Home / IAG / Determination 611153

Determination 611153

Storm water damage claim declined

FirmIAG
Decided2019-10-18
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The insurer declined a storm-related basement water damage claim, relying on exclusions for faulty construction, tree roots and wear. AFCA found the storm caused the damage and the insurer had not proved an exclusion applied, ordering reassessment, cash settlement with statutory interest, and up to $5,000 for the complainant's engineers' reports.

The insurer's expert opinion did not establish on the balance of probabilities that the policy exclusions caused the damage, so the onus under the storm insured event was not discharged.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay compensationpay interestreassess claim

Related

All IAG determinations · Find similar determinations

Text of the determination

Determination Case number 611153 Financial firm Insurance Manufacturers of Australia Pty Ltd Determination | Case number: 611153 Page 1 of 15 Case number: 611153 15 October 2019 1 Determination overview 1.1 Complaint The complainant holds a home insurance policy with the financial firm (insurer). She lodged a claim on 4 December 2017 for damage sustained to her property following heavy rainfall over the preceding days. The insurer declined the claim because it says the damage did not occur as a result of an insured event such as storm but because of lack of waterproofing around the perimeter of the basement and an ineffective or damaged subsoil/subfloor drainage system. The insurer also said damage occurred over an extended period and was related to poor design. It says it is not liable for the claimed damage because the policy does not provide cover for damage caused in this way. The complainant disputes this and requires the insurer pays for repairs. 1.2 Issues and key findings Has the complainant established a valid claim? The complainant has established a valid claim as the available information establishes on the balance of probabilities the property was damaged by storm. Is the insurer entitled to rely on its policy exclusions to decline the claim? The insurer is not entitled to rely on its policy exclusions to decline the claim as the competing engineers‟ reports and photographs and available information do not establish on the balance of probabilities the proximate cause of damage to the property were the policy exclusions relied on by the insurer. 1.3 Determination This determination is in favour of the complainant. Should the complainant accept this determination then within seven days of notification of acceptance:  The insurer is to re-engage its builder (JP) to reinspect and reassess the water damage to the basement and prepare a detailed scope of works. The insurer is to work with the complainant to settle the scope of works before the insurer cash settles the claim pursuant to the policy terms and conditions. Determination | Case number: 611153 Page 2 of 15  The insurer is to pay statutory interest on the agreed cash settlement pursuant to section 57 of the Insurance Contracts Act (the Act) from 15 January 2018 (the date it denied the claim) until the date of settlement.  The complainant is to provide the insurer with invoices evidencing the cost of her engineer‟s reports .  U pon receipt of these invoices, the insurer is to pay the cost of the complainant‟s engineer‟s reports up to $5,000 .  If the complainant has paid for these reports already, the insurer is also to pay statutory interest on the cost of the reports pursuant to section 57 of the Act from the date of payment of the reports until the date of settlement. Determination | Case number: 611153 Page 3 of 15 2 Reasons for determination 2.1 Has the complainant established a valid claim? Complainant has established damage caused by storm The complainant is represented by her son. For the sake of brevity, any reference in this determination to the complainant includes reference to the complainant‟s representative. The complainant must establish on the balance of probabilities she has suffered a loss caused by an event to which the policy responds. This is known as a prima facie or valid claim. The policy covers several insured events, with optional cover for accidental damage. The certificate of insurance (COI) confirms the complainant did not take out cover for accidental damage. Under the insured event „storm‟, the policy provides cover for loss or damage caused by a storm. This includes violent wind, cyclone, tornado, rain, thunderstorm, hail, snow and landslide or subsidence which happens immediately because of the storm. The complainant lodged a claim on 4 December 2017 for damage sustained to her property following heavy and sustained rainfall over the preceding days. Following lodgement, the insurer appointed a builder (JP) and plumber (PB) to attend the complainant‟s property and report on the damage. JP found damage to the complainant‟s property which included soaked carpets, swelling timber skirting, blistering paint on lower sections of walls and mould growth along skirting and walls. There is no dispute that a storm involving significant rainfall affected the complainant‟s property in early December 2017. Bureau of Meteorology records (close to the complainant‟s property) indicate 41mm of rainfall was recorded on 2 December 2017 and 68mm of rainfall was recorded on 3 December 2017. The complainant engaged an engineer (CC) who inspected the property in June 2018. He described the storm events as significant. He said the basement flooded because of the rain events and not because of the failure of the basement construction as contended by the