Determination 606090

Flood exclusion applied to water inundation of commercial building

FirmFinancial Firm (Unknown - Insurer)
Decided2019-09-26
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$100,000
Non-financial loss—
Amount claimed$316,051
SourceAFCA PDF

Summary

Water inundated the commercial building during Cyclone Debbie, and the insurer declined the claim as flood damage. AFCA found the initial storm and water damage was covered but limited the insurer's liability to $100,000 inclusive of interest because the property was later flooded by the Tweed River.

The insurer bears the onus to prove an exclusion, and the flood exclusion did not apply to the initial water damage but limited liability to damage before flood inundation, with a fair 50% reduction for prejudice and unproven costs.

Issues

Subjects and remedies

natural disastersmall businesspay claimpay interest

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination | Case number: 606090 Page 1 of 14 Determination Case number: 606090 20 September 2019 1 Determination overview 1.1 Complaint The complainant holds a business insurance policy with the financial firm (insurer) covering a commercial building located in Murwillumbah NSW. In May 2017, the complainant lodged a claim after the building was inundated by water on or about 30 March 2017 following Cyclone Debbie. The insurer declined the claim and says the damage to the building was caused by flood. Flood damage is excluded under the policy. The complainant does not accept this and says the damage was storm and water damage covered under the policy. 1.2 Issues and key findings Has the complainant established a claim within the terms of the policy? Yes. The policy provides cover for a series of defined events including storm and water damage caused directly or indirectly by the discharge of water mains, drains, gutters, pipes and water systems. The panel is satisfied that the initial damage to the property arose from storm and water damage within the terms of the policy. Can the insurer limit its liability? Yes. The property was ultimately inundated by flood and damage caused by flood which is excluded from cover. To the extent as set out under section 2.2 of this determination, the insurer is entitled to limit its liability. Is the complainant entitled to compensation for non-financial loss? No. Whilst the complainant has been inconvenienced, the inconvenience arose from the damage rather than the way the insurer handled the claim. 1.3 Determination This determination is substantially in favour of the complainant. Determination | Case number: 606090 Page 2 of 14 The insurer is to pay the complainant $100,000 inclusive of interest, in settlement of the complainant’s claim for loss or damage arising from the inundation of the building on or about 30 March 2017 following Cyclone Debbie. Determination | Case number: 606090 Page 3 of 14 2 Reasons for determination There has been a full exchange of material between the parties and eac h party has had the opportunity of addressing the issues that arise from the information exchanged. Due to the complexities involved in this complaint, the complaint has been dealt with by a panel. The panel has had access to all relevant information. This determination is based on what is fair in all the circumstances having regard to the relevant legal principles, terms of the policy, good industry practice including codes of practice and prior determinations where applicable. 2.1 Has the complainant established a claim within the terms of the policy? Complainant has the onus to establish a claim within the terms of the policy The policy covers the insured for a series of defined events. Particulars of cover are set out in section 3 of this determination and include:  storm, wind and rain events, including run-off of rainwater that accumulates directly on and flows across normally dry ground , or that overflows from public roadside gutters, channels and drains that are normally dry.  water damage caused directly or indirectly by the discharge, leaking or overflowing of water from any public water main, drain or gutter, as well as from pipes or water systems servicing the building or surrounding property. The policy also contains a several exclusions. Flood, as defined in the policy is excluded from cover for storm damage. The flood exclusion is not attached to the defined event of water damage. Accidental damage is also covered, but only if a loss does not fall within any of the other defined event categories. Such damage is subject to the other listed exclusions for all events, meaning flood is excluded under the same terms which exclude it from storm, wind and rain events. The onus is therefore on the complainant to establish the damage arose from the storm event or from water damage due to water discharging, leaking, overflowing from any public water main, drain or gutter as well as from pipes or water systems servicing the building or surrounding properties. Circumstances of the loss There is no dispute a significant weather event occurred during the latter part of March 2017. The exchanged material shows a substantial amount of rain fell in and around the area of the complainant’s property at that time. Determination | Case number: 606090 Page 4 of 14 The property was leased to a retail liquor outlet. It is understood the staff vacated the property in the early afternoon of Thursday 30 March 2017, upon hearing reports of road closures in the area and water pooling. There