Determination 604046

Credit decisions, settlement deed and submission #19 on development finance

FirmNAB
Decided2019-11-08
ProductCredit · Business lending
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The trust and its guarantor-director complained about the bank's development lending, a 2016 settlement deed and an internal submission, seeking compensation. AFCA found the settlement deed binding and the bank not liable, so no compensation was ordered.

The complainants released the bank from claims about the facilities in a binding settlement deed, and the submission errors caused no loss.

Issues

Subjects and remedies

mental healthsmall businessno remedy

Related

All NAB determinations · Find similar determinations

Text of the determination

Determination Case number 604046 Financial firm National Australia Bank Limited Determination | Case number: 604046 Page 1 of 13 Case number: 604046 8 November 2019 1 Determination overview 1.1 Complaint In 2007, the financial firm (bank) approved facilities totalling $1,700,000 to the complainant trust (trust) for a rural residential property development and subdivision (the development). In 2010 and 2011, the bank approved increases to the loans and overdraft. In May 2011, the bank also approved a loan of $400,000 to Mr E in his sole capacity. In June 2014, the bank created a record of decision (submission #19) relating to a proposal to renew the existing loans and overdraft for the trust and to release a portion of the land (lot 1) being held as loan security. In October 2015, the parties entered into a Deed of Forbearance, and in November 2016, the parties entered into a Deed of Release and Settlement (settlement deed). Both deeds settled all matters between them in relation to the facilities. The complainants say:  the bank did not assess the loans correctly when it approved the loans and the overdraft. The trust had not recorded an income since 2012 so it had no capacity to repay the loans and the overdraft  the bank did not lend responsibly when it provided the loan for $400,000 in Mr E’s personal name as he could not afford to repay the loan  the bank ’s submission #19 was “ outside ” of the settlement deed as it was unknown to Mr E at the time. The submission increased the trust ’ s loss, by releasing lot 1 security and not using the sale proceeds to reduce the loans and overdraft  the bank revealed the value of lot 1 to the purchaser, which resulted in a lower price being paid for the land. The sale of lot 1 diluted the equity of the minor security holders  the trust ’ s income amount is incorrectly stated in submission #19 as it shows income of $8,000 per month from a hire contract  the bank provided a verbal indication that it was going to fund the earthworks on the property site. By not funding the extra costs, the eve nts that followed were to the detriment of the trust  the bank placed Mr E under duress when he signed the settlement deed in 2016 and he lacked the legal capacity to understand what he was signing due to an existing medical condition  the bank should not be allowed to hide behind the settlement deed and it should be set aside Determination | Case number: 604046 Page 2 of 13  the bank is guilty of unconscionable conduct as they knowingly withheld information when the settlement deed was signed on 11 November 2016 and  the bank should pay compensation to the stakeholders affected by the actions of the bank. 1.2 Issues and key findings Did the bank breach any obligation it owed to the complainants at the time of signing the settlement deed? Under the settlement deed in 2016, the complainants settled and released the bank from all claims relating to the provision of the facilities. The complainants had already agreed to release the bank from all claims about the facilities by signing the October 2015 Deed of Forbearance. Based on all the available information, it has not been established the bank breached any obligation when it entered the settlement deed and there is no legal basis to set aside the deed for the reasons set out in section 2 below. As the complainants have settled all matters relating to the facilities and released the bank from liability, AFCA is not able to review a number of the claims raised by the complainants. Did the bank make appropriate credit decisions when it funded the development? Even though the settlement deed released the bank from all liability in relation to the facilities, the available information shows the bank acted in accordance with its lending obligations in supporting the development from 2007 to 2011. The only bank submissions that occurred after 2012 either approved an extension to the loan expiry dates or released loan security. The approved extensions of the loan terms were completed to allow the trust time to complete the various development requirements and sell the property. The extensions of the loan term were the actions of a prudent lender operating within the parameters of acceptable industry practice. Did the complainants incur a loss as a result of the bank’s submission #19? Submission #19 did not increase the complainants level of debt. Submission #19 did approve the release of a security property (lot 1) being used as security for the trust loans and overdraft as well as Mr E’s loan. The proceeds from the sale of lot 1 were paid to the trust. Regardless of the content of Submission #19, some of which was incorrect, it did not increase the complainants ’ liability and did not result in a loss to the complainants. Determination | Case number: 604046 Page 3 of 13 Did the bank breach any obligation it owed to the complainants when lot 1 was sold? For the reasons set out in section 2 below, it has not been established that the bank made any error or breach leading to a loss to the trust in this regard. Was the bank obliged to approve additional finance to fund payments for the sub-contractor and legal costs? The bank was not required to fund the works performed by the sub-contractor or the trust ’s legal costs. Should the bank be required to compensate the complainants? The bank is not required to compensate the complainants. In relation to other parties affected by the subject matter of this complaint, including creditors of the complainants and/or guarantors, further information is set out in section 2.6 below in this regard. 