insurer‟s expert. Based on the available material, I am satisfied on the balance of probabilities the complainant‟s property was damaged because of the storm event in early December 2017. Therefore, I am satisfied the complainant has established a valid claim. Determination | Case number: 611153 Page 4 of 15 2.1 Is the insurer entitled to rely on its policy exclusions to decline the claim? Onus shifts to the insurer to establish an exclusion applies Once so established, the onus shifts to the insurer to prove on the balance of probabilities that an exclusion applies if it seeks to deny or limit its liability for the loss. The insurer relies on material from JP and PB and reports from an engineer (F). F says the proximate cause of the water ingress to the basement is not the rainfall event but poor detailing, construction and abandoning of the stormwater drainage system. The compl ainant also relied on reports from an engineer (CC). CC‟s reports were referred to F. F said CC‟s opinion did not change its opinion and conclusion. Relying on this material, the insurer says it has satisfied the onus it has to establish the policy exclusions apply to defeat the claim. The policy exclusions and expert material relied on by the parties are summarised in supporting section 3 of this determination. JP noted a channel drain had been installed along the front of the basement rooms which drained into a PVC pipe directing water to the garden along the east boundary. He said this did not comply with regulations because the downpipes were not connected to the underground stormwater drainage system. Having considered the available evidence, I accept the drainage into the garden was a temporary measure during the storm event and the trenches were dug along the front and side of the house after the storm event. The statutory declaration from the complainant‟s neighbour supports the complainant‟s positi on. PB inspected the below ground stormwater drain system to the right-hand side of the house by CCTV. He found major tree root intrusion which he said restricted the flow of water resulting in overflows and saturation to the soil to the external wall resulting in water ingress into the basement via the poorly tanked external wall lining. It is not in dispute there was no water proof membrane on the basement walls. However, I am satisfied from the available information this was not a requirement when the basement was constructed. Moreover, the complainant‟s engineer (CC) says although the stormwater system was full of tree roots it did not affect the functioning of the remaining stormwater system servicing the house. This is not rebutted by the insurer‟s experts. The insurer‟s engineer (F) inspected and photographed the property in March 2018. He concluded the basement was not suitably constructed and waterproofed. He also Determination | Case number: 611153 Page 5 of 15 said the earthenware pipe in the subfloor which was intended as a drainage system around the perimeter of the basement wall had been abandoned or was badly damaged and therefore no longer effective. He described where water likely entered the subfloor and said the block work at this point was poorly constructed and allowed an easy path for water to flow into and build up within the sub floor. F‟s opinio n was challenged by the complainant. The complainant also obtained an expert opinion from his own engineer (CC). The engineers had the opportunity to comment on each other‟s reports. Probable cause of the claimed damage was not the policy exclusions relied on Having considered the available material, I am not satisfied F‟s opinion about the cause of damage is sufficiently persuasive to establish on the balance of probabilities the application of the policy exclusions relied on by the insurer. Firstly, I accept it is probable the basement walls were waterproofed adequately according to the standards applicable at the time of construction. In his second report, F agrees when the basement was constructed it would not have required waterproofing membrane. CC says the exterior retaining block walls were rendered below ground level which was the appropriate method of waterproofing at the time of construction. This is not persuasively rebutted by F. Secondly, having reviewed the detailed report from CC and photographs, I accept F was probably mistaken when he said the pipe in the subfloor was abandoned or damaged so as to be ineffective. I accept the opinion of CC that the pipework was not modified, abandoned and is still functioning . Thirdly, even if I accepted the area of the block wall relied on by F was poorly constructed, I am not satisfied this is relevant in relation to how the water came into the basement. Rather, I find the opinion of CC more persuasive. He says the area identified by F as being wet was dry when seen by the complainant the day after the event. Further, CC says water could not have entered in this area because of the distance from the external wall and the area above is a concrete tiled veranda. I also accept CC‟ s contention that moisture found by F on the other side of the wall in this area was probably because of the wet carpet. Having considered the available material, I consider it is more likely water probably entered the basement from the corner of the building. In the circumstances, I agree with CC that the faulty construction of the wall (if any) is not relevant because it is unlikely water entered the basement around the alleged faulty construction. The insurer says the complainant‟s expert reports fail to substantiate their position and merely rely on assertions. However, I do not accept this contention. Rather, I am Determination | Case number: 611153 Page 6 of 15 satisfied the reports and photographs adequately explain the complainant‟s assertions and persuasively rebut F‟s opinion. Taking all matters into account, and for the reasons stated, I am not satisfied the insurer has established on the balance of probabilities the claimed damage was caused by one of the excluded events. In the circumstances, I am not satisfied the insurer is entitled to decline the claim. JP to reinspect and reassess the water damage to the basement AFCA asked the parties to provide information about the quantum of the claim. The insurer arranged for JP to provide a scope of works for damage to the front and middle rooms. (The available information establishes there was no damage to the back room). JP provided a scope of works and quote in the sum of $12,981.36. Before repairs commenced JP said the complainant must undertake work to prevent further water ingress into the basement room including replacement of stormwater drainage pipework to the affected areas, installation of Aggi drains along the external walls of the basement rooms and application of a suitable waterproofing membrane to the external Besser block walls. The complainant has provided no quotation for the cost of repairs. He has provided a document described as a cost comparison. Some of the items claimed relate to contents which are not covered. The policy provides cover for buildings only. The policy clearly states carpet is not part of the home unless the complainant is a landlord. As the complainant is not a landlord, the claim for carpets is not covered. The complainant claims for costs resulting from a 2005 building claim. This determination deals only with damage which occurred because of the 2017 storm event. The claim is to be cash settled including payment of statutory interest I note JP‟s scope of works includes only a provisional sum in relation to mould remediation works. I also note no allowance appears to have been made for the initial clean-up. The policy describes the method of settlement. The insurer can arrange for its preferred repairers to repair the home or pay the reasonable cost to repair the home. Where preliminary work is required by the complainant, I am satisfied a cash settlement is fair in the circumstances. Determination | Case number: 611153 Page 7 of 15 I note the insurer has made cash settlement offers to the complainant which have been rejected by the complainant. In view of the time since JP has inspected the property and the provisional allowance made for mould remediation works, I am satisfied a fair outcome is the insurer re- engage JP to reinspect and reassess the water damage to the basement. JP is then to prepare a detailed scope of works and work with the complainant to settle the scope of works before the insurer cash settles the claim pursuant to the policy terms and conditions. When the insurer cash settles the claim, it is to pay statutory interest on the agreed cash settlement pursuant to section 57 of the Insurance Contracts Act (the Act) from 15 January 2018 (the date it denied the claim) until the date of settlement. Insurer to pay the cost of the complainant’s engineer’s reports. The complainant also claims $2,500 for the reports from his engineer. Pursuant to the AFCA rules, we may decide an insurer is to contribute to the professional costs (capped at $5,000) incurred by the complainant during the complaint. In this complaint, I am satisfied it is fair the insurer contributes to the cost of the complainant‟s engineer‟s reports. This is because the issues in dispute were technical and complex and required expert opinion particularly in circumstances where the insurer had obtained the expert opinion of an engineer. The complainant is to provide the insurer with invoices evidencing the cost of the reports. Upon receipt of these invoices, the insurer is to pay the cost of the complainant‟s engineer‟s reports up to $5,000. If the complainant has paid for these reports already, the insurer is also to pay statutory interest on the cost of the reports pursuant to section 57 of the Act from the date of payment of the reports until the date of settlement. Determination | Case number: 611153 Page 8 of 15 3 Supporting information 3.1 Our Approach As advised to the parties, we have considered it appropriate to expedite this complaint in accordance with the Operational Guidelines to the AFCA Rules, due to the nature of the complaint. Accordingly, this complaint has not been the subject of a recommendation and has proceeded directly to determination. This complaint has been determined based on what is fair in all the circumstances, having regard to legal principles, applicable industry codes or guidance, good industry practice and previous relevant determinations of AFCA or predecessor schemes (which are not binding). There has been a full exchange of all material information relied on for the purposes of this determination and each party has had the opportunity to address any issues raised by the other. All the material provided by the parties has been reviewed and considered for the purposes of this determination. While the parties have raised numerous issues in their submissions, for the purposes of this determination, commentary has been restricted to those issues considered directly relevant to the outcome only. It is an accepted principle of general insurance law that the insured bears the onus to establish on the balance of probabilities that they have suffered a loss caused by an event to which the policy responds. This is known as a prima facie claim. Once so established, the onus shifts to the insurer to prove on the balance of probabilities