Hail damage claim to commercial premises; insurer declined most roof and wall damage
Text of the determination
Determination | Case number: 618734 Page 1 of 12
Determination
Case number: 618734 25 July 2019
1 Determination overview
1.1 Complaint
The complainant is a small business which held building insurance with the financial
firm (insurer) and lodged a claim for hail damage to its business premises.
The insurer offered a partial settlement of the claim but declined most of the damage
to the main roof of the warehouse, saying the hail denting is so minor that it does not
qualify as „damage‟ under the policy and does not necessitate the replacement of the
roof.
The complainant disagrees, seeking a cash settlement for the replacement of all parts
of the premises affected by the hail. The complainant also seeks compensation for
non-financial loss for the way the insurer handled the claim.
1.2 Issues and key findings
Has the complainant established a valid claim?
Yes. The expert evidence shows there is widespread hail denting to the premises.
Has the insurer established it is entitled to limit its liability?
No. The insurer has neither established a policy exclusion applies nor shown it may
otherwise limit its liability.
The policy entitles the complaina nt to the repair or replacement of parts of the building
damaged by the insured event. Hail denting is, prima facie , damage. The insurer has
provided insufficient evidence to the contrary. The engineer and builder who quoted
for the repairs both suggest the dented sheeting needs to be replaced. The insurer
has not refuted this evidence or provided an alternative repair method. Therefore, the
insurer is liable to meet the claim.
Is the complainant entitled to compensation?
No. The complainant is not entitled to compensation for non-financial loss as the
evidence shows the insurer did not handle the claim unreasonably overall.
Determination | Case number: 618734 Page 2 of 12
1.3 Determination
This determination is substantially in favour of the complainant. Within 14 days of the
complainant‟s acceptance of this determination, the insurer must settle the claim in
accordance with section 2.2 below.
Determination | Case number: 618734 Page 3 of 12
2 Reasons for determination
2.1 Has the complainant shown a prima facie claim?
Complainant has established prima facie claim
It is established law the complainant bears the initial onus to show, on balance, the
policy covers the loss. This is known as a prima facie claim.
Once the complainant establishes a prima facie claim, the onus then shifts to the
insurer to demonstrate, on balance, the loss is not covered, either by way of one of
the policy exclusions or on some other basis.
The insurer‟s building policy is a defined events policy which includes accidental
damage cover. The policy responds where an incident caused by one of the defined
events results in loss or damage, subject to any exclusions. The relevant defined
event is for storm (including hail) damage.
In my view, the complainant has established a prima facie claim for hail damage to
the disputed areas. MCS (the engineer) and PP (a builder who quoted for the repairs)
confirm there is widespread damage to the property.
MCS says the hail damage is to:
the roof sheeting to the warehouse including the polycarbo nate sheeting
the gable wall sheeting to the northern side of the warehouse
the wall sheeting to the western side of the warehouse
the commercial roller door to the western side of the warehouse
the roof sheeting to the shop
the metal and plastic signage to the western side of the warehouse and shop front.
HBC disagrees there is damage, but I do not accept his findings considering the
reports – and photographs – of MCS and PP.
2.2 Is the insurer entitled to limit its liability?
Insurer has not established policy exclusions apply
HBC and the insurer suggest that, if the roof does require replacement, it is due to
foot traffic damage and pre-existing design issues rather than the insured event.
These submissions are unsupported. HBC provides insufficient information about the
extent and causal contribution of the foot traffic and design issues. I note that, in any
event, the insurer‟s policy does not generally exclude design or workmanship defects.
The insurer has not established foot traffic, design issues or any other excluded
cause is the proximate cause of the loss.
Determination | Case number: 618734 Page 4 of 12
The insurer has therefore not discharged its onus to show a policy exclusion applies.
Hail denting constitutes „damage‟
The insurer says the hail denting is so minor that it does not qualify as „damage‟
under the policy. In support of its position, it relies mainly on:
the caselaw of Ranicar v Frigmobile Pty Ltd (1983) 2 ANZ Ins Cas 60-525, in which
Green CJ defined damage as “a physical alteration or change, not necessarily
permanent or irreparable, which impairs the value or usefulness of the thing said to
be damaged”
MCS‟s findings that the hail denting was minor, did not perforate the zincalume roof
coating or cause water ingress
a technical paper suggesting microfractures or certain types of minor dents to roof
sheeting are not regarded as „damage‟ from an engineering perspective.
The policy defines damage as: “Physical damage or dest ruction unexpected by you”.