is no dispute that the complainant’s property was inundated by water. The parties agree that the property was inundated to a depth of approximately 0.5 metres above floor level causing significant damage to the internal fittings and subsidence of the concrete slab. Upon claim lodgement, the insurer appointed a hydrologist (W) to inspect the property and identify the cause of inundation to the building. W reports the cause of damage was an overflow of water from the Tweed River directly into the building. The insurer subsequently declined the complainant’s claim on the basis the proximate cause of damage to the building was flood, which the policy excludes. A proximate cause of damage is storm and water The various reports provided by the parties have been set out under section 3 of this determination. Following careful review of this material the panel is satisfied on balance that the initial inundation of the property and resultant damage was storm and water damage as defined within the terms of the policy. While the parties dispute the time and cause of the initial inundation to the property, the Panel accepts the complainant’s assertion that water first entered the building sometime between 5pm and 6pm on 30 March 2017. This is because:  water from rainwater run-off and water via drains began to inundate the complainant’s building at about 5pm on 30 March 2017  significant volumes of water from rainwater run-off and water via drains continued to inundate the building throughout the evening of 30 March 2017 and the very early morning of 31 March 2017  a photograph shows water ponding above floor level height of the carpark at 5.03pm on 30 March 2017, and W confirms the floor level of the carpark and the building are the same  a photograph taken at 6.19pm on 30 March 2017, just over an hour after the first photograph was taken, shows the water ponding around the building had not subsided or drained away  an eye witness (J) residing next door to the insured bui lding says water first entered under her door at about 5.30pm on 30 March 2017, and a surveyor (B) confirms the floor level of the neighbour’s building is the same as the floor level of the insured building.  W confirms the ponding water shown in the two photographs (noted above) was unable to drain away from the property Determination | Case number: 606090 Page 5 of 14  the building most likely reached its maximum level of inundation (0.5m) at about 3am on 31 March 2017, and this water was a mixture of rainwater run-off and floodwater from drains  the Tweed River did not reach floor-level height of the building until about 3am on 31 March 2017, by which time the building was already inundated with water. Further the panel notes:  W reports sometime in the afternoon of 30 March 2017, large volumes of water topped the floodgates of the Tweed River and overflowed into a drainage channel to the north-east of the complainant’s property, causing riverine water to flood the drains and cane fields adjacent to the insured building. In so far as this caused water damage as defined, the flood exclusion would not apply.  photographs show large storm drains underneath Tweed Valley Way which would allow water to travel from the cane fields directly to the complainant’s property  W confirms the table drains, adjacent to the complainant’s property were already full of water by 5pm on 30 March 2017 and the ponding water (at the complainant’s property) could not drain away  the meteorological data shows the peak rainfall period in the vicinity of the complainant’s property occurred from 8.50pm to 11.50pm on 30 March 2017  W says it is likely the inundation of the complainant’s property coincided with the most intense period of rainfall  Eye witness J states that once water entered her building at around 5.30pm on 30 March 2017, the water level continued to rise until the point of maximum inundation.  J confirms the maximum inundation to her building occurred at approximately 3am on 31 March 2017 and peaked at about 15 to 18 inches (0.38m to 0.46m). Having considered the available information the Panel accepts that the initial inundation and resultant damage was a result of storm and water damage as defined within the terms of the policy. In the circumstances the panel accepts the complainant has established a valid claim within the terms of the policy, for damage due to storm water as defined and water damage as defined. 2.2 Is the insurer entitled to limits its liability? The onus is on the insurer to establish the application of an exclusion Although the initial inundation of the property was due to storm water and water damage as defined within the policy, the area in which the complainant’s property was located was ultimately inundated by flood waters from the Tweed River. Hydrology indicates the Tweed River reached a height of 4.2 metres AHD (floor height at the property) at approximately 3am on 31 March 2017 before reaching a maximum height of 4.75 metres. Determination | Case number: 606090 Page 6 of 14 The panel accepts that after the Tweed River broke its banks it is likely that the property was inundated by flood waters. To the extent that the property was inundated by flood waters as defined, the insurer is entitled to limit its liability. ‘Wayne Tank’ principle does not apply The insurer has argued that as there were two causes of inundation, one of which is covered under the terms of the policy and one of which is excluded (flood) that it is entitled to rely upon the exclusion