Text of the determination
Determination
Case number 615589
Financial firm Commonwealth Bank of Australia
Determination | Case number: 615589 Page 1 of 5
Case number: 615589 6 January 2020
1 Determination overview
1.1 Complaint
In October 2017, the financial firm (bank) provided home loan ending 4841 (loan) to
the complainants. The loan was for $800,000 and the funds were paid progressively
to fund renovations works at the complainants ‟ home (property).
In November 2017, the complainants entered a building contract with a builder to
renovate the property for $600,037.04 (building contract). The works commenced in
January 2018. By 31 May 2018, seven progress payments using the loan funds had
been made to the builder totalling $549,166.03.
In June 2018, the building works ceased. The builder subsequently went into
liquidation leaving the renovations incomplete.
The complainants have made several claims against the bank including:
it misled them to believe the builder was solvent, so they did not need to
investigate his solvency (solvency misrepresentation)
it misled them to believe they had to sign the builder‟s invoices immediately on
receipt as a formality without inspecting the building works as those works were
complete (contract misrepresentation)
they relied on the bank‟s misrepresentations and they entered the building contract
and authorised payment of invoices for work which had not been completed by the
builder
th e bank‟s conduct was negligent.
On 11 July 2019, an Australian Financial Complaints Authority (AFCA) case manager
issued a recommendation on the issues in dispute. The recommendation was in
favour of the bank. A copy of the recommendation is attached to this determination.
The complainants rejected the recommendation for reasons set out in 2.1 below.
1.2 Issues and key findings
Were the findings of the recommendation correct?
Based on all the available information, the findings contained in the recommendation
were correct and are adopted in this determination. The available information shows:
while it is more likely than not Ms SF of the bank told Mrs complainant “the
[builder‟s name] is a good builder”, this does not amount to misleading conduct
the complainants did not rely on Ms SF‟s statement when they decided to enter the
building contract
Determination | Case number: 615589 Page 2 of 5
the bank did not make an error or mislead the complainants about the progress
payments or building contract, and
the bank did not owe the complainants a fiduciary duty or breach any such duty.
1.3 Determination
This determination is in favour of the bank. The complainants are not entitled to any
compensation.
It is unknown whether the renovations works have been complete, or if the
complainants are experiencing financial hardship meeting the loan repayments. If the
complainants are in financial hardship, then within 30 days of the date of this
determination, they should complete a statement of financial position for the bank and
contact the bank to discuss a repayment arrangement. The parties should work
together to try and come to an arrangement for the complainants to overcome their
financial hardship. In doing so, the bank should have regard to its obligations for
dealing with customers in hardship.
If the parties are unable to reach an agreement and the complainants are in financial
hardship, the complainants can lodge a further dispute with AFCA about that issue. If
the complainants take no action within 30 days of the date of this determination, and
the loan is in arrears, the bank will be entitled to take enforcement action in
accordance with the terms and conditions of the loan.
Determination | Case number: 615589 Page 3 of 5
2 Reasons for determination
2.1 Were the findings in the recommendation correct?
The recommendation was correct
I have decided this case on its merits, having regard to the relevant law, good industry
practice, codes of practice and previous AFCA decisions. I have considered all the
material submitted by the parties, both before and after the recommendation. I am
satisfied that the documentation I have relied on has been provided to both parties.
I am satisfied that the case manager‟s recommendation contains an accurate
summary of the complaint, the issues to be determined, any applicable paragraphs of
the Rules and any relevant law.
Based on all the available information I agree with the findings in the recommendation
and recommended outcome. The recommendation is adopted into this decision and I
have not repeated the analysis in this determination.
The recommendation was in the bank’s favour
The attached recommendation sets out in detail the reasons why the outcome is in
the bank‟s fa vour. In summary, those reasons include the:
information supported that on 31 May 2017, Ms SF told Mrs complainant “the
[builder‟s name] is a good builder” (bank‟s good builder statement)
good builder statement did not amount to a misrepresentation
complainants undertook their own research prior to engaging the builder before the
31 May 2017 meeting with Ms SF. The complainants therefore did not rely on the
bank‟s good builder statement
bank did not mislead the complainants by requiring them to sign the bui lder‟s
invoices before it made the progress payments to the builder
bank did not mislead the complainants about the building contract, and
bank did not owe the complainants a fiduciary duty to ensure the original building
schedule was on track.
