Home / Financial Firm (Unknown - Insurer) / Determination 607553
Determination 607553
Home building damage claim declined as not caused by an insured event
Summary
Owners claimed under home building cover for foundation-related damage they attributed to Cyclone Debbie rainfall, lodged through a broker. AFCA accepted the insurer's expert evidence that the damage resulted from seasonal soil movement and found the claim not covered.
The insured must establish on balance that the damage resulted from a listed insured event within 72 hours, and this was not shown.
Issues
- Claim denial primary · not upheld“The available information does not establish on the balance of probabilities that the damage to the insured building is the result of an insured event.”
Subjects and remedies
home or building damagenatural disasterno remedy
Related
All Financial Firm (Unknown - Insurer) determinations · Find similar determinations
Text of the determination
Determination | Case number: 607553 Page 1 of 4
Determination
Case number: 607553 29 March 2019
1 Determination overview
1.1 Complaint
The complainants held a home insurance policy (the policy) with the financial firm (the
insurer) covering their property. On or about 23 August 2018, the complainants
through their broker (AS) lodged a claim seeking cover for damage to the insured
building.
The insurer has declined the claim and says the damage is the result of
circumstances which the policy does not cover. The complainants remain dissatisfied
with the insurer’s position and are seeking a fair and reasonable settlement form the
insurer under the claim.
1.2 Issues and key findings
What does the complainants’ pol icy cover?
The policy is an insured events contract of insurance. It provides cover for loss or
damage caused by or arising from the listed insured events provided in the product
disclosure statement (PDS). Cover for such loss or damage is subject to the policy
exclusions and limitations specified in the PDS.
Have the complainants established a valid claim under the policy?
The available information does not establish on the balance of probabilities that the
damage to the insured building is the result of a n insured event for which the policy
extends cover.
Accordingly, the insurer is entitled to decline cover on the basis a valid claim has not
been established in this instance.
1.3 Determination
This determination is in favour of the insurer.
The insurer is entitled to decline the claim as the damage to the insured building is not
covered under the policy.
Determination | Case number: 607553 Page 2 of 4
2 Reasons for determination
2.1 What does the complainants’ policy cover?
The policy is an insured events contract of insurance
The complainants’ policy is an insured events contract of insurance. This means the
policy provides cover for loss or damage caused by or arising from the insured events
listed in the PDS. Cover for loss or damage from these listed insured events is subject
to the policy limitations and exclusions specified in the PDS.
It is an accepted insurance legal principle that the onus first rests with the claimant to
establish on balance that the loss claimed is covered under the policy. Only once this
is established does the onus shift to the insurer to show an entitlement to decline the
claim in line with the policy exclusions or otherwise.
Therefore, the onus first rests with the complainants in this instance to establish (on
balance) the claimed damage to the insured building is the result of a listed insured
event specified in the PDS.
2.2 Have the complainants established a valid claim?
The damage to the insured building is not the result of an insured event
I have considered the available information and am satisfied on the balance of
probabilities it establishes the following:
the claim was lodged on or about 23 August 2018 seeking cover for building
damage which the complainants say was due to extensive rainfall in the area
where the insured property is located
the damage is consistent with movement in the foundation soils i.e. ground
movement in the form of subsidence
the complainants say the damage is caused by or arises from a heavy
rainfall/storm event (Cyclone Debbie) which took place in March 2017
the complainants provided a quote from engineers ‘MG’ outlining the cost, method
and extent of repairs it believed were required to repair the damaged insured
building
there was reference to possibly inadequate foundation laid originally to support the
extension of the insured building. Further, in an email dated 7 January 2018, MG
says having looked for obvious causes for the damage, it could not see any
the insurer, after lodgement of the claim, appointed consultants ‘MS’ which in turn
appointed an engineer ‘SP’ to attend the insured property to investigate the cause
and extent of the damage to the insured building
MS submitted a detailed assessment report dated 8 September 2018 detailing the
extent and location of the damage. It concluded the damage was not consistent
Determination | Case number: 607553 Page 3 of 4
with a single insured event rather has occurred over time due to seasonal changes
in the moisture levels within the foundation soils
There is inadequate supporting information to establish a valid claim
Having considered the available information, I note the events/circumstances listed
below have been referred to as being the possible cause for the damage to the
insured building subject of the claim:
movement in the foundation due to possible inadequate foundation laid originally to
support the extension of the insured building
subsidence of the foundation soils over a period of time due to seasonal changes
and associated moisture levels of the foundation soils
the extensive extent of rainfall that accompanied Cyclone Debbie March 2017.
I acknowledge the complainants strongly believe the proximate cause for the damage
is the extreme weather event (cyclonic storm system) and associated extreme rainfall
that came with it. The timeline provided by the complainants refers to initially noting
slight movement damage at the property in July 2017 and further cracking to internal
and external areas in October 2017. This being months after the claimed weather
event.
I note the complainants’ view that the damage began appearing in areas of the home
that were not in use and as such may have gone unnoticed for some time. This may
indeed be the case, however, what needs to be established on balance is that the
damage occurred within 72 hours of the insured event, which the available
information does not show or support.
Without compelling supporting information, I am not satisfied this weather event has
been shown to be the proximate cause for the damage to the insured building.
Further, as noted above, the policy in addition to requiring the subsidence to be the
direct result of the weather event also requires the damage to occur within 72 hours of
the claimed insured event.
I note there is also reference to a weather event in October 2017. However,
considering the damage to the insured building had already commenced and was
noted prior to this event, I am not satisfied this event has been shown to be the
proximate cause for the damage to the insured building.
There has been some reference in the information to the damage arising from
inadequate foundations being laid at the time the insured building’s extensions were
constructed. However, again, there is an absence of supporting information in this
regard and ultimately it would not assist the complainants. If this were to be accepted
to be the proximate cause, it would also result in the damage being excluded under
the policy.
Determination | Case number: 607553 Page 4 of 4
I acknowledge the complainants’ view that MS’s opinions provided after having
completed an assessment of the extent and cause of the damage claimed are simply
personal assumptions. I am not of the same view and accept MS is suitably qualified
to undertake the assessment of the damage and provide an informed opinion on the
cause and extent of the damage subject of the claim.
Having considered MS’s report dated 8 September 2018, I am satisfied it does on
balance establish the damage to the insured building occurred as a result of
subsidence over a period of time due to seasonal changes and resultant moisture
levels in the in the foundation soils. There is an absence of equally compelling and
qualified evidence to the contrary with MG’s information not establishing an
alternative cause to which the policy would respond.
For these reasons, I am not satisfied the complainants have been successful in
establishing the claimed damage to the insured building is on balance covered under
the policy. Accordingly, a valid claim for the purpose of the policy has not been
established and the insurer is entitled to decline the claim.