Building fire and storm damage settlement amount disputed; claim handling and builder conduct criticised
Text of the determination
Determination | Case number: 605526 Page 1 of 13
Determination
Case number: 605526 30 September 2019
1 Determination overview
1.1 Complaint
The complainants hold insurance with the financial firm (insurer) for cover of their
home and contents. They lodged a claim after a fire damaged the property in August
2018. Before repairs had commenced the property was further damaged during a
heavy storm in October 2018.
Initially there was a dispute as to the contents, temporary accommodation and
building repairs. The dispute with respect to the contents and temporary
accommodation has resolved. The parties remain in dispute as to the building
damage. The insurer paid the complainants $120,631.03 to cover the cost of repairs.
The complainants submitted a quote for $195,568.59 and seek the additional
$74,937.56.
In addition, the complainants say the insurer has mishandled the claim, has caused
lengthy delays and as a result, they have suffered considerable stress and
inconvenience. They seek compensation for non-financial loss.
1.2 Issues and key findings
Should the insurer increase the cash settlement payment for the building
damage?
Yes. The insurer is to increase the cash settlement payment to a total of $178,000 as
set out under section 2.1 of this determination.
Is the insurer liable to pay compensation for non-financial loss?
Yes. The complainants have suffered an unusual degree of inconvenience because of
the insurer’s handling of th e claim. Compensation for non-financial loss of $3,500 is
appropriate.
Determination | Case number: 605526 Page 2 of 13
1.3 Determination
This determination is in favour of the complainants.
The insurer is to increase its cash settlement from $120,631.05 for the building
damage to $178,000. Payment must be made within 14 days of the complainants’
acceptance of this determination.
The insurer is liable to pay compensation by way of non-financial loss of $3,500 as
set out under the AFCA Rules.
Determination | Case number: 605526 Page 3 of 13
2 Reasons for determination
There has been a full exchange of material between the parties and each party has
had the opportunity of addressing the issues that arise from the information
exchanged.
Both parties have provided a considerable amount of information in this dispute. All
information has been considered in reaching this determination.
The determination is based on what is fair in all the circumstances, having regard to
the relevant legal principles, terms of the policy, good industry practice including
codes of practice and prior determinations where applicable.
2.1 Should the insurer increase its cash settlement for the building
damage?
Circumstances of the loss
There is no dispute that extensive damage occurred to the complainants’ property
after a fire broke out in the roof of the home in August 2018. The fire resulted from a
blockage in the flue of the slow combustion heater. The home also suffered significant
water damage as the fire brigade extinguished the flames.
Before the property was repaired it sustained further damage during a heavy storm in
October 2018. The additional damage included water damage to various areas of the
home plus electrical and fire damage after a second fire broke out in the kitchen.
Parties dispute settlement of the building damage
There is no dispute that the complainants have a valid claim for fire damage following
the fire in August 2018. The parties have recently negotiated settlement terms for
contents, storage costs, and temporary accommodation.
This dispute relates to the extent of damage caused to the building because of the fire
and the subsequent water, electrical and fire damage that occurred in October 2018.
The dispute not only relates to the reasonable costs to repair and replace some of the
items but also to the extent of the insured damage.
The insurer eventually cash settled the complainants ’ claim for building damage for
$120,631.03. The complainants provided the insurer with a quote from the male
complainants building company for $195,568.59.
Both parties have provided significant amounts of material about the cause, extent
and repair cost of the damage . The experts’ findings are summarised in section three
of this determination.
Determination | Case number: 605526 Page 4 of 13
Water damage caused by insured event
While there is no dispute that the property had suffered fire damage, there is dispute
as to the extent, if any, that the damage arising from the storm in October 2018 is
related to the insured event.
The complainant says the insurer’s builder failed to adequately enclose the roof when
completing ‘makesafe’ repairs. The insurer disagrees and says the damage occurred
due to pre-existing defects with the roof.
I have carefully reviewed the available material, of which there are numerous reports
and opinions about the cause and extent of damage, much of it conflicting.