The complainants rejected the recommendation
In response to the recommendation the complainants say:
the bank did represent that the builder was solvent
they relied on the bank‟s representation that the builder was solvent to their
detriment
the bank misled them with respect to the progress payments
the bank misled them with respect to the building contract
the bank owed them a fiduciary duty, which arose because of the bank ‟s conduct
Determination | Case number: 615589 Page 4 of 5
the bank breached its fiduciary duties that it owed them, to their detriment.
The complainants’ further submissions do not change the outcome
In rejecting the recommendation, the complainants have not provided any new or
additional information. Rather, they refer to and rely on the substantive submissions
they made during this investigation.
I have carefully reviewed the complainants‟ submissions. I have a lot of sympathy for
the unfortunate position they find themselves in. Ultimately, however, I am not
persuaded the information shows the bank misled the complainants about the
solvency of the builder (either by way of the bank‟s good builder statement or by
requiring them to sign the invoices before each progress payment).
In my view, the bank‟s good builder statement falls well -short of representing the
builder was, and would therefore remain, solvent. I am also not satisfied the
complainants relied solely on this statement to engage the builder for several reasons
including:
the complainants initially spoke to the builder prior to Mrs complainant‟s 31 May
2017 discussion with Ms SF
in her affidavit sworn on 8 January 2019, and in relation to her discussion with Ms
SF, Mrs complainant says:
I recall at this meeting I mentioned to [Ms SF] that we intended to engage [the
builder] to perform the Renovations. I was not seek ing [Ms SF‟s] comment or
approval however [Ms SF] responded without hesitation “[builder‟s name‟s] a
good builder”. Given that the [bank] had endorsed him, I felt that we had picked a
good builder whose business had not financial issues.
the complainants knew the builder and had been recommended to use him by
other parents at the school they attended, and
they conducted their own research about him.
In my view, a brief passing statement that the builder “is a good builder” cannot
reasonably be regarded as a representation that the builder had no financial issues.
The bank has privacy and confidentiality obligations to its customers and would not be
at liberty to discuss financial matters with other customers. Mrs complainant did not
ask any questions about the builder‟s financial status and, in light of the bank‟s
privacy obligations, I do not consider reasonable for them to now say the bank ought
to have disclosed such information to them. In any event and having reviewed the
liquidator‟s report annexed to Mrs complainant‟s affidavit, I note the builder held bank
accounts and loans with different financial firms.
I have also considered the complainants‟ claims about the builder‟s 22 November
2017 email to the bank, as well as whether the bank made a misrepresentation about
Determination | Case number: 615589 Page 5 of 5
the progress payments. I am satisfied that these matters were adequately dealt with
in the recommendation and do not require further comment. I am satisfied the bank
did not mislead the complainants in relation to each of these matters.
The complainants are not entitled to any compensation
As noted, the matters raised by this complaint are extremely unfortunate and have left
the complainants in a difficult position. However, I am not satisfied that the bank has
made an error in its dealings with the complainants and the loan that now requires it
pay any compensation, or otherwise reduce the balance owing on the loan.
Recommendation
Case number 615589
Financial firm Commonwealth Bank of Australia
Recommendation | Case number: 615589 Page 2 of 14
Case number: 615589 11 July 2019
3 Overview
3.1 Complaint
In October 2017, the financial firm (the bank) provided a $800,000 home loan to the
complainants. The loan funds were to renovate their home at 5 C Terrace (the
property).
In November 2017, the complainants entered a building contract with C C
Constructions (the builder) to undertake the building works for $600,037.04 (the
building contract). The works commenced in January 2018. B y 31 May 2018, seven
payments had been made to the builder totalling $549,166.03.
In June 2018, the building works ceased and the builder subsequently went into
liquidation leaving the renovations incomplete.
The complainants say:
the bank misled them to believe:
> the builder was solvent, so they did not need to investigate his solvency
(solvency misrepresentation)
> they had to sign the builder‟s invoices immediately on receipt as a formality
without inspecting the building works as those works were complete (contract
misrepresentation).
relying on the misrepresentation they entered the building contract and authorised
payment of invoices for work which had not been completed by the builder.
the bank‟s conduct was negligent.
3.2 Issues and key findings
Did the bank misrepresent the builder was solvent?
The bank made the good builder sta tement however the bank‟s good builder
statement was not misleading. In any event, the complainants did not rely on the good
builder statement when they entered the building contract.
Did the bank misrepresent the progress payments?
The bank did not mislead the complainants regarding progress payments. The
complainants did not rely on the contract representation. The complainants had an
obligation to pay the builder‟s invoices. The bank had an obligation to release the loan
funds as progress payments on receipt of an authorised invoice.
Recommendation | Case number: 615589 Page 3 of 14
Did the bank mislead the complainants regarding the building contract?
