Text of the determination
Determination | Case number: 613835 Page 1 of 8
Determination
Case number: 613835 29 April 2019
1 Determination overview
1.1 Complaint
The complainant holds a home insurance policy with the financial firm (insurer). The
complainant lodged a claim for water damage to the balcony. The claim was originally
declined, however was later accepted. The insurer appointed a builder to attend to
repairs.
During this period, the complainant requested the patio window to be added to scope.
This was declined by the insurer as it was deemed not related to the water damage.
The engineer was appointed and confirmed the damage related to settlement which i s
excluded under the policy. The complainant disputes the decision to decline this part
of the claim.
Due to the complainant’s concerns with the quality of the repairs, the insurer agreed
to cash settle the complainant for the cost of the full replacement of the balcony.
The complainant has raised further issues with safety at the property. She is also
dissatisfied with the conduct of the insurer, the delays with the claim and is seeking
compensation.
The Case Manager provided the parties with a recommendation on the issues in
dispute. The recommendation was in substantially favour of the insurer. A copy of the
recommendation is attached to this determination.
1.2 Issues and key findings
Were the findings of the recommendation correct?
The findings contained in the recommendation were correct and are adopted in this
determination. Further submissions provided after the recommendation have been
considered.
Is the insurer entitled to decline the damage to the window?
The information shows, the gap in the window is caused by settlement. This is
excluded under the policy. Therefore, the insurer is entitled to decline the damage to
the window.
Determination | Case number: 613835 Page 2 of 8
Is the insurer entitled to decline replacing the electrical components?
The insurer has repaired the meter box damaged by a builder. The insurer is not
required to take any further action regarding replacing the electrical components.
Is the insurer entitled to cash settle the complainant for repairs?
In consideration of the complainant’s concerns regarding the quality of repairs, a cash
settlement for the repairs is in my view the best option to bring a resolution of the
claim for the parties.
However, the insurer is required to increase the cash settlement by 15% to allow for
any contingencies.
Is the property unsafe?
The available information does not establish the property is unsafe. No additional
alternative accommodation is required.
Is the complainant entitled to compensation?
The available information shows no misconduct on behalf of the insurer.
However, the information provided indicates delays in the repairs and further damage
caused by the builder. An award of $1,000 compensation for non-financial loss is
warranted in the circumstances.
1.3 Determination
This determination is substantially in favour of the insurer.
The insurer is required pay the complainant $38,949.16 within seven days of
acceptance of this determination by the complainant.
The insurer is required to arrange return of the balustrades within seven days of
acceptance.
Within seven days of acceptance the insurer is required to obtain a quote for the
painting of the internal damage. Within a further seven days the insurer is to pay the
quoted sum plus 15% to the complainant.
The insurer is required to pay the complainant $1,000 compensation.
The insurer is not required to take any other action.
Determination | Case number: 613835 Page 3 of 8
2 Reasons for determination
2.1 Were the findings in the recommendation correct?
I have decided this case on its merits, having regard to the relevant law, good industry
practice, codes of practice and previous AFCA decisions. I have taken into account all
the material submitted by the parties, both before and after the recommendation. I am
satisfied that the documentation I have relied on has been provided to both parties.
I am satisfied that the case manager’s recommendation contains an accurate
summary of the complaint, the issues to be determined, any applicable paragraphs of
the Rules and any relevant law.
In her rejection of the recommendation, the complainant stated the recommendation
did not cover:
the works to the power box
the roof repair
side gate damage
the return of balustrades
the repair and repaint the inside of the property.
I have considered these points in this determination.
2.2 Is the insurer entitled to decline the damage to the window?
Complainant has established a valid claim under the terms of the policy
The complainant’ s policy provides cover for accidental loss or damage, which occurs
during the period of insurance, subject to various conditions and exclusions.
The policy defines accidental loss or damage as damage caused by an unintentional
act, or an unforeseen and uncontrollable incident.
There is no dispute the gap between the window and brick veneer was caused by an
unintentional act. Therefore, the complainant has established a valid claim for
accidental loss or damage under the policy.
The insurer is required to establish, on the balance of probabilities, it is entitled to rely
on exclusions under the policy to decline the damage to the window.
Evidence shows settlement caused the damage to the window
The insurer engaged engineer (IE) to determine the cause of the gap between the
window and brick veneer. IE determined the cause of the damage to the window is
settlement.