The Macquarie dictionary defines the term as: “injury or harm that impairs value or
usefulness.” This is relatively consistent with the caselaw cited by the insurer.
In my view, prima facie , hail denting impairs the value or usefulness of the object.
This is reinforced by the fact that MCS, an engineer who physically inspected the
sheeting, concluded that replacement of the sheeting is necessary. Whilst he has not
provided detailed reasons for this conclusion, the insurer has not provided sufficient
engineering evidence to establish it was wrong. The loss adjuster‟s notes of their
discussion with MCS are hearsay and do not assist with the inquiry.
The fact the zincalume is not perforated does not establish there is no impairment of
the roof ‟s function. This is an engineering question which, as I have said, the insurer
has not answered. HBC‟s report does not assist the insurer because they deny
outright the existence of denting which PP and MCS clearly observed.
The technical engineering paper provided is not persuasive because :
it specifically says it is not interpreting the legal or insurance meaning of „damage‟
it is not based on a physical inspection of the property
it says such an inspection is necessary to certainly determine the issue from an
engineering perspective.
In any event, even if the property was functionally unaffected, it is reasonable to
assume that its value would be diminished; a prospective purchaser may well offer
less for property with hail denting, however light. The insurer has not shown the
denting has not diminished the property‟s value.
This means the hail denting constitutes „damage‟ for the purposes of the policy.
Determination | Case number: 618734 Page 5 of 12
Evidence establishes damage requires replacement
The policy gives the insured the right to repair or replacement of the damaged
property to a condition the same as its condition when new. The MCS and PP reports
show, prima facie , the damaged areas require replacement. The insurer has not
provided evidence to undermine this conclusion or to show some other repair method
is more appropriate.
AFCA invited the insurer to provide an independent assessment report on this issue
on two occasions – first: in our initial letter requesting information; second: on 7 March
2019 by phone. The complainant was willing to allow access to his property on the
proviso the assessor was independent. The insurer chose to rely on the existing
evidence, but as it happens this is insufficient for the insurer to exclude the claim or
limit its liability.
Insurer is liable to meet the complainant‟s claim
For the above reasons, the insurer is liable for the claim.
PP‟s quote dated 29 January 2019 for $122,718.34 appears to be based on MCS‟s
scope of works for the hail damage. The insurer has not provided other actionable
quotes from local builders and has not shown PP‟s quote is unreasonable or
inaccurate.
Whilst the loss adjuster speculates that the repair quotes provided may be inflated
due to local regulatory and OH&S requirements, this is unproven. The complainant
says he is unaware of such requirements and there is no professional evidence on
the point. In any case, the policy includes an extra benefit for costs of reinstatement,
comprising “the extra costs necessarily incurred by you to comply with any
requirements of any regulation or statute in connection with the repair or replacement
of property insured.”
The only other comparable quote provided is that of MJM. However, MJM does not
carry out work in the complainant‟s area and their quote is not itemised.
Therefore, I consider PP‟s quote is the most appropriate. I also consider it fair in the
circumstances to allow a further 5% on top of that quote to take into account the
transfer of risk and contingencies. This amounts to an additional $6,135.92.
I understand PP‟s quote does not cover the damage to the signage, but an undated
quote from PSG does. This quote is for $6025.00 + GST, and the insurer has already
accepted this as part of its liability.
Within 14 days of the complainant‟s acceptance of this determination, the insurer
must:
cash settle the complainant for the cost of the PP quote (plus 5%)
Determination | Case number: 618734 Page 6 of 12
cash settle the complainant for the cost of the PSG quote
pay interest on the settlement sum in accordance with section 57 of the Insurance
Contracts Act 1984 (Cth) from 1 February 2019 until payment is made.
Complainant not entitled to compensation for non-financial loss
The complainant seeks compensation for stress and inconvenience (non-financial
loss) due to the way the insurer handled its claim.
Under our Rules, AFCA may determine an insurer pay compensation for non-financial
loss to a complainant in limited circumstances. AFCA awards compensation
conservatively. This is because complainants are expected to be moderately robust
and bear the normal degree of inconvenience associated with the insurance claims
process. Compensation is not awarded when the degree of inconvenience is within
the normal range of a claim, or when an insurer has handled the claim reasonably.
Compensation is not warranted in this case, considering AFCA‟s conservative
approach and the way the insurer handled the claim. I understand the insurance
broker (who was the complainant‟s agent) may not have communicated proactively
with the complainant, but this was not the insurer ‟s res ponsibility. Based on my review
of the available evidence, the insurer did not handle the claim unreasonably overall.
