Home / Suncorp Group / Determination 617591

Determination 617591

Refusal to pay costs of complying with fire safety order and claims preparation fees

FirmSuncorp Group
Decided2020-06-02
ProductGeneral Insurance · Strata
OutcomeFor the complainant in part
Amount awarded$27,159
Non-financial loss—
Amount claimed$200,000
SourceAFCA PDF

Summary

After a fire, the council issued a fire safety order to bring the whole strata premises up to code and the complainants sought the compliance costs and claims preparation fees. AFCA found the insurer not liable for compliance costs or claims preparation fees, but ordered it to pay $25,866 plus 5% contingency to rectify its own non-compliant repairs, with interest.

Extra cost cover under clause 8.2 extends only to reinstating damaged property and excludes compliance costs the insured was already required to meet before the incident, although the insurer must rectify its own non-compliant repairs.

Issues

Subjects and remedies

pay claimpay interestreassess claim

Related

All Suncorp Group determinations · Find similar determinations

Text of the determination

Determination Case number 617591 Financial firm AAI Limited Determination | Case number: 617591 Page 1 of 10 Case number: 617591 12 December 2019 1 Determination overview 1.1 Complaint The complainants are represented by solicitors (BP). Any reference to complainants in this determination includes BP. The complainants lodged a claim under a residential strata insurance policy underwritten by the financial firm (insurer) following a fire on 8 June 2014. The insurer accepted the claim and authorised repairs to fire damaged sections of the insured premises. The repairs necessitated submission of an Occupation Certificate to the Local Council (council). The council subsequently issued a fire safety order (order) under section 121B of the Environmental Planning and assessment Act 1979 to the complainants, requiring them to complete specified works to bring the entire premises into compliance with current fire safety codes. The complainants say the insurer should indemnify them for costs associated with complying with the order under the policy provision for „ extra cost ‟ (EC). However, the insurer says the EC provisions only apply to portions of the property reinstated (damaged in the claimed incident), not undamaged areas. The complainants disagree with the insurer‟s interpretation of the EC provisions and seek a review. 1.2 Issues and key findings Is the insurer liable for the costs of complying with the order? The insurer is not liable to pay for bringing undamaged portion of the premises into compliance with current fire safety laws/regulation because:  it is clear from the relevant policy wording that extra cover does not extend to: ‒ reinstatement to undamaged portions of the premises ‒ any laws/regulation, the complainants were required to comply with prior to the claimed incident  the fire order largely relates to areas undamaged by the fire incident  while the occupation certificate provided to the council led to the council checking the status of fire safety compliance at the premises, available information shows the complainants were at all times, prior to the fire, required to be in compliance with relevant fire codes. This is demonstrated in the council‟s letter dated 9 January 2015 which includes that the complainant had not submitted past “ Annual Fire Safety Statement” . Determination | Case number: 617591 Page 2 of 10 Are the complainants entitled to payment for claims preparation? The complaints have not satisfied the policy conditions for payment of claims preparation fees because costs claimed relate to works required to comply with the fire safety order rather than the claim itself, and the insurer did not consent to the costs as required by the policy. 1.3 Determination This determination is substantially in favour of the insurer. Other than as set out in section 2.2 of this determination, the insurer is not req uired to take any further action. Determination | Case number: 617591 Page 3 of 10 2 Reasons for determination There has been a full exchange of material between the parties, and each party has had the opportunity to address the issues arising from that. Due to the nature/complexities of this dispute, it has been referred to a Panel for determination. This determination follows consideration of all the information exchanged and is based on what is fair in all the circumstances, having regard to the relevant legal principles, terms of the policy, good industry practice including codes of practice, fairness and previous AFCA decisions where applicable. The Panel has considered all the material submitted by the parties and is satisfied that the documentation relied on has been provided to both parties. For the purposes of this determination, only those points considered relevant will be addressed. 2.1 Is the insurer liable for the costs of complying with the fire order? Circumstances of the complaint In summary:  the complainants ‟ policy covers residential apartment blocks (Blocks A – F) at the insured premises, for physical loss or damage  the complainants lodged a claim following a fire in the basement car park in building E.  the insurer accepted the claim and authorised repairs to fire affected areas (including reinstating smoke affected stairwell and units, and electrical works in buildings C and D). On completion of repairs, the insurer provided an occupancy certificate to the local council as required by law  the local council issued a fire safety order requiring the complainant to bring the property into compliance with current fire codes  the complainants contend requirement to comply with the order is claim related and seek indemnify from the insurer for the cost of meeting the order under clause 8.2 (extra costs) in section one of the policy.  the insurer says clause 8.2 does not operate to cover the cost of compliance with the order as the cover is for extra cost of „reinstatement‟, where reinstatement means restoration of damaged portions of the property only  the complainants disagree with the insurer‟s interpretation of clause 8.2. Further, they say the works completed by the insurer were not to fire safety code  after further review, the insurer offered to cover the cost of rectifying its repairs to meet relevant codes. It estimates the cost doing so at $25,886. However, the complainant estimates these costs will be around $200,000 Determination | Case number: 617591 Page 4 of 10  the complainants have also argued that given some of the items the insurer agreed to rectify are part of the fire order, it has essentially accepted liability for compliance with the order. The insurer contends this is a misinterpretation of its submissions.  