I accept the insurer has identified some pre-existing issues with the building. In
accepting this I note however, that there is no evidence that these pre-existing issues
had caused any damage to the building.
On review of all the information, I accept that the water ingress that occurred during
the storm and resulting damage to the property occurred largely due to the unrepaired
fire damage and inadequate ‘ makesafe ’ repairs.
This is because:
Expert IC reports there is evidence of pre-existing repairs to some areas of the roof
but does not identify any current leaks. IC says despite the roof being poorly
designed, good workmanship with the flashings means the roof resists the inherent
design issues
The area of roof with pre-existing flashing issues has been directly affected by the
fire
IC says temporary roof sheets have been installed and the claim-related repairs to
this section of the roof negate any pre-existing design issues with the flashings
IC inspected the roof prior to the storm and the roof being tarped. IC had full
accessibility and visibility of the roof at the time of its inspection
Builder E completed ‘ makesafe ’ repairs to the roof following the fire . E could not
get the correct size roof sheets for the repairs
E damaged undamaged sections of the roof when completing the ‘ makesafe ’
repairs, due to installing the wrong sized roof sheets
E worked on the roof with full access and visibility. E noted the property is
structurally sound. No building faults or maintenance issues were identified
MK asserts there are defects to the roof. The roof was heavily tarped during MK
inspection. In some instances, MK relies on photographs to form its opinions
MK did not complete any actual leak testing to the roof or other areas of the
property to validate its assertions about roof leaks and water ingress
Determination | Case number: 605526 Page 5 of 13
MK considered there is pre-existing defects to the roof, windows and skylight on
the basis there is evidence of water staining to these areas. MK inspected the
property three months after water was pumped into the home by the fire brigade to
extinguish the initial fire and over a month after the storm
MK reports heat from the fire affected the washers in the roof and this has allowed
rainwater entry to the home following the fire
CE did not inspect the roof and makes assumptions about pre-existing roof defects
based on the opinions of others
CE says it expects there is a water tightness issue around the frame of the door
into the laundry, but does not say why or confirm this is occurring
CE notes water tightness issues are expected to the window of bedroom 2, but
says it is difficult to ascertain this
Photographs provided by the complainants show daylight entering the home
through holes and defects in the temporary roofing installed by E
Photographs also show several other points of water ingress to the roof due to the
initial fire, including melted roof washers
While water damage has occurred in areas which are quite a distance from the roof
‘ makesafe ’ area the experts accept that water can travel around the home through
the C sections of the building frame to saturate areas which are some distance
from the initial points of water ingress
The complainants live in a sub-tropical location which experiences regular storm
activity. There is little evidence of water ingress to the home prior to the fire and
‘ makesafe ’ repairs, as would be expected if the cause of water ingress was pre-
existing defects.
Taking all this information into account I accept that there was additional damage
sustained to the house during the storm and subsequent electrical fire. I accept that
this damage is related to the original insured event and that the insurer is liable in the
circumstances to cover the costs to repair the home.
Complainants quote from MS represents a fair assessment of the damage
The parties have each provided a significant amount of material for consideration,
including several building reports and repair quotations.
The insurer has provided a detailed quote from MK. It has based its settlement of
$120,633.03 on MK’s quote.
MK has removed from the Scope of Works a number of items, including:
ceiling lining/sheets
wall linings/sheets
architraves and skirtings.
Determination | Case number: 605526 Page 6 of 13
MK believes these items are undamaged or do not relate to the claimed event.
I accept that there are differing and conflicting expert reports as to the cause and
nature of the damage. However, I accept, on balance, that it is likely these items were
damaged during either the fire and attempts to extinguish the fire or during the
subsequent storm. This is because:
whilst the insurer says the damage was caused by pre -existing issues, there is no
evidence of any pre-existing damage to the home
three out of four builders include the items in their repair quotations, suggesting the
items have been damaged
moisture readings provided by the restorer F show significant saturation occurred
to the plaster walls of most of the rooms
the two significant water events occurred in a relatively short period and both the
complainant and IC confirm water can travel through the C sections of the building
frame to saturate areas some distance from the initial point of ingress
although CE suggests some plaster damage and cracking was a result of earlier
movement, the complainants have noted that the cracking only occurred after the
two significant water events.
