Determination 606389
Storm damage to shed claim declined
Summary
The complainants claimed storm damage to a 30-year-old farm shed that the insurer declined as deterioration and wear. AFCA found the storm caused the damage but settled the claim at 50% of the replacement and removal quotes, ordering $16,897.50.
The storm was the main cause, but deterioration and construction defects contributed, so the insurer must contribute only to the storm-related share of the loss.
Issues
- Claim denial primary · upheld“I accept the wind damage was strong enough to have caused the damage however I am satisfied it would have been to a less extent had it not been for the condition of part of the shed.”
Subjects and remedies
home or building damagenatural disasterpay claim
Related
All Financial Firm (Unknown - Insurer) determinations · Find similar determinations
Text of the determination
Determination | Case number: 606389 Page 1 of 4
Determination
Case number: 606389 27 May 2019
1 Determination overview
1.1 Complaint
The complainants hold a farm insurance policy with the financial firm (insurer). They
lodged a claim for storm damage to their shed. The complaint relates to the insurer’s
decline of the claim as it says the cause of damage was excluded under the policy.
The case analyst provided the parties with a recommendation on the issues in
dispute. The recommendation was partially in favour of the complainants. A copy of
the recommendation is attached to this determination.
1.2 Issues and key findings
Can the insurer refuse the claim?
The findings contained in the recommendation were correct and are adopted in this
determination. Further submissions provided after the recommendation have been
considered.
The complainants have established a prima facie claim.
On the information provided, on balance, it is fair that the insurer is required to
partially accept the claim and pay 50% of the damage.
1.3 Determination
This determination is partially in favour of the complainants.
Should the complainants accept this determination, then within fourteen days of
acceptance, the insurer is to pay the complainants the amount of $16,897.50.
Otherwise, the insurer is not required to take any further action in relation to this claim
or complaint.
Determination | Case number: 606389 Page 2 of 4
2 Reasons for determination
I have decided this case on its merits, having regard to the relevant law, good industry
practice, codes of practice and previous decisions. I have considered all the material
submitted by the parties, both before and after the recommendation. I am satisfied the
documentation I have relied on has been provided to both parties.
I am satisfied that the case analyst’s recommendation contains an accurate summary
of the complaint, the issues to be determined, any applicable paragraphs of the Rules
and any relevant law. A copy of the recommendation is attached.
Material provided after the recommendation
After the recommendation was rejected, the complainants provided their quote for the
demolition and instalment of the shed. The complainants did not provide any expert
reports challenging the expert’s report about the cause of damage to t he shed.
2.1 Can the insurer refuse the claim?
Information shows strong winds occurred at date of loss
The complainants lodged a claim for storm damage that occurred to their shed on 17
July 2018.
The complainants’ policy is a farm insurance policy which covers accidental storm
damage.
The policy defines accidental as ‘ sudden, external, violent, visible, unusual and
specific event that occurs fortuitously that one does not foresee or intend and that
occurred at an identifiable time and place ’ .
The information showed the Bureau of Meteorology weather data near the
complainants’ property was categorised as causing considerable structural damage.
Whilst the closest weather station was not operating, there were 89 kilometres per
hound winds recorded approximately 40 kilometres away.
The complainants have the initial onus to prove that on balance, that an accidental
loss occurred. The complainants have established a valid claim.
Shed was subject to structural/workmanship issues and gradual deterioration
The shed/stable building was constructed approximately 30 years prior to the storm
event. The damage was to the north and west part of the shed/stable structure.
The building had evidence of areas of construction deficiencies and areas where it
was exposed to the weather and gradual deterioration; and a combination of both.
Determination | Case number: 606389 Page 3 of 4
T he insurer’s engineer, C, says all post bases had evidence of rot. The west wall
posts were not restrained laterally at the lower and intermediate levels and less
vertical loading to restraint and less lateral bracing against the wind .
Further, C says the building structure was not braced vertically or horizontally. The
timber purlins were end fixed to rafters. There were numerous failed connections that
were not corroded but were slender. Nail fi xed through the end of purlins lacked
capacity and were insufficient for restraint purposes.
