Insurer limited exploratory leak-detection costs to $1,000 policy benefit; claim otherwise declined

FirmFinancial Firm (Unknown - Insurer)
Decided2019-04-30
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed$12,025
SourceAFCA PDF

Summary

Complainant sought $12,025 for leak-detection and reinstatement costs under a home policy; the insurer paid the $1,000 exploratory-costs benefit. AFCA affirmed the insurer's position.

The insurer met its Insurance Contracts Act notice obligations at renewal, so the 2014 PDS applies and caps no-damage exploratory costs at $1,000.

Issues

Subjects and remedies

no remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination | Case number: 612655 Page 1 of 6 Determination Case number: 612655 30 April 2019 1 Determination overview 1.1 Complaint The complainant holds a home building and contents policy underwritten by the financial firm (the insurer) covering his home address . On 17 September 2018, a claim was lodged under the policy after the complainant discovered a leaking pipe at the property. The insurer considered the claim, however noted there was no resultant damage to the property from the leak to which the policy could respond. However, the insurer covered the complainant for the exploratory costs incurred to locate the leak, for the maximum benefit of $1,000 available under the policy. The complainant believes the insurer has relied on an incorrect product disclosure statement (PDS) when imposing this limit, as the most recent copy of the PDS he has covers unlimited leak detection and exploratory costs. He also says as the insurer accepted a similar claim in 2016, it is bound to accept this one. He seeks the amount of $12,025 in settlement of his claim. 1.2 Issue and key findings Has the insurer fulfilled its obligations under the policy terms? The insurer has fulfilled its obligations under the policy terms because:  under section 35 of Insurance Contracts Act 1984 (the Act), the insurer is required to provide the product disclosure statement (PDS) to clearly inform of the terms of the policy;  the insurer has shown it has a process in place for dispatching the renewal notices including the PDS to its insureds;  on balance, the complainant was provided with the updated PDS when renewing the policy in 2014;  the insurer is therefore entitled to rely on those terms when assessing any claim made against the policy;  the insurer is entitled to limit its liability to the exploratory costs maximum benefit set out in the policy of $1,000; and  there is no resultant damage to the property to whic h the policy would respond. Determination | Case number: 612655 Page 2 of 6 1.3 Determination This determination is in favour of the insurer. The insurer has fulfilled its obligations under the policy by way of payment of the $1,000 exploratory costs benefit and is not required to take any further action. Determination | Case number: 612655 Page 3 of 6 2 Reasons for determination 2.1 Has the insurer fulfilled its obligations under the policy? Complainant has the onus to establish a prima facie claim It is established insurance law the complainant carries the initial onus to show that the terms and conditions of the relevant insurance policy covers the loss. This is known as a prima facie claim. Once the complainant establishes a prima facie claim, the onus then shifts to the insurer to demonstrate the loss is not covered, either by way of one of the policy exclusions or on some other basis. The insurer’s policy is a defined events policy. Therefore, the policy only responds where an incident caused by one or more of the listed events results in loss or damage, subject to any exclusions. No resultant damage to the property The insuring clause states the policy will respond to loss or damage to the building caused by liquid leaking… from a fixed pipe . The parties agree there is no resultant damage to the property caused by the leak. Rather, the only costs incurred by the complainant are the costs to locate the leak, access the pipe for repair and to reinstate the area. Therefore, as there is no resultant damage to the building from the leak, there is no claim under this section of the policy. The insurer was therefo re entitled to decline the claim as there is no loss to which the policy would respond, save for the exploratory costs benefit which will be addressed below. Complainant says insurer not entitled to rely on policy terms The complainant says he was not aware of the change in the policy to impose a maximum benefit for exploratory costs. The PDS he relies on, which is dated 2006, provides no limit for this benefit. He says he has not received an updated PDS since the 2006 edition. Further, the complainant says he was advised by the insurer he was covered for reinstatement costs of the area as part of the benefit. Therefore, the complainant asserts the insurer has failed in its obligations to inform him of the terms with which it was offering cover and as a consequence, is not entitled to rely on those terms. The insurer says it updated the PDS in 2014 and the complainant was provided with a copy of the new policy with his renewal notice of that year. It therefore asserts it is entitled to rely on the 2014 terms when assessing the claim. Determination | Case number: 612655 Page 4 of 6 Insurer complied with its legal obligations to advise of the policy terms The insurer has provided evidence of its mail out procedures operative in 2014, which show it had a process in place for dispatching documents to its insureds. On balance, I accept the insurer has demonstrated its