Home / Financial Firm (Unknown - Insurer) / Determination 607207

Determination 607207

Hail damage to commercial roof: scope of replacement and cash settlement amount

FirmFinancial Firm (Unknown - Insurer)
Decided2019-05-21
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded$309,252
Non-financial loss—
Amount claimed$309,252
SourceAFCA PDF

Summary

A commercial building owner claimed for hail damage to her roof. The insurer offered $124,323.08 for partial replacement, but AFCA found the whole roof needed replacement and ordered cash settlement of $309,251.78 plus interest.

Replacement cost cover requires reinstatement to substantially the same condition, and requiring the insured to incur repair costs before payment is an unfair barrier to the entitlement.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay interest

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination | Case number: 607207 Page 1 of 11 Determination Case number: 607207 16 May 2019 1 Determination overview 1.1 Complaint On 10 July 2018, the complainant lodged a claim with the financial firm (Insurer) for hail damage to the roof of her commercial building. The complainant says the damage was caused by a hail storm on 20 November 2014. The insurer has accepted the claim and says the roof can be repaired. The insurer has offered $124,323.08 as a cash settlement once the complainant incurs the repair costs. This amount includes an allowance of 15% for variations. The complainant says the roof needs to be replaced. 1.2 Issues and key findings Does the roof require complete replacement? Considering all the information, the panel is more persuaded by the report provided by the insurer’s second builder (PG), than the insurer’s building consultant (SE). Accordingly, the panel is satisfied, on the balance of probabilities, the roof should be replaced in it s entirety as recommended in PG’s report. How should the claim be settled? The claim should be cash settled based on the complainant’s quote. The cash settlement amount should be $309,251.78. 1.3 Determination This determination is in favour of the complainant. The insurer is required to pay the complainant $309,251.78, plus interest pursuant to section 57 of the Insurance Contracts Act 1984 (the Act). Interest is payable from the date of the quote, being 2 November 2018, until the date payment is made by the insurer. Determination | Case number: 607207 Page 2 of 11 2 Reasons for determination 2.1 Does the roof require complete replacement? Complainant’s representation The complainant has appointed a roofing consultant (AC) to represent her in this complaint. For the sake of clarity and brevity in this Determination, whilst AC is acting in his capacity as the complainant’s representative, both the complainant and AC will be referred to as ‘the complainant’. Where AC is acting in his professional capacity as a roofing consultant, he will be referred to as AC. Complainant says roof requires complete replacement In support of the claim the complainant supplied a report from AC dated 18 May 2018. In his report AC says:  there is hail damage to the main roof and lower front awning  the curved roofing and caps have moderate hail damage  the roof top plant, vents and platform have hail damage. AC recommends replacement of both the main and curved roof elements. Insurer says roof only requires partial replacement The insurer appointed a builder (AG) to assess the roof. AG provided a report dated 16 July 2018. AG says there is hail damage to the whirly birds but no damage to the roof sheets themselves. Following AG’s report conflicting with AC’s report, the insurer appointed a second builder (PG) to provide a report. In its report dated 14 August 2018 PG says:  the roof area is approximately 1224 m 2  there is widespread and consistent hail damage to the roof  there were 12 hail indentations in a section of roof sheeting 1m x 1.2m  hail damage identified in this section of roof sheeting will be reflected across the entire surface of the roof sheeting  the entire surface area of the roof sheeting has sustained sufficient hail damage to warrant replacement. Following PG’s report, the insurer sought a third report from a building consultant (SE). In its report dated 11 December 2018, SE says:  hail dents in the roof surface and capping are insufficient in size or depth to see without the use of chalk  the size and depth of the hail denting does not warrant replacement of the roof sheeting or capping Determination | Case number: 607207 Page 3 of 11  the hail denting to the front southern aluminium awning is consistent with being caused by the November 2014 Brisbane hailstorm event. SE provided a further report dated 12 February 2019 and says:  two dents per m 2 of roof sheeting were identified to the central roof surface areas and south-eastern roof surface area  this suggests the entire flat metal roof sheeting has the same damage  no evidence of hail denting was observed to several areas of the roof and in its opinion the following areas do not need replacement: > curved sheet metal roofing > polycarbonate roof sheeting to the skylight panels > sheet metal parapet capping > sheet metal box guttering. The insurer has accepted the whirly birds require replacement along with the flat metal roof sheeting (and associated flashings, linings etc.) and aluminium awning. However, the insurer does not accept the curved metal roofing, polycarbonate sheeting, parapet capping and metal box guttering were damaged by hail. Roof should be replaced in its entirety The reports from both PG and SE contain photos of the damage, they identify and agree on several areas of the damage, however, relevantly, they