as the complainants consider the insurer accepts responsibility for compliance with some of the fire order, they say they are entitled to indemnity for claims preparation costs up to $50,000 under clause 9.2 of section one in the policy. The insurer says the complainant are not entitled to claims preparation costs in the present case. The policy sets out how claims are settled The complainants‟ policy covers physical loss or damage to insured property subject to specified terms and conditions set out in the applicable PDS. Relevant policy terms are provided in section 3.3 of this determination. There is no dispute the complainants‟ property suffered physical damage. However, as explained above, the complainants are seeking further indemnity. Page 19 of the applicable PDS contains clauses that sets out the basis of claims settlement. Clause 8 says claims will be settled on the basis of reinstatement or replacement and extra costs. Insurer required to pay extra cost to reinstate damaged portion of property only Having regard to the context in which the definition appears, the panel is satisfied it operates such that:  the insurer is required to reinstate property that has suffered damage to its pre- incident condition  the insurer is required to cover for the extra costs where the reins tatement (of damaged property) means those costs need to be incurred to comply with a) any Act of Parliament or regulation made under it; or b) any by-law or regulation of any municipal or other statutory authority operative at the time of reinstatement  clause 8.2(b)(ii) excludes indemnity for “additional cost in curred in complying with any Act, by-law or regulation which You had been required to comply with prior to the happening of the damage”. This supports the interpretation that the policy intent is to cover extra cost as a result of incident damage, and not to meeting costs of compliance the complainants were responsible for before the claimed incident  while the order to comply with the order was not issued until after the incident, the available information shows the complainants were required to be in compliance and provide annual fire safety statements prior to the claimed incident and the council found they had not done so when they checked their record . We do not agree with the complainants that without the occupancy certificate, the council would not have been entitled to issue the fire safety order. Determination | Case number: 617591 Page 5 of 10 In view of the above, the panel agrees with the insurer‟s interpretation of the policy term. The Panel accepts that the insurer is not liable for costs of compliance with the fire safety order under clause 8.2. Insurer to cover cost of bringing all damaged items to code There is an overriding obligation that insurers are required to undertake and complete repairs to adequate standard and in compliance with any relevant code. The complainants say that the reinstatement work completed by the insurer do not satisfy its obligations. It identified a number of items that the insurer needed to bring to code. The insurer accepts there are repaired items that require rectification. Following further assessment, it accepts the following repairs require rectification:  fire separation for single exit door from carpark level (furniture and hardware) at car park level  fire hose reel installed to be removed and placed in position that complies with - AS2444-2005  remove and dispose of smoke alarms to carpark and stairwells of blocks C-E, and supply & install smoke alarms compliant with AS3786  local fire detection and alarm system It also notes it would consider its liability (if any) for the following, on provision of further information:  fire stop/seal to car parks of blocks C – E on provision of evidence the works previously completed by the insurer was remedied by the complainants  remove and replace internal exit doors with compliant door furniture and hardware on provision of evidence that the doors installed by the insurer were not compliant The insurer initially offered to indemnify the complainants for the above items based on an estimate it obtained from loss adjustor (DH). The complainants objected to the insurer relying on the estimate it obtained from DH on the basis they had retained DH in relation to this matter; the insurer did not seek their consent to contact DH, and that an independent review should have been conducted to establish the appropriate settlement for the above items. The insurer subsequently obtained and provided an estimate of $25,866 from builder (AB) . This information, along with the insurer‟s offer were exchanged with the complainants. The complainants have not made any subsequent submissions about the estimate. On the available information, and in the absence of any evidence to the contrary, the panel is satisfied the insurer ‟s offer meets its obligation in relation to the accepted Determination | Case number: 617591 Page 6 of 10 rectification for all items above (other than fire stop/seal to car parks of blocks C – E) on provision of evidence of the actual rectification completed by the complainants. If the complainants accept this determination, the following is to occur:  within seven days‟ pay the assessed cost of $25,866 allow a further 5% of that amount (being $1293.30) for contingencies  within 14 days of the complainants accepting this determination, the insurer must assess whether works to fire stop/seal to car parks of blocks C – E (completed by the complainants) included rectification to its previous repairs. If so, ‒ the insurer is to establish the cost/value and propose settlement for this item within a further seven days ‒ the parties are encouraged to work together to achieve a fair outcome  pay interest on the settlement sum in accordance with section 57 of the Insurance Contracts Act 1984 (Cth) from 30 May 2017 until payment is