Determination | Case number: 613835 Page 4 of 8
Policy excludes loss or damage caused by settling or movements
The policy excludes loss or damage caused by or as a result of settling, shrinkage or
any movement. Given the evidence provided by IE and in the absence of evidence to
the contrary, I am persuaded the damage was caused by settlement movements
caused by volumetric changes in the foundation soil.
As the policy excludes this type of movement, the insurer is entitled to decline the
damage to the window
2.3 Is the insurer entitled to decline replacing the electrical components?
Insurer repaired the damage to the meter box caused by the builder
The complainant advised the insurer the meter box had sustained damage as result
of works being completed at the property. The insurer accepted the damage and
arrange for completion of repairs to the meter box.
The complainant is dissatisfied with repairs to the meter box. The complainant is
requesting the insurer to replace all the electricals. There is insufficient information to
show the electrical items need to be replaced.
Based on the available information, I am satisfied the insurer has repaired the
damage caused by the builder. The insurer is not liable for replacement for all of the
electricals.
2.4 Is the insurer entitled to cash settle the complainant for repairs?
Policy allows the insurer the discretion of how to settle the claim
The policy provides the insurer will decide how it will settle the claim. It states:
If your buildings, suffer loss or damage, we will decide whether to:
repair
rebuild, or
pay you the cost to repair that part of your buildings that suffered loss or damage.
I am satisfied the insurer is entitled to cash settle the claim in accordance with the
policy wording.
Cash settlement is the best resolution in the circumstances
The insurer has utilised four builders over the course of the claim. The complainant
has expressed dissatisfaction with the various builders and the quality of the repairs.
In consideration of the complainant’s dissatisfaction, the insurer offered to cash sett le
the complainant for the repairs. The insurer offered the complainant $33,863.83. This
Determination | Case number: 613835 Page 5 of 8
amount is based on a quote provided for the full cost of the replacement of the
balcony.
In her rejection of the recommendation, the complainant advised she had approached
seven builders who have refused to complete the repairs. This information was only
raised at the recommendation stage of the complaint. However, the complainant has
not provided information show this. Further, the complainant originally requested of
her builder to complete repairs.
Based on the evidence provided and bearing in mind the need to bring finality to the
matter for the parties, I am satisfied a cash settlement of the claim is the most
appropriate resolution in the circumstances.
The complainant has not been satisfied with various builders appointed by the insurer.
In my view a cash settlement with a further allowance for contingencies is the best
way to resolve the claim, given it is clear the relationship between the parties has
broken down.
Insurer is required to increase the cash settlement amount
As stated above, the insurer has offered the complainant $33,868.83 for the full cost
of the replacement of the balcony.
The insurer requested the complainant provide a quote for consideratio n. The insurer
and AFCA did not receive a quote from the complainant for the full cost of the
replacement of the balcony.
Based on the available information, I am of the view an increase of 15% of the quote
of $33,868.83 is fair and reasonable in the circ umstances. This increase in the cash
settlement will allow for any contingencies which may arise when the complainant
appoints her builder to complete repairs.
Upon acceptance by the complainant, the insurer is required to raise payment of
$38,949.16 within seven days of acceptance by the complainant.
Insurer is required to obtain a quote for the internal painting
The complainant says the scope of works does not include the internal painting of the
entrance of the property. The complainant says this was accepted as part of the
claim, however was not included in the scope of works or quote for cash settlement.
The complainant says the claim notes provided show the internal painting was
accepted.
In review of the claim notes, I note the insurer said on multiple occasions, the painting
needed to be included in the scope of works. It is unclear as to why this did not occur.
Determination | Case number: 613835 Page 6 of 8
On that basis, I am satisfied the insurer is required to obtain a quote for the internal
painting and cash settle the complainant for the quote and including an addition 15%
to allow for any additional contingencies.
Insufficient information to show other damage
The complainant submits the make safe works caused additional damage to the
property. The complainant says the make safe damaged the roof above the balcony
which was caused as a result of the posts being screwed in the wrong position. The
complainant says the insurer was aware of this and this was referred to in the claim
notes.
The complainant further submits the make safe works caused additional damage to
the side gate. The complainant says this was a result of gate being forced opened for
make safe works to be completed.
I have reviewed the claim notes in full. There is no mention of the roof sustaining
damage from the make safe. Therefore, I am of the view there is insufficient
information to show the roof sustained damage because of the make safe. Further, I
am of the view there is insufficient information to show the side gate sustained
damage as a result of the make safe works.