that an exclusion applies if it seeks to deny or limit its liability for the loss. 3.2 Relevant policy terms The relevant policy extracts are referred to in the correspondence between the parties and in the insurer‟s Notice of Response dated 14 February 2019. Both the policy document and the Notice have been exchanged with the complainant. Section The events we cover Storm If loss or damage is caused by a storm. For example, damage caused when:  hail breaks your windows  a cyclone lifts the roof off your home. Covered  violent wind, cyclone or tornado  rain, thunderstorm, hail or snow  landslide or subsidence that happens immediat ely as a result of a Determination | Case number: 611153 Page 9 of 15 Section storm. No t covered  loss or damage to: > retaining walls > gates, fences or free - standing walls if they are not structurally sound or well maintained > pontoons, jetties or bridges > gravel driveways > swimming pool/spa covers that are more than 5 years old  loss or damage caus ed by wat er which ent ers your home through any tarpaulins or fixings set up while you‟re renovating or altering your home  loss or damage caus ed by actions of the sea, u nless the loss or damage is the result of: > storm surge that happens at the same time as a storm has caused damage to your home or contents. General exclusions that apply to your policy Exclusions for all cover These exclusions apply to all cover under your policy. What we don’t cover Loss, damage, injury or death arising from:  rust, corrosion, gradual deterioration, depreciation, wear or tear  erosion, including coastal erosion […]  subsidence or landslide unless it happens immediately as a result of: > an earthquake or explosion > a storm or flood  atmospheric conditions or extreme temper ature […]  tree roots […] Maintaining and occupying your home We don‟t cover loss , d amage, injury or death arising from:  faulty design or workmanship  previous damage that has not been repaired […]  you not maint aining your home in good repair and condition. This means your home must be watertight, structurally sound, secure and well maintained Determination | Case number: 611153 Page 10 of 15 Section  you not taking reasonable care to protect your home or contents against loss or damage. […] Incident is a single occurrence, or a series of occurrences arising out of the one event. 3.3 Summary of expert reports Report Findings Building consultant (C S ) report 14 - 4 - 2005  Insurer ‟s engineer report obtained in relation to previous claim following flooding in the ground floor rooms after a storm o n 2 and 3 February 2005.  Inspected in the presence of the insured. Included a review of the subfloor and lower ground floor construction, the site drainage and plumbing services.  Insured had previously observed one occ urrence of water entry to lower ground floor rooms which had been minimal with no resultant damage.  Insured said son noticed signific ant amount of rainwater collecting behind lower ground floor walls.  Observed clear evidenc e of significant rainwat er collec tion .  Construction of subfloor areas closest to lower ground floor rooms do not comply with general engineering and design requirements as the steep cut face was left free standing and without adequate structural ret ention via a retaining wall.  Noted no wa terproofing membrane or drainage system has been provided directly behind these lower ground floor rooms and so there was no adequate protection to water ingress.  Even though building is 40 years old at the time of construction , this building method was n ot acceptable and would not have complied with relevant regulations .  General surface drainage between neighbouring proper ti es is almost non - existent and during steady rain it is likely significant amounts of rainwater run through into the insured‟s proper ty.  I nsured‟s son has diverted one of the downpipes away from storm water system to reduce amount of collected rainwater ent ering drains. This can only be a temporary solution as over long - term this distribution of rainwater directly onto the ground surfac es will only increase water seepage into the lower ground floor rooms.  C aus e of erosion and displacement of sections of subfloor and destabilisation of foundations is flows from uphill areas over long period of time.  C onstruction of basement is not complia nt.  Drainage pipelines are possib ly blocked.  Recommends camera inspections to all below ground drains. Builder (JP) report 7 - 12 - 2017  Attended and photographed complainant‟s property with insured on 7 December 2017 . Determination | Case number: 611153 Page 11 of 15 Report Findings  Complainant advised that she had lodged a claim 8 - 10 years ago when a similar situation occurred with wat er ingress into bas ement rooms.  Complainant had plumbing works carried out after previous claim.  Channel drain has been installed along the front (south) of basement rooms which drains into PVC pipe directing water to (east) garden.  Downpipes diverted to drain int o garden along east boundary.  Way downpipes diverted does not comply with regulations as pipes required to be connected to underground sto rmwat er drains.  Plumbing CCTV inspection found stormwater earthenware pipes are blocked due to tree root intrusion resulting in overflows which are saturating soils in the areas.  Plumber believes water ingress is due to overflows and saturation to soil to the external wall.  Inspection of basement found soaked carpets, swelling in timber skirting, blistering paint on lower sections of walls and mould growth along skirting and besser block walls.  D amage due to poor existing drainage and likely failure of wall tanking (waterproofing) to external walls of basement rooms.  