to avoid liability. This it says is the ‘Wayne Tank principle’. The panel does not accept this to be the case. The Wayne Tank principle applies if there are two concurrent causes of equal importance. This is not the case in this complaint. The panel accepts that the initial inundation of the property occurred sometime prior to the Tweed River reaching a height of 4.2 metres and breaching its banks. To the extent that the hydrology refers to the river breaching its banks earlier at a different location causing water to overflow through the paddocks and drains to the property such water damage would fall within the definition of water damage within the terms of the policy. The flood exclusion does not apply to the defined event of water damage. In this respect the damage was not concurrent. The panel accepts that the insurer is liable for the initial damage to the property. It is entitled however, to limit its liability to the damage that occurred prior to the inundation of the property by flood waters. The insurer was prejudiced in its ability to assess the loss The complainant did not immediately submit a claim but attended to the urgent replacement of the slab and flooring. According to the complainant this was done to mitigate any further losses as the property had been tenanted and the tenant would only cease trading for a period of three months before it could void the lease. The panel accepts the complainant’s explanation for attending to the urgent replacement of the slab. The panel accepts that the insurer’s ability to assess the extent of the loss and damage and costs to repair such loss or damage has been prejudiced by the complainant ’s actions in commencing those repairs prior to the lodgement of the claim. Nevertheless, the insurer has not questioned the costings provided by the complainant for the repairs nor has the insurer provided its own costings. The complainant submitted several invoices as part of the claim and a costing of $316,051. Items included amounts for accommodation, fuel, equipment repairs, stationary, hardware and travel which would not be covered under the terms of the policy. It also included costings for work that had not been done. Determination | Case number: 606090 Page 7 of 14 The complainant submitted a separate costing of $215,000 which again included items such as accommodation, fuel etc as well as $80,000 for work not yet done. This costing identified damage to a mezzanine but noted that it had no plans to rebuild the mezzanine. The insurer’s loss adjuste r who had first attended the property on 30 May 2017 placed an estimate on the damage of $150,000. How this estimate was reached has not been identified. Assessment based on what is fair in all the circumstances The panel is required to determine this matter based on what is fair in all the circumstances. The panel in reaching its view acknowledges:  that the insurer has been prejudiced in its ability to assess the damage but that the complainant was required to mitigate the loss and has done so  the damage to the slab is genuine damage that arose following the inundation of the property  the available information identifies that whilst there was an initial inundation to the property, the property was ultimately inundated by flood waters  in the circumstances there is some uncertainty as to the extent of damage caused by the insured events  the actual construction costs identified by the complainant are not unreasonable and the insurer has not challenged the complainant’s construction costs  the costings provided by the complainant of $215,556 include numerous items as indicated that would not be covered under the terms of the policy  it also includes $80,000 for work not yet done. The property has since been sold and it is unclear whether the work was completed. In the panel’s view , taking all things into account it would be fair that the insurer’s liability be limited to approximately 50% of the complainant’s loss or damage. In the absence of more precise accounting information from either party, the panel in the circumstances considers it fair that the insurer pays an amount of $100,000 being approximately 50% of the total costings claimed by the complainant less those matters that are not covered under the terms of the policy. 2.3 Is the complainant entitled to compensation for non-financial loss? We may award compensation for non-financial loss The AFCA Rules outline we can award compensation for non-financial loss of up to $5,000, where there has been an unusual amount of inconvenience, time taken to resolve a situation, or interfe rence with a complainant’s expectation of enjoyment or peace of mind. Determination | Case number: 606090 Page 8 of 14 AFCA adopts a conservative approach to the award of compensation for non-financial loss and we expect a complainant to be moderately robust and tolerate a normal degree of inconvenience when making a claim. The complainant is a small business comprising of two owners, a father and daughter . It has suffered considerable inconvenience because of the damage sustained to the property. The panel is not satisfied that that inconvenience has b een caused by the insurer’s handling of the claim. The complainant had commenced the repairs prior to lodgement of the claim and the insurer was entitled to thoroughly investigate the claim to determine the actual cause of loss. The panel also accepts that it was not unreasonable for the insurer to obtain relevant hydrology information or to rely upon that