2.5 Is the property unsafe?
The property is safe and no further entitlement for alternative accommodation
The complainant alleges the property is unsafe. The complainant says there is
structural issues with the balcony. The insurer requested IE assess the structural
issues with the balcony. IE found the balcony is not in danger of collapse. IE found
the balcony framing has not been significantly softened or damaged.
While I acknowledge the complainant’s concerns regarding the safety, I am not
satisfied she has established the property is unsafe. The available expert information
shows there is no danger of the balcony collapsing.
The policy provides cover for alternative accommodation where the buildings suffer
loss or damage and the complainant is unable to live in her home as a result.
The findings of IE do not establish the complainant is unable to live in the property.
Therefore, I am satisfied there is no further entitled for alternative accommodation
2.6 Is the complainant entitled to compensation?
AFCA may award compensation for non-financial loss
Under the AFCA Rules, AFCA may award compensation (capped at $5,000) for non-
financial loss where a complainant has suffered an unusual degree or extent of
Determination | Case number: 613835 Page 7 of 8
physical inconvenience, time taken to resolve the situation or interference with their
expectation of enjoyment or peace of mind.
However, AFCA adopts a conservative approach to the award of the compensation
for non-financial loss. AFCA expects complainants to be moderately robust and bear
the usual stress and inconvenience associated with an insurance claim.
No evidence to show misconduct
The complainant alleges the insurer lied to her and bullied her into accepted the cash
settlement. These are very serious allegations.
I reviewed the correspondence provided the parties, including the claim notes and
listened to the call recording. I am satisfied the insured acted in a professional
manner in handling the claim.
Some delays in the claims handling
The complainant is dissatisfied with the time taken to attend to repairs. The
complainant is further dissatisfied of the time taken during the complaint process with
the insurer.
I reviewed the claim notes and various reports provided. I agree there was an initial
delay in acceptance of the claim. There was a further delay due to alternate builders
being appointed and issues with the quality of repairs.
I accept these delays are not ideal. As discussed above, the builders caused further
damage to the meter box at the property. I acknowledge the insurer attended to this
damage. However, I accept the delays and further damage has caused the
complainant stress and inconvenience in the repair process.
An award of $1,000 compensation is warranted in the circumstances
As detailed above, I am not persuaded there was misconduct on behalf of the insurer.
However, I am satisfied the delays and further damage caused the complainant stress
and inconvenience. Therefore, I am satisfied an award of $1,000 compensation is
warranted in the circumstances.
Determination | Case number: 613835 Page 8 of 8
3 Supporting information
3.1 AFCA approach
There has been a full exchange of material between the parties and each party has
had the opportunity of addressing the issues that arise from the information
exchanged.
This determination follows consideration of all information and is based on what is fair
in all the circumstances, having regard to the relevant legal principles, terms of the
policy, good industry practice including codes of practice and prior determinations
where applicable.
Recommendation | Case number: 613835 Page 1 of 1 0
Recommendation
Case number: 613835 4 April 2019
4 Overview
4.1 Complaint
The complainant holds a home insurance policy with the financial firm (insurer). The
complainant lodged a claim for water damage to the balcony. The claim was originally
declined, however was later accepted. The insurer appointed a builder to attend to
repairs.
The complainant requested a different builder, which was agreed by the insurer. A
new builder was appointed. The complainant remained dissatisfied with the quality of
repairs and requested a different builder to complete repairs.
During this period, the complainant requested the patio window to be added to scope.
This was declined by the insurer as it was deemed not related to the water damage.
The engineer was appointed and confirmed the damage related to settlement which is
excluded under the policy. The complainant disputes the decision to decline this part
of the claim.
During repairs, the builder damaged the meter box. The insurer arranged for repairs
to be completed to the meter box. The complainant is requesting all of the electrical
components to be replaced.
Due the complainant’s concerns with the quality of the repairs, the insurer agreed to
cash settle the complainant for the cost of the full replacement of the balcony. The
complainant is requesting the insurer appoint a qualified builder to complete the
repairs.
The complainant has raised further issues with safety at the property. She is also
dissatisfied with the conduct of the insurer, the delays with the claim and is seeking
compensation.
4.2 Issues and key findings
Is the insurer entitled to decline the damage to the window?
The information shows, the gap in the window is caused by settlement. This is
excluded under the policy. Therefore, the insurer is entitled to decline the damage to
the window.
Recommendation | Case number: 613835 Page 2 of 10
Is the insurer entitled to decline replacing the electrical components?
The insurer has repaired the meter box damaged by a builder. The insurer is not
required to take any further action regarding replacing the electrical components.
Is the insurer entitled to cash settle the complainant for repairs?