C says the damage to the shed was due to a combination of shed
construction/workmanship issues and gradual deterioration/rot. C further stated that
no other buildi ng damage was evident in the area. However, the complainant’s broker
has stated that there were other claims for damage in the area. This has not been
denied by the insurer.
Despite some of the structural and developed gradual deterioration issues raised, the
shed appeared to be robust against the storm event, particularly to the south and east
parts of the building structure. The structure had withstood previous storms for a
substantial number of years.
The claimed damage is distinguished from the remainder of the building structure in
that no north wall was constructed which would reasonably secured the shed against
more exposure to the weather conditions and gradual deterioration.
Having reviewed the circumstances, I accept the wind damage was strong enough to
have caused the damage however I am satisfied it would have been to a less extent
had it not been for the condition of part of the shed building structure.
I am satisfied the construction issues and gradual deterioration affected part of the
building structure’s robustness prior to the storm . I do accept that the main damage to
the shed was caused by the wind
Insurer to contribute to the settlement
The insurer declined the claim as it says the shed was subject to deterioration and/or
wear or tear. The insurer did not put forward an argument that a workmanship or
building construction policy exclusion applies.
C says the building is unsuitable for repair due to the pre-existing gross dilapidation
and deficient and defective construction.
During the complaint process, the insurer arranged a quote from builder, J, for the
shed installation which totalled, $13,417.28.
The complainants have provided a quote from shed supplier, G, to replace the shed
for $27,995 and quote from excavator, W, to remove shed for $5,800. This quote has
not been disputed by the insurer.
Whilst I accept that the damage to the shed was caused by the strong winds I also
accept that the damage would not have been as severe if the parts of the shed had
Determination | Case number: 606389 Page 4 of 4
been maintained in a better condition. I consider it fair for the insurer to settle the
complainants claim at 50 % the complainant’s costs based on G and W’s quotation to
account for storm damage.
I acknowledge the complainant is seeking either:
the sum insured payment and removal of debris costs
full repair of existing shed or
replacement of the shed and removal of debris.
However, as noted above, I am satisfied it is fair in all the circumstances that the
insurer contributes to the complainant’s costs to account for the storm related
damage. The insurer is not liable to contribute to the costs relating to building
construction issues and gradual deterioration issues.
Within 14 days of the parties accepting the determination, the insurer is to cash settle
the complainants $16,897.50.
Recommendation | Case number: 606389 Page 1 of 8
Recommendation
Case number: 606389 13 February 2019
3 Overview
3.1 Complaint
The complainants lodged a claim with the financial firm (insurer) when their shed
collapsed due to a storm event. The insurer declined the claim as it says the cause of
damage was due to gradual deterioration, wea r or tear, developing flaws and general
maintenance which are excluded for cover under the policy.
The complainants disagree with the claims outcome and seek their claim to be
accepted in full.
3.2 Issues and key findings
Is the insurer entitled to decline the claim?
The insurer is not entitled to decline the claim as
the complainant has established a valid claim
on the balance of probabilities, the proximate cause of the damage is building
construction issues and gradual deterioration.
Considering what is fair in all the circumstances, the insurer is to cover 33.3% of the
damage.
3.3 Recommendation
This recommendation is partially in favour of the complainants.
Within 14 days of the parties accepting the recommendation, the insurer is to cash
settle the complainants the amount of $4,467.95.
Recommendation | Case number: 606389 Page 2 of 8
4 Reasons for recommendation
4.1 Is the insurer entitled to decline the claim?
Complainants have established a valid claim
The complainants are required to show that, on the balance of probabilities, they
suffered a loss caused by a risk insured against under the policy. This is known as a
valid or prima facie claim.
The complainants hold domestic farm building cover under a farm insurance policy.
The policy will cover the property damage if it was caused by accidental damage due
to the storm event.
The policy defines accidental as a sudden, external, violent, visible, unusual and
specific event that occurs fortuitously that one does not foresee or intend and that
occurred at an identifiable time and place.
The available information supports that a strong storm event occurred at the time the
complainants had lodged a claim for shed damage on 17 July 2018. The
complainants’ claim is for damage to the west wall frame and north west roof of the
shed and roof of the north stable.
The insur er’s builder, J, and engineer, C, support the shed had sustained damage
due to the storm event.