made. 2.2 Are the complainants entitled to payment for claims preparation? Policy cover for claims preparation fee subject to conditions Benefits under the complainants‟ policy include that the insurer will pay up to $50,000 (or an amount shown on the applicable policy schedule) claim preparation. This is contained in clause 9.2 of the PDS which includes : 9.2 Claims Preparation Fees … professional fees and other expenses for preparation of claims that You reasonably and necessarily incur with Our consent and which are not otherwise recoverable under this Policy. The complainants must therefore show they reasonably and necessarily incurred the claim fees/costs and had the consent of the insurer to do so, in order to be entitled to payment of claims preparation fees. Insurer is not liable for claims preparation fees The complainants say they are entitled to payment under 9.2 for expert‟s fees and costs as well as obtained, BS legal fees/costs. The insurer says it is not required to indemnify the complainants under clause 9.2 because it did not provide any consent to the fees/costs being incurred and the costs do not relate to the management of the fire claim itself. Determination | Case number: 617591 Page 7 of 10 The panel has considered the available information carefully and is of the view the complainants do not satisfy the policy condition for payment of claims preparation fees. This is because:  they have not shown that the professional fees or expenses claimed, were reasonably and necessarily incurred for preparation of the claim. The experts only got involved after the order was issued to deal with the complainants‟ dispute about liability for the cost of compliance  there is no suggestion the insurer consented to paying such costs Determination | Case number: 617591 Page 8 of 10 3 Supporting information 3.1 Our approach A full exchange of the relevant information has taken place between the respective parties and each party has had the opportunity of addressing any issues raised. All the provided material has been read and considered. The parties have raised numerous issues in their submissions. For the purpose of this determination, commentary is restricted to only those issues considered relevant to the outcome. 3.2 Relevant terms Record Wording PDS Page 10 general definition Wherever the words listed below are used in the Policy wording, they mean what is set out below. Other words may have special meanings for particular Policy Sections. They will be defined in those Policy Sections. PDS Page 12 Section one Physical loss or damage 1. Cover This section covers: 1.1 Physical loss or destruction of or damage to Insured Property caused by an Event occurring during the Period of Insurance and not otherwise excluded. Unless stated otherwise in this Section, the most We will pay is the Sun Insured. PDS Page 19 Section one Physical loss or damage 8. BASIS OF SETTLEMENT OF CLAIMS Unless otherwise shown in the Policy Schedule, claims will be settled on the basis of Reinstatement or Replacement and Extra Costs, as follows. 8.1 Reinstatement or Replacement means a) where Your Insured Property is lost or destroyed, in the case of Buildings, the rebuilding of it, or in the case of Insured Property other than Buildings, t he replacement of it, by similar property, in either case in a condition equal to but not better or more extensive than its condition when new. b) where Your Insured Property is damaged, the repair of the damage and the restoration of the damaged portion of Your Insured Property to a condition substantially the same as but not better or more extensive than its condition when new. Determination | Case number: 617591 Page 9 of 10 Record Wording Claims for the cost of reinstating or replacing Your Insured Property lost, destroyed or damaged are subject to the follo wing provisions: i. The work of rebuilding, or replacement, or repairing as the case may be (which may be carried out upon another site and in any manner suitable to Your requirements but subject to Our liability not being increased), must be commenced and carried out with reasonable dispatch, failing which We will effect settlement on an indemnity basis. ii. When any property to which this clause applies is damaged or destroyed in part only, We will not pay more than the Sum Insured. iii. We will not pa y more than the indemnity value until a sum equal to the cost of reinstatement has actually been incurred. iv. With Our prior consent, You will not be bound to rebuild any Buildings destroyed but may purchase alternative Buildings to replace those destroye d. This replacement will be deemed to constitute reinstatement for the purpose of this insurance but We will not under any circumstances be liable to make any payment beyond the actual cost of rebuilding the building destroyed. 8.2 Extra Cost We will also pay the extra cost of reinstatement including demolition or dismantling of Your Insured Property necessarily incurred to comply with the requirements, operative at the time of reinstatement, of: a) any Act of Parliament or regulation made under it; or b) a ny by - law or regulation of any municipal or other statutory authority, provided in either case that: i . the work of reinstatement (which may be carried out wholly or partially upon another site if the Act, by - law or regulation so necessitates and subject t o Our liability not being increased) must be commenced and carried out with reasonable dispatch, failing which We will not be liable to make any payment bey ond the amount which would have been pay able under this Policy Section if this clause had not been i ncorporated; and ii. the amount recoverable will not include the additional cost incurred in complying with any Act, by - law or regulation which You had been required to comply wit h prior to the happening of the damage. PDS Page 20 Section one Physical loss or damage 9. CONDITIONS APPLYING TO THIS SECTION 9.2 Claims Preparation Fees We will pay up to $50,000 or any higher amount shown in the Policy Schedule for professional fees and other expenses for preparation of claims that You reasonably and necessarily incur with Our consent and which are Determination | Case number: 617591 Page 10 of 10 Record Wording not otherwise recoverable under this Policy.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.