Cash settlement amount for late-notified storm damage to shed
Summary
The complainant disputed the insurer's $5,960 cash settlement for a shed damaged by a falling tree in 2012 and claimed in 2018. AFCA found the offer fair and that no further amount was payable.
The complainant had not provided contemporaneous evidence that the shed needed full demolition from the 2012 impact, so the insurer's settlement satisfied the policy.
Issues
- Claim amount dispute primary · not upheld“I am also satisfied the insurer's offer of $5,960 is fair in the circumstances.”
Subjects and remedies
no remedy
Related
All Financial Firm (Unknown - Insurer) determinations · Find similar determinations
Text of the determination
Determination | Case number: 620085 Page 1 of 5
Determination
Case number: 620085 15 July 2019
1 Determination overview
1.1 Complaint
The complainant lodged a claim with the financial firm (insurer) for damage to his
shed from a falling tree. Whilst the damage occurred in March 2012, the complainant
did not lodge a claim until 29 October 2018.
The insurer accepted the claim; however, it says it has been prejudiced by the late
notification of the claim and only agreed to cash settle part of the damage claimed.
The complainant is dissatisfied with the cash settlement amount.
1.2 Issue and key findings
Has the insurer settled the claim appropriately?
Whilst I accept the insurer is liable for some of the damage to the shed, the insurer’s
offer of $5,960 is fair in the circumstances. This is because the complainant has not
provided sufficient information to establish, on balance, the shed required a full
demolition from the tree impact in 2012.
1.3 Determination
This determination is in favour of the insurer.
T he insurer’s offer satisfies its obligations under the policy and is it not required to pay
the complainant any further amount.
Determination | Case number: 620085 Page 2 of 5
2 Reasons for determination
2.1 Has the insurer settled the claim appropriately?
Complainant disputes insurer’s cash settlement amount
In March 2012 , a tree fell on the roof of the complainant’s shed, breaking asbestos
roofing sheets and timber supports. At the time, the complainant did not believe the
shed was insured and performed his own repairs.
The complainant then lodged a claim on 29 October 2018. The complainant originally
reported the date of loss as June 2014, however he says he provided the incorrect
date of loss, and believes the loss actually occurred on 3 March 2012.
The complainant provided a building inspection report from a building consultant
(IMH), which inspected the property on 12 April 2019. IMH stated:
a tree has fallen East onto the outbuilding
the stress on the components of the timber structure was mostly due to a chain
reaction from the fallen tree, causing the roof to collapse in areas
the outbuilding to the South of the leaning tree was mostly intact.
The complainant provided a quote for the shed demolition and asbestos removal for
$8,250, as he says the shed is beyond repair.
The complainant provided an aerial photograph of the property, which he says shows
the shed’s roof was undamaged in 2009, prior to the tree branch falling. The
complainant also provided a photograph of the shed from 13 September 2013, whi ch
he says shows the shed is in the same condition now as it was in 2013.
The complainant says based on the initial damage, the shed would have required
demolition in 2012, therefore the late notification of the claim has no bearing on the
insurer’s curren t liability.
Insurer says its cash settlement is reasonable
The insurer does not dispute a tree impacted the shed in 2012, however it says due to
the passage of time between the event and the lodgement of the claim, the fallen tree
has been allowed to grow and this has caused further dislodgement of the timber roof
structure. It says the shed is also in a poor condition and state of disrepair.
The insurer provided a report from a builder (R), which states:
damages were caused by a tree branch/trunk to the western aspect of the shed
roof and appears to be storm related
the overall condition of the shed is poor, with numerous separations of the timber
members, which has compromised the structural integrity
Determination | Case number: 620085 Page 3 of 5
whilst a tree branch has caused a proportionately small area of damage, the tree
has supported the roof and wall and has prevented a collapse due to the aged and
deteriorated condition
a section of the roof on the western side would require repairs, however other
damages to the roof are due to age, deteriora tion and method of construction.
R provided a quotation of $2,431.04 for repairs to the shed it says were damaged by
the tree branch.
The insurer says it has been prejudiced by the late notification of the claim because it
was unable to investigate the claim contemporaneously, assess the claim, and
remediate the damage and prevent further damage from occurring. The insurer says
the photographs show no major damage to the roof structure, suggesting t he tree
impact was of low force. It also says the complainant did not supply any
contemporaneous information to show the nature of the damage at the time it
occurred.
The insurer offered $5,960, which included the costs of demolition, repairs, partial tree
removal, material, debris removal and deduction of the excess.
Insurer has settled claim reasonably
The complainant holds a home building policy, which provides cover for damage
caused by impact from a fallen tree. There is no dispute the complainant has
established a prima facie claim, as the insurer has accepted the claim, however the
complainant’s onus extends to establishing the extent of loss.
Whilst the complainant says the shed required demolition from the initial impact in
2012, there is no contemporaneous information from 2012 to support the
complainant’s position. The photographs provided are not sufficient to show the
shed’s condition prior to the damage and the extent of damage at the time of the loss.
The complainant provided a report on the cause of damage, however IMH has not
explained how it came to the conclusion that the shed was structurally sound prior to
the tree impact in 2012, given it inspected the property in 2019. I have therefore not
found the conclusions in the report persuasive.
The insurer says it has been prejudiced by the late notification of the claim because it
could have performed a make-safe, if appropriate, and could have prevented further
damage. From the information provided, there is insufficient information to show the
shed required demolition in 2012. It is also possible the insurer could have prevented
further damage to the property if allowed to assess the property at this time.
I accept the insurer is liable for some of the damages present at the property,
however I am also satisfied the insurer’s offer of $5,960 is fair in the circumstances.
This is because I am not satisfied, on balance, the insurer is liable for the full
Determination | Case number: 620085 Page 4 of 5
demolition of the shed based on the information provided, and the amount offered is
more than the quote to repair inc luded in R’s report.
I therefore accept the insurer’s offer satisfies its obligations under the policy and it is
not required to pay the complainant any further amount.
Determination | Case number: 620085 Page 5 of 5
3 Supporting information
3.1 AFCA approach to this complaint
This complaint has been determined based on what is fair in all the circumstances,
having regard to the relevant law, good industry practice, codes of practice and
previous decisions of AFCA or its predecessor schemes (which are not binding).
A full exchange of the relevant information has taken place between the respective
parties. Each party has had the opportunity of addressing any issues raised.
All of the provided material has been reviewed and considered. The parties have
raised numerous issues in their submissions to AFCA. However, commentary in this
determination is restricted only to those issues considered relevant to the outcome.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.