C notes the Bureau of Meteorology (BOM) weather station at PC (approximately
30kms away from the complainants’ property) recorded a maximum wind speed of 89
km/h on the date of loss.
The widely accepted categorisation of wind speed is the Beaufort wind force scale.
On this scale, wind within the range of 88 to 102 km/h are classified as Force 10
(storm) winds. Force 10 winds are described as ‘seldom experienced i nland; trees
uprooted’ and capable of causing ‘considerable structural damage’.
I am satisfied the complainants have established a valid claim.
In these circumstances, the onus shifts to the insurer to establish, on the balance of
probabilities, it is entitled to rely on a policy exclusion to decline the claim or is
otherwise able to limit its liability.
Proximate cause of damage
The complainants say the insurer had confirmed similar claims in the surrounding
area at the same time, this indicated the claims were not the result of deterioration,
but a strong weather event has a contributing factor to the damage.
Recommendation | Case number: 606389 Page 3 of 8
The insurer says the cause of damage to the shed collapse was due to its dilapidated
condition. It says the shed was approximately 30 years old and constructed poorly.
The way the shed was constructed was expected to be less durable than a shed built
to code.
The insurer says the shed was subject to deterioration and/or wear or tear. As the
policy excludes damage caused by or arising from gradual deterioration, wear or tear,
developing flaws or from general maintenance or repair, it declined the claim.
The insurer’s position is supported by J and C whose report summaries are outlined
under section 3.1.
To understand whether the policy responds or not, it is appropriate to first determine
the proximate cause of the loss. The proximate cause of the loss is a question of fact
depending upon the case’s circumstances.
It is well established at law that a proximate cause is not necessarily the first , last or
the sole cause of the loss. It is the effective or dominant or operative cause of the
loss. If there are several causes operating contemporaneously, then each must be
examined for the qualities of predominance and efficiency as the active, efficient
cause that sets a relevant train of events in motion.
Courts have said that if one cause would have resulted in the harm in any case and
the other would not have done so in the absence of the first, then the first is the
proximate cause.
C says nails were driven through the ends of girts most of which were damaged and
swollen due to weathering. The girts were not butted up to the timber log posts. Large
gaps were evident at the interface across loads transfer due to absence of a timber to
timber connection.
The nail connection lacked capacity to transfer loads. The timber purlin was end fixed
to rafters through nails driven into the rafters. Nails at numerous failed connections
were not corroded and appeared slender. C says nails fixed through the purlins ends
lacked capacity and were insufficient for restrain purposes.
Further, C says the shed structure was not braced vertically or horizontally. Bridging
and blocked was not provided to roof purlins to prevent lateral movements and
twisting under load.
It says the west wall posts were rotten and broken away at the base. The north end of
the shed was unenclosed and open to the weather. The west wall posts were not
restrained laterally at low and intermediate levels. There was no northern end wall,
which meant the posts had less vertical loading to restrain against uplift and less
lateral bracing against the wind.
C says the shed structure had failed due to one or both of the following:
Recommendation | Case number: 606389 Page 4 of 8
westerly wind loading caused vertical and/or lateral movement of west wall post
bases which were rotten. The wall frame movement caused an unbraced roof
frame to move facilitating the roof loss, failure of wall connections and post
collapses or
wind caused failure of defectively braced and nailed roof frame, facilitating roof loss
cladding and framing. This then facilitated the loss of lateral support for the walls
which facilitated the rotten post collapse.
C says the first scenario was likely, as recorded winds were not extreme and the past
winds would not have caused failure were it not for the dilapidation.
C says the west wall frame relied on the embedment of the posts for lateral and uplift
restraint. The loss of the structural integrity of the posts at embedment locations
resulted in the total loss of lateral and uplift restraint.
C says the shed failure (partial loss of defectively constructed roof frame and cladding
and west wall frame and cladding and north stable roof) would not have been
sustained if it was reasonably constructed and maintained.
C says the damage would not have occurred if the building was built to current or past
codes and maintained. No other building damage was evident even though the
building was old and appeared dilapidated.
Causes of damage are building construction issues and gradual deterioration
I consi dered C’s report most persuasive due to C’s engineering expertise, the level of
detail and photographs to support its conclusions.
