Home / Financial Firm (Unknown - Insurer) / Determination 606991

Determination 606991

Claim for cracking damage declined under ground movement exclusion

FirmFinancial Firm (Unknown - Insurer)
Decided2019-06-27
ProductGeneral Insurance · Strata
OutcomeFor the complainant
Amount awarded$87,189
Non-financial loss—
Amount claimed$90,000
SourceAFCA PDF

Summary

The complainant's strata insurer declined cracking damage to her unit as earth movement not caused within 72 hours of a flood. AFCA found the damage most likely occurred within 72 hours of the flood, ordered settlement of $87,188.75 plus interest, and refused cover for the pipe repairs.

Earth movement damage is covered where it occurs within 72 hours of a flood, and the complainant's engineer's evidence was preferred on the balance of probabilities.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay interest

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination | Case number: 606991 Page 1 of 11 Determination Case number: 606991 24 June 2019 1 Determination overview 1.1 Complaint The complainant holds a strata insurance policy with the financial firm (the insurer) and lodged a claim on 31 May 2018 after noticing damage to her property. The complainant believes the damage was caused by flood water from cyclone Debbie in March 2017, a broken sewer pipe in August 2016 and a leaking pipe in January 2018. The insurer, relying on the reports from its experts, denied the claim and says:  that the damage to the property was because of differential ground movement over time  the policy excludes cover unless the damage occurred within 72 hours of an insured event.  The damage was not caused by a leaking pipe. The insurer says its experts did not find the cracking damage occurred within 72 hours of cyclone Debbie and therefore determined the damage was not covered. The complainant disputes the insurer’s deci sion and seeks to cover the cost of repairing the damage to her property amounting to over $90,000. 1.2 Issue and key findings Is the insurer entitled to decline the claim? The insurer is not entitled to deny the claim as, on the balance of probabilities, the property suffered damage from ground movement within 72 hours of being inundated by flood waters following Cyclone Debbie. Determination | Case number: 606991 Page 2 of 11 1.3 Determination This determination is in favour of the complainant. The insurer is to settle the claim in accordance with the terms of the policy and pay the complainant $87,188.75 plus interest under section 57 of the Insurance Contracts Act 1984 (the Act) from 17 January 2019 to date of payment of the claim. Determination | Case number: 606991 Page 3 of 11 2 Reasons for determination 2.1 Is the insurer entitled to decline the claim? Policy provides cover for insured events subject to exclusions The complainant’s policy provides cover s accidental damage including damage caused by flood and water escaping from fixed pipes subject to conditions and exclusions. The policy defines ‘accidental’ to mean ‘without intent’ . Specifically excluded under the policy are damages caused by:  erosion, vibration, subsidence, landslip, landslide, mudslide, collapse, shrinkage; or any other earth movement, except where the damage occurs within 72hrs of a storm, flood or cyclone Complainant says that cracking was caused by multiple factors The complainant submits that cracking damage to her property was caused by a combination of causes including:  a leaking sewer pipe on the eastern side of the p roperty in July/August 2016  inundation of rain water during cyclone Debbie in March/April 2017 and;  a burst water pipe at the south-eastern corner of the property in January 2018. While the complainant believes that multiple sources caused damage to her property, she considers the flood water that escaped a nearby river and the rainwater from Cyclone Debbie in March 2017 was the dominant cause of the damages. The complainant has provided an invoice for $4,389.51 from her plumber, K. This shows that K identified and repaired a sewer pipe under the concrete path of the property in August 2016. The complainant also provided a further invoice from K for $1,867.24 for the repair of a leak from an underground copper pipe on 4 January 2018. The complainant acknowledges that her property had some cracks prior to Cyclone Debbie in March 2017 but contends that the new cracks appeared after the cyclone. To support her view, the complainant submitted a report from F, a real-estate agent managing her property, dated 20 April 2018 . F’s report s tates that two large cracks had appeared in the walls of unit one of the property since the previous inspection. Complainant has established a prima facie claim The complainant and insurer provided reports from structural engineers G and JH. Both engineers confirmed the property had suffered damage due to ground movement. Determination | Case number: 606991 Page 4 of 11 Although the engineers disagreed as to the cause of damage there is no doubt the damage was accidental in that it occurred without intent. The complainant has established a valid claim for accidental damage under the policy. The onus is therefore on the insurer if it is to refuse payment of the claim to show that, on the balance of probabilities, that an exclusion applies if it is to deny the claim. Information confirms there was some pre-existing damage The insurers engineer, JH inspected the property