Determination | Case number: 618734 Page 7 of 12
3 Supporting information
3.1 Key evidence
Relevant reports
Record Key points
Insurer‟s expert (MCS)
Engineering report
22 - 03 - 2018
Observations
On the date of the storm, the recorded rainfall in the area was
9.2mm. There was no recorded wind gust, but the wind from a
station 50km away was 107km/h.
There is evidence of foot traffic damage t o the t op of the warehous e
roof sheeting crest s with crimping occurring, considered pre - existing
damage.
There is also evidence of impact damage / denting occurring to the
webs of the sheeting crests. This is wide spread over the entire
warehouse roof, shop front roof, western wall sheeting and the
co mmercial roller door (3m wide x 3.6m high) on the western side.
The denting in my opinion is consistent to that from hail impact and
the direction reported.
The denting to the roof and wall sheeting was viewed wit h sunlight
from a similar direction to the hail, therefore very little shadowing to
highlight the denting. I understand that the denting is more
noticeable with shadowing light in the morning and late afternoon.
The denting to the sheeting though very slim has changed the
geometry of the sheeting h owever does not appear t o have
damaged the zinc coating or resulted in perforation. In my opinion,
the denting to the „Zincalume‟ sheeting would not res ult in water
ingress.
The 4 piece metal signage to the western side of the building and
the removed sign age stored upstairs on the warehouse mezzanine
had a few isolated dents which are in my opinion most likely
attributable to the hail event.
There was no evidence of damage from event resulting in water
ingress except for the hail damage to the polycarbonat e sheeting
and the gap in the sheeting above the western commercial roller
door whic h would allow water ingress with wind driven rain.
In relation to the office, there was no evidence of damage from the
event resulting in water ingress. The office roof she ets are
incorrectly fitted to the side of the wall cladding and their ends
beneath the flashing have not been turned up, which means they
are not weather proof. There is also evidence of prior maintenanc e
and weat hered silicone seals to the office roof and flas hings.
Determination | Case number: 618734 Page 8 of 12
Record Key points
The shop front windows and ent ry doors were not damaged.
The c abinetry of the shop front is water damaged. Given the lack of
damage to the roof, this damage most likely is due to defective
sheeting and flashing installation.
The 4 „Whirlybird‟ vents to the warehouse roof appear to have been
hail damaged.
Proximate cause and effect
In summary: the damage to the property as a result of t he hail event
on the 18 November 2017 is as follows:
1. The roof sheeting to the warehous e including the polyca rbonat e
sheeting.
2. The gable wall sheeting to the northern side of the warehouse.
3. The wall sheeting to the western side of the warehouse.
4. The commercial roller door to the western side of the warehouse.
5. The roof sheeting to the shop.
6. The metal and plastic signage to the western side of the
warehouse and shop front.
Maintenance Issue s
1. The eaves gutters to the warehouse are a domestic size and
inadequate to cater for the warehouse roof, however, whilst
defective, this will not likely resu lt in water ingress into the
warehouse.
2. Water ingress was reported to the 2 shop front windows.
However, no hail damage or storm damage was evident. Given the
report of ingress the seals are recommended to be replaced.
Warnings or particular concerns
1. The warehouse and shopfront in my opinion are not waterproof.
Water ingress is likely to continue to both the warehous e and shop
front if remedial / repair work, unrelated to the storm event, is not
carried out.
Scope of works
A scope of work has been pre pared to remediate hail damaged
items being replacing the entire warehous e roof, shop front roof,
western wall sheeting, commercial roller door (3m wide x 3.6m high)
on the western side and signage. A separate section has been
Determination | Case number: 618734 Page 9 of 12
Record Key points
added for remaining building defects for the Ins ured to rectify.
Insurer‟s expert (HBC)
Building report
14 - 05 - 2018
We have inspected this shed twice before; the second visit was
mainly to report how the water was entering the shed which was
very obvious after the ridge capping was re moved.
On this inspection we could not find any additional hail damage from
the first two site visits and reports.
As can be seen in the photo‟s the zincalume Roof and Wall sheeting
is not hail damaged at all, as can be seen in photo‟s the wall
sheeting is in poor condition with obvious rust holes.
The roofs imperfections are from foot traffic only and do not
resemble hail damage.
The Solar panels (which usually are the first item to be damaged)
are not marked or damaged.
The cost to replace the roof and w all sheeting 452m/2 x $69 per
square metre is $31,188.00 +GST.