I have considered the complainants’ concerns regarding C’s report that all timber
posts had rotted through. I have carefully reviewed C’s report, along with the colour
photographs provided. I accept C’s photographs show that in all shed/stable rooms
there are degrees of rot on the timber posts throughout.
Further, J noted displaced timber posts rotten at ground level with one post rotten all
the way through. J found 30% of a second post rotten and snapped during the storm
event. The damage described is indicative of gradual deterioration.
C’s conclusions are supported by the photographs provided. C has shown the
construction of the whole shed/stable structure had compromised its restraint and
capacity integrity and there had been some evidence of long-term weathering on
some wall frames and rotted timber posts. The south of the shed/stable structure had
evidence of pest damage and excessive ground moisture.
While the whole shed/stable structure were subject to these factors, the north-east,
east and south of the shed/stable structure appeared to be compact/secured and was
not damaged nor collapsed due to the storm event.
Recommendation | Case number: 606389 Page 5 of 8
It is likely the north/west part of building (considering the way it was constructed) may
have withheld from the wind impact if it was enclosed when comparing the way the
rest of the building dealt with the storm event even with other issues such as minor
pest damage and excessive moisture.
The distinction between the construction on the south, east and north east of the
shed/stable structure was that the north/west structure was built in a way leaving that
area exposed to the weather over time.
While it is foreseeable that the construction issues preceded the gradual deterioration
that occurred. The reports show an entwined relationship between the gradual
deterioration and building construction issues to the shed.
C says the roof, wall and posts structures lacks restraint and bracing mechanisms. C
says without both the construction issues and the dilapidation; the building would not
have sustained damaged from the wind event.
I consider both construction issues and gradual deterioration issues were present and
contributed to the damage of the building prior to the wind event.
Based on the above, I am satisfied the proximate cause of damage is both building
construction issues and gradual deterioration.
Insurer to partially settle the claim for storm damage
The information above shows the cause of damage of the shed was gradual
deterioration and building construction issues. The insurer has not relied on building
construction issues as a policy exclusion that applies. This indicates that part of the
building would be damaged by an insured event.
Having reviewed the circumstances, I accept the damage would not have occurred,
but for the storm. However, I equally accept the damage would not have occurred, but
for the condition of the structures.
During the complaint process, the insurer arranged a repair quote for the shed which
totalled, $13,417.28. In the circumstances, I consider it fair for the insurer to settle the
complainants 33.3% of these costs to account for storm damage.
Within 14 days of the parties accepting the recommendation, the insurer is to cash
settle the complainants $4,467.95.
5 Supporting information
5.1 Expert opinion
Record Ke y points
Recommendation | Case number: 606389 Page 6 of 8
Record Ke y points
Insurer’s builder (J)
Report
20 - 07 - 2018
Found stable/shed damaged by strong wind gusts. A portion of the
roof and out er wall has been removed during make safe and entire
shed structure is on a lean and needs to be replaced.
Shed structure built out of hardwood posts and weatherboard,
however construction method used is not standard building practice
and may have contributed to collapse of shed. Roof framing
attached to timber posts with nails however there was no bolts or
brackets used.
Displaced timber rotten at ground level with one post rotten all the
way through. Approximately 30% of second post rotten and
snapped during storm event. Remainder of shed fascia not in good
condition with fascia ends showing signs of rotting and there was
no gutte ring on one side of structure.
Shed has sustained damage during storm and entire shed requires
replacement.
Insurer’s engineer (C)
Report
24 - 08 - 2018
Timber purlins and roof beams defectively nailed to timber posts.
Shed is old and dilapidated.
Structural sections and connections are grossly deficient.
All post embedment in the ground have rotted completely (100%).
Prior to the event, the shed was similar to partially enclosed box
with freestanding and substantially unrestrained internal side panel,
particu larly failed west wall. Structure pre - disposed to wind damage
at far less than design wind speeds.
Structure displays large differential settlements in wall planks which
are grossly misaligned from south to the north. Differential
settlements are in excess of 150mm.
Structure has ad - hoc construction. Member sizes are variable.
Wide gaps occur between connected members, which are bridged
by nails only. Structure not constructed in compliance wit h a
reasonable understanding of building framing practices or
st andards.