Remediation work includes replacement of the stormwater drainage pipes to the affected area, installation of drains along the external walls of the bas ement rooms and application of waterproofin g membrane to the external Besser block walls. Plumber (PB) report 12 - 12 - 2017  Attended and photographed complainant‟s property on 12 December 2017.  CCTV inspections limited due to tree root intrusion affecting entire length of drainage system on the home‟s right - hand side.  Defects include tree root intrusion and blockages at downpipe connection point.  Downpipes have been redirected with 90mm PVC above the surface level discharging onto the external wall.  Spray tested external wall. Tanking f ailure.  Major tree root intrusion is restricting flow of water resulting in overflows and saturation to soil to external wall resulting in water ingress via poorly tanked external wall lining.  Complainant needs to carry out re running of drainage system, installation of aggi drainage system to the perimeter of home and tanking application to external wall. Engineer (F) report 27 - 3 - 2018  Photographed and attended complainant‟s property with complainant on 16 March 2018.  Site slopes from west to east.  Drainage around house is adequate to keep water from ponding against the house.  Drainage appears well maintained, however, house is only paved around parts of the perimet er.  Basement is located partially below ground, amount of soil being Determination | Case number: 611153 Page 12 of 15 Report Findings retained varies a round perimeter of basement.  Carpet removed prior to attendance.  Moisture damage evident to skirtings, delaminated paint from some blockwork, blubbing paint on blockwork walls, corrosion of heating pipework at low level, crack in concrete slab which has be en sealed.  No waterproofing membrane could be seen against the basement wall or in the subfloor.  When subfloor inspected, some soil was noted as collaps ed against the basement wall instead of being battered away from the wall.  South - western corner of subfl oor space is poorly detailed, blockwork is located on its side rather than vertically and a void is visible behind this blockwork.  Earthenware pipe in subfloor along basement wall was badly damaged and therefore no longer effective.  Local Bureau of Meteorology records i ndicate 41mm of rain was recorded on 2 December 2017 and 68mm of rain was rec orded on 3 December 2017.  Water ingress is long - term as evidenc ed in form of bubbling/ delaminated paint.  Efflorescence visible in rear of bas ement.  Blockwork placed on its side is poor construction det ail. It allows easy path for water to flow through and build up within the subfloor. This is where water likely entered the subfloor and then into the basement.  Had basement been appropriately tanked (w aterproofed) then water would not have entered basement during the recorded rainfall events.  Hous e was built before current standards put in place.  Had the drainage system in subfloor been fully functional at time of event then water ingress may still have occurred.  B asement is not suitably constructed or waterproofed to be considered a „dry‟ basement by current standards.  No measures taken around the perimeter of the house will be sufficient to prevent wat er ingress without excavating around the basement t o install waterproofing membrane and a new AG pipe around the full perimeter.  P roximate cause is a lack of waterproofing around perimeter of the basement and ineffective/damage d subfloor drainage system.  Recorded rainfall within normal parameters and is no t the proximat e cause of the water ingress. Engineer (F) report 30 - 5 - 2018  Further report prepared in response to complainant‟s contentions.  Requiremen t in UBR 1959 for treatment of ground beneath the building: need s to be regraded and provided with adequate outlets to prevent any accumulation of wat er beneath the floors or covered with approved damp - resisting material.  Earthenware pipe in subfloor was satisfying this requirement Determination | Case number: 611153 Page 13 of 15 Report Findings however as it has been abandoned there is no means to prevent the accumu lation of wat er in the subfloor which is able to flow into the subfloor easily due to the detailing of the wall.  Original design allowed water to flow into the subfloor at this location by design.  Changes to the drainage around the perimeter of the house a nd to the roof of the house have abandoned subfloor drainage system.  Complainant uns ure when new stormwater system installed.  Water entered the basement either directly through the floor/wall interface along the southern and eastern walls.  Water source p robably not direct overland flow but a temporary perched water table due to prolonged rainfall which was within normal rainfall parameters.  P roximate cause of damage is not the rainfall event but the construction type of the bas ement (blockwork wall), poo r det ailing, lack of waterproofing, and lack of/abandoned/ damaged subsoil drainage at the rear of the retaining wall. Building consultant (C C ) report 29 - 6 - 2018  Reviewed F‟s report and inspected and photographed the site early June 2018 and made the following observations:  B asement was constructed to meet the required standards when i t was constructed as a habitable room and was approved by the relevant building survey or at the time .  Not constructed as a wet basement as would have rendered the space u nliveable during large rain events. Complainant says space flooded only twice in the past 60 years.  