The bank did not mislead the complainants or represent it was not satisfied with the
building contract when it received the builder‟s 22 November 2017 e mail.
Did the bank breach a duty of care owed to the complainants?
The bank did not owe a fiduciary duty to the complainants. The complainants were
able to protect their own interest under the building contract by following the progress
of the building works before authorising the builder‟s invoices.
Should the bank compensate the complainants?
The bank has not made and error or breached an obligation to the complainants. No
compensation is payable.
3.3 Recommendation
This recommendation is in favour of the bank.
Recommendation | Case number: 615589 Page 4 of 14
4 Reasons for recommendation
4.1 Did the bank misrepresent the builder was solvent?
The bank made the good builder statement
The complainants say:
on 31 May 2017, Ms SK of the bank said to Mrs complainant “[the builder‟s name]
is a good builder‟ at a t ime when it knew the builder was in financial difficulty (the
bank‟s good builder statement)
the bank‟s good builder statement was made to induce the complainants to enter
the building contract by reassuring them regarding their choice of builder.
The bank says Ms SF, who assisted the complainants to apply for the loan was aware
of the builder as having a good building reputation because he had:
worked in the area for a long time and
previously won building awards.
There is information to show the bank‟s good builder statement was made. However,
where the builder:
had previously won Housing Industry Association (HIA) building awards and
was known to the bank‟s staff member as a good builder in the area
the representation that the builder was “a good builder” is not misleading.
The bank did not represent the builder was solvent
The complainants say when the bank‟s good builder statement was made, the bank:
knew the builder was in financial difficulty/insolvent
should have communicated this information to them rather than remaining silent.
The complainants‟ say the bank knew of the builder‟s insolvency as he was a
customer of the bank. This knowledge was confirmed during an onsite meeting
between Mrs complainant and Ms SK of the bank on 26 October 2018 (the October
2018 meeting). Mrs complainant says during the meeting Ms SK said „we knew that
[the builder] had been in trouble for a couple of years‟.
The bank says it was not aware the builder was in financial difficulty until Mrs
complainant contacted Ms SF and said the builder had gone into liquidation in mid-
2018.
Ms SK of the bank says she recalls the October 2018 meeting but says she:
did not know the builder
did not have a view regarding his building works or his financial position
Recommendation | Case number: 615589 Page 5 of 14
was made aware of t he builder‟s insolvency just before the October 2018 meeting
when Ms SF of the bank (who was going on leave and could not attend the
meeting with Mrs complainant) said the builder had gone into receivership
did not make the comment attributed to her by Mrs complainant.
There are conflicting statements as to what Ms SK said about the builder‟s insolvency
at the October 2018 meeting. A conclusion cannot be reached on the balance of
probability that a solvency statement was made by the bank at the October 2018
meeting.
There is no information to show in May 2017:
the builder was a customer of the bank
the bank was aware of the builder‟s insolvency/financial difficulty.
Even if the builder was a customer of the bank due to its privacy obligations, the bank
could not disclose information about who its customers are or details of their accounts
to the complainants.
There was no information to show the builder was insolvent
At the time the complainants entered the building contract:
the builder was licensed
the builder‟s email signature on communications with both the bank and the
complainants included a list of the five HIA awards he had won between 2014 and
2016.
The builder‟s license was not recorded as suspended until July 2018, nine months
after the building contract was entered.
There is no information to show the bank:
knew the builder was in financial difficult before the building contract and loan were
entered
represented to the complainants with the bank‟s good builder statement the builder
was solvent
stayed silent when it should have made the complainants aware of its alleged
knowledge of the builder‟s financial difficulty/solvency.
The complainants did not rely on the bank’s good builder statement
The complainants say they were aware of the builder because:
the builder‟s children and their children were at school and involved in sport
together
the builder was recommended by other school parents
they researched the builder on the internet.
Recommendation | Case number: 615589 Page 6 of 14
In May 2017, Mrs complainant met the bank‟s mobile le nder Ms SF. At the meeting
the complainant said she intended to use the builder to undertake the building works.
In response Ms SF made the bank‟s good builder statement.
Where the complainants were aware of the builder and undertook their own research
and enquiries regarding his work, before Mrs complainant met Ms SF there is no
information to show the complainants relied on the bank‟s good builder statement.
Even if the complainants had relied on the bank‟s good builder statement, the
statement was not misleading.
4.2 Did the bank misrepresent the progress payments?
The bank did not mislead the complainants regarding progress payments
The complainants say they were misled by the bank into believing they had to sign
the builder‟s invoices immediately upon rece ipt:
as a formality
without inspecting the building works as those works were complete
(contract misrepresentation).