The male complainant, who is a licensed builder, provided a quote for $195,568.59.
The quote was primarily based on a Scope of Works provided by the insurer’s builder,
CC with additions by the complainant for damage occurred following the storm and
second fire which CC did not assess.
The quote from MK is based on removing items from the Scope of Works on the basis
that those items were not damaged. As indicated, I accept that whilst there were
some pre-existing defects, most of the damage has been sustained because of the
insured event.
The complainant provided a further quote from an independent builder, MS. MS
assessed the damage at $178,645.09. This was based on the scope of works. I
accept that it represents a fair assessment of the cost to repair the damage related to
the insured event.
In my view, the insurer should increase its cash settlement from $120,631.03 to
$178,000. The increase takes into account the additional insured damage and the fact
that by cash settling the claim the insurer has transferred the risk of the repair process
to the complainant.
Determination | Case number: 605526 Page 7 of 13
2.2 Are the complainants entitled to compensation?
We may award compensation for non-financial loss
The AFCA Rules outlines we can award compensation for non-financial loss of up to
$5,000, where there has been an unusual amount of inconvenience, time taken to
resolve a situation, or interference with a c omplainant’s expectation of enjoyment or
peace of mind.
AFCA adopts a conservative approach to the award of compensation for non-financial
loss and we expect a complainant to be moderately robust and tolerate a normal
degree of inconvenience when making a claim.
Complainant is entitled to compensation for non-financial loss
I accept the insurer and its contractors mishandled the claim and made significant
errors which resulted in further damage occurring to the home and contents, as well
as lengthy delays. This includes:
poor communication by the insurer and its contractors, including failing to respond
to the complainants or provide information they requested on several occasions
errors by the insurer in establishing appropriate settlement costs, resulting in
additional payments needing to be made
late payment of temporary accommodation costs on more than one occasion
the builder failing to adequately enclose the roof following the fire, which caused
additional damage to the home and delayed the claim
the restorer failing to clean contents items before putting them into storage, which
caused contamination to occur to a large amount of previously undamaged items
the restorer failing to provide the complainants with a contents inventory for a
significant period despite repeated requests, and upon providing the inventory
failing to include numerous items, all which resulted in the complainants spending
considerable time and effort to provide much of this information themselves
the restorer losing some of the complainants’ contents and returning the wrong
contents items to the complainant following restoration.
The complainants say that because of the insurer’s conduct and mishandling of the
claim, they spent a period of 12 months living in a small pool shed on their property
with extremely limited facilities, while trying to manage their business and their family,
and while completing repairs to their home after losing faith in the insurer’s builders to
complete these works satisfactorily. The complainants say they have not received
several contents items back from the restorer. It appears these items cannot be
located and will not be returned.
Given the above, I accept the complainants experienced considerable stress and
inconvenience for an extended period. I consider it fair in the circumstances that the
insurer pays the complainants $3,500 compensation for non-financial loss.
Determination | Case number: 605526 Page 8 of 13
3 Supporting information
3.1 Relevant policy provisions
PDS page Relevant Section
51 7.3 How we settle your claim
Repairing or replacing
When we agree to pay a claim for loss or damage:
If the loss or damage:
• involves wall coverings, floor coverings or window coverings that are present in
more than one room of the home, we’ll only repair or replace those wall coverings,
floor co verings or window coverings in the room or rooms, hall or passageway
where the damage occurred.
However, if such loss or damage involves tiled or timber floor or wall coverings,
we’ll only pay up to a maximum of $1,000 to match undamaged tiled or timber w all
or floor coverings in the room or rooms, hall or passageway where the damage
occurred to creat e a uniform appearance.
3.2 Review of expert material
Record Key Points
Builder (E)
Makesafe Report
30 - 08 - 2018
Introduction
Property is structurally sound.