1.3 Determination This determination is in favour of the bank. The bank is not required to compensate the trust and may commence recovery action if the loans and overdraft are in default, in accordance with the terms and conditions of the loans and overdraft, once our file is closed. Determination | Case number: 604046 Page 4 of 13 2 Reasons for determination 2.1 Did the bank breach any obligation it owed at the time of signing the settlement deed? The settlement deed was signed by both parties Under the terms of the settlement deed in November 2016, the bank agreed to forbear to take any action against the complainants and provided funds by way of $250,000 in return for a release of all claims against the bank. The settlement deed was agreed to by Mr E in his own capacity and as trustee of the complainant trust. Generally if a complainant has settled matters with a financial firm and released the firm from any liability, it means that AFCA will not review any claim covered by the settlement deed, including the claims raised about the facilities provided to the complainants, unless it can be established there is a reason to set aside the deed. Mr E says the settlement deed of 2016 should be set aside as the bank was aware that:  he was suffering from a mental illness at this time which was severe enough that it could not go unnoticed by the average person  he was under extreme duress when asked to sign the settlement deed, as it occurred at the same time that he was being sued in court by the sub-contractor to which he owed money for work on the development  evidence of his incapacity to understand the outcome, was evident during the settlement deed meeting where he declined a number of bank offers which would have improved his financial position. Instead he counter offered with a deal that left him worse off and the bank agreed to it, even though the bank knew the settlement deed terms were to the detriment of the complainants  before the meeting to finalise the settlement deed, Mr E asked the bank for documents to be provided so he could verify the information. The bank repeatedly denied his information requests. If Mr E was provided with the documentation, it was likely the settlement deed would not have been entered into and the bank’s position would have been significantly diminished. I note that Mr E signed a similar Deed of Forbearance in October 2015, which released the bank from all claims relating to the facilities in exchange for the bank’s forbearance to take action and other matters. In addition, it is noted that the complainants did not abide by the terms of that deed. At the time the next settlement deed was signed in 2016, Mr E was actively involved in the negotiations over several months and he made an offer which was accepted by the bank. The bank insisted that the complainants obtain legal advice and obtain the consent from the beneficiaries of the trust. Determination | Case number: 604046 Page 5 of 13 Compliance with these requirements took time and provided Mr E with sufficient time to reconsider the offer he had made to the bank which the bank accepted. At no time during this period was the bank made aware of any issues with Mr E’s capacity to sign the settlement deed. Mr E signed the settlement deed in the presence of a solicitor, obtained the consent of the trust beneficiaries and returned the signed settlement deed to the bank. There is no information to show the bank was on notice that the Mr E lacked capacity to understand or enter into the deed. Further, although Mr E suffered from depression, it has not been established that Mr E in fact lacked the capacity to understand or enter the deed at the time. There is no information to show that Mr E was subject to illegitimate duress from the bank when considering his options to sign the deed of settlement. It has long been established that financial pressure is not illegitimate duress and in the circumstances of this case, there is no information to show that the bank applied any illegitimate duress to Mr E to sign the settlement deed. Further, under the terms of the 2015 Deed of Forbearance signed by the complainants, which were reiterated in the 2016 settlement deed, the complainants had already agreed to settle any claims they may have had in relation to the facilities and had released the bank from liability. Although the complainants say they may not have signed the deeds if they had known about the submission #19 at the time, I find that the claims made by the complainants in relation to submission #19 do not change the obligations and concessions made under both deeds for the reasons set out below. This includes the reason that it has not been established that the complainants would have made any other decisi on than to sign the relevant deeds in 2015 and 2016 even if they had known about submission #19. The complainants had no intention of selling the development or surrendering it to the bank at that time, nor is it likely the complainants could have refinanced the facilities, and so had very little choice on that basis other than to