hydrology in reaching its assessment of the loss suffered. While the panel acknowledges the time and effort spent by the complainant in seeking to resolve this matter, the panel is not satisfied that it is appropriate to award additional non-financial compensation because of the insurer’s handling of the claim. Determination | Case number: 606090 Page 9 of 14 3 Supporting information 3.1 Relevant policy provisions PDS page Relevant Section 14 - 15 General Definitions Unless defined differently in individual sections, these definitions apply to all sections of this Policy. Flood means the covering of normally dry land by water that has escaped or been released from the normal confines any of the following: (a) a lake (whether or not it has been altered or modified); (b) a river (whether or not it has been altered or modified); (c) a creek (whether or not it has been altered or modified); (d) another natural watercourse (whether or not it has been altered or modified); (e) a reservoir; (f) a canal; (g) a dam . 18 - 19 Fire and defined events This section forms part of this Policy only if shown in the Schedule. About thi s Section This Section covers physical loss of or damage to your property caused by or arising out of any insured event listed in this Section. What we cover Provided ‘Fire and defined events’ is shown under ‘What’s Covered’ in the Schedule , we will cover you for loss or damage occurring during the period of insurance to your property insur ed shown in the Schedule , located at your premises, caused by, arising out of or connected to an insured event specified below. Insured events … 7. Storm, wind and rain (including snow, sleet or hail) What we cover This is limited to: (a) storm; (b) win d; (c) rainwater; (d) cyclones or tornadoes; (e) snow or sleet; (f) hail; and (g) run - off of rainwat er that accumulates directly on and flows across normally dry ground or that overflows from public roadside gutters, channels and drains that are normally dry or swimming pools, spas or saunas. What we exclude We will not cover you for more than $25,000 in respect of any one insured event for loss of or damage to property in the open air, gates, fences, retaining walls, shade - cloth, hail nets, exterior text ile awnings or blinds, shade houses, fibreglass hous es or glass houses, unless a higher amount is specified in the Schedule with regard to loss Determination | Case number: 606090 Page 10 of 14 PDS page Relevant Section or damage caused by this insured event. We will not cover loss or damage caused by: (a) flood , however caused; (b) the sea, including tidal wave, storm surge or high - water, unless it is caused by or arises out of an earthquake or a tsunami; (c) erosion, landslide, mud slide, subsidence or any earth movement unless it is caused by or arises out of and occurs within 168 hours of this insured event. (d) steam or condensation; (e) water seeping or percolating the building from outside the premises , or that occurs gradually due to lack of maintenance; (f) compaction, shrinkage or ex pansion of the earth or land but we will pay the cost to restore soil or earth to the extent that it is necessary to repair insured damage to your building. … 8. Water damage What we cover We cover loss or damage caus ed directly or indirectly by the discharge, leaking or overflowing of wat er from: (a) any pipe, water system (including a fire protection system), tanks or drains installed in and servicing the building or surrounding property; or (b) any public water main, drain or gutter. … 11. Accidental damage What we cover We cover accidental loss or damage to property at the premises , not otherwise insured under insured events 1 to 10 above or excluded from cover under ‘What we exclude’ shown below. What we exclude We will not cover loss of or damage to property that is or could have been insured under any other section, even if you have not selected the other section or have had cover under the other section excluded or otherwise denied by us . We will not cover you for loss or damage caus ed by: (a) any of the insured events 1 to 10, this also includes any of the ‘insured events’ related exclusions; … 3.2 Review of expert material Record Key Points Hydrologi st (W) Inspection Report 27 - 06 - 2017  Ground elevations around the property typically fall away to the north towards low lying area adjacent to the Tweed River.  Ground elevations in the car park adjac ent to the front entrance to the building are about 4.2 mAHD.  Building has a floor level similar to the surrounding car park area.  Tweed Valley, located to the immediate south, is elevated about 0.3m Determination | Case number: 606090 Page 11 of 14 Record Key Points higher than the levels in the car park.  Extensive debris and damage in vicinity of property which indicat es a large body of water inundated the property .  No catchment draining directly to the building – any run off would flow towards the rear of the subject property.  Rainfall data indicates the largest falls occurred in the 24 - hour period to 9am on Friday 31 Marc h 2017 at all four stations.  Murwillumbah Station (recorded rainfall totals) > Wed 29/3 – 0mm > Thurs 30/3 – 133mm > Fri 31/3 – 327mm > Sat 1/4 – 3mm .  The data indicates over the 26 - hour period from 2am on 30 March to 4am on 31 March, there was 456mm of rainfall measured.  The highest intensity rainfall occurred in the 3 - hour period from 8.50pm to 11.50pm on 30 March (163mm).  