Caus ation and Resultant Damage
Electrician
Damage is due to fire incident as the damaged electrical power and light
circuits are around the fire affected area. This has caused the property to
have no power. No additional damages to house electrical system found
during inspection.
Builder
Fire started in flue of free - standing fire place in loungeroom.
Fire has affected the living room area.
Water from firehose has damaged the ceiling on one side of the apex and
the plaster wall lining to the back wall.
Insulation in the ceiling has been fire damaged and the rest has been
damaged by water from the fire hose.
Timbers in ceiling of pitched roof will need to be replaced, but unsure how
much of the timber is affected until the plaster ceiling is removed.
Fire damaged timbers and plaster have fallen on loungeroom floor during
the fire, damaging the flooring, as to the water throughout.
Defects/Maintenance Issues (contributing to damage)
No building faults or maintenance issues have cont ributed to the damage
Determination | Case number: 605526 Page 9 of 13
Record Key Points
as it appears the flue was installed correctly with fire retardant insulation,
and this most likely saved the rest of the house from going up in the fire.
Works Complet ed
Electrician
D isconnected and removed all damaged wiring.
Wiring system was repaired to a llow re - energisation of the whole area
except for the fire damaged area.
Tested installation to ensure electrical safety.
Builder
Cut out the fire damaged plaster ceiling and trimmed out with new timbers
and neatly fitted 2 x sheets of MDF to the affecte d areas and moved
debris as required.
R emoved the damaged roof iron and pulled out the wet and fire damaged
insulation to the most affected area only (approx. 12m2).
F itted some new timber to the roof to fit the new iron (note: I could only
get small leng ths of iron that had the correct profile, so I had to cut the
non - damaged area of iron of the existing sheets.
Fitted new iron to roof to make safe.
Builder (C C )
Assessment Report
21 - 09 - 2018
Introduction
Attended site on 22 August 2018 to inspect damage.
Substantial water damage throughout ceiling cavities and adjoining room
ceilings and walls.
Heat er flue has been disconnected and an electrical makesafe has been
done to isolate some of the circuits inside the house.
Roof sheeting has been removed and some temporary timber trimmers
have been installed along with temporary roof sheets to ensure the
property is watertight.
Restorers have attended site and blowers and dryers were installed and
running at the time of our inspection.
Extensive water damage to surrounding areas caused by fire brigade
putting out the flames in the ceiling cavities surrounding the flue area.
Engineer (I C )
Inspection Report
13 - 09 - 2017
Resultant Damage
Water damage to plasterboard ceilings of living room + bedroom 1.
Smoke tarnish to underside of roof sheeting, roof battens and framing in
the loft area above bedroom 2.
Burn damage to timber framing within the roof cavity around a diameter of
approx. 2 metres from the centre of the flue.
Heat distortion of roof battens in area of fl ue penetration through roof.
Heat damage to Colorbond roof sheeting up to 2 metres from flue.
Staining of floor tiles affecting approx. 10m2 around fireplace.
Water damage (presumably due to extinguishing flames) to ceiling and C
sections of building frami ng (which caused wat er to flow horizontally
around the building, saturating areas some distance from the fire).
Note: det ails/scope of water damage not confirmed by engineer
Heat damage to electrical wiring concealed within roof + wall cavities.
Determination | Case number: 605526 Page 10 of 13
Record Key Points
Opinion
Building Defects:
> Roof is poorly designed and is heavily reliant on good workmanship of
flashings to be able to resist the inherent design issues.
> Existing problem areas over bedroom 1 and living area will be corrected
during fire repairs (see below).
> Nil insurance repairs to roofed area above front deck (all pre - existing
issues/damage), which means pre - existing roofing issues and
incomplet e water damage repairs to ceiling over front deck will not be
included in our repair scope.
Building Non - Complianc e (p re - existing defects/damage)
> Bedroom 1 Roof: Evidence of multiple attempts to prevent water
ingress + recent unfinished repairs to plasterboard ceiling, however
despite this we have included water damage repairs to this area in our
repair scope as it is fai r to assume water to extinguish fire would have
saturated this area. Transition flashing should have been installed along
change in roof pitch + pan flashing required to seal skylight.