agree to some type of forbearance from the bank. Therefore, the complainants are bound by the terms of the settlement deed and there is no legal basis to set it aside. The outcome for the trust would be the same if the deeds were set aside The settlement deed included a loan increase of $250,000 provided to the complainants. The funds from the loan increase ($250,000) were provided to assist with the marketing and sale of the development to try to revitalise the development. Prior to the loan increase, the debt owing by the trust and Mr E totalled $2,892,552.65. The settlement deed of 2016 required the complainants to sell the development or refinance the loans and overdraft within six months. If the complainants sold the Determination | Case number: 604046 Page 6 of 13 development or refinanced the loans and overdraft, the bank agreed it would reduce the combined debt for the trust and Mr E to $1,750,000 plus interest and fees. That represented a significant reduction in debt obligations for the complainants and likely more than any remedy provided for if AFCA had continued to review the claims as set out below. The complainants did not sell the development or refinance the loans and overdraft by the due date. As a result, the complainants breached the terms of the settlement deed. If the settlement deed was set aside, the trust position would not change. The deed provided the trust with extra funds to market and sell the development. It is not clear if these funds were used for this purpose. The development property has not been subdivided and is still owned by the trust. Even if the settlement deed was set aside, which I have not found to be required, based on the information from both parties, the complainants would still be required to pay the outstanding loans and overdraft in any event for the reasons set out below. 2.2 Did the bank make appropriate credit decisions when it funded the development? The bank ’s initial loan approval was appropriate In July 2007, the trust applied to the bank for loans totalling $1,500,000 and an overdraft of $200,000. The trust was contributing $1,000,000 from its own funds towards the development. The trust had spent money on major works to improve the access road and commence the property sub-division. The trust had obtained preliminary approval from the local council and had a plan to develop the property in three stages. During the first stage of development, the interest payable on the loan was to be capitalised to the loan. The loan was to be repaid by the sale of the vacant blocks of land following completion of the development. The bank noted the complainants had successfully completed a similar type of development previously with another lender. This type of loan application is standard in the industry. Based on all the available information, the initial loan approvals met the standards of the care and skill of a diligent and prudent lender as th e bank’s decision to capitalise loan interest provided sufficient funds to complete the first stage of the development. The bank assessment of the loan increases was appropriate In April 2010, the trust requested a loan increase of $500,000. These loan funds were required to assist with the on-going development costs. These funds were to be used to pay the costs of consultants, engineers and sub-contractors. As was the case in the original loan application, the loan increase was to be repaid from the sale of the vacant blocks of land once the development had been completed. Determination | Case number: 604046 Page 7 of 13 In December 2011, the trust requested a further loan increase of $250,000. These additional loan funds were required to pay for the access road to be completed . The bank’s approva l of this loan increase was appropriate as potential buyers needed to get access in to the sub-division, to view the vacant blocks of land that were for sale. This increase was again subject to the sale of the development or refinance of the loans and overdraft, to repay the debt. The bank refinanced the loans and the overdraft to provide more time to achieve sales By 2012, the trust had not sufficiently completed the development to sell the subdivided vacant blocks of land. After the loan increase in December 2011, the bank continued to refinance the loans and overdraft to allow the complainant time to complete the development. The refinancing of the loans and overdraft were limited to expiry date extensions and the available information shows the bank acted in accordance with the care and skill of a prudent lender operating within the parameters of acceptable industry practice. Given the contents of the settlement deed, this office will not review any provision of funds provided to the trust and/or Mr E beyond 2011, as the complainants agreed to release the bank from any such claims in any event. 2.3 Did the complainants incur a loss as a result of the bank’s submission #19? Submission #19 did not increase the complainants ’ loss In June 2014, the bank created decision document in relation to a proposal to refinance the existing loans and overdraft, known as submission #19. The complainants say that the bank created submission #19 without their authority or knowledge. The bank ’ s internal credit memorandum shows submission #19 supported a refinance of the loans and overdraft and approved the release of a security property (lot 1) the trust had decided to sell. If a bank agrees to extend the expiry date of a loan, it is generally considered that it is refinancing the existing loan for a further term. If a bank refinances an existing debt that was already owed, AFCA’s approach is that the complainant has not suffered a loss. This is because the liability