Girt are not butted up to the timber log posts. Large gaps evident at
interface across which the loads were trans ferred due to the
absence of a timber to timber connection. Nail connections lacked
capacity to transfer loads.
Nails at numerous fail ed connections were not corroded and
appeared slender. Nails fixed through the end of purlins lack
capacity and are insufficient for restraint purposes.
Structure not braced vertically or horizont ally. Bridging and blocking
not provided to roof purlins to prevent lateral movements and
twisting under load.
Posts in west wall were rotten and broken away at base.
West walls posts were not restrained laterally at low and
intermediate levels. Due to abs ence of a northern end wall, posts
had less vertical loading to restrain against uplift and less lateral
bracing against the wind.
Timber offered no resistance at any post bases indicating posts
completely rotten. Soil surrounding excavated post bases retained
Recommendation | Case number: 606389 Page 7 of 8
Record Ke y points
moisture and was saturated.
Roof does not have gutters and storm water is discharged directly
above edge of building and over the walls down the foundation;
roof has pre - existing fixing holes and tears. Roof framing deformed,
evident in the cladding similarly deformed and not installed in
compliance with manuf acturer recommendation.
Bureau of Meteorology weather station at PC recorded a maximum
wind speed of 89 km/hr on 17 July 2018 from the West. This
weat her station is located about 20km to the East. Other weat her
stations at W and Phillip Island did not reco rd maximum wind
speeds on the day. Maximum wind speed recorded at PC will result
in less than 50% of design wind pressures for the area based on
AS1170.
Structure has failed bec ause of one or both of following: i. Westerly
wind loading caused vertical and/ or lat eral movement of west wall
post bases which were rotten. Resultant west wall frame movement
caused movement of roof frame which was unbraced, facilitating
roof loss, failure of wall connections and post collapse or ii. Wind
caused failure of defectiv ely braced and nailed roof frame,
facilitating roof loss cladding and framing. This then facilitated
lateral loss support for the walls which facilitated rotten posts
collapse.
Scenario i. is most likely as recorded winds were not extreme and
occurred on a regular annual basis in the past and would not have
caused failure were it not for dilapidation. Progressive rotting of
post bases is most extreme and significant example of dilapidation,
but there are others including weathered timber and corroded wall
g irt nail connections.
Loss of structural integrity of posts at embedment locations
resulted in total loss of lateral and uplift restraint.
None of damages to defectively constructed roof frame and
cladding over hay shed part, west wall of defectively frame d and
clad shed wall part and corrugat ed metal roof over north stable
would have been sustained if shed was reasonably constructed
and maintained.
Shed grossly structurally unsound and had no residual value prior
to wind event. Shed was at risk of catastro phic failure due to the
following in order of priority i. failed post footings ii. Grossly
deficient wall girt connections and framing iii. Grossly deficient
weat herboard plank installation and fixing iv. Grossly deficient roof
framing and connections v. A S1684.2 notes maximum life of timber
posts embedded in the ground. Posts have exceeded maximum life
by many years. All posts including internal posts were protected
from different effects of moisture were 100% rotten and failed
throughout cross - section. Ve ry unusual and indicates severity of
gross dilapidation.
Insured would have been reasonably aware the building was
dilapidated and in danger of failing prior to the event. Building
displayed large differential settlement distortions and leans.
Framing gros sly warped, swelling and weathered in different parts
Recommendation | Case number: 606389 Page 8 of 8
Record Ke y points
of the structure. Timber visibly separat ed at nailed connections.
Building always had drainage issues were likely to cause post
bases and lower timber wall sections to rot. These issues were not
address ed.
Age of building is uncertain; bas ed on nail construction of roof
purlins and longer lengths of roof cladding; roof was constructed or
reconstructed in 1970s or 1980s. Framing not constructed in a
trade like manner and not compliant wit h any post timber framing
Codes.
Shed and attached stable partially damaged during wind event
equivalent to regular annual event due to effects of gross building
dilapidation and deficient construction, which were readily evident
prior to the event.
Several building dilapi dation and deficiency issues have
contribut ed directly to the failure have been identified in this report.
Building would not have failed during wind event, were it not for
these issues.
Building has not been constructed to any applicable timber framing
co des.