> Deck Roof: heavy application of sealant around windows + section of
pla sterboard replaced directly under low pitched roofed area. Flashings
in this area appear at risk of allowing water ent ry.
Roofer (IR)
Roof Report
01 - 11 - 2018
Could not complete full inspection due to roof makesafe (tarping and
sandbags) which Insured would not allow me to remove.
Report is limited to phot ographs of internal damage and tarped roof.
Insured has agreed a full inspection can be completed if additional
roofers attend and remove and replace the tarp on t he same day.
Engineer (C E )
Engineering Report
26 - 11 - 2018
Observations
Roof
> we were unable to access the roof during our visit due to wind. A
decision has been made for the roofer to attend on another day. Other
professional bodies have inspected the roof and provided opinion which
we reference below.
External Perimeter walls
> Nort hern elevation: walls comprised of vertical boards. Separation at a
fascia join was visible alone with some separation of the vertical boards
immediat ely below the join in the fasc ia board.
> Western elevation: cladding comprised of colorbond sheets. We expect
a water tightness issue around the frame of the entry door into laundry.
Severe corrosion is occurring to base of colorbond wall sheets where in
contact with the slab outside Be droom 2 (see photo).
> Southern elevation: includes extension. Water tightness issues are
expected to the main dwelling around the location of the window to
Bedroom 2, due to poorly executed installation of the window and
cladding. Cladding to extension is i n good condition. It is difficult to
confirm the flashing around the window are in place & correct.
> Eastern elevation: comprises of a large timber deck which has some
sheet irregularities in the ceiling. Sheets appear to be new and have not
Determination | Case number: 605526 Page 11 of 13
Record Key Points
been painted ye t. We are unaware of the connection between the deck
roof and dwelling as we were unable to access the area. The owners
have pointed out a leaking window in the corner of the extension. The
window comprises of 2 panes of glass, at 90 - degree angles, butted
together with a line of silicone used to ensure water tightness. There is
no damage to framing around the window, except for cracking to
paint work on a joint over the window. The rest of the cladding is
generally acceptable.
Conc rete Slab
> Slab edge was cov ered in locations were extension joined the main
dwelling under the deck area. Where inspection was visible, the edge
was undamaged. We cannot confirm the depth of the slab but based on
where ins pection was visible, we would agree the dept h is around
200mm thick. No damp proof course was visible along edge of the slab.
Internal Area
> Inspected all internal rooms, including extension.
> Joint separation/cracking identified. Table with res ults included. Red
dots have been placed close to some of the loc ations. External deck is
not included in internal inspection area.
Tiles in main living area
> Tiles finished heights are irregular, with finished height differentials of
up to 2mm between adjoining tiles, in living area and kitchen.
> Tile joints are unbroken.
> Grout joints installed to negate height differenc e of tiles.
> Tiles are not drummy, with no loos eness found.
> No tiles have been removed.
Tiles in ensuite bathroom
> Grouting around 1 tile immediat ely inside entry door is damaged.
> Grouting has been removed.
> Tile in questions was loose and is likely to have popped.
> The popped tile may be affecting other tiles in the immediate vicinity.
> No tiles have been removed.
Other observations
> Ground around north west corner of house has numerous visible
cracks. This is generally indicative of reactive soils classed as medium
to highly reactive. Reactive soils are clay - type soils that swell on wetting
and shrink on drying, causing ground movement which affects dwellings
sited upon this soil type.
Conclusion
Issue in this dwelling is initial fire followed by notification of leaking
through mak esafe, which was then redone a second time. Further
complications are that drying works have been completed to the home.
Due to our inability to access the roof design, b uild and damage, we
cannot comment on the structural adequacy of the roof. We have read
documentation on other professionals on this matter.
Due to our attendance sometime after the events, in some areas we have
relied on the opinions of others to help form or confirm our own.