on 2 July 2018. JH reported the existence of post construction in the brickwork that had been installed to mitigate cracking damage to the building caused by movement. JH also noted that the western wall of the property had previously been underpinned and says that this resulted in minimal cracking in the western wall of the property. The insurer’s assessor reported that the complainant had confirmed the existence of cracking when the property was purchased 15 years ago. The complainant also acknowledged that a previous insurer had authorised and completed underpinning repairs of the western wall. The complainant does not dispute this. The complainants structural engineer G in a supplementary report on 17 January 2019 agrees the property had previous repairs and confirmed there were pre-existing cracks and settlements prior to the flood event in March 2017. Information does not suggest that leaking pipes caused damage JH states that the leaking sewer pipe was located to the east of the property. JH says that a sewer pipe is typically damaged when it separates at a joint in the piping which can occur due to tree roots or uneven settlement. Based on the sewer pipe being located about three metres from the building, a leak from the sewer pipe would not cause adverse movement and cracking in the building. JH also examined the likelihood of the burst water pipe in the eastern side of the property contributing to the damage. He noted that the brick wall on the south of the building had a stepped crack in the mortar joints that had been filled with sealant that appeared to be several years old. Given this, JH concluded that any movement in the southeast corner of the building was pre-existing and could not have been caused by the flood. Furthermore, JH submits that a leak of water from a pressured water supply would be evident by the presence of surface water and detected at its onset. On this basis, such a leak could not cause erosion in the foundation soil and subsequent cracking damage. G in his reports does not attribute the cracking damage to the leaking pipes. Determination | Case number: 606991 Page 5 of 11 Based on the assessments completed by the experts from both parties, I am persuaded that the proximate cause of the damage is not consistent with an escape of liquid from either of the pipes. Engineering reports differ as to cause of damage There is no dispute the property was heavily inundated by flood waters in March 2017. JH was of the view that the rain water from Cyclone Debbie in March 2017 would have resulted in surface water inundation to a depth of approximately 300mm for a period of one to two days. G notes it would have penetrated deep down under the footings There is no dispute that the property was built on highly reactive soil that was subject to cycles of shrinking and swelling resulting in gross movement of the building. Both engineers agree that following a period of wet weather, saturation of reactive soil can result in either heaving of the foundation or loss of support, resulting in differential movement. JH considered the water inundation from the flood would have saturated water uniformly over the property. Given the absence of any large trees at the property, J H considered the evaporation of soil moisture would occur at a uniform manner and the flood could not cause differential movements of the building. JH found:  the cracking in the external brick wall on the western side of the property was caused by outward rotation of the wall and footing.  due to the evidence of patching and/or filling of the cracks in some locations, most likely the eastern side of the building had been undergoing incremental movement over an extended period.  the brickwork in the north-eastern side of the building was not uniform and appeared to have been removed and reconstructed. This finding along with the presence post construction articulation joints supported the view that cracking in the north east side of the building had been occurring over a period of time. G notes that the site is relatively flat with a minor fall across the site. G found that the footings at the back of the site had sunk significantly more and that storm water drainage at the back of the property was poor. Although G acknowledged that the complaint’s property had exist ing cracks caused by movement he says that these existing cracks significantly widened after the flood. G disagrees with J that the property’s footings were exposed uniformly to rain water and consequently would not have been subject to differential movement. G refers to the settlement survey provided by M. The settlement survey indicates that the footings had settled between approximately 10mm to 100mm. G says that while Determination | Case number: 606991 Page 6 of 11 settlement up to 10mm can be attributed to the reactive soil, settlement beyond 10mm is attributed to the flood. The difference in the settlement between the front and back of the property can only be attributed to the flood. G says that local government data indicates that a medium to heavy clay soil can be penetrated by water at the rate of 500mm per day. G says that based on the assumption that a 400mm footing is buried 100mm below ground level, the bottom of the footing will be 500mm below ground level. G says that the site was flooded with water for more than 48 hours. G says that based on the permeability rate of water, the cracking damage