Rainfall intensities were m ore than a 1 in 20 - year event for all durations, except the 30 - minut e mark  The 3 - hour and 24 - hour mark were bot h close to a 1 in 100 - year event  The peak 1 - hour rainfall intensity was 73mm (1 in 20 - year event)  There are two water level gauges close to the p roperty: > Murwillumbah (located approx. 4.3km upstream) > Tumbulgum (located approx. 4.9km downstream)  Water level data from these two gauges was interpolated to give an indicative water level at Condong .  The interpolation point is some distance downstream o f the property, so it is reasonable to expect the observed Tweed River levels to be slightly higher than the estimated Condong water level, but lower than the Murwillumbah level.  The version of events provided by the insured regarding the timing of the rai nfall event and subsequent inundation is consistent with the available rainfall and river level data.  The BOM rainfall radar images indicate wides pread rainfall from the early hours of Thurs morning 30 March, through to early hours of Fri 31 March.  Recorde d rainfall in Murwillumbah was very significant for longer duration storms, with an estimated AEP of between 1 in 50 (year) and 1 in 100 (years ) for storm durations of 6 - 12 hours. The intensity of the short duration storms (less than 1 hour) had AEP’s of u p to 1 in 20 (years). Note: it is likely the rainfall intensity at the property was similar to the Murwillumbah levels/records.  Topographic data indicat es the ground elevation of the building is approx. 4.2mAHD. The floor level of the building is similar t o this (4.2mAHD).  The maximum observed depth of inundation at the property was reported by the insured to be 0.5m above the floor level of the building.  The estimated max. water level at the property (based on data + insured observations) is generally con sistent with the interpolated water level for Condong (based on upstream & downstream water level gauges).  Given the intensity of rainfall recorded at the property, it is possible some Determination | Case number: 606090 Page 12 of 14 Record Key Points ponding of water could have occurred at the property. However, any pond ed water would have flowed towards low - lying areas to the nort h of the property (adjacent to the Tweed River). Additionally, there is no defined catchment draining to the building on the property.  Given the drainage and topographic configuration around the property, the inundation of the property was caused by elevated Tweed River water levels overflowing on the property.  It is possible some inundation of the property has contributed to the substantial structural damage to the concrete slab inside the build ing (however assessment of the structural damage is beyond our scope).  All the evidence indicates the damage caused to the site was due to riverine floodwat ers leaving the Tweed River and inundating the property.  The initial and maximum above floor inundation of the building was caused by water from the Tweed River which flowed back up into the low - lying area at the rear of the subject property before overflowing into the building.  It is possible the inundation of the property has contributed to the substantial structural damage to the concrete slab inside the building, however an assessment of the structural damage is beyond my scope. Hydrologi st (W) Supplement ary Report 22 - 09 - 2017  Supplement ary desktop report to respond to several queries received from insured via the insurer on 13 Sep 2017 (hydrologist did not re - attend)  Insured provided additional photographs and a written statement.  This report is a response to the insured’s 3 x queries:  Query 1 : According to WT, the Tweed River rose to the level of the building floor at 3am on Fri 31 March, however we have provided photos showing run - off water at floor level at 5.03pm and 6.19pm on Thurs 30 March, some 8 hours before. Over the next few hours the rainfall intensified (to a 1 in 100 - year event ) and fell on already saturated ground over acres of sugarcane farm across the road. This water had nowhere to go but west towards the river, around/through my building.  Response 1: The peak water level at the property was estimated by interpolating the le vels bet ween two water level gauges located upstream and downstream to the property. The Tumbulgum gauge is located some distance downstream to the property, so it is reasonable to expect the observed Tweed River levels to be slightly higher than the water level in Tumbulgum, but lower than the Murwillumbah level. Please note the Tumbulgum gauge has a period of data missing on eit her side of the peak. The water level records (both gauged and interpolated) were included to assist in providing an estimation o f the approximate time the property was inundated by water.  Drainage wit hin the floodplain area to the south & south - east of the property is complex in nature and is shown in Fig. 2 - 2. The main drainage feature in this low - lying area is the large drainage channel which joins the Tweed River some 0.6km north - east of the property. Water that falls in the low - lying area to the south of the property is conveyed through the drainage channel to the Tweed River. Fig. 2 - 3 shows water from the Tweed River overflowin g the flood gates and entering the larger drainage channel to the north - east of the property on Thurs afternoon (30 Mar). Additionally, Determination | Case number: 606090 Page 13 of 14 Record Key Points water overflowing from the Tweed River would have entered the table drains adjacent to the Tweed Valley Way on Thurs aft ernoon (30 Mar). Once the water level in the low - lying areas to the south and south - east reached the height of the crest level of Tweed Valley Way, it would have started to flow in a north - westerly direction to inundat e the property.  