disagree on the damage to the curved metal roofing and the parapet capping. SE says the curved metal sheeting is not damaged, however, the photos provided by SE of the curved sheeting appear to show these as being flat sheets with one end curved. SE says the flat metal sheeting has been damaged throughout. This suggests the flat portion of the curved sheets is damaged and as these are one complete sheet the entire sheet would need to be replaced. SE also says the parapet capping is not damaged, however, the photos provided by PG show damage to sections of the parapet capping. Having considered all the information, in particular the reports from PG and SE, the panel is more persuaded by the report provided by PG than the report provided by SE. Accordingly, the panel is satisfied, on the balance of probabilities, the roof should be replaced in its entirety as recommended in PG’s report. Determination | Case number: 607207 Page 4 of 11 2.2 How should the claim be settled? Settlement to be based on complainant’s quote The insurer has offered $124,323.08 in settlement of the claim, however, this is based on a quote for the partial replacement of the roof. As above, the panel is satisfied the roof requires replacement in its entirety, therefore, the cash settlement the insurer has offered does not reflect the cost of reinstatement. Three quotes have been provided for the full replacement of the roof. Two of the quotes have been provided by the insurer’s builder (BB) and one has been provided by the complainant’s builder (LB). The two quotes from BB are for $182,301.50 and $304,313.50. The lower of the two quotes does not include the curved metal roof sheet, rather it i nvolves a redesign of the roof to have only flat roofing. The policy covers reinstatement to ‘ a condition substantially the same as but not better or more extensive than its condition when new ’. The redesign to have no curved sections does not meet this standard and therefore the lower of the two BB quotes is not a true reflection of the cost of reinstatement. The quote from LB is for $309,251.78. The higher quote from BB includes a builders margin of 18%. It is not clear what builders margin (if any) has been allowed for in the LB quote. Both the quotes appear to be for substantially the same scope of works and have relatively small differences in the total amount. The BB quote is date 19 September 2018 and the LB quote 2 November 2018. Considering all the information and the LB quote being more recent, the panel is satisfied it is fair for settlement to be based on the complainant’s quote, provided by LB, of $309,251.78 incl GST. Claim should be cash settled The policy says the insurer will pay the replacement cost, however, it also says it will not pay beyond the indemnity value until the replacement cost has been incurred. The insurer says it will make payment of the repair cost once the costs have been incurred by the complainant as per the policy wording. If the policy is interpreted in the manner suggested by the insurer the complainant would be required to incur the repair costs prior to payment being made by the insurer. However, the value of the repair is large and it would be unlikely for the complainant to have the money available to pay these costs up front to be reimbursed at a later Determination | Case number: 607207 Page 5 of 11 date. The complainant may need to take out a loan for the costs and incur additional costs for this such as application fees and interest. The panel considered this to be unfair and is of the view it acts as a barrier to an insured party obtaining their entitlement under the policy. Accordingly, the panel considers it fair in all the circumstances for the claim to cash settled based on the repair cost. Cash settlement should be $309,251.78 plus interest The insurer is to cash settle the complainant for a total of $309,251.78 incl GST, for the repair works. The complainant is also entitled to interest on this sum pursuant to section 57 of the Act. Interest is payable from the date of the quote, being 2 November 2018, until the date payment is made by the insurer. Determination | Case number: 607207 Page 6 of 11 3 Supporting information 3.1 Our approach to this complaint We have considered it appropriate to expedite this complaint in accordance with the AFCA Rules, due to the nature of the complaint. Accordingly, this complaint has not been the subject of a preliminary assessment and has proceeded directly to determination. The determination is made by a panel consisting of the ombudsma n together with a consumer representative who has extensive experience in consumer claims and an industry representative who has had extensive experience in the insurance industry. This complaint has been determined based on what is fair in all the circumstances, having regard to the relevant law, good industry practice, codes of practice and previous decisions (which are not binding). There has been a full exchange of all material information relied on for the purposes of this determination and each party has had the opportunity to address any issues raised by the other. All of the material provided by the parties has been reviewed and considered. 3.2 Expert reports Record Key points Complainant’s expert ( AC ) Report 18 May 2018 5.0 CONCLUSIONS Our general conclusions relevant to the situation may be summarised as follows:  Hail damage has occurred to the main roof and lower front awning Trimdek roof cladding of the commercial Warehouse at the above address which include: > Structural durability defects as a result of deformations to the roof sheeting laps due to hail stone indentations creating the potential for wat er ingress and corrosion. > Hail Indentations to the roofing corrugations and flashings.  