for river flood water backing up the storm water system.  Ultimately, it was the flood water that caused the loss. Complainant’s expert (N) Invoice 31 July 2017  Carried out a CCTV drain camera inspection of all accessible sewer drains servicing the property. There is one joint that is leaking which was just starting to allow tree roots through, this was just upstream from the first 1.0 down the left hand side and under the house slab. C omplainant’s expert (N) Drain Inspection Report 24 April 2019  On 24 th April 2019 carried out hydrostatic testing and CCTV visual inspection to all accessible sewer and stormwater drain pipes.  The sewer drain appears to be mostly o f a sound condition with the exception of 2 points.  There are fine tree roots entering the drain at the 100mm x 50mm reducer under the laundry tub.  There are tree roots in the 100mm pipe immediat ely downstream of the gully servicing the bathroom greywate r fixtures.  The sewerage system failed hydrostatic testing indicating that the pipework is not watertight, and water is leaking from the pipes at the points where the tree roots are gaining access.  There are articulation joints installed in the sanitary drainage system at the points where the pipe exits the house footprint.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.