processes in place meant the 2014 renewal documents, including the updated PDS, were dispatched and lodged with Australia Post. It is important to note that the Act requires only that the insurer provide the notices in accordance with the provisions set out in the Act. It is not incumbent on the insurer to demonstrate the notice was received by the complainant. Rather, the test is that it was sent in accordance with the Act. Whilst the insurer has only provided a copy of the PDS in 2014, this is not fatal to its case. This is because Section 11(10)a of the Act provides that where an insurer has previously provided notice of the policy terms as required under section 35 of the Act, then the insurer is deemed to have satisfied the requirements of the Act at any subsequent renewal, variation or extension of the contract. The customer then has the option of cancelling the contract during the cooling off period once they have received the policy documents and had an opportunity to review it if they are dissatisfied with the cover offered. The onus rested with the complainant to review the policy documentation to ensure the level of cover provided met with his particular needs. Therefore, I accept the insurer has met its obligations to advise of the policy terms at renewal under sections 35, 58 and 72A of the Act. It is therefore entitled to rely on the 2014 PDS when assessing the claim against the policy, as that forms the basis of the contract in place as at the 2017 renewal. Policy contains a limit for the exploratory costs benefit The policy offers two differing benefits for exploratory costs incurred. Which benefit is applicable is dependent on whether there was resultant damage sustained due to the leak. In this instance, there was no resultant damage suffered. Accordingly, the benefit for exploratory and leak detection costs where there is no corresponding claim is triggered. This benefit clearly states the maximum level of cover available under the benefit is $1,000. There is no dispute the insurer has settled this amount. Whilst this benefit will cover costs to not only locate the leak but to repair and reinstate the damage caused to the building by the exploratory work, which is the bulk of the costs incurred in the complainant’s case, it is still subject to the policy limit. Whilst I accept the insurer has advised the complainant he had cover for not only the leak detection and exploratory costs but the reinstatement costs as well, the material Determination | Case number: 612655 Page 5 of 6 shows he was informed of the policy limit on 18 September 2018, before any exploratory works were undertaken. In any event, even if I were to accept the complainant was given incorrect information regarding the policy limits (and I do not), he has not shown he relied in the information provided by the insurer to his detriment. This is because he was required to locate, access and repair the leak and reinstate the area regardless of the outcome of his claim or any advice given by the insurer. Therefore, the insurer has fulfilled its obligations under the policy by way of its payment of the policy limit of $1,000 for the exploratory costs and leak detection benefit. Other matters The complainant has raised the issue of a prior similar claim in 2016 which was accepted by the insurer. He maintains this created a precedent and the insurer is therefore bound to accept this claim. The insurer points out that the previous claim differed as there was resultant damage from the leak, which coincidentally was in the same area which required removal to access the leaking pipe for repairs. This is why the costs to reinstate the area were not subjected to the $1,000 limit in that claim. However, each claim is assessed on its own individual merits including the specific loss suffered and the policy in place at the time of the loss occurring. Prior acceptance of claims does not bind an insurer to acceptance of all future claims for similar losses. Accordingly, the claim is assessed on its merits as set out above. Determination | Case number: 612655 Page 6 of 6 3 Supporting information 3.1 AFCA approach to this dispute This complaint has been determined based on what is fair in all the circumstances, having regard to the relevant law, good industry practice, codes of practice and previous decisions of AFCA or its predecessor schemes (which are not binding). A full exchange of the relevant information has taken place between the respective parties. Each party has had the opportunity of addressing any issues raised. All of the provided material has been reviewed and considered. The parties have raised numerous issues in their submissions to AFCA. However, commentary in this determination is restricted only to those issues considered relevant to the outcome. 3.2 Relevant sections of the policy Escape of liquid We cover Loss or damage to the building caused by liquid leaking, ov erflowing or bursting from any of the following: • any drain, fixed pipes, roof gutters or guttering and rainwater downpipes, drainage and sewage systems; ... … Exploratory costs where a leak is not covered under insured event ‘Escape of liquid’ We cover We will pay the cost to locate the source of liquid escaping or ov erflowing at the insured address and to repair and restore the damage to the building caused by our exploratory work if the escape of liquid first happens during the period of insurance. The most we will pay is $1,000 for each incident . If you make a claim under this additional cover, no excess applies.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.