would have occurred within the first 24 hours of the flood. Therefore, G contends that the cracking damage occurred within 72 hours of the flood. Damage most likely caused by flood in March 2017 As outlined above, both engineers agree that the cracking and movement damage was caused by differential movement of the foundations due to changes in the moisture content of the soil at the property. I have carefully reviewed the information put forward by the parties. I accept that the damage to the property’s walls had been previously repair ed, a section of the property had been underpinned and articulation joints had been installed to mitigate the effects of movement. This is agreed between the engineers. While both engineers’ reports are detailed I am persuaded by the opinion expressed by the complainant’s engineer G. He not only had the opportunity of reviewing the findings of JH but provided two supplementary reports to address issues raised by the insurer. JH did not respond to G ’s reports. JH has not addressed the settlement survey or the findings of the differential movement. While the insurer had an assessor comment on G’s initial report, the a ssessor did not address G’s opinion that the damage was caused by the flood. In fact, the assessor commented, incorrectly, that the complainant’s policy did not cover riverine flood. The opinion is of little assistance in this matter. As outlined above, the complainant’s policy provides broad cover for accidental damage. Although the policy excludes cover for earth movement unless the damage occurred within 72 hours of the insured event I am satisfied that most likely the additional damage to the property occurred within 72 hours of the flood. Insurer is liable for the complainant’s claim The complainant provided a quotation for the repairs from MM of $76,670-$87,188.75. It is not a detailed quote but has not been disputed by the insurer. In the absence of any other relevant quote I consider it fair to allow the insurer to cash settle the claim based on the maximum figure quoted of $87,188.75. This takes into Determination | Case number: 606991 Page 7 of 11 account that while there may be of some pre-existing damage it is also likely that there is some internal damage that will occur during the repair process that will require repair. Interest should be paid on the settlement under section 57 of the Act from 17 January 2019 to date of payment of the claim. The complainant also claimed the cost to repair the broken sewer pipe and underground pipe leak. While the complainant’s policy covers loss or damage caused by escape of liquid, it specifically excludes the cost of repairing or replacing the item from which the liquid escaped. The insurer is not liable for the cost the complainant incurred to repair the broken sewer pipe and the underground pipe leak. Determination | Case number: 606991 Page 8 of 11 3 Supporting information 3.1 Reports Record Key points financial firm ’s expert ( J ) Report 5 July 2018  The pre - existing cracking to the western wall was minimal as only one crack at 1.5mm wide was visible and the visual appearance of the wall suggested that a section of brickwork may have been replaced as a part of the rectific ation works.  There were numerous cracks on the brick walls and it was evident p ost - construction articulation joints had been installed in the brickwork for the purpose of controlling or mitigating further cracking and/or damage to the building.  This type of event will saturate the foundation uniformly over the site and given the abse nce of any large trees, the evaporation of soil moisture from over the site would be similarly uniform. Therefore, it would not cause differential movement of the building.  The pipe is located along the eastern boundary of the allotment and was repaired in July/August 2016.  As the pipe is about three metres outside the building footprint this type of leak would not cause an increase in soil moisture levels under the building and in tum would also not cause the adverse movement and cracking in the building.  The brick wall to the southern elevation of the building showed evidence of a stepped crack to the mortar joints of the brickwork. The crack had been overfilled with a flexible sealant that appeared as thought it was several years old. This means that the building movement to this area of the building was pre - existing and was not caused by the claimed event.  This type of leak age would not caus e undermining or erosion of the foundation under this section of the building.  In summary, the movement to this sect ion of the building was the result of long - term foundation movement and was not a direct result of the burst water pipe event.  The cracking to the brickwork was typically caused by differential foundation movement.  Due to the evidence of patching and/or f illing of the cracks in some locations, it is our opinion that this movement has been occurring incrementally over an extended period of time, Also, the cracking to this elevation of the building could not be attributed to either of the two leakage events occurring along the eastern elevation of the building.  