The 2 photographs prov ided by the insured show water ponding in the carpark of the property late on Thurs afternoon (30 Mar). It is assumed the intent of the insured’s query is to suggest any inundation that occurs after the time of the phot os would need to be considered stormw ater runoff. WT’s response to this, is that this approach ignores the increases in wat er level of both the Tweed River and floodplain flow within the Murwillumbah flood that occurred during this time. It also ignores the fact that water from the Tweed Rive r had overflowed onto Tweed Valley Way to the north - east of the property and had started to flow into the table drains prior the phot os being taken.  The available rainfall data indicates the most intense period of rainfall started after 9pm on Thurs 30 Mar ch. An assessment of the rainfall prior to 9pm indic ates the rainfall was only moderately severe (1 in 10 - year event) for the 12 - hour storm duration. The shorter duration rainfall intensities, such as the 1 hour and 2 - hour durations, had a AEP of 1 in 5 ye ars, Given the available information, it is likely the inundation of the property coincided with the most intense period of rainfall, however the property and surrounding areas were already subject to inundation by water from the Tweed River at this time.  Query 2 : The photos show the run - off water is on the rise by approx. 100mm per hour. Given the rate of rising run - off water and the int ensity and duration of rain that followed, and given the run - off water was already at the building floor level at 6.19pm on 30 March, it is reasonable to suggest the run - off water rose in the building to the peak level of 500mm over the floor before the Tweed river rose to the same level some 8 hours later.  Response 2: The photos show ponding in the car park and in the drain age reserve adjacent to Tweed Valley Way. The insured indicates the ponded water shown in one photo is the same level as the floor level of the building, but the photographs do not support this statement (the building on the property is not in frame).  The insured states the ponded depth of stormwater run - off on the property was rising by 100mm an hour, however: > It is not agreed the phot ographs show stormwater runoff. The water shown in the photos consists of a combination of runoff from direct rainfall and breakout water from the Tweed River. It is agreed the water levels were rising at this time. However, the available gauge records indicate that at 6pm on Thurs 30 March the water levels in the Tweed River were rising at approx. 60mm per hour.  The topogra phic information indicates water ponding in the area adjacent to Tweed Valley Way would flow in a general north - easterly direction along the drainage reserve towards the drainage channel. The ponded wat er shown in the insured’s photograph indicates this wa ter was possibly unable to discharge freely due to the ingress of Tweed River. Given the photographic evidence of water overflowing from the Tweed River (to the Determination | Case number: 606090 Page 14 of 1 4 Record Key Points north east of the property) on Thursday afternoon, prior to the insured’s photos being taken, i t is likely the water from the Tweed River would have started flowing back up into the table drains adjacent to Tweed Valley Way.  The insured indicated the water ponding around the building is runoff from the area to the east of the property (from the sug arcane fields). However, a photo provided by the insured taken at 6.22pm on Thurs 30 March shows Tweed Valley Way was not overtopped by water flowing from the east at this time. As such, the water shown ponding in the area around the insured’s building was not flowing from the east of the property .  The ability of wat er to drain into the river is simply a matter of relative level. If the pooling water is at a higher level than the river, given a flow path it would flow the river. Alternatively, if the river is at a higher level than the pooling water, given a flow path the river water would flow to the area of pooling water. Additionally, the available topographic data indicates the ground elevations slope down from the front of the property to the rear (i.e . towards the Tweed River) with a difference in elevation of greater than ½ a meter towards the rear of the property. As such, any stormwater runoff ponding to significant enough depth (i.e. greater than 10cm) would flow in a general nort h - westerly directi on towards the Tweed River.  Conclusion : The information supplied by the insured does not alter the conclusion of the initial site report. That is: the initial and maximum above floor inundation of the building on the subject property was caused by water from the Tweed River which flowed back up into the low - ly ing area at the rear of the property before overflowing into the building. Surveyor (B) Surveyor Report 07 - 02 - 2019  We have taken a level at the front door of the insured building and have found same to be RL 4.565 A.H.D.  We have taken a level at the fron t door of (neighbour’s building) and have found same to be RL 4.625 A.H.D.  We note the buildings are approximately 21.7 metres apart.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.