In consideration of the complainant’s concerns regarding the quality of repairs, a cash
settlement for the repairs is in my view the best option to bring a resolution of the
claim for the parties.
However, the insurer is required to increase the cash settlement by 15% to allow for
any contingencies.
Is the property unsafe?
The available information does not establish the property is unsafe. No additional
alternative accommodation is required.
Is the complainant entitled to compensation?
The available information shows no misconduct on behalf of the insurer.
However, the information provided indicates delays in the repairs and further damage
caused by the builder. An award of $1,000 compensation for non-financial loss is
warranted in the circumstances.
4.3 Recommendation
This recommendation is substantially in favour of the insurer.
The insurer is required pay the complainant $38,949.16 within seven days of
acceptance of this recommendation by both parties.
The insurer is required to pay the complainant $1,000 compensation.
The insurer is not required to take any other action.
Recommendation | Case number: 613835 Page 3 of 10
5 Reasons for recommendation
5.1 Is the insurer entitled to decline the damage to the window?
Complainant has established a valid claim under the terms of the policy
The complainant’s policy provides cover for accidental loss or damage, which occurs
during the period of insurance, subject to various conditions and exclusions.
The policy defines accidental loss or damage as damage caused by an unintentional
act, or an unforeseen and uncontrollable incident.
There is no dispute the gap between the window and brick veneer was caused by an
unintentional act. Therefore, the complainant has established a valid claim for
accidental loss or damage under the policy.
The insurer is required to establish, on the balance of probabilities, it is entitled to rely
on exclusions under the policy to decline the damage to the window.
Evidence shows settlement caused the damage to the window
The insurer engaged engineer (IE ) to determine the cause of the gap between the
window and brick veneer. IE found:
the foundation soils in the vicinity of the site are likely to include reactive clay
horizons, which will expand if their moisture content increases, and shrink if their
moisture content reduces.
these volumetric heaving and shrinkage movements will lead to vertically upward
heaving and downward settlement movements.
settlement of a building is likely to occur if its footings are supported on a reactive
clay foundation soil that is subject to tree drying.
the minor gap between the window frame and the brick veneer has been caused
by volumetric changes in the foundation soil beneath the home due to seasonal
moisture variations and environmental changes and moisture demands of nearby
vegetation.
Policy excludes loss or damage caused by settling or movements
The policy wording is clear and unambiguous. The policy excludes loss or damage
caused by or as a result of settling, shrinkage or any movement. The report provided
by IE establishes the cause of the gap between the window and brick veneer is
settlement movements caused by the volumetric changes in the foundation soil.
Recommendation | Case number: 613835 Page 4 of 10
Given the evidence provided by IE and in the absence of evidence to the contrary, I
am persuaded the damage was caused by settlement movements caused by
volumetric changes in the foundation soil.
As the policy excludes this type of movement, the insurer is entitled to decline the
damage to the window.
5.2 Is the insurer entitled to decline replacing the electrical components?
Insurer repaired the damage to the meter box caused by the builder
The complainant advised the insurer the meter box had sustained damage as result
of works being completed at the property. The insurer accepted the damage and
repairs to the meter box were completed.
The complainant is dissatisfied with repairs to the meter box. The complainant is
requesting the insurer to replace all of the electricals. There is insufficient information
to show the electrical items need to be replaced.
Based on the available information, I am satisfied the insurer has repaired the
damage caused by the builder. The insurer is not liable for replacement of the all the
electricals.
5.3 Is the insurer entitled to cash settle the complainant for repairs?
Policy allows the insurer the discretion of how to settle the claim
The policy provides the insurer will decide how it will settle the claim. It states:
If your buildings, suffer loss or damage, we will decide whether to:
repair
rebuild, or
pay you the cost to repair that part of your buildings that suffered loss or damage.
I am satisfied the insurer is entitled to cash settle the claim in accordance with the
policy wording.
Cash settlement is the best resolution in the circumstances
The insurer has utilised four builders over the course of the claim. The complainant
has expressed dissatisfaction with the various builders and the quality of the repairs.
The complainant has alleged the trade people are not qualified to complete the works.
The complainant requested the insurer appoint a new builder to complete the repairs.
In consideration of the complainant’s dissatisfaction, the insurer offered to cash settle
the complainant for the repairs. The insurer offered the complainant $33,863.83. This
Recommendation | Case number: 613835 Page 5 of 10
amount is based on a quote provided for the full cost of the replacement of the
balcony.