The brickwork at the north - eastern corner of the building was not uniform in appearance, which suggested that sections of the brickwork had been removed and reconstructed. The location of the post - cons truction articulation joints, the slight difference in colour and texture of the face of the bricks, and the satisfactory condition of the mortar joints, were the reasons for our opinion. Determination | Case number: 606991 Page 9 of 11 Record Key points There was no evidence of structural damage to the dwellings that could be attributed to, or be considered the direct result of, the three events claimed by the insured. Complainant’s expert ( G ) Report 30 August 2018  According to observation of site surrounding the residence. The building site has a classification of highly reactive "Class H2". This means that the soil is susceptible to large movements in case of moisture changes in the soil.  Vertical isolation joints have been provided in the brick wall in some locations. These joints are designed for allowing movemen ts in a large or long building. All minor defects in the inside walls and underside of windows are cons equences of movement of the footings below.  There are two major causes for the footing settlements. They are: 1. Flood inundation in March 2017 2. Highly reactive soils.  The settlements from l0 mm up to 100mrn are attribut ed to the flood inundation. Complainant’s expert ( G ) Report 17 January 2019  The existing cracks widened a lot larger and settled a lot deeper into the ground due to the weakened bearing capacity of the soils caused by the flood inundation.  The settlement survey by M' provides the explanation for differenc es in footing settlements and therefore concludes the major cause. The settlement survey indicated (attached to my earlier report) that the front of the units (garage side) settled only by 10mm while the other sides settled a lot deeper; say 100mm.  The difference in settlement amount bet ween the front and the back can only be caused by major events such as the flood event in March 2017. A ssuming that the soil reactivity was same throughout the entire units at the time of construction, the total long - term settlements of about 10mm can be attribut ed to the soil reactivity to the entire units.  The front area of the units is mainly of garages . The driveway slab covers all the soil and prevents it from any in undation by flood waters for very short period of time. Due to the covered nature of the front area, flood inundation did not affect the front walls. This explains the footing settlement be ing only 10mm.  The other walls in the north and east were exposed to flood inundation and also suffered from slow drying. The soil was wet and soft up to 30 days in the area. Therefore, the major settlements are attributed to the flood. Complainant’s expe rt (G) Report  The soil at the subject site can be classified as medium to heavy clay. The permeability of those soil structures can be assumed as 500mm below the ground level (or flood water).  The site was inundated by the flood water for more than 48 hours) from Friday morning to Saturday night). The elevation head of the flood water cont ribut es towards increasing the flow of wat er downwards. Determination | Case number: 606991 Page 10 of 11 Record Key points  The sketch illustrates that the water has penet rate d deep down below the bottom of footings and weakened the bearing capacity of the soil wit hin 72 hours (or within a day) from the time of the flood.  Once the soil had been weakened, the walls would have cracked and deformed immediat ely.  Therefore, I stron gly believe that the cracks and defects of many walls in the building had occurred within 72 hours o f the flood event. 3.2 Policy wording R ecord Key points What you are covered for page 14  When we insure your building, we will cover it for accidental loss or damage at the insured address in the period of insurance provided that the loss or damage is not excluded and subject to the conditions of your policy. Accidental loss or damage page 14  Accidental loss or damage is loss or damage that was not int entional and includes loss or damage from the incidents shown on pages 15 to 23. Flood we cover loss or damage caused by flood page 15 We do not cover  loss or damage caus ed by erosion, vibration, subsidence, landslip, landslide, mudslide, collapse, shrinkage or any other earth movement, but we will cover damage caused by a landslide or subsidence proved to have occurred within 72 hours of, and directly because of, flood and not because of erosion over time, structural fault or design fault. Storm we cover loss or damage caused by storm including cyclone page 16 We do not cover  loss or damage caus ed by erosion, vibration, subsidence, landslip, landslide, mudslide, collapse, shrinkage or any other earth movement, but we will cover loss or damage caused by a landslide or subsidence proved to have occurred within 72 hours of, and directly because of, a storm and not because of erosion over time, structural fault or design fault. Escape of liquid We cover loss or damage caused by escape of liquid Page 20 We do not cover  the cost of repairing or replacing the item from which the liquid escaped; General exclusions page 42 Ground movement  erosion, vibration, subsidence, landslip, landslide, mudslide, collapse, shrinkage or any other earth movement, but we will cover landslide or subsidence to your building if it is caused by any of the following insured incidents if the loss or damage they cause Determination | Case number: 606991 Page 11 of 11 R ecord Key points happens within 72 hours of the insured incident: • storm; • flood.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.