The TL - 5 Crank Curved roofing Trimdek Zincalume and Pittsburgh caps has moderate damaged by the hail storm.  The roof top plant, vents and plat form have all bee n damaged by hail indentations. > Cladding end spans and cantilevers all meet manufacturer’s specifications > Roof Pitch whilst at the minimum meets manufacturer’s standards. financial firm ’s expert (A G ) Report 16 July 2018 CAUSE/CIRCUMSTANCES  Our in spection confirmed hail damage to the Whi rly birds x 11, 6 of which no longer opera te correctly. The damage bl ades of the w hirly b irds are allowing water ingress, however there is no Determination | Case number: 607207 Page 7 of 11 Record Key points resultant damage from the wat er ingress.  The remainder of the roof is aged, oxidised and at the time of inspection there was no evidence of hail damage to the roof sheets them selves, only the whir ly bird roof ventilators. financial firm ’s expert ( PG ) Report 14 August 2018 Circumstances I Discussions  An inspection was undertak en at the request of [insurer] to determine if hail damage has been sustained the roof sheeting at [insured address]. As conflicting reports have been supplied by previous attending trades and [AC].  Discussions with the tenant revealed water ingress to the showroom area initiating from the sout h - western most whirly - bird. The tenant advised that a bucket is permanently positi oned in this location to catch water from the whirly - bird above. No ot her damage was report ed by the tenant. Observations Roof sheeting  Upon gaining access to the roof top, I observed the TRIMDEK® profile roof to cover an area of approximately 1224 m 2  At first glance the roof sheeting did not appear to be hail damaged, as the fawn coloured roof sheeting and dust build up on the surface was not conducive to identifying hail indentations. However, close inspection revealed widespread and consistent hail inde ntations over the roof surface.  With the use of coloured chalk rubbed across the surface of the roof sheeting indent ations became apparent. Hail indentations ranging in diameter from approximately 5 mm to 30 mm were observed and photographed.  To assist is quantifying the level of hail damaged sustained to the roof sheets, a section of roof sheeting approximat ely 1 m x 1.2 m at the southern end of the roof was coloured with chalk to highlight the presence of hail indentations. A total of 12 hail indentations were identified within this section of roof sheeting.  I am of the opinion, and evidenc e would support, that the amount of hail damage identified in this section of roof sheeting will be reflected across the entire surface of the roof sheeting. Flashings a nd capping  I am of the opinion that the metal fixings securing the parapet capping have reached the end of their life expectancy and should have been replaced as a matter of maintenanc e prior to this point in time. Whirly - bird ventilators  Inspection of the "whirly - bird" roof top ventilators also reveal consistent hail indentations consistent with the remainder of the roof sheeting. Hail indentations ranging in diameter from approximately 5 mm to 20 mm were observed to the head and base of the whirly - bird's. Air conditioning Units  I observed two roof top mounted air conditioning units, one locat ed in south - western corner of the roof, and the other diagonally Determination | Case number: 607207 Page 8 of 11 Record Key points opposite in the north - eastern corner of the roof.  Inspection of the aluminium cooling fins revealed indentations consistent with that of hail impact, ranging in diameter from approximately 5 mm to 35 mm. Approximately 8 - 12 indentations were obs erved on each air conditioning unit. Recommendations  It is recommended that the hail damaged TRIMDEK® profile roof sheeting, whirly - birds, associated flashings and capping be replaced.  It is also recommended that air conditioning units be service by an Air Conditioning specialist using a "Fin Comb" to realign the indented aluminium cooling fins Summary  I am of th e opinion that the entire surface area of TRIMDEK® profile roof sheeting has sustained sufficient hail damage to warrant replacement, as has the associated flashings, parapet capping's and whirly bird ventilators.  I am also of the opinion that the omission of pan flashings to the whirly - bird roof top ventilators is considered poor building practises and has resulted in wat er ingress in the north - western end of the showroom.  I am further of the opinion that the met al fixings securing the parapet capping on t he western elevation have surpassed their life expectancy and should have been replaced as a matter of maintenance prior to this point in time. Albeit, this items become inconsequential as the parapet cappings and associated flashings will require replacem ent due to hail damage.  Based on the concentration and severity of the hail damage observed, it is my opinion that the damage was sustained during the November 2014 storm event experienc ed within the local area. financial firm ’s expert ( SE ) Report 11 December 2018 SUMMARY Roof Cover I Fla shings I Capping:  I am of the opinion that the alleged hail dents in the roof surface and capping are insufficient in size or dept h to be sighted with the naked ey e without the use of chalk to highlight the denting.  I am also of the opinion that the insignificant size and depth of the alleged hail denting to the roof surface and capping would not allow the fut ure pooling of water in the alleged hail dent or compromise the integrity or longevity of the roof sheeting as detailed in the manufactures Bluescope Steel Technic al Bulletin TB - 32 - Impact Of Alleged hail Damage To COLORBOND® Steel Roo f ing - November 2003.  