Based on the evidence provided and bearing in mind the need to bring finality to the
matter for the parties, I am satisfied a cash settlement of the claim is the most
appropriate resolution in the circumstances.
The complainant has not been satisfied with various builders appointed by the insurer.
In my view a cash settlement with a further allowance for contingencies is the best
way to resolve the claim, given it is clear the relationship between the parties has
broken down.
Insurer is required to increase the cash settlement amount
As stated above, the insurer has offered the complainant $33,868.83 for the full cost
of the replacement of the balcony.
The insurer requested the complainant provide a quote for consideration. The insurer
and AFCA did not receive a quote from the complainant for the full cost of the
replacement of the balcony.
Based on the available information, I am of the view an increase of 15% of the quote
of $33,868.83 is fair and reasonable in the circumstances. This increase in the cash
settlement will allow for any contingencies which may arise when the complainant
appoints her builder to complete repairs.
Upon acceptance by both parties, the insurer is required to raise payment of
$38,949.16 within seven days of acceptance by the complainant.
5.4 Is the property unsafe?
No information to indicate the property is unsafe
The complainant alleges the property is unsafe. The complainant says there is
structural issues with the balcony.
The insurer agrees the balcony needs replacement. The insurer arranged for a
temporary fence to be placed around the property. Due to the Christmas holiday no
further work occurred and the insurer offered alternative accommodation.
The insurer requested IE assess the structural issues with the balcony. IE found the
balcony is not in danger of collapse. IE found the balcony framing has not been
significantly softened or damaged.
While I acknowledge the complainant’s concerns regarding the safety, I am not
satisfied she has established the property is unsafe. The available expert information
shows there is no danger of the balcony collapsing.
Recommendation | Case number: 613835 Page 6 of 10
No further entitlement for alternative accommodation
The policy provides cover for alternative accommodation where the buildings suffer
loss or damage and the complainant is unable to live in her home as a result.
The findings of IE do not establish the complainant is unable to live in the property.
Therefore, I am satisfied there is no further entitled for alternative accommodation.
5.5 Is the complainant entitled to compensation?
AFCA may award compensation for non-financial loss
Under the AFCA Rules, AFCA may award compensation (capped at $5,000) for non-
financial loss where a complainant has suffered an unusual degree or extent of
physical inconvenience, time taken to resolve the situation or interference with their
expectation of enjoyment or peace of mind.
However, AFCA adopts a conservative approach to the award of the compensation
for non-financial loss. AFCA expects complainants to be moderately robust and bear
the usual stress and inconvenience associated with an insurance claim.
Insufficient information to show misconduct by the insurer
The complainant alleges the insurer lied to her and bullied her into accepted the cash
settlement. These are very serious allegations.
I reviewed the correspondence provided the parties, including the claim notes and
listened to the call recording. I am satisfied the insured acted in a professional
manner in handling the claim.
The complainant has not provided any evidence supporting her allegations. In the
absence of clear evidence to support these allegations, I do not consider the insurer
has acted inappropriately.
Delays have occurred
The complainant is dissatisfied with the time taken to attend to repairs. The
complainant is further dissatisfied of the time taken during the complaint process with
the insurer.
I reviewed the claim notes and various reports provided. I agree there was an initial
delay in acceptance of the claim. There was a further delay due to alternate builders
being appointed and issues with the quality of repairs.
I accept these delays are not ideal. As discussed above, the builders caused further
damage to the meter box at the property. I acknowledge the insurer attended to this
damage. However, I accept the delays and further damage has caused the
complainant stress and inconvenience in the repair process.
Recommendation | Case number: 613835 Page 7 of 10
An award of $1,000 compensation is warranted in the circumstances
As detailed above, I am not persuaded there was misconduct on behalf of the insurer.
However, I am satisfied the delays and further damage has caused the complainant
stress and inconvenience. On that basis, I am satisfied an award of $1,000
compensation is warranted in the circumstances.
Recommendation | Case number: 613835 Page 8 of 10
6 Supporting information
6.1 AFCA approach to this recommendation
This case has been decided on its merits, having regard to what is fair in all the
circumstances, the relevant law, good industry practices, codes of practice and
previous decisions.
There has been a full exchange of all material information relied on for the purpose of
this recommendation and each party has had the opportunity to address any issues
raised by the other. All of the material provided by the parties has been reviewed and
considered.
While the parties may have raised numerous issues in their submissions, for the
purposes of this recommendation commentary has been restricted to those issues
which are considered directly relevant to the outcome.