The relationship between the bank and the complainants is commercial and based in
contract. The loan contract sets out the terms of the agreement between the bank and
the complainants.
The relevant terms of the loan contract are set out in section 3.2 below. Before the
bank would release loan funds, in the form of progress payments, it required the
builder‟s invoice signed by one of the b orrowers authorising payment.
By receiving the builder‟s invoices and directing them to the complainants to authorise
payment the bank did not mislead the complainants.
The bank was required to release loan funds
Under the loan contract:
the bank agreed to pay each loan drawing in accordance with the loan contract and
the complainants‟ written instructions
the complainants agreed to „only request payment at specific stages of the building
works in accordance with the building contract‟.
Where the loan contract requirements had been met for the release of each progress
payment the bank had an obligation to pay the builder‟s invoices authorised by the
complainants.
The complainants were required to pay the builders invoices
The complainants entered the building contract with the builder to undertake their
home renovations. The bank was not a party to this contract.
Recommendation | Case number: 615589 Page 7 of 14
The relevant terms of the building contract are set out in section 3.3 below. Under the
building contract the complainants were required to pay a progress claim to the
builder within five working days of receipt of the claim (clause 4.5). Payment of a
progress claim was on account only and was not evidence that works had been
performed in accordance with the contract (clause 4.8).
After the bank approved the loan it wrote to the complainants requesting additional
information including:
the signed building contract incorporating a progress payment schedule and
completion date
council approved plans
the builders contract insurance and public liability insurance.
There is email communication between the bank and builder to show the bank was
prepared to release the first progress payment (deposit) before it received a copy of
the council‟s approved plans and builders contract insurance. The builder was to use
some of these funds to meet the costs of obtaining the council‟s approved plans and
builder‟s contract insurance. Mrs complainants signed the first invoice in December
2017 and the funds were rereleased. The building works commended in mid-January
2018.
The complainants could track the progress of the building works
The builder provided the complainants with access to an online interface to aid
communication between them including a job schedule to track progress. Mrs
complainant says she also drove past the property daily and visited it to follow
progress of the building works.
It was up to the complainants to satisfied themselves that the building works were
being carried out in accordance with the building contract.
4.3 Did the bank mislead the complainants regarding the building contract?
The bank did not mislead the complainants regarding the building contract
On 22 November 2017, the builder sent an email to the bank with an „approximate
guide‟ for the building works to have been completed for each progress payment (the
builder‟s 22 November 2017 email). The email is set out in section 3.3 below.
The complainants say the bank represented that it was satisfied with the terms and
content of the building contract and original schedule. However, by receiving the
builder‟s 22 November 2017 email, the bank was not satisfied with the building
contract and/or the original schedule. Therefore, this representation was false and
misleading
Recommendation | Case number: 615589 Page 8 of 14
Set out in section 3.3 below is a copy of the Part B- Progress Payment Schedule (the
original schedule).
There is no information to show:
the email was sent by the builder at the request of the bank
the bank was not satisfied with the original schedule or required this information to
release the loan funds.
Receipt o f the builder‟s 22 November 2017 email, does not amount to a
representation the bank was not satisfied with the building contract and/or the original
schedule.
At the time of the bank’s building inspection the building works were on track
On 15 February 2018, the bank arranged for an independent valuer to inspect the
building works and deliver a progress inspection report. At the time of the inspection
three of the six progress payments had been authorised.
The report shows the building works appeared to have been completed in line with
the plans and specifications provided and payments approved in accordance with the
schedule to 51% complete.
In February 2018, there is information to show the building works were progressing in
line with the building contract. The bank was not required under the loan contract to
inspect the building works prior to releasing the progress payments. The bank‟s
obligation to release progress payments and pay the builders invoices authorised by
the complainants continued.
The bank made a commercial decision to lend
The bank did not make an error when it exercised it judgement and made a
commercial decision to lend to the complainants in October 2017. It was the
complainants‟ decision to enter the building contract and undertake r enovations to
their property using the loan funds.
4.4 Did the bank breach a duty of care owed to the complainants?
The bank does not owe a fiduciary duty to its customers
The complainants say:
the bank owed them a duty to take reasonable steps to make them aware that the
original schedule and the building contract were not satisfactory
the bank requested further details from the builder in respect to what portion of the
renovation would be completed prior to a demand for each progress payment
this informati on was provided to the bank in the builder‟s 22 November 2017 email.
