Cash settlement offer for storm damage based on updated builder quote
Summary
The complainants disputed the insurer's cash settlement based on an updated builder quote. AFCA found the quote was not deliberately underquoted but ordered an extra $6,127.55 for risk transfer and a builder's clean.
The settlement must follow the earlier determination, which required a risk-transfer allowance and the omitted builder's clean, while the updated quote covered the correct rooms.
Issues
- Claim amount dispute primary · upheld“Offer must include an additional 10% allowance for transfer of risk from the cash settlement, plus a builder's clean allowance.”
- Repairs or contractors secondary · upheld“Updated quote omitted the builder's clean that the original scope of works required; $443 allowance added.”
- Third-party or outsourcing failure secondary · not upheld“Insurer's builder did not underquote; no misconduct found in preparation of the updated quote.”
Subjects and remedies
pay claim
Related
All Financial Firm (Unknown - Insurer) determinations · Find similar determinations
Text of the determination
Determination | Case number: 604883 Page 1 of 6
Determination
Case number: 604883 29 May 2019
1 Determination overview
1.1 Complaint
The complainants lodged a home insurance claim with the financial firm („the insurer‟)
after a storm in April 2015. The insurer‟s builder, „JL‟, assessed the home and
prepared a scope of works to repair the storm damage, which they costed at
$41,574.86.
The claim was the subject of FOS Determination 442271. The Determination says the
insurer may settle the claim by paying a cash settlement based on an updated costing
from JL.
The insurer obtained an updated costing from JL totalling $55,427.90 and made a
settlement offer based on this quote. The complainants do not accept the offer and
say the updated costing has been deliberately underquoted.
1.2 Issues and key findings
Does the insurer’s settlement offer comply with the Determination?
The available evidence does not establish that the updated quote from JL has been
deliberately underquoted.
The latest quote is consistent with the Determination except that an allowance of
$443 (exclusive of GST) for a builder‟s clean should be included.
1.3 Determination
This determination is substantially in favour of the insurer.
The insurer is entitled to base its settlement offer on the JL quote totalling $55,427.90
with an extra allowance of $443 (plus GST) to be included.
The insurer must also increase its settlement offer by 10% of the quote to account for
the transfer of risk from the insurer to the complainants due to the cash settlement of
the claim.
This means the insurer should increase its offer by $6,127.55 to be consistent with
FOS Determination 442271.
Determination | Case number: 604883 Page 2 of 6
2 Reasons for determination
2.1 Does the insurer’s settlement offer compl y with the Determination?
Insurer obtained two updated quotes from JL
FOS Determination 442271 says the insurer may settle the claim by paying a cash
settlement based on an updated quote from JL.
JL‟s original quote included a report and scope of works dated 19 May 2015. This
totalled $41,574.86.
The insurer sought an updated quote from JL, based on its original scope of works,
and taking into account the issues set out in the Determination. JL pro vided a scope
of works and quote totalling $96,247.80 („Quote 2‟).
The insurer says Quote 2 included “repairs that do not form part of [the] claim”, so it
asked JL to amend it. JL then provided a scope of works and quote totalling
$55,427.90 („Quote 3‟).
In a letter to the complainants dated 7 January 2019, the insurer says:
[JL] has confirmed that [Quote 3] was prepared by a more experienced estimator,
who has provided a more realistic quote than [Quote 2]. [JL] has further confirmed
that [Quote 3] is an actionable quote, meaning that the required repairs can
actually be completed for the quoted cost…
I appreciate that the provision of [Quote 2] would have created confusion, and I
am sorry for any stress that was caused. However, [the insurer] is not liable to pay
you as per [Quote 2] as it has been shown to be incorrect.
The complainants have disputed the insurer‟s reliance on Quote 3. They have
highlighted various aspects that have been amended to a lower figure or rate. The
complainants say the insurer has engaged in misconduct in instructing JL to
underquote.
Discrepancies in quotes mainly to do with extra rooms
The complainants‟ submissions highlight various items where the allowance in Quote
3 is less than Quote 2. This was broken down based on the following areas:
General – specifically to the removal and storage cost
Main Bedroom and walk-in robe
Hallway, sitting, and landing
Bedroom 2.
The major difference between Quote 2 and Quote 3 is that Quote 2 allows for repairs
to more rooms. Quote 3 covers the main bedroom and one other bedroom, while
Determination | Case number: 604883 Page 3 of 6
Quote 2 covers the main bedroom and three other bedrooms. This accounts for
almost the entirety of the difference between the cost totals, as shown in the
comparison table in section 3.2 of this Determination.
For the main bedroom and walk-in robe, I note the following:
the overall allowance between the two quotes are relatively consistent with Quote 3
being a little higher
Quote 3 has a greater allowance for labour to skirting
whilst the complainants highlighted discrepancies in the allowance for material on
the parquetry floor, Quote 3 provided a greater amount for labour towards this
the complainants‟ submission also confused the quotes in one instance – when
talking about removing and reinstalling the built-in-robe, the greater allowance was
in Quote 3.