to repay the funds existed before the debt was refinanced by the bank. In these circumstances, even if it was inappropriate for the financial firm to approve such finance, the complainants are generally no worse off as a result of the financial firm ’s actions. The available information shows there was no increase to the complainants ’ loans and overdraft as a result of submission #19. The sale of lot 1 had already been completed by way of a signed contract of sale prior to the commencement of Determination | Case number: 604046 Page 8 of 13 submission #19. Accordingly, the complainants’ claims in relation to submission #19 do not progress any claim for loss. Further, it has not been established that the complainants would have made any other decision than to sign the relevant deeds in 2015 and 2016 even if they had known about submission #19. The complainants had no intention of selling the development or surrendering it to the bank at that time, nor is it likely the complainants could have refinanced the facilities, and so had very little choice on that basis other than to agree to some type of forbearance from the bank. Submission #19 did not show the correct information The complainants state that submission #19 contained the following inconsistencies:  the loan template used was for a property investment application, and  the loan serviceability section contained information that was not true. The bank had used an internal property development template for previous loan applications such as submission #18. When the bank completed submission #19, the bank made an error and used the wrong type of internal template, being an investment property template. This error did not have any impact on the loans and the overdraft, the overall serviceability or the security for the loans and overdraft. The complainants did not incur a loss as a result of the bank’s error in choosing the wrong template. Submission #19 shows the trust receiving an income of $8,500 per month from the lease of earth moving equipment to a third party. The equipment had been sold prior to the commencement of submission #19 and the equipment loan provided to purchase the equipment was paid out with the sale proceeds. The bank should have been aware the trust was not receiving income from the equipment and that information was incorrect. However, the loans and overdraft were provided prior to submission #19, and as no further funding was provided based on submission #19, the complainants are no worse off as a result of the bank’s error or incorrect information in the submission. 2.4 Did the bank breach any obligation when lot 1 was sold? The sale of lot 1 was documented correctly In December 2011, a sub-contractor, who was owed money for earthworks on the development, agreed to complete the access road earthworks. This agreement was in writing and stated that the contractor wouldn’t be paid and agreed not to be paid, until the development achieved sales of the vacant blocks of land. The earthworks were completed by the sub-contractor, but the trust was not in a position to market and sell the vacant blocks of land and the complainants had concerns about the quality of the works. Determination | Case number: 604046 Page 9 of 13 In 2014, the trust decided to sell lot 1 to the contractor to raise funds for the costs associated with the property subdivision. Mr E says the bank provided the purchaser with information about the value of lot 1 prior to the sale of lot 1 in 2014. An email dated 28 May 2014, confirms the bank provided the purchaser with details of the valuation completed for the bank. The valuation stated the value of lot 1 was $660,000. The email asked the purchaser to discuss the value of lot 1 with Mr E. The trust subsequently prepared and signed a contract of sale for lot 1 in or about June 2014. The agreed sale price on the contract of sale was $660,000. As the vendor, the trust controlled the sale of lot 1 and its sale price. The trust signed the sale contract, agreeing to the price, terms and conditions. Lot 1 was sold, and the sale proceeds provided to the trust. Based on all the available information, it has not been established that the actions of the bank led to any loss in this regard. 2.5 Was the bank obligated to approve additional finance to fund payments for the sub-contractor and legal costs? The sub-contractor completed earthworks without payment guaranteed Mr E says at a meeting between the bank, the sub-contractor and himself, the bank made a verbal promise to fund the earthworks, including the roadworks, on the development. He says the bank later reneged on the promise which left the trust with an aggrieved creditor pushing the trust for payment. The contractor knew the funding was not approved by the bank. On 20 December 2011, the sub-contractor sent an email to Mr E, confirming they would not seek payment for the work performed on the development until there are sufficient sales that allow the trust to make the payment. This email was provided to the bank. In 2018, the sub-contractor initiated court action against the trust to recoup his costs as there had been no sales from the development. The bank was not required to fund further costs on the project or the trust ’ s legal defence against the sub-contractor Mr E says:  the bank was aware of the court case initiated by the sub-contractor  the bank declined to fund the trust ’ s defence  if the bank had upheld its promise to fund the earthworks, the court case would not have proceeded By the time the court case was lodged, the development had been underway for almost seven years. Over this time, the bank had: Determination | Case number: 604046 Page 10 of 13  funded various costs associated with the development  entered into a forbearance deed arrangement which had expired without the agreement being met by the complainants  been served with a notice to participate in a conciliation with the Australian Small Business and Family Enterprise Ombudsman. As a result of:  the time that had lapsed since the development commenced,  the lack of progress on the development,  the inability of the complainants to sell any part of the development, and  the complainants not meeting the terms of the two agreements that had been entered into, the bank was entitled to decline the complainants ’ request for further finance to fund the completion of the development and the legal defence against the sub -contractor. 