Determination | Case number: 605526 Page 12 of 13
Record Key Points
Builder (M K )
Inspection Report
28 - 11 - 2018
At time of inspection the entire roof has tarps installed, secured with
sandbags and ropes.
Self - adhesive composite flashing to main bedroom extension with what
appears to be an internal waterproofing membrane application, which is
not suitable for exposure to the elements, particularly UV exposure.
Multiple applications of silicone indicating previous leaks to this area.
Inspected underside of roof cladding to loft space above b edroom 3 which
directly adjoins lounge room where fire occurred. We noted soot staining
which appears to be seeping from under the metal top hat battens.
We believe because the fire was predominantly in the ceiling space
between the raked plasterboard cei ling lining and roof cladding, the ceiling
insulation has also been burned and the heat emitted from the flames has
affected the neoprene washers to the roof cladding fixtures, which allowed
rainwater ent ry to occur after the fire event.
Subsequent rain events have caused additional damage to the
plasterboard ceiling lining to the main bedroom which has been removed
and covered with plastic.
Flashings to out door ent ertaining area whic h is attached to the gable end
of the main dwelling has multiple applica tions of silicone, indicating
previous leaking has been occurring, with ongoing repair attempts.
Ceiling lining to outdoor entertaining area has had plasterboard
replacement adjoining and running along external wall of main dwelling
and appears to be repai r from water damage. Insured says plasterboard
was removed and replaced to facilitate installation of downlights, however
we are of the opinion the ceiling lining has had previous water ingress as
the ceiling did not require removal to install downlights ( as the insured
suggested) and is not related to an insurable event.
Walk in robe to main bedroom has a skylight installed wit h mould/water
damage to plasterboard ceiling lining surrounding skylight. This clearly
indicates a leak to the skylight has caused the damage and not the fire
event. We were unable to view the skylight due to the tarps obstructing
the roof, however after viewing images supplied we noted the skylight has
rainwater pooling with an application of internal waterproofing membrane
not desig ned for external use. A pan flashing installation is required as
maintenance by the insured.
Insured informed us that rainwater flowed through ensuite ex haust fan
and downlight, however there was no visible water staining to the ceiling
lining to the ensui te, exhaust fan or downlight. As the walk - in robe is
located directly behind the ensuite whic h has obvious signs of water
staining and mould around the skylight we believe rainwat er may have
entered through the defective skylight in the ceiling space above the walk -
in robe and tracked approx. 2m to the downlight and exhaust fan. There is
no result ant damage to the ensuite ceiling from the rainwater ingress.
Insured informed us a floor tile to the ensuite entry has lifted as result of
the fire, however there is no visible sign of water ingress into or around
the bathroom particleboard subfloor. The lifting tile is not the result of an
insurance event.
The ensuite wall and floor tiles have been poorly installed wit h multiple
Determination | Case number: 605526 Page 13 of 13
Record Key Points
tiles not square or level and unfi nished ceiling/ wall junctions. We also note
the gable panel to the ensuite vanity has absorbed water and becomes
swollen as the result of general water splash from the shower recess and
is not the result of an insurance event.
We recommend the roof claddin g, insulation and entire ceiling lining to the
open plan lounge/kitchen is replaced due to the fire damage and soot and
smoke damage.
Entire dwelling has multiple unfinished surfaces or poor workmanship not
related to the claim.
Timber architraves to windo ws have not been painted, subsequently the
mitre joints to each corner have minor separation which to be ex pected if
timber is not sealed. There is also cracking to the plasterboard set joints
throughout the dwelling.
Timber window sills to eastern elevati on have signs of water staining
which is the result of defective installation of windows in Colorbond
cladding. Multiple screw fixings are missing, and existing gaps will allow
rainwater to enter easily. It appears rainwater has been entering the
dwelling for some time and not from an insurable event.
Imitation timber floor tiles in the open plan area have been poorly installed
with multiple tiles not level. This is defective workmanship and not the
result of the fire event.
As the dwelling has multiple unf inished surfac es and defects we would
recommend settlement so that any incomplete and/or defective works can
be rectified as maintenance items at the insured’s expense.