The workmanship standard on the Shed is very low, the problems
need to be addressed and supervised by a Registered Builder.
As the roof has not been constructed to the Codes and by - laws it is
d eemed unsafe and should not accessed.
The sign has three tiny hail marks in the top right hand section only.
On the main roof, the only hail damage is to the two acrylic roof
sheets and four whirly birds.
Insurer‟s loss adjuster (JA)
report #7
15 - 05 - 2018
Di scussion with MCS
“ He was queried specifically as to why he had therefore listed a
complete renewal of the wall sheets and roof when there was at the
most maybe minor indentations and said that after the big hail storm
in Perth he was associated with ma ny losses and it had been
agreed by all insurers that if there was any indentations then the
metal sheeting had to be replac ed.
We explained to him that was the case with colorbond coated
sheeting but not zincalum type mat erial where there was a big
differ enc e in the way the sheets were made and constructed.
Distortion of zincalum does not cause any need to have it replaced,
Determination | Case number: 618734 Page 10 of 12
Record Key points
it is purely cosmetic.
He was also queried as to why his scope of works had been
prepared for repair/ reinstatement of hail damaged ite ms attributable
to the claimed event.
His answer to that was that if there was any suggestion of any
marking it would automatically fit into his scope of works.
The question was asked whether or not it was justifiable to replace
the items and he said that was a decision for the insurer to
“negotiate” with the owner of the building and nothing to do wit h him
other than the fact that he had noted it was damaged.
We further asked him if he had any photographs to demonstrate the
damage to the metal sheeting and was told that he had taken a
number but they would not show the type of marking as it was
minor. ”
Quote for repair (PP)
31 - 01 - 2019
“ The date of this incident was 18/11/2017 which, the roof, roller door
and signage was damaged due to a storm / hail event.
The corrugated iron on the roof to the shed and verandah/patio was
damaged from the hail. Structurally the building is OK.
SHED EXTERNAL
Approx 90 % of the corrugat ed iron on the west side of the roof is
damaged with approx 20 - 30 dents per square met re.
Approx 65% of the corrugated iron on the east side is damaged with
approx 12 - 15 dents per square metre.
No damage has accured to the solar panels.
Minor hail damage to corrugated iron below solar panels and
guttering.
FRONT VERANDAH
Approx 75% of the corru gated iron is damaged with approx 10 dents
per square metre.
Total quote: $122,718.34.
Insurer‟s loss adjuster (JA)
report #5
30 - 1 - 2019
“ PP have now submitted an alternative and more detailed quote and
are suggesting that the majority of the sheets on the building show
some signs of hail dents.
Determination | Case number: 618734 Page 11 of 12
Record Key points
That was n't obvious at the time the building was inspected and if
they are there, they are very minor. It is accepted that whilst there
may be no practical or aesthetic need to replace these sheet s, the
Insured has a valid claim where there are confirmed damages.
The building is aged and does have some age issues, but ultimately
if the sheets are being replaced there is an Occupational Health and
Safety requirement for scaffolding and some regulato ry upgrade
requirements with regard to previous construction that have
contribut ed to the significant total quoted cost.
Given the damage is for large portions of the structure and does not
justify replac ement (even though they can validly claim for it), a t this
stage we believe the insured is probably agreeable to a cash
settlement of the $60,000.00. ”
Relevant policy provisions
Definitions
„Damage‟ or „damaged‟ means: “Physical damage or destruction unexpected by
you”.
„Indemnity value‟ means: “The value of the insured property at the time of loss or
damage, which takes into account the age, condition, depreciation and remaining
useful life”.
Additional benefit for extra costs of reinstatement
Additional benefit [if insured event accepted]: Extra cost of reinstatement: “the
extra costs necessarily incurred by you to comply with any requirements of any
regulation or statute in connection with the repair or replacement of property
insured”.
> Limitations on this benefit:
“Where the damage to property insured i s:
(a) more than 50% of the replacement cost, we will not pay more than the total
sum insured;
(b) less than 50% of the replacement cost, we will only pay for extra costs
necessarily incurred in respect of the damaged part of the property insured.
Determination | Case number: 618734 Page 12 of 12
We will not pay for extra costs in complying with any regulatory or statutory
requirements that applied prior to the loss or damage occurring”.
“How we pay your claim”
If the building is damaged , we will, “at our option, pay the cost to
rebuild/repair/replace your property to a condition the same as but not better or
more extensive than its condition when new.”
We only pay this if work is started and completed by you without unreasonable
delay. If it is delayed, we only pay you the indemnity value of the damaged
property.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.