2.6 Should the bank be required to compensate the complainants? The bank is not required to compensate the complainants For the reasons given above, the bank is not required to compensate the complainants. AFCA understands that Mr E is now bankrupt. Accordingly, Mr E no longer has authority to conduct this complaint at AFCA without the consent of the Trustee in Bankruptcy. As a result, this decision will be directed to the Trustee in Bankruptcy. The bank is not required to compensate parties that lent money to the trust The complainants say that several parties lent money to the trust to assist with the development over a number of years and have not been repaid. AFCA is only able to review a claim for loss in relation to one of its members (such as the bank) where the bank has provided a financial service to the complainant. To the extent that third parties may have lent funds to the trust or the complainants, that issue does not relate to any financial service the bank provided to them. AFCA can only investigate issue relating to the bank’s conduct and whether it made any error or breach when providing a financial service. Accordingly, any claim a third party may have against the trust for unpaid debts is not a matter AFCA can consider. It is a matter that those parties will have to seek independent legal advice about as to their options for recovery. Determination | Case number: 604046 Page 11 of 13 Other parties that received a financial service may lodge a complaint at AFCA If there are other parties that received a financial service from the bank (such as a guarantor), that consider that there has been an error or breach of obligation to them that has caused a loss, then those parties may lodge their own complaint at AFCA. Other matters AFCA cannot consider AFCA is unable to consider a dispute about any alleged collusion between bank and a third party, as such a claim necessarily involves obtaining evidence from third parties. AFCA is not a court and is not able to take evidence on oath, or compel evidence from third parties. AFCA has no jurisdiction over parties named by a complainant that are not participants in the dispute resolution scheme . It follows that such a claim is more appropriately dealt with in court where they can be joined as a party and evidence taken on oath. On that basis, a court is a more appropriate place for consideration of such a claim. For this reason, AFCA is not able to review allegations of collusion as between any third party and the bank. In addition, AFCA is not able to review allegations of criminal conduct which are more appropriately dealt with by the Police. Determination | Case number: 604046 Page 12 of 13 3 Supporting information 3.1 Key references  Loan submissions including #1, #11 and #19  Property sale contract  Email dated 28 May 2014  Settlement Deed  Forbearance Deed  Tax returns 3.2 Chronology Date & source Key points 17 Jul 2007 Loan s ubmission # 1 Bank approve s initial loans to develop the property. Capit alise interest Sale of first stage by 2008 21 Apr 2010 Loan s ubmission # 11 Increase loans ($500,000) to cover subdivision costs, Engineers, Consultants 11 May 2011 Loan s ubmission # 13 New l oan $400,000 (Mr E) Purchase shareholding 50% in new business December 2011 Condition required by bank No payment to sub - contractor prior to presales 20/12/ 2011 – Sub - contractor sent email confirming his agreement 20 Dec 2011 Estoppel letter provided by Sub - contractor confirming payment terms in line with the bank conditions. June 2012 Family member ’ s company goes into Voluntary Administration Mr E loses his 50% shareholding in the company, paid for by the $400,000 loan in his personal name. 16 Sept 2013 File sent to credit re - structuring removed from front line management 31 Jan 2014 Loan s ubmission # 18 Mrs E resigns as trustee of family trust 08 May 2014 Email from sub - contractor to bank with Lot 1 sale draft document – pu rchas e price $900k 28 May 2014 Email from bank to sub - cont ractor advising Valuation of Lot 1 is $660k so draft document will have to be revised Determination | Case number: 604046 Page 13 of 13 Date & source Key points June 2014 Cont ract of Sale for Lot 1 . S ale price $660, 000 01 Jul 2014 Loan s ubmission # 19 Renewal of facilities Include covenants (sales) Includes sale of Lot 1 security release 07 Aug 2015 Bank settlement instructions signed by Mr E Lot 1 settled for $660,000 1 Oct 2015 Bank approval to provide three months to sell whole development 29 Oct 2015 Bank Forbearance Deed signed Need to sell properties or refinance Ended 31 Jan 2016 – No sale or refinance took place 24 Dec 2015 Bank letter to c omplainant s confirming local bank manager is removed from involvement in complaints and the banking facilities. 1 8 Jul 2016 Demands issued 11 Nov 2016 Forbearance Deed providing r eleas e and s ettlement signed Aug 2017 Court case brought against complainant s , by sub - contractor Oct 2018 Judgment issued i n favour of sub - contractor