It is therefore my opinion that the insignificant size and depth of the alleged hail denting does not warran t replacement of the roof sheeting or capping. Whirlybird I Roof Ventilators:  It is my opinion that the hail denting to the 12 roof mounted whirly birds is consistent with being caused by the impact from alleged hail stones during the claimed November 2014 Brisbane Determination | Case number: 607207 Page 9 of 11 Record Key points alleged hailstorm event. Aluminium Awning:  It is my opinion that the alleged hail denting to the front southern aluminium awning is consistent with being caused by the impact from alleged hailstones during the claimed November 2014 Brisbane allege d hailstorm event financial firm ’s expert ( SE ) Report 12 February 2019  T wo dents per m 2 area of roof sheeting were identified to the central roof surface areas and sout heastern roof surface area that is attributed to the impact from hail stones would sugg est that the entire TRIMDEK® profile COLORBOND® metal roof sheeting to the flat skillion roof area had sustained an average of 2 dents per m 2 area of roofing.  Although no hail dents were detected to the 2.0m2 area of the chalked up north - western end of the roof surface at the time of my inspection, the industrial buildings roof cover is a flat skill ion roof cover and any alleged hail denting would be consistent in size pattern across the entire roof surface as the hailstorm would not have impacted random roof sheets and left the adjacent sheets unaffected. I would also note that the TRIMDEK® profile COLORBOND® metal roof sheeting to the flat skillion roof surface is the same thickness and profile and in my opinion would be subjected to the same denting dur ing the claimed storm event across the entire roof surface.  I consider that if the 2 "insignificant" dents per m2 area of roof sheeting are considered to be accepted as hail damage that the surrounding roof sheeting would have been subjected to the same im pact from hail stones during the claimed hailstorm event and suffered the same pattern of hail damage.  In stating the above, I stand by my initial report findings that the insignificant size and depth of the alleged hail denting to the roof surface would n ot allow the future pooling of water in the hail dent or compromise the integrity or longevity of the roof sheeting as detailed in the Bluescope Steel Tec hnicalBulletin TB - 32 - Impact Of Alleged Hail Damage To COLORBOND® Steel Roofing - November 2003.  I observed no evidence of hail denting to the following roof areas of the building and in my opinion do not warrant replacement: > Curved TRIMDEK® profile COLORBOND® sheet metal roofing. > TRIMDEK® profile Polycarbonate roof sheeting to the skylight panels. > COLO RBOND® sheet met al parapet capping. > Sheet metal box guttering.  I would therefore recommend that the tendering builders quoting the roof cover replacement delete the above from their reinstatement quotation.  I observed hail denting to the ot her building com ponents detailed in my Forensic Building Consultancy Report dated the 10 th December 2018 res ulting from the claimed storm that warrant replacement listed as follows: Determination | Case number: 607207 Page 10 of 11 Record Key points > 12 ZINCALUME® roof mounted whirlybirds. > The 2.6m long x 900mm front southern ent ry alumini um awning . 3.3 Relevant policy wording Section 1 Property … Cover We cover you for physical loss, destruction or damage to the Property that occurs at the Situation during the Period of Insurance. … Settlement of claims For the purpose of the settlement of claims clauses: Replacement Cost means the cost necessary to replace, repair or rebuild the Property insured to a condition substantially the same as but not better or more extensive than its condition when new. Indemnity Value means the Indemnity Value as defined in the 'General definitions' being the cost necessary to reinstate, replace or repair the Property to a condition substantially the same as but not better or more extensive than its condition at the time of the physical loss, destruction or damage, taking into consideration its age, condition and remaining useful life. in the event of a claim for: 1. Buildings and Contents , other than for Buildings awaiting demolition as specified in clause 2 below or Specified Items: a) We will pay the Replacement Cost. Conditions 1) The work of rebuilding, or replacing, or repairing, or restoring (which may be carried out upon another site and in any manner suitable to your requirements Determination | Case number: 607207 Page 11 of 11 provided that our liability is not increased because of that) must be commenced and carried out with due diligence, failing which we will not be liable to make any payment beyond the amount that would have been incurred if the work of rebuilding, replacing or repairing had been commenced and carried out with reasonable dispatch. 2) Where Property is physically lost destroyed or damaged in part only, our liability will not exceed the sum representing the Replacement Cost which we would have been called upon to pay if the Property had been wholly destroyed. 3) No payment beyond the Indemnity Value will be made, until a sum equal to the Replacement Cost has been incurred. 4) We will pay for fixed coverings to walls, floors and ceilings (including carpets) only in the room, hall or passage in which the physical loss, destruction or damage occurred.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.