For the hallway, sitting, and landing, it appears the complainants have failed to
consider Quote 3‟s scope of works under the heading „Entry/Hall‟. If you add this to
the other parts, again Quote 3‟s allowance in greater than Quote 2.
For bedroom 2, the scope of works in Quote 2 is greater than what was allowed in
JL‟s original quote. Quote 3‟s scope of works is consistent with JL‟s original quote.
Therefore, Quote 3‟s amount should be preferred.
An allowance for a builder’s clean should be added
The complainants also say there were seven items that were omitted from Quote 3.
Three were associated under „General‟ and the other four were to do with the „Main
bedroom‟, „Hallway‟ , and „Bedroom 2‟.
As stated previously, Quote 3 provided a greater allowance than Quote 2 on the main
bedroom and hallway. Quote 3‟s scope of works is consistent with the original quote
on these areas as well as „Bedroom 2‟. The extra items the complainants say were
omitted are not included i n JL‟s original quote.
Therefore, I do not accept any greater allowance is required to Quote 3 for the „Main
bedroom‟, „Hallway‟ , and „Bedroom 2‟.
Under „General‟, JL‟s original quote made no allowance for drop sheets or carrying
materials to the second floor and back. Therefore, Quote 3 is consistent with the
original quote on these points.
On the cleaning, I do accept there is merit to the complainants ‟ position. JL‟s original
quote did say „Provide builder clean upon completion of all works‟. Quote 2 a llowed
$664 for this whereas Quote 3 has no allowance.
Determination | Case number: 604883 Page 4 of 6
The insurer said this costing was allowed for under „supply 6m3 skip to facilitate
removal of debris‟. I do not accept this. JL‟s original quote had a separate item for
removal and skips under „Demolition‟.
I therefore accept an allowance for a builder‟s clean should be included.
The amount of $664 in Quote 2 was based on cleaning all rooms. However, as stated
previously, Quote 2 included two extra rooms. Therefore, I consider two -thirds of
Quote 2‟s allowance ($443 rounded up) to be appropriate.
Quote 3 generally consistent with previous Determination
The Determination calls for an updated quote based on JL‟s original quote. Quote 3
covers the same rooms as JL‟s original quote, while Quote 2 covers t wo additional
bedrooms as well as other additional works. The available evidence does not
establish that repairs to the additional rooms or these additional works are necessary
to repair storm-related damage.
I do not accept the complainants‟ argument that there has been misconduct by the
insurer in JL‟s preparation for Quote 3. This is because the differences in the two
quotes show that Quote 3 has predominantly provided greater allowances for the
rooms and areas covered by the previous Determination.
Insu rer’s offer based on updated quote
Section 2.2 of the previous Determination says the settlement should account for:
the transfer of risk from the insurer to the complainants due to the cash settlement
of the claim
an allowance for contingencies and variations, such as the possibility of further
damage being revealed during repairs
any additional benefits to which the complainants are entitled to under the policy,
such as temporary accommodation
compensation for non-financial loss in the sum of $350.
The in surer‟s settlement offer includes the following costs:
updated costing from JL (Quote 3: $55,427.90)
10% allowance for possible variations ($5,542.80)
28 nights‟ temporary accommodation at $450 per night ($12,600)
compensation for non-financial loss ($350)
reimbursement of the cost of the complainants‟ plumber‟s report ($264).
The Determination says the settlement should account for possible variations, and
separately says it should account for the transfer of risk. The insurer‟s offer includes a
10% allowance for possible variations but does not otherwise account for the transfer
Determination | Case number: 604883 Page 5 of 6
of risk. I consider it fair in all the circumstances that the offer should include an
additional 10% allowance for the transfer of risk.
Therefore, when considering this and the extra $443 for the builder‟s clean (plus
GST), the additional amount payable on top of the insurer‟s offer is $ 6,127.55.
Determination | Case number: 604883 Page 6 of 6
3 Supporting information
3.1 This determination is made under the AFCA Rules
The Australian Financial Complaints Authority ( AFCA) has commenced managing
disputes previously lodged with F inancial O mbudsman S ervice (FOS) .
The complainants‟ claim was the subject of FOS Determination 442271, which was
made under the FOS Terms of Reference. This Determination is made under the
AFCA Rules.
3.2 Comparison between quotes
Room s Quote 2 costs Quote 3 costs Difference
General/ Demolition $10,476.00 $7,509.00 $2,967.00
Entry/Hall $0.00 $2,113.00 - $2,113.00
Hallway/Sitting Room $18,279.80 $16,557.55 $1,722.25
Main Bedroom/WIR $22,602.80 $23,134.25 - $531.45
Other bedrooms $36,139.40 $1,075.20 $35,064.20
TOTAL (ex GST) $87,498.00 $50,389.00 $37,109.00
TOTAL ( with GST) $96,247.80 $55,427.90 $40,819.90