6.2 Relevant policy wording
Alternative accommodation – page 11
If your buildings or contents suffer loss or damage and you are unable to live in your home as a result,
we will cover the costs of alternative accommodation for up to 12 months.
Exclusions to Your Cover – page 24
Any cover we provide is subject to the following exclusions.
Accident Damage cover, additional cover and Strata Title Mortgagee Protection exclusions
We will not cover any loss or damage as a res ult of, or caused by:
settling, shrinkage or any movement of earth
..
roots from trees, plants, shrubs or grass
…
How we settle a buildings claim – page 37
1. We will decide how we will settle your claim
If your buildings suffer loss or damage, we will decide whether to:
Repair
Rebuild, or
Pay you the reas onable cost to repair or rebuild that part of your buildings that suffered loss or
damage.
If we do, we will:
Recommendation | Case number: 613835 Page 9 of 10
…
only repair, rebuild or pay for the part or parts of the building that actually sustained loss or
damage…
6.3 Expert reports
Record Key points
complainant’s expert (RR)
Email
1 May 2018
water has gotten underneath damaged the cement sheeting and
caused the cement sheet to move and expand and crack the tiles
with all of the movement.
the only reason this has happened is there is no water proofin g
under the tiles and the cement sheeting absorbs water.
insurer’s expert (RB)
Report
11 May 2018
lack of waterproofing to the entire balcony floor has allowed
moisture and dampness to seep through the tile grout of a
number of years.
this has resulted in the timber particle board sub flooring to
become swollen and detach the floor tile.
insurer’s expert (AJ)
Report
1 5 June 2018
unable to warrant concerns.
using a particle board in an external environment will always
welcome return and damage issues.
a fibrous board is highly rec ommended to complet e repairs over
the current scope.
the fall of the balcony needs to meet Australian code.
the perimeter and po st penetration areas of floor tiling has no
return lips to isolate any seepage flow through issue to the
balcony.
a perimeter and post penetration junctions require waterproofing
and sealing.
installation matting is recommended with a tile cover is highl y
recommended to meet AS3740.
insurer’s expert (AJ)
Report
29 June 2018
all resultant damage is covered except for the noted structural
movement to the property.
as the structural movement was a previous issue within the
property and outside of the covered event this damage will not be
scoped for.
insurer’s expert (BB)
Report
31 October 2018
repairs to the balcony at the front of the premises had not been
completed.
upon inspection of the incomplete repairs we believe that the
insured has not been satisfied with the standard of workmanship
to this point.
requested by the ins urer to provide a scope of works and
quotation for the rectification and completion of the rep airs to the
balcony.
all other items that are in need of repair will require subsequent
quotations.
Recommendation | Case number: 613835 Page 10 of 10
Record Key points
insurer’s expert (IE)
Report
2 January 201 9
the available evidence indicates that balcony framing has not
been significantly softened or damaged.
there was also no visible damage to the floor framing connections
or to the supporting posts.
the balcony structure is not in danger of collapse.
foundations soils in the vicinity of this site are likely to include
reactive clay horizons which will ex pan d if their moisture content
increases and shrink if their moisture cont ent reduces.
these volumetric heaving and shrinkage movements will lead to
vertically upward heaving and downward settlement movements,
respectively, at the soil surface.
the presence of abnormal soil moisture conditions (i.e caused by,
for instance, an absence of impervious paving, poor surface
water drainage conditions, tress etc.) can significantly exacerbat e
the seasonal changes in moisture content.
the actual foundati on soil conditions at the site can be determined
by recovering soil samples, which we can arrange should you
consider it warranted.
the available evidence indicates that the gap between the balc ony
window frame and the brick veneer has occurred due to lon ger -
term footing movement.
a council reserve in located near the building’s corner, which may
adversely affect the soil moisture condition under the part of the
front of the dwelling, particularly during drier years.
because the soil in which the trees a re growing contains reactive
clay soil, the removal of soil moisture causes the soil to shrink,
which leads to a settlement that will be a maximum at the soil
surface, with the degree of soil shrinkage reducing with the depth
in the soil profile as well as the horizont al distance from the trees
that are causing the drying influence.
settlement of a building is likely to occur if its footings are
supported on a reactive clay foundation soil that is subject to tree
drying.
the minor gap between the window f rame and the brick veneer
has been caused by volumetric changes in the foundation soil
beneath the home due to seasonal moisture variations and
environmental changes and the moisture demands of nearby
vegetation.
6.4 Other material considered
complainant’s submissions.
insurer’s submissions.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.