Subsoil drainage around the bas ement has not been modified or abandoned since it was installed. Remain s as originally constructed and discharge s into exter nal stormwater system.  External walls around the basement are not retaining walls as the soil is battered.  O nly stormwater system that has been replaced is the external line to the south of the basement. It was removed and replaced due to tree roots.  D id not observe any wat er marks on the external walls of the basement which suggest s water has not been ponding against these walls .  Water ingress was b ecause of surface run - off and not a perched water table.  Rainfall event was significant with 70mm over th ree days which is more than the December monthly average.  Rainfall saturated the topsoil which would have led to surface run - off not perched water table. Creation of a perched wat er table requires knowledge of sub surface conditions. Not aware of F testin g for this.  Flooding occurred in the period of the storm event. Time required for a perched water table to develop and then flow is greater than observed on site during the storm event.  Basement construction is not the proximate cause. Determination | Case number: 611153 Page 14 of 15 Report Findings  Ba sement flooded be cause of the rain events. Engineer (F) report 5 - 9 - 2018  Provides res ponses to C C ‟s findings.  Agrees when basement constructed it would not have required waterproofing membrane.  Relies on a statement from the complainant that the drains were abandoned . F initially stated drains were in poor condition and no longer draining the rear of the basement. Therefore, F said drainage does not meet building regulations.  Agree the external wall on the west is not a retaining wall but the walls retaining walls along the south , east and nort hern walls.  Photographs show a variation in soil colour near the sout hern end of the w estern basement wall indicating water ingress here.  Agrees rainfall above normal parameters but says statements about the temporary perched wate r table referred to the high saturation of the soil to such an extent that wat er would not migrate downwards but migrate laterally. This allowed water to build up at the rear of the retaining wall.  F was told water entered the basement at the interfac e of the floor and wall. Had the water been surface run - off, infiltration would have occurred at a higher level.  Observations on site showed works to drains at other locations including along the eastern side of the property.  Conclusion unchanged. P roximate c ause of the water ingress to basement is not the rainfall e vent, but rather poor detailing, construction, and abandoning of the stormwater drainage system. Building consultant (C C ) report 12 - 3 - 2019  Provides res ponses to F‟s findings.  Basement constructed in accordance with construction methods of the day. Exterior retaining block walls are rendered below ground level which was method of wat erproofing at time. Drainage system is earthenware agric ultural pipes which drain to a rubble pit or the like as per the relevant building regulations. No drainage system under the house or to the perimeter of the basement has been abandoned.  Pipework identified by F as abandoned was a mistake. Pipework was earthenware agricultural pipework which has not been modified, is not abandoned and is functioning. Only visible stormwat er under the house is PVC pipe work suspended from timber ground floor.  Area identified by F as being wet was dry when seen by complainant the day after the event and dry when in spected by CC in June. Water could not have entered here because area 2m from the west external wall and above is a concrete tiled veranda. Moisture found on the other side of the wall was because wet carpet had not been removed.  Because of the high inten sity of rain , water probably entered the basement from the sout h - west corner of the building . B ecause of the continuous rainfall over three days rain made its way into the Determination | Case number: 611153 Page 15 of 15 Report Findings base of the wall. It entered the property at this point and not on the north side of the basement as stated by F.  As supported by the neighbour, t wo downpipes on the south side of the house were diverted to the boundary fence during the rain event.  Trenc hes to the south and part west of the house were excavated after the rain event.  Af ter the rain, complainant started the excavation to replace the clay stormwater pipes to the south side of the house. This was replaced prior to F visiting.  Concludes “poor det ailing” in the area noted by F does not correlate to the flooding of the baseme nt area. The agricultural drains on the north of the basement over 300mm below the basement slab level and no water was detected here after the flood event.  Rain over three days flooded the basement and F cannot determine where or why the basement was floo ded but deduc es its reasons from misinterpreted comments made by the complainant. Neighbour’ s s tatutory declaration 21.2.2019  On 1 and 3 December 2017 the complainant had the downpipes on the south side of her house diverted by temporary stormwater pipes to the garden beds to her southern boundary of her property.  Water ran into my property and down my driveway into the eastern corner of my block.  After the event, complainant installed stormwater drains so any future run - off would empty into designed stor mwater system. 3.4 Other relevant material considered and relied on  Parties‟ submissions /emails and all attachments to all submissions/emails.  Parties‟ expert reports.  Photographs and statutory declaration.  Correspondence between the parties.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.