The receipt by the bank of the builder‟s 22 November 2017 email with additional
information regarding progress payments did not give rise to a duty of care between
Recommendation | Case number: 615589 Page 9 of 14
the bank and the complainants. There is no information to show the bank requested
these further details or that it had concerns regarding the original schedule. Instead it
appears the builder provided additional progress payment information to the bank
unprompted. The information provided was in line with the original schedule in terms
of the number of payments, work to be completed and timing of the progress
payments.
The bank does not have a „fiduciary‟ duty or responsibility to its customers. It is a
lender and is not obliged to advise the complainants that it received the builder‟s 22
November 2017 email. In any event, the complainants were able to protect their own
interest under the building contract by following the progress and completion of the
building works before authorisation of progress payments.
4.5 Should the bank pay compensation to the complainants?
No compensation is payable
Where the bank has not made an error or breached an obligation to the complainants
no compensation is payable.
Recommendation | Case number: 615589 Page 10 of 14
5 Supporting information
5.1 AFCA approach
Our role and powers & how we assess disputes
AFCA is an external dispute resolution service offered as an alternative to the courts.
We can review a dispute where a complainant believes that their bank has made an
error or breached an obligation owed to them.
We will consider whether the bank has made an error, and if so, what loss has been
incurred by the complainant because of the error. If a complainant is unable to show
they have incurred a loss, we may not consider the matter any further.
As AFCA is not a court of law, when we assess disputes, we consider available
documents, the recollections of the parties, and all relevant circumstances. We give
more weight to contemporaneous documentary information.
If there is no relevant documentation, we will decide what is most likely to have
occurred based on the information provided to us. If there are conflicting recollections
and these are evenly weighted, we may find that a claim cannot be established.
Binding nature of terms and conditions
If a person signs a document that they know contains contractual terms and which
they understand will affect their legal relationship with a financial firm, then the person
is legally bound by those terms. It is irrelevant whether or not the person read the
document before signing it. The only exception to this is if there are extenuating
circumstances, for example if the person was misled into signing the document.
Misleading conduct
AFCA can investigate a claim that a financial firm misled a complainant and caused
them to incur a loss. If we find that a complainant was misled, we assess how much
worse off they are as a result of relying on the misrepresentation. The remedy for
misleading conduct is not to make the promise come true.
To establish a claim for misleading or deceptive conduct, the complainant must
establish that:
the financial firm made a misleading statement to the complainant
the complainant relied on the misrepresentation and
the complainant suffered loss as a consequence.
Misleading conduct may also occur where a financial firm has been silent about a
particular matter, in circumstances where such silence was likely to be misleading or
deceptive. AFCA can consider whether a financial firm‟s failure to disclose relevant
information to a customer amounts to misleading conduct. The outcome will depend
Recommendation | Case number: 615589 Page 11 of 14
on the financial firm‟s knowledge of the customer‟s position. In some cases, AFCA will
decide a customer who was not given necessary information was misled.
5.2 Loan contract
The contract between the bank and the complainants is made up of the Schedule and
the usual terms and conditions for consumer mortgage lending (UTC).
The Schedule includes
The UTC includes
Section 2: General Terms and Conditions that apply to all Loans
1. Meaning of words
„Building Works‟ means the building works you tell us are to be carried out before we approve
the Loan or are varied with our approval. These include works referred to in any plans,
specifications, building contract or estimate of costs or quantities which you provide to us.
Recommendation | Case number: 615589 Page 12 of 14
Section 2: Home Loans (HL)
5.3 Building contract and email to bank
Building contract
Details include
Date 14 November 2017
Cont ract price $600, 037. 04
The bank is shown as the lending body
The works are renovations and additions as per plans and quotation
Part B was completed so that the Standard Progress Payment Schedule did not
apply.
Recommendation | Case number: 615589 Page 13 of 14
Recommendation | Case number: 615589 Page 14 of 14
22 November 2017 email builder to the bank
Here is an approximate guide to where we should be with each Progress Draw.
D eposit
Draw 1 D ecember- ( Most demolition exc ept r oof/ B athr ooms stripped/ Wi ndow Deposit pai d/ C oncr ete
Cutting.
Draw 2 J anuary- (Pr ep for footi ngs / Fr aming delivered and commence on i nternal Frami ng)
Dr aw 3 F ebr uary- ( C oncr ete s tr uctur al Sl abs / Ex ter nal LB W c ons tr uc ted)
Draw 4 March - (Trusses/ Roof/ Windows)
Draw 5 April - (Brickwork/ Rough ins/ Plasterboard)
Draw 6 May - (Tiling/ Cabinetry/ Fixout)
Final Pr actic al Completion.
Let me know if this is all you need.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.